S04 - Site Visit Mtg Min - RFP 2-13-2024.doc
DOC document 79 KB Posted
- Solicitation number
- 36C77624R0025
About this file
This document outlines the agenda and minutes from a site visit meeting for solicitation 36C77624R0025 to expand and renovate clinics at Building 80. The solicitation issued by the Department of Veterans Affairs Technology Acquisition Center Austin seeks commercial and institutional construction services estimated between $10-20 million. The period of performance is 602 calendar days from notice to proceed.
The procurement is fully set aside for Service-Disabled Veteran-Owned Small Businesses certified in the SBA VetCert database. Offers must be from SDVOSBs certified at both the time of proposal submission and award. Questions are due by February 20th and proposals are due March 4th. The meeting summary reviews the solicitation scope split into two phases, with presentations from the contracting agency and architect-engineer on site requirements. A site walkthrough concluded the meeting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77624R0025 0006.docx | DOCX document | |
| Amendment 06 Att.zip | ZIP file | |
| 36C77624R0025 0005.docx | DOCX document | |
| Amendment 04 Att.zip | ZIP file | |
| 36C77624R0025 0004.docx | DOCX document | |
| 36C77624R0025 0003.docx | DOCX document | |
| 36C77624R0025 0002.docx | DOCX document | |
| 36C77624R0025 0001.docx | DOCX document | |
| 678-328 Bid Walk Sign In Sheet.pdf | ||
| tucson b80 pre-bid presentation rev1.pdf | ||
| Part4-00 DRAWINGS.pdf | ||
| Part7-00 DRAWINGS.pdf | ||
| Part6-00 DRAWINGS.pdf | ||
| DBA WD AZ20240040 01.19.2024.pdf | ||
| SPECIAL NOTE - BID TAXES - AFTER FAR 52.229-3.docx | DOCX document | |
| Site Visit SITE MAP Parking Location1.pdf | ||
| Part5-00 DRAWINGS.pdf | ||
| PPQ.docx | DOCX document | |
| SPEC VOL I.pdf | ||
| Part3-00 DRAWINGS.pdf | ||
| 36C77624R0025_1.docx | DOCX document | |
| SPEC VOL II.pdf | ||
| Part1-00 DRAWINGS.pdf | ||
| Part8-00 DRAWINGS.pdf | ||
| Brand Name JA.pdf | ||
| Limitations on Subcontracting - Construction.docx | DOCX document | |
| Part2-00 DRAWINGS.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C77624R0025 Expand and Renovate Clinics B80 Construction Site Visit Agenda 2/13/2024 - 9:00 AM (MT) – Actual Start 9:10 AM Copy of sign-in sheet and meeting minutes will be posted to SAM website as an amendment.
1. Open meeting & Introductions (Sign in sheet)
· Introduction of VA Team
· Contract Specialist: Joelle Mascarenas
· Contracting Officer: Andrea Fink
· COR: Yasdany Suarez Morales
· Other Technical: Doug Trinder, Ronald Muriera, Floyd Librea
· Architect-Engineer (A-E): Toland Mizell Molnar, LLC – David Novak, PM/Designer of Record
2. Solicitation Information
· This solicitation is set-aside for SDVOSB concerns under NAICS Code 236220 Commercial and Institutional Building Construction.
· This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSB concerns will not be considered. All SDVOSBs must be listed as “certified” by the Small Business Administration (SBA) Veteran Small Business Certification (VetCert). Offerors must be certified in the SBA VetCert database (Veteran Small Business Certification (sba.gov)) at TIME OF SUBMISSION OF PROPOSALS AND TIME OF AWARD. Failure to be BOTH visible and verified at the time of proposal submission and time of award will result in the offeror’s proposal being deemed unacceptable and ineligible for award.
· Request for Proposal (RFP) IAW FAR Part 15
· The VAAR range of magnitude for the project is between $10 and $20 Million. (NOTE that this project is not at the low or high end of this magnitude. It’s somewhere in the middle.)
· The Period of Performance for the project is 602 calendar days after receipt of NTP.
· Note that CLIN 02 is a deductive CLIN. Please pay special attention to this item.
· There are brand name items included in the project documents.
· Solicitation Closing Date: March 4, 2024 at 10:00 AM MT
· Cut-off date for technical questions is February 20, 2024 at 10:00 AM MT
· Technical Questions after the Cut-Off date will be reviewed, but the VA does not guarantee that they will be answered.
· Please submit all technical questions via email at joelle.mascarenas@va.gov.
· Responses to technical questions will be posted in a timely manner as an amendment to the solicitation on sam.gov. Please confirm receipt of all amendments in RFP responses.
· Proposal format submission requirements are included in the solicitation.
· Only electronic copies of the proposals will be accepted via email to Joelle Mascarenas at Joelle.mascarenas@va.gov and Andrea Fink at andrea.fink@va.gov.
· Please be advised that the bid bond shall be submitted as part of the electronic proposal submission. An original hard copy of the bid bond is NO LONGER required.
· Ensure that the Limitations on Subcontracting certification is included in your proposal as required per the Instructions to Offerors.
· A copy of the site visit sign in sheet will be provided as an amendment to the solicitation and posted to: sam.gov.
3. Questions
· Please submit all technical questions in writing as outlined in the solicitation. All verbal communication is considered unofficial and for general information sharing only. Please note that any verbal exchange at this site visit does not constitute a change to this solicitation. Only amendments formally constitute a change.
· The site walk through should be done as a group, so please do not break-off and ask questions to the COR or any other VA staff member individually.
· Site will provide guidelines on photos.
· Are there any questions concerning this solicitation that I can clarify?
4. COR Presentation: Provide general review of the job and review of any important Drawings and Specifications, unique requirements and site-specific items.
A/E Presentation Slides – See attached Powerpoint Presentation.
Slide 6 - 2 Phases (Phase I and II)
Meeting ended 9:37 AM and then followed by walk-throuigh.
5. Site Walk Through: COR will lead.