Parking Restriping Checklist.docx

DOCX document 24 KB Posted

Attached to
Parking Lot Striping & Crack Filling -Bangor Area - MEARNG
Solicitation number
RFQ - 15A - 26031700000000000235
Issued by
Penobscot County, Maine

About this file

This is a Parking Restriping Checklist and Evaluation of Service Tour form used by the Department of Defense, Veterans and Emergency Management - Military Bureau to assess contractor performance on parking lot restriping and crack filling projects for the Bangor Area Maine Army National Guard (MEARNG) facility. The contractor is responsible for restriping all parking spaces including standard spaces, electric vehicle charging spaces, handicap accessible spaces, motorcycle spaces, and no-parking areas, as well as restriping walkways and covering unused lines with blank paint. The contractor must provide all materials necessary to complete the work and perform all tasks during scheduled times. Evaluation of Service Tours must be conducted within 72 hours of the contractor's notification that work is complete, with the tour confirmed one week in advance. The contractor is required to contact the Program Administrator or designee within 10 days of contract execution to establish a tentative schedule for the work.

The contractor will be given two weeks from the date of the Evaluation Tour to correct any deficiencies identified during the inspection. Failure to complete corrections within this timeframe may result in contract termination with thirty days' notice, and poor performance may be considered in the evaluation of subsequent bids submitted by the contractor. The contractor has fifteen calendar days from the date of termination notification to appeal any contract termination decision to the Director of the Division of Procurement Services. If the contractor fails to contact the Department designee as required or does not attend the scheduled Evaluation of Service Tour, the level of service will be documented by the Department, and the contractor will not be able to dispute the evaluation. The evaluation checklist includes yes/no ratings for general tasks such as material provision, proper space sizing and coloring, symbol usage, crack filling with appropriate materials, and adherence to scheduled work times.

View the file

Other files

File Type Posted
RTI Parking.pdf PDF
rfq260317-0235.pdf PDF
rfq bid sheet - bangor striping and filling.xlsx XLSX spreadsheet
Bldg 255 Parking.pdf PDF
AFRC Parking.pdf PDF
Bangor East Inside Gate Parking.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Defense, Veterans and Emergency Management – Military Bureau Evaluation of Service Tour – Parking Restriping

Date of Tour:

Time:

Location:

Program Administrator/Designee:

Contractor:

Rating: E=Excellent G=Good (Meets Expectations) NI=Needs Improvement N/A = Not Applicable

NOTES:

1. Some tasks may not pertain to some facilities. Place N/A in the notes if not at your facility.

2. Pictures should be taken where they can be and submitted with the form. (If issue is with length/height use a ruler as reference) Instructions for Evaluations

· These tours should happen within 72 hours of when the Contractor indicates work is complete.

· If additional evaluations are deemed necessary, this will be scheduled by the Program Administrator or their designee via written email notification a minimum of three (3) business days prior to requested meeting.

Contractor Performance:

· This Evaluation of Service Tour is to review the completed restriping product and provide acceptance of the completed job.

· This will take place for each location stated in this combined area contract.

· The Contractor is required to email the Program Administrator or their designee within 10 days of official execution of the contract to set up the tentative schedule (see Pre Job Expectations above). Once this schedule is set then a schedule needs to be set for Evaluation of Service tours, these will be scheduled for within 72 hours of when the Contractor thinks the Service will be completed at the specific location.

· Tour will be confirmed a week before taking place

· The tour will be documented using an Evaluation of Service Worksheet that must be signed by the Contractor and the Department’s representative.

· If the Contractor fails to contact the Department designee as required, it will be documented on the Evaluation of Service Worksheet and noted as poor performance.

· If the Contractor fails to attend the scheduled Evaluation of Service Tour, the level of service will be documented by the Department, and the Contractor will not be able to dispute the evaluation.

· This is also the opportunity to develop a “punch list” of any outstanding items, or items that need to be “cleaned up” Contractor Corrections:

· The Contractor will be given two (2) weeks from the date of the Evaluation Tour to correct all issues discovered during the Evaluation of Service Tour.

· If the issues are not resolved during that timeframe the contract could be terminated due to documented poor performance with a thirty (30) day notice.

· Poor performance may be considered in the evaluation of a subsequent bids submitted by the Contractor.

· The Contractor will have fifteen (15) calendar days from the date notified to appeal any termination of contract decision based on the Evaluation of Services Tours.

· The appeal must be addressed to the Director of the Division of Procurement Services.

General

Task
Rating
Notes
Contractor Provided all their own materials to complete the work, including paint
Y or N
All standard size spaces were restriped as required by standards
Y or N
All EV Charging spaces were restriped as required by standards
Y or N
All Handicap Accessible spaces were restriped as required by standards
Y or N
All Motorcycle spaces were restriped as required by standards
Y or N
All no-parking spaces were restriped as required by standards
Y or N
All walkways were restriped as required by standards
Y or N
All lines no longer being used were covered with blank paint
Y or N
All designated spaces were the appropriate size and color, and symbols used
Y or N
All work was performed during scheduled time
Y or N
Were all cracks indicated filled?
Y or N
Was the appropriate material used to fill cracks
Y or N

Evaluation Tour Attendees (must Sign & Date)

Facility Contact_______________________________________________________

DFE Contact__________________________________________________________

Vendor/Provider Contact_______________________________________________ Return completed sheet kenneth.r.merrifield.nfg@army.mil