Part 3 ITB 26-056-PW Arthur_Amazon Bridge Plans - Signed.pdf
PDF 659 KB Posted
- Solicitation number
- S-P00140-00016850
- Issued by
- Oregon
About this file
This document is a set of engineering plan sheets for a water main replacement project prepared by the Eugene Water & Electric Board (EWEB) in Eugene, Oregon, in connection with Invitation to Bid (ITB) 26-056-PW. The project involves the removal and installation of a new 8-inch ductile iron water distribution main on Arthur Street from Garfield Street to Amazon Creek Bridge, with the new pipe to be braced to the bottom of the Amazon Creek Bridge. The engineering drawings include a cover sheet with location map and sheet index, general notes and legends, and plan and profile views covering two sections of the project alignment (Station 10+00 to 10+75 and Station 10+75 to 11+46). The plans are dated February 24, 2025, with a design date of December 9, 2024, and are associated with EWEB Work Order No. 0250190. The document is digitally signed and serves as the technical specifications and site plans for contractors submitting bids on this public works project.
The engineering plans establish the technical requirements and physical parameters for the water main replacement work, including pipe specifications, alignment, grade, and installation details at the bridge crossing. As plan sheets rather than a bid document, these drawings do not contain pricing information, contract terms, bid response dates, or award details. The plans were prepared by Abramson ASL under EWEB's design standards and represent the scope of work that bidders must address in their proposals for this water distribution infrastructure project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DES
DWN
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 1 INCH
AT FULL SIZE
(IF NOT 1" - SCALE ACCORDINGLY)
REV NO.
/9
/2
2:
P
M A
N D
ER
S
LO
VE
N D
AH
L
FUNC BY CHK APP EWEB WORK
ORDER NO.
2500190
AS NOTED02/24/25
B-41150-G1
ABRAMSON
ASL
WATER DISTRIBUTION
WATER MAIN REPLACEMENT
ARTHUR ST. AT AMAZON CREEK BRIDGE
COVER SHEET, LOCATION MAP &
SHEET INDEX
EUGENE WATER & ELECTRIC BOARD
EUGENE, OREGON
ARTHUR ST. TO AMAZON CREEK BRIDGE - WATER MAIN REPLACEMENT
NORTH
NORTH
EWEB WORK ORDER: 2500190
NORTH
DIGITALLY SIGNED
Docusign Envelope ID: BBD43469-F2AA-877D-82E1-A9853775939A
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 1 INCH
AT FULL SIZE
(IF NOT 1" - SCALE ACCORDINGLY)
REV NO.
/9
/2
2:
P
M A
N D
ER
S
LO
VE
N D
AH
L
FUNC BY CHK APP EWEB WORK
ORDER NO.
2500190
NTS04/08/21
B-41150-G2
ABRAMSON
ASL
WATER DISTRIBUTION
WATER MAIN REPLACEMENT
ARTHUR ST. AT AMAZON CREEK BRIDGE
GENERAL NOTES, LEGEND & ABBREVIATIONS
₂
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 1 INCH
AT FULL SIZE
(IF NOT 1" - SCALE ACCORDINGLY)
REV NO.
/9
/2
2:
P
M A
N D
ER
S
LO
VE
N D
AH
L
FUNC BY CHK APP EWEB WORK
ORDER NO.
2500190
AS NOTED02/24/25
B-41150-C1
ABRAMSON
ASL
WATER DISTRIBUTION
WATER MAIN REPLACEMENT
ARTHUR ST. AT AMAZON CREEK BRIDGE
PLAN & PROFILE
STA: 10+00 TO 10+75
N O R T H
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 1 INCH
AT FULL SIZE
(IF NOT 1" - SCALE ACCORDINGLY)
REV NO.
/9
/2
2:
P
M A
N D
ER
S
LO
VE
N D
AH
L
FUNC BY CHK APP EWEB WORK
ORDER NO.
2500190
AS NOTED02/24/25
B-41150-C2
ABRAMSON
ASL
WATER DISTRIBUTION
WATER MAIN REPLACEMENT
ARTHUR ST. AT AMAZON CREEK BRIDGE
PLAN & PROFILE
STA: 10+75 TO 11+46
N O R T H
| Sheets and Views |
| 41150-G1-B-41150-G1 |
| 41150-G2-B-41150-G2 |
| 41150-C1-B-41150-C1 |
| 41150-C1-B-41150-C2 |
| 2026-04-30T08:08:30-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .