PARK_IMPROVEMENTS_-_CHARTER_OAK_PARK_WEST_(Addendum_#7_Revision).pdf
PDF 676 KB Posted
- Attached to
- PARK IMPROVEMENTS - CHARTER OAK PARK WEST
- Solicitation number
- 23/24-96
- Issued by
- Hartford County, Connecticut
About this file
This is an Invitation to Bid (ITB) document for the Town of Manchester, Connecticut, for the Park Improvements - Charter Oak Park West project (Bid No. 23/24-96). The project involves constructing a 360' x 240' synthetic turf playing field and a 74-stall bituminous concrete parking lot at 30 Charter Oak Street. Work includes excavation, grading, synthetic turf field installation with resilient pad and field drainage system, bituminous concrete paving, concrete curbs and sidewalks, site lighting, storm drainage systems, timber rail, and turf establishment. The bid includes alternate bid items for LED sports lighting, a CMU block utility building, and aluminum bleachers. Bids are due electronically by June 5, 2024, at 2:00 pm, with a project completion timeline of 150 working days.
The project has several notable financial and compliance requirements. There is a 5% bid bond requirement, and the state-funded portion is estimated at $1,500,000. The bid mandates a minimum of 25% of the state-funded contract be awarded to subcontractors holding current certification from the Connecticut Department of Administrative Services (DAS), including 25% with DAS-certified Small and Minority owned businesses. Bidders must be prequalified by the State of Connecticut with a SITEWORK classification and submit a current DAS Update (Bid) Statement. The town reserves the right to accept or reject any bid and has included specific requirements around worker safety, dust control, utility coordination, and environmental compliance.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
23/24-96
PARK IMPROVEMENTS - CHARTER OAK PARK WEST
Town of Manchester
Lincoln Center
Manchester, CT 06040
RELEASE DATE: April 29, 2024
DEADLINE FOR QUESTIONS: June 3, 2024
RESPONSE DEADLINE: June 5, 2024, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/townofmanchester https://secure.procurenow.com/portal/%7bproject.government.code%7d
Town of Manchester
INVITATION TO BID
23/24-96
PARK IMPROVEMENTS - CHARTER OAK PARK WEST
Table of Contents
1. INTRODUCTION
2. BIDDING REQUIREMENTS
3. STANDARD INSURANCE & INDEMNIFICATION
4. PREVAILING WAGE
5. CHRO PROJECTS
6. GENERAL CONDITIONS FOR ALL PROJECTS
7. PROJECT SPECIFIC REQUIREMENTS
8. PROJECT TECHNICAL SPECIFICATIONS
9. PROJECT PLANS
10. VENDOR SUBMISSIONS
11. FORM OF GENERAL BID
Appendices
A - Technical Specifications
B - Project Plans
C - Town of Manchester Contract (Blank)
D - Town of Manchester Performance Bond
E - Town of Manchester Labor and Materials Payment Bond
G - Town of Manchester 2024 Holiday Calendar
H - Town of Manchester 2024-2025 Working Days Calendar and Reporting Form
I - Town of Manchester Traffic Control Ordinance (2020-01-23)
M - State of CT Prevailing Wage Rates
N - Prevailing Wage Notes and Certification Form (as of 2023-09-27)
Invitation To Bid #23/24-96 Title: PARK IMPROVEMENTS - CHARTER OAK PARK WEST
O - CHRO Contract Language for Municipal Projects
1. INTRODUCTION
1.1. Summary
NOTICE IS HEREBY GIVEN that the Town of Manchester, Connecticut, herein called the Town, acting by and through its Town Manager will receive sealed Bids for project Bid No. 23/24-96 PARK
IMPROVEMENTS - CHARTER OAK PARK WEST. Bids will be accepted via the Town's eProcurement Portal until 2:00 pm on Wednesday, June 5, 2024 at which time and place said bids will be publicly opened and read aloud.
Bids may be submitted prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered.
1.2. Background
Work under this contract includes the construction of a 360' x 240' synthetic turf playing field and a 74-stall bituminous concrete parking lot at 30 Charter Oak Street in Manchester. Work includes excavation;
grading; synthetic turf field installation with resilient pad and field drainage system; bituminous concrete paving; installation of extruded concrete curbs, concrete sidewalks and pads, site lighting, storm drainage systems, timber rail and accessories; turf establishment and other incidental items.
The project includes alternate bid items for the furnishing and installation of LED sports lighting, construction of a 42' x 16' CMU block utility building and the furnishing and installation of aluminum bleachers.
The Project Schedule for this project is projected to be completed within ONE HUNDRED FIFTY (150)
WORKING DAYS (contract days).
1.3. Contact Information
Cora Narracci
Purchasing Agent
494 Main Street
Purchasing Department
Manchester, CT 06040
Email: cnarracci@manchesterct.gov
Phone: (860) 647-3033
Department:
Engineering
Department Head:
Jeff LaMalva
Town Engineer
1.4. Timeline
Advertisement/Release Project Date April 29, 2024 mailto:cnarracci@manchesterct.gov tel:(860)647-3033
Question Submission Deadline June 3, 2024, 4:00pm
Question Response Deadline June 4, 2024, 4:00pm
Bid Opening June 5, 2024, 2:00pm
Join Zoom Meeting https://us06web.zoom.us/j/86288607639?pwd=4 mumg8mrHvaImwxCM5lDqUC4kwL0T2.1
Meeting ID: 862 8860 7639
Passcode: K9jSK8
One tap mobile
+13126266799,,86288607639#,,,,*101945# US
(Chicago)
+16465588656,,86288607639#,,,,*101945# US
(New York)
Dial by your location
• +1 312 626 6799 US (Chicago)
• +1 646 558 8656 US (New York)
• +1 646 931 3860 US
• +1 301 715 8592 US (Washington DC)
• +1 305 224 1968 US
• +1 309 205 3325 US
• +1 689 278 1000 US
• +1 719 359 4580 US
• +1 720 707 2699 US (Denver)
• +1 253 205 0468 US
• +1 253 215 8782 US (Tacoma)
• +1 346 248 7799 US (Houston)
• +1 360 209 5623 US
• +1 386 347 5053 US
• +1 507 473 4847 US
• +1 564 217 2000 US
• +1 669 444 9171 US
Meeting ID: 862 8860 7639
Passcode: 101945
Find your local number:
https://us06web.zoom.us/u/kcigJ4RnIU https://us06web.zoom.us/j/86288607639?pwd=4mumg8mrHvaImwxCM5lDqUC4kwL0T2.1 https://us06web.zoom.us/j/86288607639?pwd=4mumg8mrHvaImwxCM5lDqUC4kwL0T2.1 https://us06web.zoom.us/u/kcigJ4RnIU
2. BIDDING REQUIREMENTS
2.1. RULES AND REGULATIONS FOR COMPETITIVE BIDDING
These rules and regulations have been adopted by the Board of Directors of the Town of Manchester pursuant to Section 5-22 of the Town Charter. They are standard for all competitive bidding proposals issued by the Town of Manchester, Connecticut for contracts of all types where labor, materials and necessary equipment to complete work is to be furnished to the Town, where the Town is to purchase supplies, materials and equipment, where the Town is to sell surplus materials and equipment, or where the Town is to sell real estate. These rules and regulations shall be binding upon all prospective bidders and the Town of Manchester.
GENERAL RULES
1. The Purchasing Authority may delete or modify any of the instructions to bidders herein for a particular proposal, indicating such change in the appropriate section of the bid documents. The
Purchasing Authority may insert special instructions in any special contracts which are subject to competitive bidding.
2. The attached proposal is signed by the bidder with full knowledge of, and agreement with, the general specifications, conditions and requirements of this bid.
3. Where appropriate, return copy of proposal on the enclosed form.
4. Submit proposal via the Town's eProcurement Portal.
5. Proposals received later than 2:00 pm on Wednesday, June 5, 2024 will not be considered.
Amendments to, or withdrawals of bids received later than the time and date set for bid opening will not be considered.
6. All deliveries of commodities or services hereunder shall comply in every respect with all applicable laws of the Federal Government and/or State of Connecticut. Purchases made by the Town of
Manchester are exempt from payment of Federal Excise Taxes and the Connecticut Sales Tax, and such taxes must not be included in bid prices. Federal Excise Tax exemption certificates, if requested, will be furnished.
7. The Bidder, shall submit their itemized pricing via the Town's eProcurement Portal. Bid tabulations are automatically created; however, in the event there is a discrepancy between the unit price and the extension, the unit price will govern.
8. Bidders shall, where applicable, submit terms for payment in spaces provided in the proposal form, showing the amount of cash discount which shall apply to bid prices when paid within the stated number of days in the proposal.
9. All inquiries shall be submitted via the Town's eProcurement Portal, Q&A section. All information given by the Town, except by written addenda, shall be informal and shall not be binding upon the
Town, nor shall it furnish a basis for legal action by any Bidder or prospective Bidder against the Town.
10. A. The Town reserves the right to reject any and all bids, to waive technical defects and to make such awards including accepting a bid, although not the low bid, as it deems in its sole discretion to be in the best interest of the Town. The Town reserves the right to reject any bid if the Bidder, any officer of the
Bidder, or any other company owned in whole or in part by an officer(s) of the Bidder, is delinquent in the payment of any taxes or fees owed to the Town. The Town reserves the right to require a disclosure statement from the Bidder listing the name(s) of all officers of the company.
B. In the event the Town determines that a contractor is delinquent in any payment due the Town, then the Town may offset the delinquent amount due to the Town against the sums owed the contractor.
11. The Town of Manchester may make such investigation as deemed necessary to determine the ability of the Bidder to discharge a contract. The Bidder shall furnish the Town with all such information and data as may be required for that purpose. The Town reserves the right to reject any bid if the Bidder fails to satisfactorily convince the Town that he is properly qualified by experience and facilities to carry out the obligations of the contract and to satisfactorily complete the work called for herein, or if the bid is conditional in nature.
12. Except where otherwise provided, a contract between the Town and a successful Bidder shall consist of the Invitation to Bid, Specifications, Plans, Bid, including Proposal Sheet, and Acceptance by the Town and these Rules and Regulations. Acceptance by the Town may be by purchase order for the portion of the work awarded a contractor.
13. All Invitations to Bid shall be publicly advertised in a newspaper having a general circulation within the Town of Manchester, Connecticut. The last advertising date shall be at least seven (7) calendar days before the date which is advertised for the opening of bids.
14. Copies of all bid documents shall be made available to all interested persons for a fee to be determined by the Purchasing Authority which fee will be refundable at the discretion of the Purchasing
Authority upon return of said documents.
15. Alternate bids shall not be accepted unless otherwise specified in the bid documents.
16. Any act or acts of misrepresentation or collusion shall be a basis for disqualification of any bid or bids submitted by such persons guilty of said misrepresentation or collusion. In the event that the Town enters into a contract with any Bidder who is guilty of misrepresentation or collusion and such conduct is discovered after the execution of said contract, the Town may cancel said contract without incurring liability, penalty or damages.
17. In the event that any Bidder wishes to protest the potential award of a bid or any procedure or act in the advertising or soliciting of bids, said Bidder must make said protest in writing which shall state the reason therefor and request a conference with respect thereto. Said protest must be received by the
Town Purchasing Department within five (5) business days after the Bid Opening.
18. A conference with respect to said protest shall be scheduled by the Purchasing Authority forthwith and shall be attended by the Purchasing Authority or the Purchasing Authority's designee, and such other persons as the Purchasing Authority and the General Manager shall be required to attend. The subject matter of said conference shall be limited to the reasons for the protest specified in the written request for said conference. Said conference shall also include a discussion of all possibilities for a resolution of a dispute. The Town shall make a decision in writing within three (3) business days after said conference and forward the same to the protesting Bidder forthwith.
19. In the event that any protesting Bidder wishes to take legal action against the Town, he must first fully comply with all of these Rules and Regulations, including those which have been charged by the
Purchasing Authority pursuant to paragraph 1 herein.
20. Except for special instructions inserted in special contracts by the Purchasing Authority pursuant to paragraph 1 herein, in the event of any conflicts between these Rules and Regulations and the terms and conditions of any bid document, these Rules and Regulations shall prevail.
21. All awards of Bids shall be made by the Purchasing Authority.
22. These Rules and Regulations, as revised, shall be effective as of June 23, 1993.
Revised:
April 14, 1981
March 13, 1984
August 1, 1989
June 23, 1993
2.2. STANDARD INSTRUCTIONS TO BIDDERS - CONSTRUCTION CONTRACTS
These instructions are standard for all proposals issued by the Town of Manchester, Connecticut, for construction contracts of all types where a contractor is to furnish labor, materials and necessary equipment to complete work as outlined in the Contract Drawings and Specifications. The Town of
Manchester may add to, delete, supersede or modify any of the instructions herein for a particular contract by indicating such changes in the section entitled "Special Instructions to Bidders."
1. Deposit on Contract and Drawings
A non-refundable fee of $10.00 in cash or check payable to the Town of Manchester, Connecticut, shall be required on each paper set of Contract Drawings and Specifications taken.
2. Preparation of Bid
Each bid must be submitted via the Town's eProcurement Portal. All blank spaces for bid prices must be filled in.
3. Conditions of Work
Each bidder must inform himself fully of the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material, equipment, tools, labor and incidentals necessary to carry out the provisions of this
Contract. Insofar as possible the Contractor, in carrying out his Work, must employ such methods or means as will not cause any interruption of or interference with the work of any other contractor.
4. Information Not Guaranteed
All information given in the Contract Drawings and Specifications, or in the other documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures are from the best sources at present available to the Town. All such information is furnished only for the information and convenience of bidders and is not guaranteed.
It is agreed and understood that the Town does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Drawings and Specifications or in the other documents. It is further agreed and understood that no bidder or contractor shall use or be entitled to use any of the information made available to him, or obtained in any examination made by him, in any manner as a basis of or ground for any claim or demand against the Town, arising from or by reason of any variance which may exist between the information made available and the actual subsurface or other conditions, natural phenomena, existing pipes or other structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents.
5. Laws and Regulations
The bidder's attention is directed to the fact that all applicable Federal and State laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full.
6. Obligation of Bidder
At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Drawings and Specifications (including all addenda). The failure or omission of any bidder to examine any form, instrument, or document shall, in no way, relieve any bidder from any obligation in respect to his bid.
7. Addenda and Interpretations
No interpretation of the meaning of the Contract Drawings and Specifications or other pre-bid documents will be made to any bidder orally. All information given to bidders other than by means of the Contract Drawings and Specifications, or by addenda, as described below, is given informally and shall not be used as the basis of a claim against the Town.
Every request for such interpretation should be submitted via the Q&A section of the Town's eProcurement Portal before 4:00 pm on Monday, June 3, 2024. Any and all such interpretations and any supplemental instructions will be in the form of written addenda. For bidders who have purchased paper sets of contract documents from the Purchasing Department, please note that the addenda will only be posted on the Town’s eProcurement Portal. For bidders who obtain the documents from a source other than the Purchasing Department, please note that you must subscribe via the Town’s eProcurement Portal to submit a bid. No other method of bid submission will be accepted.
No addendum will be issued less than three (3) days prior to the date fixed for the opening of bids.
Bidders shall acknowledge each addendum via the City's eProcurement Portal. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.
8. Bid Security
Each bid must be accompanied by a bid bond or bank check, payable to the Town of Manchester for five percent (5%) of the total bid. In the event of a base bid/alternate bid situation, the bid bond will be for five percent (5%) of the base bid. The bond must be furnished by a surety company satisfactory to the
Town and must be a corporate surety licensed to sign surety bonds in the State of Connecticut. The
Town of Manchester will not be liable for the accrual of any interest on any certified check submitted.
Cashiers' checks made payable to the Town of Manchester will be accepted.
9. Security for Faithful Performance
Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this Contract and for the payment of all persons performing labor and materials under this Contract. The Performance Bond and the Labor and Materials
Bond shall be equal to one hundred percent (100%) of the contract price and shall be furnished within ten (10) business days of the Notice of Award or prior to the start of Work, whichever comes first. The surety on such bond or bonds shall be a duly authorized surety company qualified to do business under the laws of the State of Connecticut and satisfactory to the Town.
10. Power of Attorney
Attorneys-in-fact who sign contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.
11. Comparison of Bids
Bids will be compared on the basis of the quantities and unit prices stated in the FORM OF GENERAL
BID.
In the event that there is a discrepancy in the FORM OF GENERAL BID between the unit prices and the extended amount, the unit prices shall govern and the extended amount will be corrected.
The Town agrees to examine and consider each FORM OF GENERAL BID submitted in consideration of the bidder's agreements, as herein-above set forth and as set forth in the FORM OF GENERAL BID.
12. Right To Reject Bid
The Town may consider informal any bid not prepared and submitted in accordance with the provisions hereof, and may waive any informalities or reject any and all bids, should the Town deem it to be in the public interest to do so.
The Town may also reject bids, which in its sole judgment, are either incomplete, conditional, obscure or not responsive, or which contain additions not called for, erasures not properly initialed, alterations, or similar irregularities, or the Town may waive such omissions, conditions or irregularities.
The Town reserves the right to reject all or any part of an unbalanced bid, to eliminate any item or part of an item or increase or decrease quantities as it deems to be in its best interest or may be necessary due to budgetary limitations.
13. Qualifications of Bidder
The Town may make such investigations as it deems necessary to determine the ability of the Bidder to perform the Work, and the Bidder shall furnish to the Town all such information and data for this purpose as the Town may request. The Town reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the Town that such bidder is properly qualified to carry out the obligations of the Contract and to complete the Work contemplated therein, by the date indicated therein for completion. Conditional bids will not be accepted.
14. Ability and Experience of Bidder
No award will be made to any bidder who cannot satisfy the Town that he has sufficient ability and experience in this class of Work and sufficient capital and plant to enable him to prosecute and complete the Work successfully within the time named. The Town's decision or judgment on these matters shall be final, conclusive, and binding. The Town may make such investigations as it deems necessary, and the Bidder shall furnish to the Town, under oath if so required, all such information and data for this purpose as the Town may request. The following objective criteria will be used for evaluating the qualifications of bidders:
The Bidder shall:
a) Have on its payroll or must be able to prove that it customarily employs supervisory personnel of the type qualified to perform the kind of work called for in the bid specifications.
b) Must show or be able to demonstrate (if requested) to the satisfaction of the awarding authority that it possesses the ability and capacity to successfully complete the project through the satisfactory past performance of work of a similar size, scope and comparable dollar value to that of the subject project.
The bidder shall have maintained the level of performances on such similar work continuously during the past three years and if the bidder does not have such three years as called for, then it must include in the Bidders Qualifications all acts which demonstrate the bidder’s ability and capacity to perform the work.
c) Own or possess rented or leased equipment of the type customarily required by contractors in the performance of contract work and that such equipment, if needed, is available for the job bid on.
d) Have purchased materials over the past three years from suppliers who customarily sell same in quantity to contractors.
e) Be financially responsible to perform the work bid on.
f) Be able to furnish references from architects, engineers or owners indicating that it has satisfactorily completed contract work of the nature bid on and in a timely manner, complete with exoneration evidence delays were evident.
g) Have adequate physical facilities in which and from which the work can be performed.
h) Have a record of harmonious relationships with subcontractors on prior State and/or Municipal projects or other projects where the bidder may be requested to demonstrate such harmonious relationships to the satisfaction of the awarding authority. Prompt payment to subcontractors is one factor to be considered by the awarding authority.
i) Have had a good track record of past performance on State and/or Municipal projects as concerns the quantity, timeliness, costs, cooperation and harmonious working relationship.
j) Not have been cited for three or more willful or serious violations of an OSHA or of any standard, order or regulations promulgated pursuant to such Act, during the three-year period preceding the bid, which violations were cited in accordance with the provisions of any State Occupational Safety and
Health Act or the Occupational Safety and Health Act of 1970 and which were not abated within the time fixed by the citation; which citation has not been set aside following appeal to the appropriate agency or court having jurisdiction.
k) Not have received any criminal convictions related to the injury or death of any employee in the three-year period preceding the bid.
15. Equal Opportunity
The Town of Manchester is an equal opportunity employer, and requires an affirmative action policy for all of its contractors and vendors as a condition of doing business with the Town, as per Federal
Executive Order 11246. By signing the Form of General Bid, all vendors and contractors agree to this condition of doing business with the Town and, should the Town choose to audit their compliance, the vendor agrees to cooperate fully.
16. Generic Term - AA-EEO
The Town is an Affirmative Action - Equal Opportunity Employer. The use of the term "he" referring to
Contractor is for convenience only and shall be deemed to include, when used in this document, women-business enterprises, (WBE), corporations, partnerships and sole proprietorships.
17. Non Resident Contractor Bonds and Deposits
In accordance with Connecticut Statutes Section §12-430(7)c, the Town is required to report names of nonresident (out of state) Contractors to the State of Connecticut, Department of Revenue Services
(DRS) to ensure that all applicable business taxes are being paid by Contractors. Upon award of contract in excess of $250,000, all nonresident contractors must furnish proof to the Town that they have obtained current status as a “verified contractor” with DRS.
An “unverified Contractor” with DRS must file a surety bond with DRS in an amount equal to 5% of the contract price. DRS has issued form AU-964, Surety Bond and Release, which must be used to post that bond.
Upon submission of the bond to DRS, the Contractor must promptly furnish to the Town a copy of the
Certificate of Compliance issued by the DRS. If the non-resident contractor fails to submit the bond to
DRS and to provide to the Town a Certificate of Compliance, the Town is required to withhold 5% of the total contract value and deposit it with DRS.
If you have any questions regarding these requirements, contact the State Department of Revenue
Services at telephone number (860) 541-7538 or visit their website at www.ct.gov/drs to obtain necessary publications, forms or information.
http://www.ct.gov/drs
3. STANDARD INSURANCE & INDEMNIFICATION
3.1. GENERAL CONDITIONS:
Within ten (10) business days of the award or notice, or prior to the start of work, whichever comes first, the contractor/insured will provide, pay for, and maintain in full force and affect the insurance outlined here for coverage’s at not less than the prescribed minimum limits of liability. Such coverage is to remain in force during the life of the contract and for such additional time as may be required, and will cover the contractor/ insured’s activities, those of any and all subcontractors, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents or employees.
A. Certificates of Insurance: The contractor/insured will give the owner a certificate of insurance completed by a duly authorized representative of their insurer certifying that at least the minimum coverage’s required here are in effect and specifying that the liability coverage’s are written on an occurrence form and that the coverage’s will not be canceled, non-renewed, or materially changed by endorsement or through issuance of other policy(ies) of insurance without sixty (60) days advance written notice to the General Services Department. Failure of the owner to demand such certificate or other evidence of full compliance with these insurance requirements or failure of the owner to identify a deficiency from evidence provided will not be construed as a waiver of the contractor/insured’s obligation to maintain such insurance. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents or employees.
B. Insurer Qualification: All insurance will be provided through companies authorized to do business in the State of Connecticut and considered acceptable by the owner.
C. Additional Insured: The policy or policies providing insurance as required, with the exception of professional liability and workers’ compensation, will defend and include the owner and owner’s architects, directors, officers, representatives, agents, and employees as additional insureds on a primary and noncontributory basis for work performed under or incidental to this contract.
D. Retroactive Date and Extended Reporting Period: Coverage, whether written on a claims made or occurrence basis, shall be maintained without interruption from the date of commencement of the
Work until date of final payment and then extended for an additional three (3) years from date of final payment.
If any insurance required here is to be issued or renewed on a Claims Made form as opposed to an
Occurrence form, the retroactive Date for coverage will be no later than the commencement date of the project. The Claims Made form will have an Extended Reporting Period of three years from the date of project completion. All Claims made policies cancelled or non-renewed and not replaced by a subsequent claims made policy will have an Extended Reporting period of three years from the date of cancellation or non-renewal.
E. Subcontractors’ Insurance: The contractor/insured will require each subcontractor hired by and/or employed by contractor/insured to purchase and maintain insurance of the types specified below. When requested by the owner, the contractor/insured will furnish copies of certificates of insurance evidencing coverage for each subcontractor.
F. Waiver of Subrogation: The contractor/subcontractor will purchase required insurance policies that shall be endorsed with a waiver of subrogation and all rights of recovery in favor of the Town, its officers, officials, agents and employees. The contractor/insured will require of subcontractors, by appropriate written agreements, similar waivers each in favor of all parties enumerated in this section.
G. Hold Harmless:The contractor/insured shall defend, indemnify and hold harmless the owner, officers, officials, agents and employees, and if applicable, the engineer and their agents and employees from and against all claims, damages, losses and expenses, including attorney’s fees of counsel selected by the owner, arising out of or resulting from the performance of the work and /or the supplying of materials, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting therefrom, and (b) is caused in whole or in part by any negligent act or omission of the contractor/ insured, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not they are caused in part by a party indemnified hereunder.
3.2. INSURANCE LIMITS AND COVERAGE:
A. To the extent applicable, the amounts and types of insurance will conform to the minimum terms, conditions and coverage’s of Insurance Services Office (ISO) policies, forms, and endorsements.
B. If the contractor/insured has self-insured retention’s or deductibles under any of the following minimum required coverage’s, the contractor/insured must identify on the certificate of insurance the nature and amount of such self-insured retention’s or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retention’s or deductibles will be the contractor/ insured’s sole responsibility.
C. Workers’ Compensation Insurance: With respect to all operations the Contractor performs and all those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry, Workers’ Compensation insurance as required by the laws of the State of Connecticut.
Employer’s Liability insurance shall be provided in amounts not less than:
• $500,000 per accident for bodily injury by accident;
• $500,000 policy limit by disease; and
• $500,000 per employee for bodily injury by disease
D. Commercial General Liability Insurance: With respect to the operations the Contractor performs and also those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry, Commercial General Liability insurance, including Contractual Liability, Products and Completed Operations, Broad Form Property Damage and Independent Contractors. See chart below for applicable minimum coverage amounts.
If the Contract amount is between 0 and $2,000,000:
• The Minimum Single Occurrence Amount required is $1,000,000 and the Minimum Annual
Aggregate Amount is $2,000,000
If the Contract amount is between $2,000,000 and $10,000,000:
• The Minimum Single Occurrence Amount required is $2,000,000 and the Minimum Annual
Aggregate Amount is $4,000,000
If the Contract amount is > $10,000,000:
• The Minimum Single Occurrence Amount is $4,000,000 and the Minimum Annual Aggregate
Amount is $8,000,000
Notes:
• If underground work is to be undertaken, each policy shall have coverage for and exclusions removed for “Explosion, Collapse and Underground” (“XCU”).
• Should blasting be required, all necessary permits for the use of explosives shall be obtained by the contractor/insured or insured from the Fire Marshall.
E. Automobile Liability Insurance: The Contractor shall obtain automobile liability insurance covering the operation of all motor vehicles, including those hired or borrowed, that are used in connection with the
Project for all damages arising out of bodily injury to or death of all persons and/or injury to or destruction of property; in any one accident or occurrence. This policy shall not be subject to an annual aggregate limitation. See chart above for applicable minimum coverage amounts.
F. Owner’s and Contractor’s Protective Liability Insurance for and in the Name of the Town and/or State:
With respect to the Contractor’s Project operations and also those of its subcontractors, the Contractor shall carry, for and on behalf of the Town and/or State for each accident or occurrence resulting in damages from bodily injury to or death of persons and/or injury to or destruction of property. See chart below for applicable minimum coverage amounts.
If the Contract amount is between 0 and $2,000,000:
• The Minimum Single Occurrence Amount required is $1,000,000 and the Minimum Annual
Aggregate Amount is $2,000,000
If the Contract amount is between $2,000,000 and $50,000,000:
• The Minimum Single Occurrence Amount required is $2,000,000 and the Minimum Annual
Aggregate Amount is $4,000,000
If the Contract amount is > $50,000,000:
• The Minimum Single Occurrence Amount is $4,000,000 and the Minimum Annual Aggregate
Amount is $8,000,000
G. Excess Coverage:
For contracts valued under $250,000, contractor shall purchase and maintain excess or umbrella liability insurance with a limit of not less than $1,000,000, covering all lines of insurance required by this contract.
For contracts with a value of $250,000 or more, contractor shall purchase and maintain excess or umbrella liability insurance with a limit of not less than $5,000,000, covering all lines of insurance required by this contract.
4. PREVAILING WAGE
4.1. SPECIAL NOTICE
To All State and Political Subdivisions, Their Agents, and Contractors Connecticut General Statute 31-55a
- Annual adjustments to wage rates by contractors doing state work.
Sec. 31-55a. Annual adjustments to wage rates by contractors doing state work. Each contractor that is awarded a contract on or after October 1, 2002, for (1) the construction of a state highway or bridge that falls under the provisions of section 31-54 of the general statutes, or (2) the construction, remodeling, refinishing, refurbishing, rehabilitation, alteration or repair of any public works project that falls under the provisions of section 31-53 of the general statutes shall contact the Labor Commissioner on or before July first of each year, for the duration of such contract, to ascertain the prevailing rate of wages on an hourly basis and the amount of payment or contributions paid or payable on behalf of each mechanic, laborer or worker employed upon the work contracted to be done, and shall make any necessary adjustments to such prevailing rate of wages and such payment or contributions paid or payable on behalf of each such employee, effective each July first.
The prevailing wage rates applicable to any contract or subcontract awarded on or after October 1, 2002 are subject to annual adjustments each July 1st for the duration of any project which was originally advertised for bids on or after October 1, 2002. Each contractor affected by the above requirement shall pay the annual adjusted prevailing wage rate that is in effect each July 1st, as posted by the Department of Labor. It is the contractor’s responsibility to obtain the annual adjusted prevailing wage rate increases directly from the Department of Labor’s Web Site. The annual adjustments will be posted on the
Department of Labor Web page: www.ctdol.state.ct.us. For those without internet access, please contact the division listed below. The Department of Labor will continue to issue the initial prevailing wage rate schedule to the Contracting Agency for the project. All subsequent annual adjustments will be posted on our Web Site for contractor access. Any questions should be directed to the Contract
Compliance Unit, Wage and Workplace Standards Division, Connecticut Department of Labor, 200 Folly
Brook Blvd., Wethersfield, CT 06109 at (860)263-6790.
4.2. Sec. 31-53b.
Construction safety and health course. New miner training program. Proof of completion required for mechanics, laborers and workers on public works projects. Enforcement. Regulations. Exceptions. (a)
Each contract for a public works project entered into on or after July 1, 2009, by the state or any of its agents, or by any political subdivision of the state or any of its agents, described in subsection (g) of section 31-53, shall contain a provision requiring that each contractor furnish proof with the weekly certified payroll form for the first week each employee begins work on such project that any person performing the work of a mechanic, laborer or worker pursuant to the classifications of labor under section 31-53 on such public works project, pursuant to such contract, has completed a course of at least ten hours in duration in construction safety and health approved by the federal Occupational
Safety and Health Administration or, has completed a new miner training program approved by the
Federal Mine Safety and Health Administration in accordance with 30 CFR 48 or, in the case of telecommunications employees, has completed at least ten hours of training in accordance with 29 CFR
1910.268.
(b) Any person required to complete a course or program under subsection (a) of this section who has not completed the course or program shall be subject to removal from the worksite if the person does not provide documentation of having completed such course or program by the fifteenth day after the date the person is found to be in noncompliance. The Labor Commissioner or said commissioner's designee shall enforce this section.
(c) Not later than January 1, 2009, the Labor Commissioner shall adopt regulations, in accordance with the provisions of chapter 54, to implement the provisions of subsections (a) and (b) of this section. Such regulations shall require that the ten-hour construction safety and health courses required under subsection (a) of this section be conducted in accordance with federal Occupational Safety and Health
Administration Training Institute standards, or in accordance with Federal Mine Safety and Health
Administration Standards or in accordance with 29 CFR 1910.268, as appropriate. The Labor
Commissioner shall accept as sufficient proof of compliance with the provisions of subsection (a) or (b) of this section a student course completion card issued by the federal Occupational Safety and Health
Administration Training Institute, or such other proof of compliance said commissioner deems appropriate, dated no earlier than five years before the commencement date of such public works project.
(d) This section shall not apply to employees of public service companies, as defined in section 16-1, or drivers of commercial motor vehicles driving the vehicle on the public works project and delivering or picking up cargo from public works projects provided they perform no labor relating to the project other than the loading and unloading of their cargo.
(P.A. 06-175, S. 1; P.A. 08-83, S. 1.)
History: P.A. 08-83 amended Subsec. (a) by making provisions applicable to public works project contracts entered into on or after July 1, 2009, replacing provision re total cost of work with reference to
Sec. 31-53(g), requiring proof in certified payroll form that new mechanic, laborer or worker has completed a 10-hour or more construction safety course and adding provision re new miner training program, amended Subsec. (b) by substituting "person" for "employee" and adding "or program", amended Subsec. (c) by adding "or in accordance with Federal Mine Safety and Health Administration
Standards" and setting new deadline of January 1, 2009, deleted former Subsec. (d) re "public building", added new Subsec. (d) re exemptions for public service company employees and delivery drivers who perform no labor other than delivery and made conforming and technical changes, effective January 1, 2009.
5. CHRO PROJECTS
5.1. CHRO PROJECTS
This contract is subject to state set-aside and contract compliance requirements. The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5.
State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of
Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g, as amended. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses). The contractor must demonstrate good faith effort to meet the 25% set-aside goals. The State funded portion of this project is estimated at
$1,500,000.
For municipal public works contracts and quasi-public agency projects, the contractor must file a written or electronic non-discrimination certification with the Commission on Human Rights and Opportunities.
Forms can be found at http://www.ct.gov/opm/cwp/view.asp?a=2982&q=390928&opmNav_GID=1806.
All bidders are required to inform themselves fully of the conditions relating to the construction and labor under which the work will be or is now being performed and the contractor shall employ, as far as possible, such methods and means in the carrying out of this work as will not cause interruption or interference with any other contractor.
5.2. DAS PREQUALIFICATION
All bidders must be prequalified by State of Connecticut Department of Administrative Services (DAS).
The DAS prequalification classification SITEWORK is required as a minimum for this project. In accordance with Connecticut General Statute Sections 4a-100, 4b-101 and 4b-91, a responsible bid must contain a current DAS Update (Bid) Statement. FAILURE TO SUBMIT THIS DOCUMENT WITH THE BID
SUBJECTS YOUR BID TO DISQUALIFICATION. If you have any questions regarding these requirements, contact the State of Connecticut DAS, at telephone number 860-713-5280 or visit their website at www.das.ct.gov.
5.3. Non-Discrimination and Affirmative Action Provisions for Municipal Public Works/Quasi-Public Agency Project Contracts
(A)(1) The contractor agrees and warrants that in the performance of the contract such contractor will not discriminate or permit discrimination against any person or group of persons on the grounds of race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, status as a veteran, intellectual disability, mental disability or physical disability, including, but not limited to, blindness, unless it is shown by such contractor that such disability prevents performance of the work involved, in any manner prohibited by the laws of the United States or of the state of
Connecticut; and the contractor further agrees to take affirmative action to ensure that applicants with job-related qualifications are employed and that employees are treated when employed without regard http://www.ct.gov/opm/cwp/view.asp?a=2982&q=390928&opmNav_GID=1806 to their race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, status as a veteran, intellectual disability, mental disability or physical disability, including, but not limited to, blindness, unless it is shown by such contractor that such disability prevents performance of the work involved; (2) The contractor agrees, in all solicitations or advertisements for employees placed by or on behalf of the contractor, to state that it is an “affirmative action-equal opportunity employer” in accordance with regulations adopted by the Commission on Human Rights and Opportunities; (3) The contractor agrees to provide each labor union or representative of workers with which such contractor has a collective bargaining agreement or other contract or understanding and each vendor with which such contractor has a contract or understanding, a notice to be provided by the Commission on Human Rights and Opportunities advising the labor union or workers' representative of the contractor's commitments under this section, and to post copies of the notice in conspicuous places available to employees and applicants for employment; (4) The contractor agrees to comply with each provision of this section and sections 46a-68e and 46a-68f and with each regulation or relevant order issued by said commission pursuant to sections 46a-56, 46a-68e, 46a-68f and 46a-86; and (5) The contractor agrees to provide the Commission on Human Rights and Opportunities with such information requested by the commission, and permit access to pertinent books, records and accounts, concerning the employment practices and procedures of the contractor as relate to the provisions of this section and section 46a-56.
(B) If the contract is a public works contract, municipal public works contract or contract for a quasi-public agency project, the contractor agrees and warrants that he or she will make good faith efforts to employ minority business enterprises as subcontractors and suppliers of materials on such public works or quasi-public agency project.
(C) For the purposes of this section, “contract” includes any extension or modification of the contract, “contractor” includes any successors or assigns of the contractor, “marital status” means being single, married as recognized by the state of Connecticut, widowed, separated or divorced, and “mental disability” means one or more mental disorders, as defined in the most recent edition of the American
Psychiatric Association's “Diagnostic and Statistical Manual of Mental Disorders”, or a record of or regarding a person as having one or more such disorders. For the purposes of this section, “contract” does not include a contract where each contractor is (1) a political subdivision of the state, including, but not limited to, a municipality, unless the contract is a municipal public works contract or quasi-public agency project contract, (2) any other state, as defined in section 1-267, (3) the federal government, (4) a foreign government, or (5) an agency of a subdivision, state or government described in subdivision
(1), (2), (3) or (4) of this subsection.
(D) For the purposes of this section, “minority business enterprise” means any small contractor or supplier of materials fifty-one per cent or more of the capital stock, if any, or assets of which is owned by a person or persons: (1) Who are active in the daily affairs of the enterprise, (2) who have the power to direct the management and policies of the enterprise, and (3) who are members of a minority, as such term is defined in subsection (a) of section 32-9n of the Connecticut General Statutes; and “good faith” means that degree of diligence which a reasonable person would exercise in the performance of legal duties and obligations. “Good faith efforts” shall include, but not be limited to, those reasonable initial efforts necessary to comply with statutory or regulatory requirements and additional or substituted efforts when it is determined that such initial efforts will not be sufficient to comply with such requirements.
(E) The contractor shall develop and maintain adequate documentation, in a manner prescribed by the
Commission on Human Rights and Opportunities, of its good faith efforts.
(F) The contractor shall include the provisions of subsections (a) and (b) of this section in every subcontract or purchase order entered into in order to fulfill any obligation of a contract with the state, and in every subcontract entered into in order to fulfill any obligation of a municipal public works contract or contract for a quasi-public agency project, and such provisions shall be binding on a subcontractor, vendor or manufacturer, unless exempted by regulations or orders of the Commission on
Human Rights and Opportunities. The contractor shall take such action with respect to any such subcontract or purchase order as the commission may direct as a means of enforcing such provisions, including sanctions for noncompliance in accordance with section 46a-56; provided, if such contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the commission regarding a state contract, the contractor may request the state of
Connecticut to enter into any such litigation or negotiation prior thereto to protect the interests of the state and the state may so enter.
6. GENERAL CONDITIONS FOR ALL PROJECTS
6.1. DEFINITIONS
Wherever used in these General Conditions or in the other Contract Documents, the following terms shall have the meanings, which shall be applicable to both the singular and plural thereof:
Bid:The offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the
Work to be performed.
Bidder:Any person, firm or corporation submitting a Bid for the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .