W911RQ-19-R-0009-0001_RFQ_Amendment.pdf

PDF 390 KB Posted

Attached to
RRAD Ball Screw Actuator Test Stand for M269 Rocket Launcher Ballscrew
Solicitation number
PANWRN_19_P_0000_006077
Issued by

About this file

SF 30 Amendment of Solicitation. All offers must acknowledge receipt of this amendment by completing items 8 and 15 of the SF 30. Offers must include this amendment with their quote or the Government may not consider their offer non-responsive.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W45G18902900J1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to change the offer due date and time from 29 Apr 2019 at 1:00 pm to 24 May 2019 at 5:00 pm; add local narratives; add provisions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911RQ19R0009

X 9B. DATED (SEE ITEM 11)

28-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Apr-2019

CODE

RED RIVER ARMY DEPOT

DIRECTORATE FOR CONTRACTING

100 JAMES CARLOW DRIVE BLDG 431

TEXARKANA TX 75501-5000

W911RQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911RQ19R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 29-Apr-2019 01:00 PM to 24-May-2019 05:00 PM.

The following have been added by reference:

52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.228-5 Insurance - Work On A Government Installation JAN 1997

The following have been added by full text:

LOCAL NARRATIVES

INSURANCE (Fixed Price Contract)

Pursuant to the requirements of the contract clause titled "Insurance-Work on a Government Installation", the contractor shall obtain and maintain at least the following kinds of insurance and minimum liability coverage during any period of contract performance:

a. Workmen's Compensation and occupational disease coverage as required by law except that, if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen's Compensation Insurance shall extend to cover employers' liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.

b. Comprehensive General Liability Insurance in the minimum limit of $500,000 per occurrence for bodily injury liability.

c. Comprehensive Automotive Liability Insurance with minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury, and a minimum limit of $20,000 per occurrence for property damage.

ENVIRONMENTAL MANAGEMENT SYSTEM

(a) RRAD has implemented an Environmental Management System (EMS), which is based on ISO-14001, and is concerned about environmental issues. RRAD desires to conduct its business operations in an environmentally sound manner. Relevant significant aspects will be communicated to contractors (including those used for outsourcing) and suppliers through the solicitation package where applicable. RRAD expects its suppliers and contractors to provide, at the same quality and price, products and services that have the least environmental consequence of all available options.

(b) Wherever possible, where a supplier’s product is causing a significant environmental aspect at RRAD, RRAD will communicate to that supplier that they should select the available option that minimizes the potential environmental impact of that product. Any contractor with plans to be working six months or longer at RRAD must receive EMS awareness training and information on operational controls where applicable. This training is thirty minutes in duration and will be provided by RRAD. A copy of the RRAD Environmental Policy can be viewed on the Depot Website via the Internet.

ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.

(c) For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.

ROUTINE UNESCORTED ACCESS CREDENTIAL REQUIREMENTS

(a) In accordance with Department of Defense (DoD) and Army policies governing Physical Access Control, all unescorted persons who require routine access to Red River Army Depot (RRAD) (includes stand-alone facilities) must have a valid purpose to enter, have their identity proofed and vetted by RRAD, and be issued, or in possession of an authorized and valid access credential. Persons possessing a DoD-issued Common Access Card (CAC) are vetted to DoD personnel security standards and shall be considered identity proofed. Non-Federal Government and Non-DoD issued cardholders who require routine unescorted access shall require identity proofing and vetting to determine fitness and eligibility for access.

(b) The National Crime Information Center (NCIC) Database is the Government's authoritative data source for vetting the claimed identity and to determine fitness, using biographical information including, but not limited to, the person's name, date of birth, and social security number. Persons requesting access to RRAD who are not in possession of an approved Government-issued identification card shall be required to provide one of the documents listed below in order to initiate the proofing and vetting requirements. Authorized documents are:

(1) US Passport or US Passport Card

(2) Permanent Resident Card or Alien Registration receipt Card (INS Form I-551)

(3) Foreign Passport with temporary (I-551) stamp or temporary (I-551) printed notation on a machine readable immigrant visa

(4) Foreign passport with current arrival-departure record (INS Form I-94)

(5) Employment authorization document that contains a photograph (INS Form I-766)

(6) Driver's License or Identification Card issued by a state or outlying possession of the United States, provided it contains a photograph and biometric information such as name, DOB, gender, height, eye color, and address

(7) Identification Card issued by Federal, State, or local Government Agency, provided it contains a photograph and biometric information

(8) School Identification Card with Photograph

(9) US Military Draft Record

(10) US Coast Guard Merchant Mariner Card

(11) Transportation Workers Identification Credential (TWIC)

(12) Native American Tribal Document

SECURITY REGULATIONS

(a) All contractors, subcontractors, and their employees are responsible for complying with the following regulations:

(1) Items forbidden on the depot include "strike anywhere" matches, alcoholic beverages, narcotics, photographic equipment, unauthorized tools, firearms, explosives and illegal knives (stilettos, switchblades, hook blades, and blades over three inches in length).

(2) Personnel will not retain passes and badges upon job completion or termination, enter depot in an intoxicated condition, fight, gamble, picket, or create a disturbance. Failure to return badges will cost your firm $50.00 per badge.

(3) Contractor will ensure that all contractor employees comply with all applicable fire, safety, and security requirements and adhere to all applicable state and federal labor laws and regulations.

(b) General Instructions:

(1) All depot traffic regulations will be observed.

(2) Predetermined work routes will be followed with no deviation.

(3) All personal vehicles and containers are subject to search and confiscation of unauthorized items while on the depot (with or without presence of owner).

(4) Notorious misconduct off the depot may be sufficient grounds for denying entrance to the depot.

(5) POV'S must have a minimum insurance coverage and state inspection sticker, in accordance with Texas State Laws.

(6) All personnel will adhere to all depot fire, safety, security, and other applicable regulations.

(7) Vehicles owned by commercial firms or common carriers must display a magnetic or other type sign/placard, visible on both sides of the vehicle.

(8) All commercial carriers will enter the depot through the Commercial Motor Vehicle Access Control Point (CVO ACP).

SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

(a) The contractor shall furnish all personnel and material necessary for the prevention of accidents, injury, or damage to employees or equipment while operating on a Federal reservation. Also includes personnel and equipment necessary for the prevention of accidental damage to Government property, Federal employees or other U.S. Government contractor personnel.

(b) The contractor and his employees to include subcontractors and their employees, will comply with all Federal, state and local laws pertaining to traffic safety and safety of public rights of way. In addition, the contractor or his authorized agent will comply with the Occupational Safety and Health Act Parts 1910 and 1926, the U.S. Army Engineer Manual 385-1-1, Army Regulations, Red River Regulations 385-1, and the Uniform Code of Traffic Control Devices.

(c) Each contractor shall have a written contractors safety program and policy. In cases where the subcontractor has a written regulation for its employees, a copy of that regulation will be forwarded to the contractor for forwarding to the Contracting Officer, prior to commencement of work.

(d) Subcontractors and Employees. Each subcontractor shall be considered a contractor employee for purposes of this section.

(e) Warning signs, barricades, and detours. The contractor shall furnish and erect adequate warning signs, flashing lights, and barricades to properly control traffic movements around or through the construction site. The contractor shall provide and maintain any detours or crossovers necessary for the safety and convenience of traffic.

(f) Contractor and Employee Vehicles. Contractor vehicles must meet with current state safety regulations and an appropriate sticker affixed in the lower left corner of the windshield. Vehicles not meeting the state safety codes will not be allowed on RRAD. Those which have a safety inspection expire while on RRAD will be removed and properly recertified NLT 15 days prior to the expiration date. Vehicles found to be out of inspection date will be ordered off of the depot and the contractor decal removed. Vehicles found by RRAD Safety personnel to be unsafe for RRAD operations will be brought to the attention of the contractor who will either repair the vehicle or remove it.

(g) Contractors are responsible for their employees' conduct and their vehicles. Employees with unsafe vehicles will be required to remove them from RRAD until they can be repaired.

(h) Accidents, other than minor first aid injuries, should be reported to the COR and/or Contract Administrator who will inform Safety as appropriate. These are reportable on a Department of Army Form 285 when they occur on U.S.

Federal property. .

(i) The Contracting Officer will notify the contractor in writing of any observed non-compliance with the foregoing provisions. The contractor shall, after receipt of such notice, immediately take corrective action. The Safety Manager may make direct contact with a contractor or his authorized representative for conditions of imminent danger to life or U.S. Government property. In such cases, the Contracting Officer will be immediately notified. In cases which have the potential for embarrassment to the U.S. Government, or Red River Army Depot, the Contracting Officer will notify the contractor verbally to be followed up by a written report of the situation and the action to be taken to correct it. If the contractor fails or refuses to promptly take corrective action, the Contracting Officer will issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders will be made the subject of a claim for extension of time or for excess costs or damages by the contractor unless it was later determined that the contractor was in compliance.

52.237-1 SITE VISIT (APR 1984)

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

(End of provision)

(End of Summary of Changes)