About this file
These are comprehensive engineering and design drawings for the Orange County, Florida's Barnett Park Redundant Chiller Replacement project. The documents detail a mechanical, electrical, and structural renovation to replace existing chiller systems at the Barnett Park facility, involving the installation of two new 115-ton air-cooled chillers, associated pumps, piping, electrical infrastructure, and building modifications. The project includes demolishing existing chiller equipment, installing new chillers with redundant capabilities, upgrading electrical systems including a new 600A automatic transfer switch, and implementing updated building automation and control systems. The drawings are dated August 16, 2024, and are prepared for permit review, indicating the project is in the final design stages before construction.
The estimated project cost is $1,450,000, with bids to be electronically submitted through the OpenGov e-Procurement Platform by December 5, 2024. The scope involves comprehensive system upgrades across mechanical rooms, chiller yards, and electrical infrastructure, with specific attention to maintaining operational continuity during the renovation. Key components include new chilled water piping, control valves, air separators, expansion tanks, and electrical disconnects and starters for chillers and pumps. The design emphasizes system redundancy, energy efficiency, and modernization of the existing central energy plant, with detailed specifications for equipment, wiring, grounding, and integration with existing building systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2017
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
8/
/2
2:
:1
PM
C :\U se rs
\w ilk
4\ O ne D riv e
- H an so n
Pr of es si on al
S er vi ce s In c\ D oc um en ts
\M
EP
_O C
B
AR
N
ET
T
PA
R K
C H
IL
LE
R R
EP
LA
C
EM
EN
T_
R
_l w ilk
LN
Q G
6.
rv t
2300 Maitland Center Pkwy, Suite Maitland, FL 32751
(321) 788-4906
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
COVER SHEET
G-001
8/16/2024 21G0138A
LMW
LMW
PLH
ISSUE FOR PERMIT
DRAWING INDEX
SHEET NO. SHEET NAME
G-001 COVER SHEET
A-100 LOUVER DETAILS
C-01 CIVIL PLAN
S-101 STRUCTURAL - JAM DETAILS
S-102 EQUIPMENT FOUNDATION DETAILS
M-001 MECHANICAL NOTES, LEGENDS, AND ABBREVIATIONS
M-100 OVERALL MECHANICAL PLAN
M-201 ENLARGED FIRST FLOOR MECHANICAL PLANS
M-202 ENLARGED FIRST FLOOR MECHANCIAL PLANS
M-601 DETAILS
M-602 SCHEDULES
M-603 CONTROLS
M-604 BAS RISER DIAGRAM
E-001 LEGEND - ELECTRICAL
E-100 FLOOR PLANS - ELECTRICAL
E-201 FLOOR PLANS - ELECTRICAL
E-501 RISER DIAGRAM - ELECTRICAL
4801 W Colonial Dr, Orlando, FL 32808
ISSUE FOR PERMIT
AUGUST 16, 2024
OC Barnett Park Redundant Chiller Replacement
HANSON PROFESSIONAL SERVICES INC.
2300 Maitland Center Pkwy, Suite 310
Maitland, FL 32751
(321) 788-4906
CODES IN EFFECT AT TIME OF DRAWING SUBMITTAL
FLORIDA BUILDING CODE, EIGHTH EDITION (2023)
FLORIDA MECHANICAL CODE, EIGHTH EDITION (2023)
FLORIDA ENERGY CONSERVATION CODE, EIGHTH EDITION (2023)
FLORIDA ACCESSIBILITY CODE, EIGHTH EDITION (2023)
FLORIDA FIRE SPRINKLER CODE 2019 (NFPA 13-2019)
NEC (NFPA 70) 2020 EDITION
TO THE BEST OF THE ENGINEER'S KNOWLEDGE, THE PLANS AND SPECIFICATIONS
COMPLY WITH THE 2023 FLORIDA BUILDING CODE WITH ALL CURRENT
AMENDMENTS.
PROJECT INFORMATION
1.
2.
3.
4.
5.
A.
6.
1.
1.
1.
SCOPE OF WORK
MECHANICAL:
REPLACEMENT OF THE EXISTING SINGLE 155-TON CHILLER WITH TWO (2)
NOMINAL 115-TON CHILLERS IN PARALLEL OPERATION.
ADDITION OF NEW VARIABLE SPEED CHILLED WATER PUMPS, BYPASS PIPING,
AIR SEPARATOR, EXPANSION TANKS, AND CHEMICAL FILTER FEEDER.
REPLACEMENT OF EXISTING 3-WAY MOTORIZED CHILLED WATER COIL
CONTROL VALVES WITH 2-WAY MOTORIZED CONTROL VALVES.
CONSTRUCTION OF A NEW CHILLER ENCLOSURE AREA.
REPLACING EXISTING AHU-1R OUTDOOR AIR INTAKE LOUVER.
REPLACEMENT OF LOUVER REQUIRES SELECTIVE DEMOLITION AND THE
INSTALLATION OF SUPPLEMENTAL STEEL FRAMING.
UPGRADING EXISTING BAS FRONT-END AND EQUIPMENT CONTROLLERS.
ELECTRICAL:
SUPPORTING MECHANICAL UPGRADES.
STRUCTURAL:
SUPPORTING MECHANICAL UPGRADES.
CIVIL:
SUPPORTING MECHANICAL UPGRADES.
MEP ENGINEERS
ORANGE COUNTY MAYOR
Jerry L. Demings
DISTRICT 1 COMMISSIONER
Nicole H. Wilson
DISTRICT 2 COMMISSIONER
Christine Moore
DISTRICT 5 COMMISSIONER
Emily Bonilla
DISTRICT 6 COMMISSIONER
Michael "Mike" Scott
DISTRICT 4 COMMISSIONER
Maribel Gomez Cordero
DISTRICT 3 COMMISSIONER
Mayra Uribe
PROJECT LOCATION
VoltAir Consulting Engineers 2180 Central Florida Parkway, Suite A8
Orlando, FL 32837
(321) 622-2230
Rhodes+Brito Architects 605 E. Robinson Street, Suite 750
Orlando, FL 32801
(407) 648-7288
ARCHITECTS
This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
J
J
J
POINT TABLE
Point # Offset North Offset East
101 0.00 0.00
1 0.00 61.11
2 22.01 61.11
3 21.95 42.26
4 21.95 12.23
5 22.01 0.00
6 21.00 0.00
7 18.16 57.43
8 10.31 37.65
9 18.16 28.72
10 10.31 8.94
11 3.84 11.87
12 3.84 8.85
13 3.84 5.87
14 6.51 2.00
15 8.91 2.09
16 17.59 4.40
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2023
54321 6
E
D
C
B
A
54321 6
MARK DATE DESCRIPTION
2300 Maitland Center Pkwy, Suite 310 Maitland, FL 32751
(321) 788-4906
CIVIL PLAN
08/16/2024 21G0138A
OC Barnett Park Redundant Chiller Replacement
ISSUE FOR PERMIT
C-01
N
N
N
S-101
A
FOUNDATION PLAN
EL 100'-0"
36"Wx72"T LOUVER
WALL OPENING,
REFER TO MECH.
1' -4
6'
-0
S-101
EXISTING CONC. BEAM
8"x22"
EXISTING DOUBLE
DOOR TO BE
REINSTALLED
S-101
3/16
REPAIR GALV.
HSS12x2x1/4 JAMB
L4x4x1/4 x 6" LONG WITH (2) 1/2" DIA.
A307 BLIND BOLTS INTO TUBE AND
LONG SLOTTED HOLES IN VERTICAL
ANGLE LEG
EXISTING DOOR
JAMB TO BE
REINSTALLED
EXISTING CONC.
BEAM 8"x22"
EXISTING L8x4x1/2 LINTEL
EXISTING FINISH TO REMAIN
1 1/2"
OUTSIDE FACE OF
LOUVER, REFER TO MECH.
8"
BASE PL1/2"x12"x5" WITH (1) 5/8" DIA.
EPOXY ANCHORS TO CMU WITH 6"
EMBEDMENT
S-101
S-101
FILL END CELL
WITH GROUT
HSS12x2x1/4 JAMB
DEPRESS BASE PLATE TO CONCEAL
ANCHOR UNDER LOUVER, PATCH
SPLIT FACE BLOCK AS REQUIRED
EXISTING 4"
SPLITFACE FACADE
EXISTING 8" CMU
HSS12x2x1/4 JAMB
EXISTING DOOR
JAMB TO BE
REINSTALLED
LOUVER, REFER TO MECH.
BASE PL 1/2"x10"x5" WITH (1) 5/8" DIA.
EPOXY ANCHOR GROUTED CMU CELL
WITH 6" EMBEDMENT
EXISTING MASONRY UNDER LOUVER
DEPRESS BASEPLATE TO CONCEAL
ANCHOR BELOW LOUVER, PATCH
SPLITFACE BLOCK AS REQUIRED
3/16
REPAIR GALV.
HSS12x2x1/4 JAMB
L4x4x1/4 x 6" LONG WITH (2) 1/2" DIA.
BLIND BOLTS INTO TUBE, LONG SLOTTED
HOLES IN VERTICAL ANGLE LEG
LOUVER, REFER TO MECH.
DOOR JAMB TO BE
REINSTALLED
6" 6"
1/
2"
EXISTING DOOR FRAME,
TO BE REINSTALLED,
SEE S-501 FOR
ATTACHMENT TO TUBE
EXISTING DOOR
PANEL
LOUVER, REFER TO MECH., OUTSIDE
FACE TO MATCH EXTERIOR SURFACE
HSS12x2x1/4 JAMB
STRUCTURAL STEEL NOTES:
S-1. MATERIAL PROPERTIES (U.N.0.)
• ANGLES - Fy = 36 KSI - (ASTM A36 OR ASTM A572)
• PLATES & BARS - Fy = 36 KSI - (ASTM A36 OR ASTM A572)
• HSS SHAPES - Fy = 50 KSI - (ASTM A500 Gr C)
• RODS - Fy = 36 KSI - (ASTM F1554 Gr 36)
S-2. ALL DETAILING, FABRICATION, AND ERECTION OF STRUCTURAL STEEL MEMBERS
SHALL BE IN ACCORDANCE WITH THE AISC - "STEEL CONSTRUCTION MANUAL",
FOURTEENTH EDITION.
S-3. ALL WELDING SHALL BE DONE IN ACCORDANCE WITH THE LATEST "AWS"
SPECIFICATIONS BY CERTIFIED WELDERS. ALL WELDS SHALL BE MADE WITH E70XX
ELECTRODES UNLESS NOTED OTHERWISE.
S-4. OPENINGS REQUIRED IN STRUCTURAL STEEL MEMBERS SHALL BE SHOWN ON THE
DRAWINGS. FIELD CUTTING OF HOLES IN STRUCTURAL STEEL MEMBERS SHALL NOT BE
ALLOWED WITHOUT WRITTEN PERMISSION OF THE ENGINEER.
S-5. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
STRUCTURAL STEEL FABRICATION.
S-6. WHENEVER CONSTRUCTION SCHEDULING REQUIRES THE ERECTION OF STRUCTURAL
MEMBERS WHICH BY THEMSELVES WOULD BE CONSIDERED LATERALLY UNSTABLE,
ADEQUATE TEMPORARY BRACING SHALL BE PROVIDED.
S-7. ALL STEEL COMPONENTS TO BE SHOP PRIMED WITH A ZINC-RICH, ORGANIC PRIMER.
REFER TO ARCH. FOR ADDITIONAL TOP COATS TO BE APPLIED IN THE FIELD.
2300 Maitland Center Pkwy, Suite 310 Maitland, FL 32751
(321) 788-4906
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2022
54321 6
E
D
C
B
A
54321 6
MARK DATE DESCRIPTION
ISSUE FOR PERMIT
21G0138A
RMF
RMF
JMC
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
STRUCTURAL JAMB
DETAILS
S-101
8/16/2024
1/4" = 1'-0"
ENLARGED PLAN VIEW
3/4" = 1'-0"
PARTIAL NORTH ELEVATION
1 1/2" = 1'-0"
SECTION
3" = 1'-0"
DETAIL
3" = 1'-0"
DETAIL
N
3" = 1'-0"
DETAIL
12" CONCRETE SLAB-ON-GRADE
WITH #6 REINFORCING BARS AT 12"
CENTERS, EACH WAY, 2" CLR OF TOP
OF SLAB
PROVIDE 12" HOOK AT
PERIMETER OF SLAB
6" 1'
-0
PROPOSED GRADE
EQUIPMENT, REFER
TO MECH.
1' -0
COMPACTED GRANULAR
FILL (6" MINIMUM)
FOUNDATION:
F-1 NET ALLOWABLE SOIL BEARING PRESSURE = 1,500 PSF PER FLORIDA
BUILDING CODE PRESUMPTIVE ALLOWABLE BEARING PRESSURES.
F-2 ALL FOOTING EXCAVATIONS SHALL BE CLEAN AND FREE OF DEBRIS,
STANDING WATER AND LOOSE SOIL AND BE INSPECTED AND APPROVED BY
THE OWNER'S REPRESENTATIVE PRIOR TO PLACEMENT OF CONCRETE.
CONCRETE:
C-1 MATERIAL PROPERTIES (U.N.O.)
• 28-DAY COMPRESSIVE STRENGTH, F'c = 4,500 PSI
• MAXIMUM WATER/CEMENT RATIO, w/c = 0.45
• CONCRETE REINFORCEMENT, ASTM A 615 - Fy = 60 KSI
C-2 PROTECTIVE COVERING FOR REINFORCEMENT BARS SHALL BE AS
FOLLOWS UNLESS OTHERWISE NOTED ON THE PLANS:
• FOOTINGS:
BOTTOM & SIDES = 3"
TOP = 2"
C-3 ALL REINFORCEMENT BARS SHALL BE FABRICATED IN ACCORDANCE
WITH THE LATEST CRSI MANUAL OF STANDARD PRACTICE FOR
DETAILING REINFORCED CONCRETE STRUCTURES AND SHALL BE CLEAN
AND FREE OF GREASE AND SCALING RUST.
C-4 ALL CONTROL JOINTS SHALL BE TOOLED OR SAWN.
C-5 LAP ALL BARS AS FOLLOWS U.N.O. (CLASS B): #6 = 3'-1"
NOTES:
1'-0"
1'-0"
S-102
PRELIMINARY EQUIPMENT PAD SIZE: 20'-6" X 9'-4"
12" CONCRETE SLAB-ON-
GRADE WITH #6
REINFORCING BARS AT 12"
CENTERS, EACH WAY, 2"
CLR. OF TOP OF SLAB, TYP.
CHILLER, REFER TO MECH.
5' -6
BUFFER TANK
5'-6"
12" CONCRETE SLAB-ON-
GRADE WITH #4
REINFORCING BARS AT 12"
CENTERS, EACH WAY, 2"
CLR OF TOP OF SLAB
S-102
SIM.
1' -0
T
Y P
1'-0" TYP.
7'-5"
CHILLER, REFER TO MECH.
1' -0
T
Y P
1'-0" TYP.
4'-3"
CONFIRM WITH SELECTED CHILLER SIZE
20'-6" +/-
CONFIRM WITH SELECTED CHILLER SIZE
20'-6" +/-
9' -4
EXPANSION
TANK
3' -7
3'
-0
3'-0" +/-
5"
2'
-0
2'-0" +/-
FEEDER TANK
6" +/- 10'-0" +/-
5"
5'
-0
CHILLER PUMPS (3)
TYP.
1'-0"
T Y
P
1' -0
12" CONCRETE SLAB-ON-GRADE WITH #4 REINFORCING
BARS AT 12" CENTERS, EACH WAY, 2" CLR OF TOP OF SLAB.
FOUNDATION SIZES SHOWN ARE PRELIMINARY AND MUST
BE COORDINATED WITH THE SELECTED AND APPROVED
EQUIPMENT WITH ANCHORAGE CONSIDERATIONS
S-102
SIM.
S-102
2300 Maitland Center Pkwy, Suite 310 Maitland, FL 32751
(321) 788-4906
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2022
54321 6
E
D
C
B
A
54321 6
MARK DATE DESCRIPTION
ISSUE FOR PERMIT
21G0138A
NDO
NDO
RMF
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
EQUIPMENT
FOUNDATION DETAILS
S-102
8/16/2024
3/4" = 1'-0"
EQUIPMENT SUPPORT DETAIL
3/4" = 1'-0"
EQUIPMENT SUPPORT PLAN
1/8" = 1'-0"
EQUIPMENT FOUNDATION PLAN
MECHANICAL SYMBOLS (HVAC)
MECHANICAL SYMBOLS (GENERAL)
MECHANICAL LEGEND (PIPING)
PIPING DESIGNATIONS
MECHANICAL SYMBOLS (PIPING)
A
PRESSURE RELIEF VALVE TAG
REHEAT OR BOOSTER COIL TAG
VAV BOX TAG
HUMIDISTATH
NIGHT SETBACK STATN
HX = HT. EXCHANGER
MD MOTORIZED DAMPER
ACC AIR COOLED CONDENSER
PENTHOUSE (INTAKE OR RELIEF)PH
RLFA RELIEF AIR
PRESSURE REGULATING VALVE
(STEAM, AIR & WATER, ARROW POINTS
TO LOWER PRESSURE.)
PRESSURE - TEMPERATURE RELIEF VALVE
REDUCED PRESSURE BACK FLOW PREVENTER
POINT OF DISCONNECT
EQUIPMENT TAGS (XX = MARKS BELOW)
UH = UNIT HEATER
EHC = ELECTRIC HEATING COIL
EF = EXHAUST FAN
CT = COOLING TOWER
CH = CHILLER
AS = AIR SEPARATOR
AHU = AIR HANDLING UNIT
Z = WHERE DETAIL OR SECTION IS SHOWN
X = SECTION [LETTER] OR DETAIL [NUMBER]
SMOKE DAMPER (S)
S
X
(OR
∅X")
EXHAUST DUCT
CONDENSATE DRAINCD
CONDENSATE WATER SUPPLY
CONDENSATE WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CR
C
CHWS
CHWR
RL REFRIGERATION LIQUID
RS REFRIGERATION SUCTION
HWR HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLYHWS
24X12
SUPPLY AIR
OUTDOOR AIR
MOTORIZED DAMPER
EXHAUST AIR
THERMOSTAT (X = COIL OR BOX NUMBER)T
FLEXIBLE DUCT CONNECTION
DISCHARGE OR SUPPLY DUCT
RETURN OR OUTSIDE AIR DUCT
SYMBOL ON DRAWING)
ON ACTUAL DUCT SIZE & NOT ON SCHEMATIC
TURNING VANES (NUMBER OF VANES SHALL BE BASED
FOR INTERNAL INSULATION, WHERE SPECIFIED
OPENING. SHEET METAL SIZE MUST BE INCREASED
DIMENSION. SIZE SHOWN IS INTERNAL CLEAR
DUCT SIZE DESIGNATION. SIDE SHOWN IS FIRST
REVISIONS
ROOM NUMBERS
M
SA
EA
OA
RA RETURN AIR
AIR DEVICE DESIGNATION
RUN BETWEEN JOISTRBJ
TDE
AFF ABOVE FINISHED FLOOR
TOP DUCT ELEVATION
CEILING SUPPLY AND RETURN AIR DEVICE
FLEXIBLE DUCT
VOLUME DAMPER (VD)
ACCESS DOOR (AD)
ACCESS PANEL (AP)
FIRE DAMPER (F)
MOTORIZED DAMPER (ELEC. OR PNEU.)
D
R
INCLINE DROP IN DIRECTION OF ARROW
INCLINE RISE IN DIRECTION OF ARROW
FOB = FLAT ON BOTTOM (IF APPLICABLE)
FOT = FLAT ON TOP OR
TRANSITIONS: GIVE SIZES.
F
M
AP
AD
AP
S
FLEXIBLE PIPE CONNECTION
VENTURI FLOW MEASURING STATION
SOLENOID VALVE
BUTTERFLY VALVE
WITH PRESSURE TAPS
PLUG VALVE
COMBINATION BALANCE & SHUTOFF VALVE
THREE - WAY AS INDICATED
AUTOMATIC CONTROL VALVE,
PNEUMATIC STRAIGHT THRU OR
AIR VENT, MANUAL (MAV)
P
P
UNION JOINT
FLANGE JOINT
"Y" STRAINER
TEE - UP, BRANCH OUT OF TOP
TEE - DOWN, BRANCH OUT OF BOTTOM
ELBOW - UP
ELBOW - DOWN
RISE OR DROP
DIRECTION OF FLOW
SLEEVE THRU WALL
CAP ON END OF PIPE
THERMOMETER, THERMOMETER WELL
PRESSURE GAUGE WITH GAUGE COCK
PUMP (TRIANGLE POINTS IN DIR. OF FLOW)
FLOW SWITCH
PRESSURE SWITCH
GATE VALVE
CHECK VALVE
BALL VALVE
GAUGE COCK
PRV
X
Z
LINEAR DIFFUSERS
# OF SLOTS FOR
NOTE: FOR 24x24 AIR DEVICES
COIL
VAV BOX #
BOX SIZE
HW REHEAT
AIR DEVICE
SLOT DIFFUSERS
AIR DEVICE
24x24 DIFFUSERS
NECK SIZE
HAVE 2-WAY VALVE
INDICATES COIL WITH 3-WAY
VALVE. COILS WITHOUT ' ' SHALL
9-2.5 4.1-750*
HW GPM
CFM
S3-200 4S-8"
MARK CFM
PROVIDE 4-WAY PATTERN
UNLESS OTHERWISE SPECIFIED.
NECK SIZE
8" S3-200
MARK CFM
AIR DEVICE LEGEND
FCU = FAN COIL UNIT
CU = CONDENSING UNIT
RTU = ROOFTOP UNIT
POINT OF CONNECT
HEX NOTES ON DRAWINGS & SCHEDULES
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2017
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
8/
/2
2:
:1
PM
C :\U se rs
\w ilk
4\ O ne D riv e
- H an so n
Pr of es si on al
S er vi ce s In c\ D oc um en ts
\M
EP
_O C
B
AR
N
ET
T
PA
R K
C H
IL
LE
R R
EP
LA
C
EM
EN
T_
R
_l w ilk
LN
Q G
6.
rv t
2300 Maitland Center Pkwy, Suite Maitland, FL 32751
(321) 788-4906
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
MECHANICAL
NOTES, LEGENDS,
AND
ABBREVIATIONS
M-001
8/16/2024 21G0138A
LMW
LMW
PLH
ISSUE FOR PERMIT
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
BEFORE SUBMITTING BID, CONTRACTOR SHALL VISIT THOSE PORTIONS OF
THE BUILDING AND SITE AFFECTED BY THIS WORK SO AS TO BECOME
FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT MAY AFFECT
EXECUTION OF THE WORK. SUBMISSION OF A BID DENOTES THAT SUCH
EXAMINATION HAS BEEN MADE AND CLAIMS FOR LABOR, EQUIPMENT OR
MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT
BE RECOGNIZED. SUBMIT ANY QUESTIONS REQUIRED TO CLARIFY SCOPE
PRIOR TO BID. INCLUDE ALL REQUIRED WORK IN BID PRICE.
PROVIDE A HINGED DUCT ACCESS PANEL FOR ALL FIRE, SMOKE, AND
COMBINATION FIRE/SMOKE DAMPERS PROVIDED. FOR PURPOSES OF
CLARITY, DRAWINGS MAY NOT SHOW ALL ACCESS PANELS.
FULLY COORDINATE ALL CEILING MOUNTED AIR DISTRIBUTION DEVICES WITH
ARCHITECTURAL CEILING GRID AND EQUIPMENT OF ALL TRADES.
ALL DUCT SIZES INDICATED ON THE DOCUMENTS ARE NET FREE AREA
DIMENSIONS.
UNFORESEEN SITE CONDITIONS MAY EXIST AND EXACT LOCATIONS OF
EXISTING UTILITIES MAY NOT BE AS SHOWN ON THE DRAWINGS. COORDINATE
WITH OTHER TRADES IN ROUTING AND/OR BURIAL DEPTHS AS DETERMINED
DURING CONSTRUCTION AND AS DIRECTED BY THE ARCHITECT/ENGINEER. IT
IS INTENDED THAT SUCH DEVIATIONS SHALL BE CONSIDERED AS PART OF
THIS CONTRACT. SUCH DEVIATIONS MAY NOT BE CONSIDERED AS PART OF
THIS CONTRACT WHEN PROPERLY DOCUMENTED IN WRITING.
CONCEAL ALL PIPING AND DUCT ABOVE CEILING OR IN NEW WALLS, UNLESS
WITHIN A MECHANICAL ROOM OR SPECIFICALLY NOTED AS EXPOSED OR
SURFACE MOUNTED. CONTRACTOR SHALL COORDINATE WITH THE GENERAL
CONTRACTOR TO PAINT ALL EXPOSED PIPING TO MATCH CORRESPONDING
EXPOSED AREAS.
WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE ESTABLISHED WORK
SCHEDULE SET FORTH BY THE OWNER. COORDINATE ALL WORK WITH THE
GENERAL CONTRACTOR.
PROVIDE ALL CONCRETE PATCHING, WALL PATCHING, CEILING REPAIR,
FENCE WORK AND OTHER GENERAL CONSTRUCTION WORK REQUIRED FOR
INSTALLING MECHANICAL SYSTEMS. COORDINATE WITH GENERAL
CONTRACTOR AND CONTRACTORS OF OTHER DIVISIONS.
ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND SHALL BE UL LISTED
WHERE APPLICABLE.
PENETRATION OF THE ROOF DECK WILL NOT BE ACCEPTABLE FOR SUPPORT
OF DUCTWORK, PIPING, EQUIPMENT OR ANY OTHER DEVICES. ALL SUPPORTS
SHALL SPAN BETWEEN THE STRUCTURAL ELEMENTS TO SUPPORT THE
MECHANICAL EQUIPMENT.
DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHOULD NOT BE SCALED.
COORDINATE EXACT LOCATION OF ALL CEILING MOUNTED EQUIPMENT SO
ALL SERVICEABLE COMPONENTS CAN BE EASILY ACCESSED BY REMOVING
CEILING TILES ONLY. REMOVAL OR RELOCATION OF LIGHTING FIXTURES FOR
SERVICE ACCESS IS NOT ACCEPTABLE. THE CONTRACTOR SHALL REINSTALL
EQUIPMENT THAT HAS INADEQUATE OR UNSAFE ACCESSIBILITY. LOCATE ALL
OTHER EQUIPMENT WITH MANUFACTURER-REQUIRED ACCESS FOR
OPERATION AND MAINTENANCE. INSTALL EQUIPMENT WITH PROPER
ELECTRICAL CODE CLEARANCES.
COMPLY WITH DIVISION 26 OF THE CONTRACT SPECIFICATIONS REFERRING
TO MOTORS, STARTERS, VFD’S, ETC.
THE SIZE AND LOCATION OF EQUIPMENT INSTALLED UNDER DIVISION 23 –
MECHANICAL SHALL BE COORDINATED WITH OTHER TRADES.
WHENEVER A REFERENCE IS MADE TO A STANDARD, THE WORK SHALL
COMPLY WITH THE LATEST EDITION OF THE STANDARD ACCEPTED BY THE
AUTHORITY HAVING JURISDICTION AT THE TIME THE PROJECT IS BID.
ALL MATERIAL STORED ON SITE SHALL BE PROPERLY PROTECTED FROM
DAMAGE OR DETERIORATION. MATERIAL SHALL NOT BE STORED IN CONTACT
WITH THE GROUND. ALL DUCTWORK AND EQUIPMENT, WHETHER INSTALLED
OR NOT, SHALL BE SEALED AT ANY OPENING. IF EQUIPMENT IS BECOMES
DAMAGED OR DETERIORATES DUE TO IMPROPER STORAGE BY THE
CONTRACTOR, THE CONTRACTOR SHALL REPLACE THE EQUIPMENT IN KIND
AT NO ADDITIONAL COST TO THE OWNER.
LONG RADIUS ELBOWS SHALL BE PROVIDED FOR ALL SUPPLY AND RETURN
AIR DUCTWORK BENDS AS SPACE ALLOWS. TURNING VANES WITH MITERED
HARD ELBOWS WILL ONLY BE ACCEPTED WHERE SHOWN ON THE
DOCUMENTS. LONG RADIUS ELBOWS MAY BE SUBSTITUTED FOR MITERED
ELBOWS WHERE SPACE ALLOWS.
IF THERE ARE ANY APPARENT CONFLICTS BETWEEN THE SPECIFICATIONS
AND DRAWINGS, THE MORE STRINGENT REQUIREMENTS SHALL APPLY.
NOTIFY THE ARCHITECT/ENGINEER OF ANY CONFLICTS PRIOR TO
PURCHASING EQUIPMENT AND PRIOR TO CUTTING OPENINGS.
THE ENTIRE AIR DISTRIBUTION SYSTEM INCLUDING SUPPLY/RETURN
DUCTWORK, TRANSFER DUCTS, GRILLES, DIFFUSERS AND ALL COMPONENTS
SHALL BE MAINTAINED DUST AND GRIT FREE DURING THE CONSTRUCTION
PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING OF ALL
COMPONENTS TO ENGINEER AND OWNER SATISFACTION PRIOR TO START-UP
OF THE SYSTEM.
PROVIDE ACCESS PANELS IN DUCTWORK, WALLS AND CEILINGS WHERE
REQUIRED FOR OPERATION, BALANCING, INSPECTION, AND MAINTENANCE OF
ALL EQUIPMENT.
VERIFY EXISTING CONDITIONS IN THE FIELD AND COORDINATE WITH ALL
TRADES PRIOR TO INSTALLING, FABRICATING OR ORDERING EQUIPMENT.
ALL EXTERNALLY-WRAPPED FIBERGLASS INSULATION SEAMS, CONNECTIONS,
AND JOINTS SHALL BE CONSTRUCTED WITH WOVEN POLYESTER FABRIC,
STAPLED, AND THEN SEALED WITH MASTIC PER SPECIFICATION SECTION 23
07 13. HEAT AND PRESSSURE SENSITIVE TAPE ARE NOT ACCEPTABLE AS A
FINAL CLOSURE.
GENERAL NOTES
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
ALL WORK SHALL BE IN ACCORDANCE WITH THE 2023 (8TH ED.) FLORIDA
BUILDING CODE, FLORIDA PLUMBING CODE, FLORIDA ENERGY
CONSERVATION CODE, AND FLORIDA MECHANICAL CODE & STANDARDS
(WITH SUPPLEMENTS) AS REFERENCED THROUGHOUT THE
SPECIFICATIONS. THE DRAWINGS AND SPECIFICATIONS DO NOT ATTEMPT
TO INDICATE ALL WORK REQUIRED BY THE CODES AND AUTHORITIES. DO
NOT INSTALL WORK THAT DOES NOT MEET THE MINIMUM CODE
REQUIREMENTS. IF NECESSARY, REQUEST CLARIFICATION FROM THE
ENGINEER PRIOR TO PROCEEDING.
CONTRACTOR SHALL NOT CONCEAL ANY WORK UNTIL INSPECTED BY
MECHANICAL INSPECTOR AND/OR THE WORK IS OBSERVED BY THE
ARCHITECT/ENGINEER. CONTRACTOR SHALL NOTIFY THE A/E AND OWNER
OF A SCHEDULED INSPECTION/REVIEW TIME WITHIN 72 HOURS OF THE
REQUESTED TIME. CONTRACTOR SHALL NOT CONCEAL WORK UNTIL
INSPECTED AND OBSERVED, REGARDLESS OF SCHEDULE.
PRIME CONTRACTOR IS RESPONSIBLE TO HAVE LICENSED AND QUALIFIED
SUBCONTRACTORS PERFORMING ALL WORK.
CONTRACTOR SHALL MAINTAIN A MARKED-UP SET OF RECORD DRAWINGS
WHICH INDICATE VARIATIONS IN THE ACTUAL INSTALLATION FROM THE
ORIGINAL DESIGN. SUBMIT DRAWINGS TO OWNER AND A/E UPON
COMPLETION FOR REVIEW.
THE SIZE, LOCATION, WEIGHT, ELECTRICAL REQUIREMENTS AND SERVICE
CLEARANCES OF EQUIPMENT INSTALLED UNDER DIVISION 23 SHALL BE
COORDINATED WITH ALL OTHER TRADES.
PROVIDE A MINIMUM OF ¾” FOR HYDRONIC PIPING UNLESS SPECIFICALLY
NOTED OTHERWISE. PROVIDE ¾” HYDRONIC PIPING RUNOUTS TO
EQUIPMENT UNLESS NOTED OTHERWISE.
MECHANICAL CONTRACTOR SHALL COORDINATE THE FABRICATION AND
INSTALLATION OF ALL STRUCTURAL SUPPORTS AND FRAMING FOR
MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING WITH THE GENERAL
CONTRACTOR
CONTRACTOR SHALL PROVIDE COORDINATED SHOP DRAWINGS PRIOR TO
PROCURING OR INSTALLING EQUIPMENT AND SYSTEMS INDICATED ON
CONTRACT DOCUMENTS. SUBMIT IN STRICT ACCORDANCE WITH THE
SPECIFICATIONS. PRIOR TO SUBMITTAL, CONTRACTOR SHALL VERIFY
THAT ADEQUATE SPACE EXISTS FOR THE SUBMITTED EQUIPMENT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED BY
OTHER TRADES DUE TO SUBSTITUTION OF OTHER THAN SCHEDULED
EQUIPMENT. WHEN EQUIPMENT FURNISHED IS DIFFERENT THAN
INDICATED, THE COST OF ADDITIONAL ELECTRICAL SERVICE, STRUCTURAL
AND RELATED WORK SHALL BE PAID BY THIS CONTRACTOR.
PIPE AND DUCT INSTALLATION HEIGHTS WHEREVER PROVIDED ON THE
DRAWINGS ARE INTENDED FOR GUIDANCE PURPOSES ONLY. RESPECTIVE
CONTRACTORS SHALL BE RESPONSIBLE FOR SHOP DRAWINGS, PROPER
INSTALLATION OF SYSTEM AND COORDINATION AMONG TRADES.
ALL PIPING AND DUCT PENETRATIONS THROUGH FLOOR AND WALLS SHALL
BE MADE THROUGH NEATLY CUT OR DRILLED OPENINGS. SEAL AROUND
ALL PENETRATIONS. SEAL NON-RATED WALLS WITH GROUT OR CAULK.
BACKING MATERIAL MAY BE USED. SEAL PENETRATIONS IN ALL RATED
WALLS WITH A UL-LISTED FIRE STOPPING ASSEMBLY MANUFACTURED BY
3M, HILTI, OR STI FIRESTOP.
LABEL ALL THERMOSTATS, SENSORS, CONTROL PANELS, ETC. IN
ACCORDANCE WITH THE SPECIFICATIONS.
INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH
MANUFACTURER’S RECOMMENDATIONS UNLESS SPECIFICALLY INDICATED
OTHERWISE OR WHERE LOCAL CODES OR REGULATIONS TAKE
PRECEDENCE.
REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH NEW AND
EXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE IN
CONTINUITY, APPEARANCE, OR FUNCTION.
RESPECTIVE CONTRACTORS SHALL BE RESPONSIBLE FOR REINFORCED
CONCRETE PADS FOR ALL EQUIPMENT BEING PROVIDED UNDER THEIR
CONTRACT. EACH PAD SHALL HAVE 1”/45° CHAMFERED EDGE ALONG
PERIMETER.
PROVIDE PROPER GRADIENTS FOR PIPING. PROVIDE MANUAL AIR VENTS
AT ALL HIGH POINTS IN HYDRONIC PIPING. ALL HYDRONIC PIPING SHALL BE
DRAINABLE AND SHALL HAVE DRAIN VALVES INSTALLED AT ALL OF THE
LOW POINTS.
REMOVE AND REINSTALL ACOUSTICAL TILE CEILING AS REQUIRED TO
PERFORM WORK SHOWN ON DRAWINGS.
IT IS THE INTENT OF THESE PLANS AND SPECIFICATION TO PROVIDE A
WORKING INSTALLATION IN EVERY DETAIL AND ALL ITEMS REQUIRED FOR
SUCH AND INSTALLATION SHALL BE PROVIDED WHETHER OR NOT
SPECIFICALLY INDICATED OR MENTIONED.
IT IS A REQUIREMENT THAT EACH SPACE IN THIS FACILITY, DURING
OCCUPIED HOURS, SHALL HAVE CONTINUOUS HEATING AND/OR COOLING
THROUGHOUT THE DURATION OF CONSTRUCTION AND THAT
TEMPERATURES SHALL BE MAINTAINED FOR EACH SPACE PER OWNER'S
REQUIREMENTS. IF THE CONTRACTOR BELIEVES THAT TEMPORARY
HEATING AND/OR COOLING METHODS WILL BE REQUIRED, PROVIDE A
COST LINE ITEM IN THE BID, INCLUDING THE DURATION REQUIRED FOR
TEMPORARY EQUIPMENT. OMISSION OF THIS LINE ITEM CONSTITUTES
CONTRACTOR'S ABILITY TO COMPLY WITH PROJECT REQUIREMENTS
WITHOUT THE NEED FOR TEMPORARY HEATING AND/OR COOLING.
WHERE PIPING IS CUT/REPAIRED/PATCHED, REINSULATE THE PIPE PER
THESE DOCUMENTS AND APPLY NEW JACKETING AND PAINT.
GLAZING:
ROOF:
WALL:
EXISTING TO REMAIN
BUILDING ENVELOPE
FLOOR AREA: ±42,600 GSF EXISTING CONSTRUCTION
VENTILATION: EXISTING TO REMAIN
EQUIPMENT: EXISTING TO REMAIN
LIGHTING: EXISTING TO REMAIN
PEOPLE: EXISTING TO REMAIN
BUILDING INTERNAL LOADS
HEATING: 70F
COOLING: 74F / 50% RH
INDOOR
ORLANDO, FL
ASHRAE WEATHER DATA LOCATION:
DAILY RANGE: 16.6 F DB
WINTER: 35 F DB 99.6% DB
SUMMER: 95 F DB / 78 F WB 0.4% MEAN COINCIDENTAL DB/WB
OUTDOOR
TEMPERATURE DESIGN CRITERIA
PROJECT DESIGN CONDITIONS
CONTROL GENERAL NOTES
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
ALL CONDUIT, WIRING, ACCESSORIES AND WIRING CONNECTIONS REQUIRED FOR
THE INSTALLATION OF THE BUILDING AUTOMATION SYSTEM, AS HEREIN SPECIFIED,
SHALL BE PROVIDED BY THE BAS CONTRACTOR UNLESS SPECIFICALLY SHOWN ON
THE ELECTRICAL DRAWINGS UNDER DIVISION 26 ELECTRICAL. ALL WIRING SHALL
COMPLY WITH THE REQUIREMENTS OF APPLICABLE PORTIONS OF DIVISION 26 AND
ALL LOCAL AND NATIONAL ELECTRIC CODES, UNLESS SPECIFIED OTHERWISE IN
THIS SECTION. ALL INSULATED WIRE TO BE COPPER CONDUCTORS, UL LABELED
FOR 90°C MINIMUM SERVICE.
THE SIZING, TYPE AND PROVISION OF CABLE, CONDUIT, CABLE TRAYS, AND
RACEWAYS SHALL BE THE DESIGN RESPONSIBILITY OF THE BAS CONTRACTOR. IF
COMPLICATIONS ARISE, HOWEVER, DUE TO THE INCORRECT SELECTION OF CABLE,
CABLE TRAYS, RACEWAYS AND/OR CONDUIT BY THE BAS CONTRACTOR, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN REPLACING
THE SELECTED COMPONENTS.
ALL CLASS 2 (24VAC OR LESS) WIRING SHALL BE INSTALLED IN CONDUIT UNLESS
OTHERWISE SPECIFIED. CONDUIT IS NOT REQUIRED FOR CLASS 2 WIRING IN
CONCEALED ACCESSIBLE LOCATIONS. CLASS 2 WIRING NOT INSTALLED IN CONDUIT
SHALL BE SUPPORTED EVERY 5’ FROM THE BUILDING STRUCTURE UTILIZING METAL
HANGERS DESIGNED FOR THIS APPLICATION. WIRING SHALL BE INSTALLED
PARALLEL TO THE BUILDING STRUCTURAL LINES. ALL WIRING SHALL BE INSTALLED
IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS. CLASS 2 SIGNAL WIRING AND
24VAC POWER CAN BE RUN IN THE SAME CONDUIT. POWER WIRING 120VAC AND
GREATER CANNOT SHARE THE SAME CONDUIT WITH CLASS 2 SIGNAL WIRING.
PROVIDE FOR COMPLETE GROUNDING OF ALL APPLICABLE SIGNAL AND
COMMUNICATIONS CABLES, PANELS AND EQUIPMENT SO AS TO ENSURE SYSTEM
INTEGRITY OF OPERATION. GROUND CABLING AND CONDUIT AT THE PANEL
TERMINATIONS. AVOID GROUNDING LOOPS.
A GRAPHIC OF EACH SYSTEM AND ITEM OF HVAC EQUIPMENT SHALL BE PROVIDED.
GRAPHICS SHALL ALSO DISPLAY ITEMS SUCH AS EQUIPMENT SCHEDULES, TREND
LOGS, RUN HOURS, OCCUPIED/UNOCCUPIED STATUS, SEQUENCE OPERATING
MODE AND A BUILDING WIDE SUMMARY ALARM SCREEN.
THE CONTROL OF MODULATING DAMPERS, CONTROL VALVES, AND VFDS SHALL
UTILIZE PROPORTIONAL-INTEGRAL-DERIVATIVE (PID) CONTROL LOOPS. THE
CONTRACTOR SHALL TUNE THE LOOPS TO PROVIDE STABLE OPERATION.
ALL ROOM NAMES AND NUMBERS USED FOR PROGRAMMING, GRAPHICS, LABELING
AND SHOP DRAWINGS SHALL BE COORDINATED WITH THOSE ACTUALLY USED,
WHICH MAY DIFFER FROM THE NAMES/NUMBERS ON THE DOCUMENTS.
ALL HVAC CONTROLLERS, ROUTERS, REPEATERS, DC AND 24 VAC POWER
SOURCES AND RELAYS OR RIB'S SHALL BE LOCATED WITHIN CONTROL PANELS. ALL
WIRING TO AND FROM THE CONTROL PANEL SHALL FIRST BE LANDED ON
SEPARATE TERMINAL STRIP TYPE CONNECTOR(S) MOUNTED WITHIN THE CONTROL
PANEL. TERMINAL STRIP CONNECTORS OR THE ENDS OF THE WIRE SHALL BE
LABELED FOR IDENTIFICATION PURPOSES. WIRING WITHIN PANELS SHALL BE RUN
PARALLEL AND PERPENDICULAR TO THE PANEL, ARRANGED NEATLY, USING WIRING
DUCT FOR MULTIPLE CONDUCTOR RUNS AND SPIRAL WRAPPING OF WIRE
BUNDLES. CONTROL PANELS SHALL BE WALL OR STAND MOUNTED. INSTALLATION
ON AHU'S IS NOT ACCEPTABLE UNLESS NOTED OTHERWISE.
COORDINATE FACILITY OPERATING HOURS FOR BUILDING HVAC SYSTEMS WITH
OWNER.
UNLESS OTHERWISE NOTED, DESIGN TEMPERATURES DURING OCCUPIED HOURS,
WHEN COOLING, NORMAL BUILDING TEMPERATURE SETPOINTS SHALL BE 74 F.
WHEN HEATING, NORMAL BUILDING TEMPERATURE SETPOINTS SHALL BE 69 F.
WHERE DEAD BANDS, INTERLOCKS, RESET RATIOS, DELAYS, RANGES AND SET
POINTS ARE LISTED THEY SHALL BE FULLY ADJUSTABLE THROUGH THE
OPERATOR'S REMOTE WORKSTATION WITHOUT ADJUSTING THE PROGRAMMING
LOGIC.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
THE BAS CONFIGURATION IS BASED UPON A TRANE. NO ALTERNATE
MANUFACTURERS WILL BE ACCEPTED. THE INSTALLATION SHALL BE PERFORMED
BY AWARDED CONTRACTOR.
THE BAS CONTRACTOR SHALL NOT SUBMIT OR INSTALL ANY HARDWARE OR
SOFTWARE THAT IS PLANNED FOR END-OF-RUN OR OBSOLESCENCE WITHIN 36
MONTHS OF THE START OF THE WARRANTY PERIOD.
THE SYSTEM SHALL COMMUNICATE WITH EXISTING ORANGE COUNTY SERVERS.
EXISTING ON-SITE BAS OPERATING SOFTWARE SHALL BE UPDATED AS REQUIRED
FOR GRAPHICAL DISPLAY, MONITORING, TRENDING, ALARMS AND SUPERVISORY
CONTROL FOR THE SYSTEM, TO INCLUDE ANY AND ALL UPGRADES OF EXISTING
HARDWARE/SOFTWARE CONNECTED TO THOSE SYSTEMS, AND/OR INSTALLATION
OF NEW SOFTWARE. UPGRADE THE EXISTING FRONT-END TO THE CURRENT
VERSION OF TRANE TRACER SC+ (BACNnet), AND PULL INTO EXISTING TRANE
ENSEMBLE SERVER. PROVIDE UPDATED GRAPHICS FOR ALL NEW AND EXISTING
EQUIPMENT. INCLUDE ALL REQUIRED LICENSING AND COSTS.
THE WORK SHALL INCLUDE, BUT NOT BY WAY OF LIMITATION, MICROPROCESSOR
BASED CONTROLLERS, SENSORS, PANELS, SWITCHES, SIGNAL SELECTORS,
CONDUIT, WIRING, PROGRAMMING, SOFTWARE, FIRMWARE, OPERATORS
WORKSTATION, ROUTERS, HUBS, REPEATERS, GATEWAYS, FILE SERVER,
WORKSTATION SYSTEM GRAPHICS, TERMINATIONS, COMMUNICATIONS
WIRING/CABLING, CALIBRATION, ACTIVATION, DE-BUGGING, COMMISSIONING,
DEMONSTRATIONS AND TRAINING. ALL NEW CONTROLLERS AND OPERATOR
WORKSTATIONS SHALL BE BTL-LISTED. NEW CONTROLLERS SHALL BE
EXPANDABLE TO TWICE THE POINT CAPACITY REQUIRED BY THE POINTS LISTS ON
THE DRAWINGS.
COORDINATE THE RANGE, SET POINT, DEAD BAND, CHARACTERISTICS AND
MOUNTING LOCATIONS OF SENSORS WITH THE ACTUAL EQUIPMENT FURNISHED.
INSTALL SENSORS, TUBING AND WIRING TO BE ACCESSIBLE, PROPERLY
SUPPORTED AND ARRANGED SO AS NOT TO IMPEDE OR ENCROACH UPON
EQUIPMENT SERVICE AND ACCESS AREAS. ALL DEVICES MOUNTED ON INSULATED
SURFACES SHALL INCLUDE APPROPRIATE METAL STAND-OFF BRACKETS MADE OF
THE SAME MATERIAL. THERMOMETER WELLS SHALL HAVE LAGGING EXTENSIONS
OF A LENGTH EQUAL TO THE INSULATION THICKNESS.
WHERE PROPOSED SEQUENCES COULD DEFEAT THE EQUIPMENT
MANUFACTURERS RECOMMENDED SAFETIES, EXCEED RECOMMENDED STARTS
PER HOUR, CONTRIBUTE TO A SHORTENED EQUIPMENT LIFE EXPECTANCY OR
OTHERWISE BE DETRIMENTAL TO THE EQUIPMENT CONTROLLED, ALERT ENGINEER
OF CONFLICT PRIOR TO PROCEEDING WITH THE WORK.
THE BASE BID SHALL INCLUDE FIELD CALIBRATION OF ALL SENSORS, REVISIONS TO
SET POINTS, SCHEDULES, PID PARAMETERS, DEAD BANDS, DELAYS AND RANGES
BASED UPON ACTUAL PERFORMANCE OF CONTROLLED EQUIPMENT, TO PROVIDE
FOR SAFE, STABLE OPERATION WITHOUT EXCESSIVE CYCLING OR HYSTERESIS.
DEMONSTRATE ALL SEQUENCES OF OPERATION IN THE PRESENCE OF THE OWNER
FOR ALL CONTROLLED EQUIPMENT, TO INCLUDE GENERATION OF ALARMS AND
GENERAL EQUIPMENT FAILURES.
IN-PLACE MEASUREMENTS WILL BE MADE AT ALL TEMPERATURE, PRESSURE,
RELATIVE HUMIDITY, AND CARBON DIOXIDE SENSORS PROVIDED BY THE CONTROLS
CONTRACTOR. REPRESENTATIVES OF THE CONTROLS CONTRACTOR SHALL BE
PRESENT TO BOTH ASSIST AND SUPPORT THESE MEASUREMENTS AND TO
CALIBRATE THE READING TO THE MEASURED VALUE. WHERE THE CALIBRATION OF
ANY DEVICE REDUCES IT'S RANGE BY MORE THAN 15% OF THAT SPECIFIED, IT
SHALL BE REPLACED WITH A NEW SENSOR.
COORDINATE SEQUENCES AND DATA ACQUISITION REQUIREMENTS AND PROVIDE
FOR TREND LOGGING, REPORT GENERATION, CALCULATE RUN HOURS AND SIMILAR
PREVENTIVE MAINTENANCE AND COMMISSIONING FUNCTIONS.
CONTROLS POINTS LISTS, SEQUENCES OF OPERATION, AND CONTROLLER
SOFTWARE REQUIREMENTS SHALL BE CONSIDERED COMPLEMENTARY. THE
CONTRACTOR SHALL COORDINATE THESE REQUIREMENTS AND PROVIDE A
COMPLETE SYSTEM WITH ALL OF THE FEATURES, FUNCTIONS AND SEQUENCES
SPECIFIED, NOTED INDICATED AND/OR REQUIRED.
COMMISSIONING NOTE:
THIS PROJECT WILL UNDERGO HVAC COMMISSIONING. THE COMMISSIONING EFFORT
WILL BE MANAGED BY A 3RD PARTY COMMISSIONING AGENT. THE COMMISSIONING WILL
FOLLOW THE REQUIREMENTS OF THE 2023 FLORIDA BUILDING CODE. THE GENERAL
CONTRACTOR AND THE MECHANICAL AND CONTROLS SUBCONTRACTORS SHALL
COLLABORATE WITH THE COMMISSIONING AGENT TO DEMONSTRATE THAT THE
INSTALLED HVAC SYSTEM AND CONTROLS ARE FUNCTIONING PER THE CONTRACT
DOCUMENTS.
This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the
AHU-1R
MECHANICAL ROOM
1-112 CHILLER AND
GENERATOR
ENCLOSURE
AHU-1G
MECHANICAL ROOM
2-110
AHU-2G
MECHANICAL ROOM
2-108
AHU-2R
MECHANICAL ROOM
1-219
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2017
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
8/
/2
2:
:1
PM
C :\U se rs
\w ilk
4\ O ne D riv e
- H an so n
Pr of es si on al
S er vi ce s In c\ D oc um en ts
\M
EP
_O C
B
AR
N
ET
T
PA
R K
C H
IL
LE
R R
EP
LA
C
EM
EN
T_
R
_l w ilk
LN
Q G
6.
rv t
2300 Maitland Center Pkwy, Suite Maitland, FL 32751
(321) 788-4906
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
OVERALL
MECHANICAL PLAN
M-100
8/16/2024 21G0138A
LMW
LMW
PLH
ISSUE FOR PERMIT
1.
2.
REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
REFER TO SPECIFICATIONS.
GENERAL SHEET NOTES
SCALE: 1" = 20'-0"1 FIRST FLOOR OVERALL MECHANICAL PLAN
SCALE: 1" = 20'-0"2 SECOND FLOOR OVERALL MECHANICAL PLAN
0 40' 60'20'10'
0 40' 60'20'10'
This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the
2" CHWS
2" CHWR
AHU-1R
M
"x
" O
A
36"x36" OA
3" CHWS
3" CHWR
AHU-1R VFD
AHU-1R
DISCONNECT
EXISTING MAIN
BAS PANEL AND
COMPUTER
D1
D2
D2
D3
MECH. ROOM
1-112
ELEC. ROOM
1-113
EXISTING AHU-1R
CONTROLS CABINET
CHWS/R UP TO
SERVE AHU-2R
EXISTING
AHU-1R VFD
NEW MAIN BAS
PANEL AND
COMPUTER
AHU-1R
2" CHWS
2 1/2"
CHWS
2 1/2"
CHWR
CHWS/R UP TO
SERVE AHU-2R
2" CHWR
R1
R3
R6
R7
L1 - 3660 CFM
33" X 72"
33"x72"
MECH. ROOM
1-112
ELEC. ROOM
1-113
AFMS
EXISTING AHU-1R
CONTROLS CABINET,
REMOVE EXISTING
CONTROLS AND
PROVIDE NEW
CONTROLS
M
R3
NEW MOTORIZED OUTDOOR AIR
DAMPER (24V), OPPOSED BLADE,
MODULATING. INCORPORATE INTO
EXISTING SEQUENCE OF CONTROL
18"x36"
NEW AIRFLOW MEASURING
STATION, INCORPORATE INTO
EXISTING SEQUENCE OF CONTROL
AHU-1G
EXISTING AHU-1G
CONTROLS CABINET
EXISTING
AHU-1G VFD
M
1 1/2"
CHWS
1 1/2"
CHWR
1 1/2"
CHWS
1 1/2"
CHWR
D1
MECH. ROOM
2-108
1 1/2"
CHWS
1 1/2"
CHWR
AHU-1G
EXISTING AHU-1G
CONTROLS CABINET,
REMOVE EXISTING
CONTROLS AND PROVIDE
NEW CONTROLS
EXISTING
AHU-1G VFD
M
R1
R2
MECH. ROOM
2-108
R2
AHU-2G
M
3" CHWS
3" CHWR
EXISTING AHU-2G
DISCONNECT
EXISTING AHU-2G
CONTROLS CABINET
D1
MECH. ROOM
2-110
AHU-2G
EXISTING AHU-2G
DISCONNECT
EXISTING AHU-2G CONTROLS
CABINET, REMOVE EXISTING
CONTROLS AND PROVIDE NEW
CONTROLS
3" CHWS
3" CHWR
3" CHWS
R5
R5
MECH. ROOM
2-110
R1
EXISTING
AHU-2R
CONTROLS
CABINET
EXISTING
AHU-2R VFD
AHU-2R
M
2 1/2"
CHWS
D1
MECH. ROOM
1-219
2 1/2"
CHWR
EXISTING AHU-2R
CONTROLS CABINET,
REMOVE EXISITNG
CONTROLS AND PROVIDE
NEW CONTROLS
EXISTING
AHU-2R VFD
AHU-2R
2 1/2"
CHWR
2 1/2"
CHWS
2 1/2"
CHWR
2 1/2"
CHWS
R4
R1 MECH. ROOM
1-219
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2017
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
8/
/2
2:
:2
PM
C :\U se rs
\w ilk
4\ O ne D riv e
- H an so n
Pr of es si on al
S er vi ce s In c\ D oc um en ts
\M
EP
_O C
B
AR
N
ET
T
PA
R K
C H
IL
LE
R R
EP
LA
C
EM
EN
T_
R
_l w ilk
LN
Q G
6.
rv t
2300 Maitland Center Pkwy, Suite Maitland, FL 32751
(321) 788-4906
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
ENLARGED FIRST
FLOOR MECHANICAL
PLANS
M-201
8/16/2024 21G0138A
LMW
LMW
PLH
ISSUE FOR PERMIT
1.
2.
REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
REFER TO SPECIFICATIONS.
GENERAL SHEET NOTES
DEMOLITION KEYNOTES
CONTRACTOR TO DEMOLISH EXISTING 3-WAY VALVE AND ASSOCIATED
BYPASS PIPING AS SHOWN.
CONTRACTOR TO DEMOLISH AHU-1R OUTDOOR AIR LOUVER, DUCTWORK,
AND AIRFLOW MEASURING STATION. SEE STRUCTURAL SHEETS FOR MORE
INFORMATION.
EXISTING BAS CENTRAL CONTROLLER TO BE DEMOLISHED.
D1
SCALE: 1/4" = 1'-0"1 FIRST FLOOR MECHANICAL PLAN - MECHANICAL ROOM 1-112 - DEMOLITION SCALE: 1/4" = 1'-0"2 FIRST FLOOR MECHANICAL PLAN - MECHANICAL ROOM 1-112 - RENOVATION
0 2' 4' 8' 0 2' 4' 8'
SCALE: 1/4" = 1'-0"3 FIRST FLOOR MECHANICAL PLAN - MECHANICAL ROOM 2-108 - DEMOLITION SCALE: 1/4" = 1'-0"4 FIRST FLOOR MECHANICAL PLAN - MECHANICAL ROOM 2-108 - RENOVATION
0 2' 4' 8' 0 2' 4' 8'
SCALE: 1/4" = 1'-0"5 FIRST FLOOR MECHANICAL PLAN - MECHANICAL ROOM 2-110 - DEMOLITION SCALE: 1/4" = 1'-0"6 FIRST FLOOR MECHANICAL PLAN - MECHANICAL ROOM 2-110 - RENOVATION
RENOVATION KEYNOTES
NEW TWO-WAY CHILLED WATER DDC CONTROL VALVE TO SERVE AHUS. SEE
DETAIL 5 ON SHEET M-601 FOR MORE INFORMATION.
CONTRACTOR TO REPAIR EXISTING 1-1/2" CHILLED WATER SUPPLY/RETURN
PIPING AT DEMOLISHED 3-WAY VALVE CONNECTION.
CONTRACTOR TO REPAIR EXISTING 2" CHILLED WATER SUPPLY/RETURN
PIPING AT DEMOLISHED 3-WAY VALVE CONNECTION.
CONTRACTOR TO REPAIR EXISTING 2-1/2" CHILLED WATER SUPPLY/RETURN
PIPING AT DEMOLISHED 3-WAY VALVE CONNECTION.
CONTRACTOR TO REPAIR EXISTING 3" CHILLED WATER SUPPLY/RETURN
PIPING AT DEMOLISHED 3-WAY VALVE CONNECTION.
NEW BAS CENTRAL CONTROLLER TO BE LOCATED IN THE SAME AREA AS
DEMOLISHED CENTRAL CONTROLLER. UPDATE FRONT END SOFTWARE ON
COMPUTER WORKSTATION. SEE CONTROL NOTES ON M-001 FOR MORE
INFORMATION.
NEW OUTDOOR AIR LOUVER TO SERVE AHU-1R. SEE STRUCTURAL SHEETS
FOR MORE INFORMATION.
R1
0 2' 4' 8' 0 2' 4' 8'
D2
D3
R2
R3
R4
R6
R7
SCALE: 1/4" = 1'-0"7 SECOND FLOOR MECHANICAL PLAN - MECHANICAL ROOM 1-219 - DEMOLITION SCALE: 1/4" = 1'-0"8 SECOND FLOOR MECHANICAL PLAN - MECHANICAL ROOM 1-219 - RENOVATION 0 2' 4' 8'0 2' 4' 8'
R5
This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the
MAIN CHILLER DISCONNECTS.
SEE ELECTRICAL FOR MORE
INFORMATION
6" CHWS
6" CHWR
6" CHWS
6" CHWR
CHEMICAL FILTER FEEDER
EXPANSION TANK
AIR
SEPARATOR
D2
D1
D1
D1
D1
D3
1 1/2" CW
D1 CHWP-1
CHWP-2
CHWP-3
6" CHWR
6" CHWR
1" CHWR
1" CW
6" CHWR
6" CHWS
4" CHWR 4" CHWS 4" CHWS4" CHWR
CH-1 CH-2
BT-1
AS-1AS-1
ET-1
FF-1
6" CHWR
3" CHW
BYPASS
6" CHWS
EXISTING CHILLER
EXISTING CHILLED WATER PUMPS
M-202
MAKEUP WATER METER
1" CW
BT-1
CH-1
AS-1
M-202
CHWP-1
CHWP-2
CHWP-3
6" CHWR
6" CHWS
4" CHWR
6" CHWR
6" CHWR
6" CHWS
4" CHWR
6" CHWR
ET-1
R2
R2
R2 R2
R2
R2
R2
4" CHWR
4" CHWR
4" CHWR
CHWP-1 VFD
CHWP-2 VFD
CHWP-3 VFD
R3 R3
R4
R4
R5
R5
3" CHW
BYPASS
FF-1 R2
M-202
CH-2
4" CHWR
4" CHWS
3/4" CHWR
4" CHWR
4" CHWS
M-202
BAS CONTROL PANEL FOR CHILLER PLANT
R6R6
1" CHWR
1" CW
1" CHWR
1" CWR8
R9
R9
R9
R9
1" CW
EXISTING CHEMICAL FILTER FEEDER
EXISTING EXPANSION TANK
R9
MAIN CHILLER DISCONNECTS.
SEE ELECTRICAL FOR MORE
INFORMATION
R1
R10
SHUTOFF VALVE
WITH BLIND
FLANGE
EXISTING CHILLER
EXISTING CHILLED WATER PUMPS
R11
STRAINER STRAINER
BALANCING VALVE
BALANCING VALVE
SHUT-OFF VALVE (TYP.)
M-202
MOTORIZED CHILLER ISOLATION VALVE (120V/1Ph)
MOTORIZED CHILLER ISOLATION VALVE (120V/1Ph)
3" CHW
BYPASS
6" CHWS
6" CHWR
MODULATING
BYPASS
CONTROL
VALVE
(120V/1Ph)
INSERTION
FLOW METER
ISOLATION
VALVE
Level 1 0"
NEW TEMPORARY
CHILLER
CONNECTIONS
R1
R7
6" CHWS
Level 1 0"
4" CHWR
4" CHWS
CH-2
Level 1 0"
1" CW
CONNECT NEW 1"
COLD WATER
MAKEUP WATER LINE
ENTERING
MECHANICAL YARD
RPZ BACKFLOW PREVENTER (BFP-1)
PRESSURE REDUCING VALVE
SHUT-OFF VALVE (TYP.)
1" CW
1" BYPASS
3/4" DISPLACEMENT-TYPE MAGNETIC MAKEUP
WATER METER, LEAD-FREE COMPLYING WITH
NSF 61 AND NSF 372. COORDINATE DESIRED
MANUFACTURER WITH OWNER.
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2017
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
8/
/2
2:
:2
PM
C :\U se rs
\w ilk
4\ O ne D riv e
- H an so n
Pr of es si on al
S er vi ce s In c\ D oc um en ts
\M
EP
_O C
B
AR
N
ET
T
PA
R K
C H
IL
LE
R R
EP
LA
C
EM
EN
T_
R
_l w ilk
LN
Q G
6.
rv t
2300 Maitland Center Pkwy, Suite Maitland, FL 32751
(321) 788-4906
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
ENLARGED FIRST
FLOOR MECHANCIAL
PLANS
M-202
8/16/2024 21G0138A
LMW
LMW
PLH
ISSUE FOR PERMIT
1.
2.
3.
4.
REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
REFER TO SPECIFICATIONS.
NEW CENTRAL ENERGY PLANT SHALL BE INSTALLED AND BROUGHT ONLINE
PRIOR TO DEMOLITION OF EXISTING CENTRAL ENERGY PLANT. COORDINATE
SCHEDULING OF WORK WITH ORANGE COUNTY.
ALL GRADE-MOUNTED EQUIPMENT SHALL BE SECURED TO NEW 4"
CONCRETE PADS.
GENERAL SHEET NOTES
DEMOLITION KEYNOTES
CONTRACTOR TO DEMOLISH EXISTING CHILLER (CH-1), CHILLED WATER
PUMPS (PCWP-1 & PCWP-2), AND ASSOCIATED EQUIPMENT AS SHOWN.
CONTRACTOR TO DEMOLISH EXISTING 6" CHW PIPING TO THE TIE IN POINT OF
THE NEW CHILLED WATER AS SHOWN. PROVIDE SHUT-OFF VALVE.
DISCONNECT EXISTING 1" CW MAKEUP WATER LINE AT THE EXISTING
SHUTOFF VALVE. EXISTING PRESSURE REDUCING VALVE AND BACKFLOW
PREVENTER SHALL REMAIN.
CONTRACTOR TO CONNECT NEW CHILLED WATER PIPING AS PICTURED IN
DETAIL 4 ON THIS PAGE (M-202).
D1
0 2' 4' 8'
0 2' 4' 8'
RENOVATION KEYNOTES
CONNECT NEW 6" CHILLED WATER SUPPLY AND RETURN PIPING TO EXISTING
CHILLED WATER PIPING. ROUTE PIPING HIGH TO NEW CHILLER YARD AS
SHOWN.
CONTRACTOR TO PROVIDE NEW 4" EQUIPMENT PAD FOR ALL NEW CHILLED
WATER EQUIPMENT AS SHOWN.
NEW 6' CHAINLINK FENCE TO SURROUND NEW CHILLER ENCLOSURE. SEE
CIVIL DRAWINGS.
CHILLER CLEARANCE AREA.
CHILLED WATER PIPE SUPPORTS. SEE SHEET M-601 DETAIL 3 FOR MORE
INFORMATION.
PROVIDE NEW CHILLER DISCONNECT IN A NEMA 3R ENCLOSURE. SEE SHEET
E-201 FOR MORE INFORMATION.
NEW 6" CHILLED WATER SUPPLY AND RETURN TEMPORARY CHILLER
CONNECTION. TEMPORARY CHILLER CONNECTIONS TO BE VALVED AND
CAPPED FOR FUTURE USE. PIPING IS TO BE ROUTED IN EXISTING CEP
ENCLOSURE.
ROUTE NEW 1" CW MAKEUP LINE AS SHOWN TO NEW AIR SEPARATOR.
EXISTING CHILLED WATER EQUIPMENT AND PIPING TO REMAIN OPERATIONAL
DURING THE INSTALLATION OF NEW CENTRAL ENERGY PLANT. CONTRACTOR
TO COORDINATE WITH OWNER DURING REQUIRED OUTTAGES.
CHILLED WATER PIPE SUPPORTS. SEE SHEET M-601 DETAIL 7 FOR MORE
INFORMATION.
INSTALL FLOW METER WITH MANUFACTURER'S REQUIRED STRAIGHT PIPE
LENGTHS UPSTREAM AND DOWNSTREAM.
R1
D2
R2
R3
SCALE: 1/4" = 1'-0"2 FIRST FLOOR MECHANICAL PLAN - CHILLER YARD - DEMOLITION
SCALE: 1/4" = 1'-0"1 FIRST FLOOR MECHANICAL PLAN - CHILLER YARD - RENOVATION
R4
R5
SCALE: 1/4" = 1'-0"3 CHILLER YARD BYPASS
R6
SCALE: 1/8" = 1'-0"4 TEMPORARY CHILLER CONNECTIONS
R7
0 2' 4' 8' 4'0 8' 16'
SCALE: 1/4" = 1'-0"5 CHILLER SECTION
D3
R8
0 2' 4' 8'
R9
D4
R10
R11
SCALE: 1/4" = 1'-0"6 NEW MAKEUP WATER CONNECTION
0 2' 4' 8'
This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the
M
HOUSEKEEPING PAD
DRAIN W/VALVE
TANK
EXPANSION
PRESSURIZED
BLADDER TYPE
CAPACITY AIR VENT
AUTOMATIC HIGH
SUPPORT FROM GRADE
ON PIPE STANCHIONS
PIPE TO GRADE
BLOWDOWN VALVE
OF MAIN PIPE
CONNECT TO SIDE
SUCTION
TO PUMP
GAUGE
AIR VENT
AUTOMATIC
PRESSURE
REDUCER
WHERE NECESSARY
NEW MAKEUP WATER LINE, MAKEUP
WATER METER, BACKFLOW
PREVENTER AND PRESSURE
REDUCING VALVE
CHW
CHW
REMOVABLE
GASKETED CAP
PRESSURE RATED
FILTER FEEDER - MIN.
CAP. 5 GAL.
UNION (TYPICAL)
LINE SIZE BALL
VALVE (TYP.)
3/4"
3/4" DRAIN
FROM PUMP
DISCHARGE
TO PUMP
SUCTION
SAMPLING CONNECTION
WITH 1/4" BALL VALVECONCRETE PAD
3/4"
PIPE HANGER WITH
16 GA. SADDLE
AT SUPPORTS HAVING HANGER ON ONLY 1 SIDE,
PROVIDE L 3"x 3"x 1/4" STRUT ON SAME SIDE
AS PIPE HANGER
W8x10 BEAM, TOP MAXIMUM
NOTES:
MIN. 1/2" DIAMETER ROD,
CLAMP OR BOLT TO BEAM
1. ALL SUPPORT COMPONENTS SHALL BE
CONTINUOUSLY WELDED.
2. PRIME & PAINT ENTIRE ASSEMBLY.
COLOR TO MATCH BUILDING EXTERIOR
COLOR.
3. ALL COMPONENTS SHALL BE
WEATHERPROOF & CORROSION- PROOF
FOR OUTDOOR USE.
4. MAXIMUM SPACING BETWEEN SHALL
BE 8 FEET FOR COPPER TUBING AND 12
FEET FOR STEEL.
5. HANGER FOR SINGLE PIPE SHOWN;
HANGER FOR MULTIPLE PIPES SIMILAR.
h h
36" MAXIMUM
8 FT. ABOVE GRADE
3" SCHED. 40 STEEL
SUPPORT PIPE
8"x 8"X 1/2" PLATE
WITH 3/4" ANCHOR BOLTS
PIPING ALTERNATIVE: PLACE PIPES ON
TOP OF BEAM WITH BOTTOM OF PIPE AT
6'-6" ABOVE FINISHED GRADE.
ELASTOMERIC AND
CELLULAR PIPE
INSULATION
PIPE
HARDWOOD INSULATION
SADDLE (CHILLED WATER
PIPING ONLY)
SUPPORT CLAMP HANGER
16 GA. GALV. STEEL
INSULATION SHIELD WITH
FLARED ENDS
ALL SERVICE JACKET ON
PIPE INSULATION
NOMINAL INNER DIAMETER
OF INSULATION SHIELD (IN.)
SHIELD
LENGTH
(IN.)
2 3/8" TO 6 5/8" 12
7 5/8" TO 20" 18
PRESSURE/TEMPERATURE TEST PORT
(TYP.)
P
FLOW
AIR
CHILLED WATER
SUPPLY
CHILLED WATER RETURN
5 PIPE DIA.
MINIMUM
2 PIPE DIA.
MINIMUM
CHILLED WATER COIL
P/T PLUG (TYP.)
3/4" HOSE END DRAIN VALVE
STRAINER WITH TEST PORTS ON
BOTH SIDES
BALL VALVE 2" OR LESS, BUTTERFLY VALVE 2-1/2" OR
LARGER
3/8" BALL VALVE AIR VENT
NEW 2-WAY MODULATING CONTROL VALVE
AUTOFLOW BALANCING VALVE
UNION
THERMOMETER
PRESSURE GAUGE
SS DRAIN PAN
CONDENSATE DRAIN. REFER TO DRAWINGS FOR
SPECIFIC SIZE.
P/T PLUG (TYP.)
THERMOMETER
PRESSURE GAUGE
P
HOSE END DRAIN
NOTE:
1. ONLY THE 2-WAY VALVE IS TO BE REPLACED. OTHER
EQUIPMENT SHOWN IS EXISTING TO REMAIN.
4" THICK CONCRETE
HOUSEKEEPING PAD
LEVEL GROUT WITH
NON-SHRINKING GROUT
PUMP MOTOR
COUPLING GUARD
BASE MOUNTED PUMP
BALL VALVE (TYP.)
P
PRESSURE GAUGE
DRAIN DOWN VALVE
MANUAL AIR VENT
THERMOMETER (TYP.)
SEE SPEC.
BUTTERFLY VALVE
SILENT CHECK VALVE
FLEXIBLE CONNECTOR
W/ TRUST RODS (TYP.)
SUCTION DIFFUSER
WITH REMOVABLE
CLEANABLE BASKET
STRAINER
1" DIA. ADJUSTABLE
PIPE SUPPORT
GROUT LEVEL
FINISHED GRADE
PT'S PLUG (TYP.)
MOUNTED ON ELASTOMERIC
VIBRATION ISOLATION PADS
1" STAINLESS STEEL
CLIP WITH STAINLESS
STEEL FASTENERS
6" DIA. CHILLED WATER
PIPE
1 1/2" x 1 1/2" x 3/16"
STAINLESS STEEL
ANGLE
WALL
NOTE:
BRACKET SPACING SHALL
BE 6'-0" MAXIMUM
ANCHOR BOLTS
(STAINLESS STEEL)
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2017
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
8/
/2
2:
:2
PM
C :\U se rs
\w ilk
4\ O ne D riv e
- H an so n
Pr of es si on al
S er vi ce s In c\ D oc um en ts
\M
EP
_O C
B
AR
N
ET
T
PA
R K
C H
IL
LE
R R
EP
LA
C
EM
EN
T_
R
_l w ilk
LN
Q G
6.
rv t
2300 Maitland Center Pkwy, Suite Maitland, FL 32751
(321) 788-4906
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
DETAILS
M-601
8/16/2024 21G0138A
LMW
LMW
PLH
ISSUE FOR PERMIT
SCALE:NTS1 AIR SEPARATOR AND EXPANSION TANK DETAIL
SCALE:NTS2 CHEMICAL FILTER FEEDER DETAIL
SCALE:NTS3 CHILLED WATER PIPE STAND DETAIL
SCALE:NTS4 INSULATED PIPE SUPPORT DETAIL
SCALE:NTS5 COOLING COIL CONNECTION (2-WAY VALVE) DETAIL
SCALE:NTS6 BASE MOUNTED END SUCTION PUMP DETAIL
SCALE:NTS7 CHILLED WATER PIPE HANGER DETAIL
This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2017
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
8/
/2
2:
:2
PM
C :\U se rs
\w ilk
4\ O ne D riv e
- H an so n
Pr of es si on al
S er vi ce s In c\ D oc um en ts
\M
EP
_O C
B
AR
N
ET
T
PA
R K
C H
IL
LE
R R
EP
LA
C
EM
EN
T_
R
_l w ilk
LN
Q G
6.
rv t
2300 Maitland Center Pkwy, Suite Maitland, FL 32751
(321) 788-4906
OC Barnett Park Redundant Chiller Replacement
4801 W Colonial Dr, Orlando, FL 32808
SCHEDULES
M-602
8/16/2024 21G0138A
LMW
LMW
PLH
ISSUE FOR PERMIT
1. AIR SEPARATOR TO BE INSULATED WITH 1" THICK ELASTOMERIC INSULATION AND COVERED WITH ALUMINUM JACKETING.
NOTES:
AS-1 CHILLER YARD CENTRIFUGAL CHILLED WATER 5 5 408 1.04 BELL & GOSSETT RL-5F 414 ALL
INLET (IN) OUTLET(IN)
TAG LOCATION TYPE SYSTEM
PIPE CONNECTIONS
FLOW
(GPM)
WPD (FT
WG) MANUFACTURER MODEL UNIT OPERATING
WEIGHT (LBS) NOTES
AIR SEPARATOR (AS)
4. CONTRACTOR TO TEST AND BALANCE TO EXISTING QUANTITIES SHOWN.
3. PROVIDE AEGIS SHAFT GROUNDING RINGS.
2. PROVIDE PREMIUM EFFICENCY, INVERTER DUTY MOTOR, SUITABLE FOR CONTROL BY A VFD.
1. ONE PUMP IS REDUNDANT. ONLY TWO PUMPS SHALL OPERATE AT A TIME
NOTES:
P-3 CHILLED WATER 204 105 73 3 2 10 5/8 7.42 10.0 1,800 208/3 BELL & GOSSETT E-1510 2EB 16 X 42 1/4 413 ALL P-2 CHILLED WATER 204 105 73 3 2 10 5/8 7.42 10.0 1,800 208/3 BELL & GOSSETT E-1510 2EB 16 X 42 1/4 413 ALL P-1 CHILLED WATER 204 105 73 3 2 10 5/8 7.42 10.0 1,800 208/3 BELL & GOSSETT E-1510 2EB 16 X 42 1/4 413 ALL
SUCTION
(IN)
DISCHARGE
(IN) BHP HP RPM VOLT-
PHASE
TAG SERVICE GPM
PUMP FT.
HEAD AT
DESIGN
PUMP EFF
CASING
IMPELLER
(IN)
ELECTRICAL
MANUFACTURER MODEL DIM (IN) WEIGHT
(LBS) NOTES
PUMP SCHEDULE
NOTES: 1. INSULATE WITH 3/4" THICK ELASTOMERIC INSULATION AND COVER WITH ALUMINUM JACKETING
FF-1 NEPTUNE / DBF CHILLER YARD CHILLED WATER 5 10-MICRON FELT BAG 250 150 1
TEMP. (°F) PRESSURE
(PSI)
TAG MANUFACTURER / MODEL LOCATION SYSTEMS SERVED CAPACITY
(GAL) FILTER TYPE
MAX OPERATING
CONDITIONS
NOTES
CHEMICAL BYPASS FILTER / FEEDER SCHEDULE
2. INSULATE WITH 1" THICK ELASTOMERIC INSULATION AND COVER WITH ALUMINUM JACKETING.
1. CONTRACTOR TO ADJUST FACTORY PRE-CHARGE PRESSURE TO SCHEDULED MINIMUM OPERATING PRESSURE PRIOR TO SYSTEM STARTUP. PRV ON MAKEUP WATER SHALL BE SET TO THIS SAME PRESSURE.
NOTES:
ET-1 CHILLER YARD CHILLED WATER 43 24 53 53 12 125 60 90 1 BELL & GOSSETT B200 651 ALL
MIN
(PSIG) MAX (PSIG) FILL
(DEG F)
MAX
(DEG F)
(PSIG)
TAG LOCATION SYSTEM
SERVED
HEIGHT
(IN)
DIA
(IN)
TOTAL
TANK
VOLUME
(GAL)
MINIMUM
ACCEPT
VOLUME
(GAL)
OPERATING
PRESSURE
OPERATING
TEMPERATURE
PVR
SETTING CONNECTION
SIZE MANUFACTURER MODEL UNIT FLOODED
WEIGHT NOTES
EXPANSION TANK SCHEDULE (ET)
3. HIGH VELOCITY WIND-DRIVEN RAIN HURRICANE LOUVER PER AMCA 550.
2. REMOVABLE BIRD-SCREEN INSTALLED ON OUTSIDE OF LOUVER.
1. COLOR - PAINT TO MATCH EXISTING FACADE.
NOTES:
L-1 OUTDOOR AIR 3,765 33 X 72 387 0.05 TYPE 1 RUSKIN ELF6375DXD NOTE 2
SYMBOL SERVICE CFM
SIZE
W x H
(IN.)
FREE
AREA
VEL. FPM
S.P.
IN.
W.C.
FINISH
NOTE 1
MANUFACTU
RER MODEL REMARKS
LOUVER SCHEDULE
2 CONTRACTOR TO RE-BALANCE AHU-1R OUTDOOR AIR FLOW RATE TO SHOWN CFM VALUE.
1. CONTRACTOR TO TEST AND BALANCE EQUIPMENT TO EXISTING WATER FLOW RATE SHOWN.
NOTES:
AHU-2R MECHANCIAL ROOM 1-219 15,500 2,100 2.0 1 DD 15.0 15,500 6 77 620 435 80.0 67.0 54.5 54.0 44.0 56.0 103 3.4 - - - 208/3/60 74.3 125 TRANE PCCA-30 TALL 1 AHU-1R MECHANICAL ROOM 1-112 13,000 3,765 2.0 1 DD 15.0 13,000 6 99 558 373 80.6 67.8 54.6 54.0 44.0 56.0 93 5.3 - - - 208/3/60 74.3 125 TRANE PCCA-30 TALL 1 AHU-2G MECHANCIAL ROOM 2-108 18,260 7,080 2.0 1 AF 20.0 18,260 6 453 925 579 83.0 69.2 53.5 52.6 44.0 56.0 154 - 185 - 3 460/3/60 - - TRANE 1 AHU-1G MECHANICAL ROOM 2-110 4,015 650 1.0 1 AF 5.0 4,015 4 533 117 99 78.6 64.2 55.6 54.3 44.0 56.0 20 - 23 - 3 460/3/60 - - TRANE MCCB040 1
(MBH) (MBH) DB (°F) WB (°F) DB (°F) WB (°F)
SUPPLY AIR
(CFM)
OUTSIDE AIR
(CFM)
ESP (IN
H2O)
NO. OF
FANS FAN TYPE
MOTOR
NAMEPLATE
HP
AIRFLOW
(CFM)
COIL ROWS
(EACH)
COIL FACE
VELOCITY
(FPM)
TOTAL
COOLING
SENSIBLE
COOLING EAT LAT EWT
(°F)
LWT
(°F)
GPM
(EACH)
COIL PD
(FT. H20)
(EACH)
KW VOLT
/PH STEPS V/PH/HZ MCA MOCP
TAG LOCATION
FAN DATA COOLING COIL DATA ELECTRICAL
MANUFACTURER MODEL NOTES
EXISTING INDOOR AIR HANDLING UNIT SCHEDULE
1. REFER TO SPECIFICATION SECTION 230716 AND 230719 FOR MORE INFORMATION
NOTES:
CHILLED WATER PUMP VOLUTE AND COLD SURFACES SHALL BE FULLY INSULATED. 2" THICK CLOSED CELL ELASTOMERIC WITH ALUMINUM JACKET FOR EXTERIOR APPLICATION
CHILLED WATER PUMP(S)
DOMESTIC MAKEUP WATER PIPING, EXTERIOR 1-1/2" THICK CLOSED CELL ELASTOMERIC WITH PVC JACKET FOR INTERIOR PIPING AND ALUMINUM
JACKET FOR EXTERIOR PIPING
POTABLE WATER PIPING
CONDENSATE DRAIN: ALL SIZES 1/2" CLOSED CELL ELASTOMERIC INSULATION SHALL BE FOR FULL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .