Part_G_-_Special_Provisions.pdf
PDF 467 KB Posted
- Attached to
- Stormwater Pipe Installation and Repair
- Solicitation number
- Y25-1066
- Issued by
- Orange County, Orlando City, Florida
About this file
This document is Part G - Special Conditions for a Stormwater Pipe Installation and Repair contract with Orange County, Florida. The contract involves road and drainage work under the supervision of Orange County's Roads and Drainage Division, with work to be performed at 4200 South John Young Parkway in Orlando. The contractor will be responsible for coordinating inspections, maintaining quality control, and ensuring work is completed efficiently and in compliance with all relevant standards, including F.D.O.T.'s Roadway and Traffic Design Standards and Federal Highway Administration guidelines.
The contract includes specific requirements for the contractor, such as providing competent personnel, maintaining proper communication and documentation, using appropriate equipment, and disposing of debris in approved landfills. The county reserves the right to make multiple awards based on bidders' capabilities, and contractors must demonstrate the ability to handle multiple concurrent projects. Liquidated damages of $200 per work day may be assessed for project delays or failure to correct deficient work within the specified timeframe. The contract emphasizes minimal public inconvenience, proper traffic management, and adherence to safety standards throughout the project duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Stormwater_Pipe_Installation_and_Repair.pdf | ||
| Part_H_-_Technical_Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .