Part 3 00014789_Bid Pricing Form.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- I-84 Moffett Creek Geotechnical Drilling
- Solicitation number
- S-73000-00014789
- Issued by
- Multnomah County, Canyonville City, Oregon
About this file
This document is a Bid Pricing Form for the Ohio Department of Transportation (ODOT) for Invitation to Bid (ITB) #S-73000-000014789, detailing a geotechnical investigation and monitoring project. The bid includes 13 line items covering administrative services, mobilization, traffic protection, drilling services (hollow-stem auger and rock core), sample collection, instrument installation (vibrating wire piezometers and slope inclinometers), monitoring well monument installations, geotechnical reporting, and miscellaneous support items. The project involves 405 feet of hollow-stem auger drilling, 250 feet of rock core drilling, 11 undisturbed samples, 4 piezometer installations, 120 feet of slope inclinometer casing, and various monitoring well monument placements.
The bid pricing form shows all line items currently priced at $0.00, which suggests this might be a template or preliminary document awaiting final pricing. The total project scope appears to be a comprehensive geotechnical investigation with multiple technical components, requiring specialized environmental and geological monitoring equipment and expertise. The document provides a detailed breakdown of anticipated work activities, quantities, and units of measurement, indicating a structured approach to project estimation and potential contract execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFCQ Addendum One.docx | DOCX document | |
| 00014789 RFCQ.docx | DOCX document | |
| Intent to Award~43.xlsx | XLSX spreadsheet | |
| 00014789 RFCQ_Att B-D.docx | DOCX document | |
| Notice of Intent to Award - RFP 25-163-G - All.pdf | ||
| Attachment A - Specifications~6.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Bid Pricing Form ITB #:S-73000-000014789 Name of Firm:_______________________ The Bidder proposes to furnish all material, equipment and labor, and perform all work for ODOT, in strict accordance with the RFCQ and the Specifications and other provisions incorporated in the RFCQ, on the basis of the unit prices as follows:
| Bid Item | Description | Unit | Quantity | Unit Price | Total Price |
| 1 | Administration | Lump Sum | 1 | $0.00 | |
| 2 | Mobilization/Demobilization/Access | Lump Sum | 1 | $0.00 | |
| 3 | Temporary Protection and Direction of Traffic (TP-DT) | Day | 6 | $0.00 | |
| 4 | Hollow-Stem Auger/Mud Rotary Drilling | Feet | 405 | $0.00 | |
| 5 | Rock Core Drilling | Feet | 250 | $0.00 | |
| 6 | 3” Undisturbed Samples (Shelby Tubes) | Each | 11 | $0.00 | |
| 7 | Vibrating Wire Piezometer (VWP) Installation | Each | 4 | $0.00 | |
| 8 | Slope Inclinometer (SI) Casing Installation | Feet | 120 | $0.00 | |
| 9 | Monitoring Well Monument - Flush Mount Installation | Each | 1 | $0.00 | |
| 10 | Monitoring Well Monument - Above Ground Installation | Each | 3 | $0.00 | |
| 11 | OWRD Geotechnical Hole Reports | Each | 11 | $0.00 | |
| 12 | Drums | Each | 2 | $0.00 | |
| 13 | Standby | Hours | 4 | $0.00 | |
| TOTAL BID AMOUNT | $0.00 |
Sheet2
| EST. | UNIT | TOTAL | |||
| ITEM | DESCRIPTION | QTY. | UNIT | PRICE | PRICE |
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | |||||
| 9 | |||||
| 10 | |||||
| TOTAL BID AMOUNT |