DRAFT DRAWING - NOT FINAL DESIGN - Rogue River South Jetty Partial Repair 2025.pdf
PDF 5 MB Posted
- Attached to
- Rogue River South Jetty Partial Repair 2025
- Solicitation number
- PANNWD2002246
About this file
These draft engineering drawings detail a partial repair project for the Rogue River South Jetty located in Gold Beach, Oregon. The technical drawings (sheets G-001 through LS101) specify a comprehensive jetty stone repair and reconstruction effort spanning approximately 260-420 linear feet, with mandatory and optional repair zones between stations 7+60 and 10+30. The repair scope includes excavating and resetting the jetty stone cross-section, installing new armor and core layers, placing toe stone, and implementing specific construction techniques to address channel-side damage.
The drawings provide detailed engineering specifications, including cross-sections showing existing and proposed grade elevations, stone placement guidelines, and construction methodology. The project includes mandatory repairs from 8+20 to 9+80 with 50-foot buffers, optional repairs from 7+60 to 8+20 and 9+80 to 10+30, and site restoration requirements. Technical specifications indicate design stone with a W50 of 18 tons and minimum density of 170 pcf, with repairs expected to be executed between August 2025 and January 2026 by the U.S. Army Corps of Engineers Portland District.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought - Rogue River South Jetty Partial Repair 2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
PORTLAND DISTRICT
ROGUE RIVER
SOUTH JETTY
EXPEDITED REPAIR
US Army Corps of Engineers ®
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
JE
R
EM
Y
S.
A
PP
T, P E
SI
TE
A C
C
ES
S
PL
AN
C
O
VE
R S
H
EE
T
AN
D
G-001
ACTION KEY DEFINITIONS
DRAWING IS OBSOLETE AT THE COMPLETION OF THIS CONTRACT 1
DRAWING SHALL BE UPDATED AT THE COMPLETION OF THIS CONTRACT 2
DRAWING WILL BE SUPERCEDED BY THE FOLLOWING DRAWINGS AT THE COMPLETION OF THIS
CONTRACT
DRAWING WAS REFERENCED BY THE FOLLOWING CONTRACT DRAWINGS 4
DRAWING IS FOR REFERENCE ONLY 5
THIS PROJECT WAS DESIGNED BY THE PORTLAND DISTRICT OF THE U.S. ARMY CORPS OF
ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF
INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR
EMPLOYMENT AS REQUIRED BY ER 110-1-8152.
RYAN SOUDERS, P.E.
CHIEF, DESIGN BRANCH
PATRICK L. DUYCK, P.E.
CHIEF, ENGINEERING & CONSTRUCTION DIVISION
LARRY D. CASWELL, JR. P.E., PMP
COLONEL, CORPS OF ENGINEERS DISTRICT COMMANDER
NORTH JETTY
SOUTH JETTY
ROGUE RIVER
DOYLE POINT
JETTY ROAD
GOLD BEACH MUNICIPAL AIRPORT
SITE MAP N
0 500' 1000'
INDEX OF CONTRACT DRAWINGS
REVISION
MARK FILE NAME SHEET ID DRAWING TITLES
SHEET
ACTION
NO.
GENERAL
ROG-1.100_General_Sheets-G-001 G-001 COVER SHEET AND SITE ACCESS
PLAN 5
ROG-1.100_General_Sheets-G-002 G-002 LEGEND, ABBREVIATION, AND
MAPS 5
ROG-1.100_General_Sheets-G-003 G-003 SURVEY CONTROL 5
ROG-1.100_General_Sheets-G-004 G-004 STAGING PLAN 2
CIVIL
ROG-1.100_Civil_Site_Sheets-C-101 C-101 SITE PLAN 7+60 TO 10+30 2
ROG-1.100_Civil_Cross_Section_Sheets_C-301 C-301
CROSS SECTION (OPTION 1)
ROG-1.100_Civil_Cross_Section_Sheets_C-302 C-302 CROSS SECTION (MANDATORY) 2
ROG-1.100_Civil_Cross_Section_Sheets_C-303 C-303 CROSS SECTIONS (OPTION 2) 2
ROG-1.100_Details Sheets - C-501 C-501 DETAILS 2
ROG-1.100_Details Sheets - C-502 C-502 DETAILS 2
SITE RESTORATION
ROG-1.100_Site_Restoration_Sheets LS 101 SITE RESTORATION 2
SITE ACCESS ROAD
HARBOR W
AY
S. JETTY ROAD
OCEANSIDE DR.
DRAFT
NORTH JETTY
SOUTH JETTY
P A C I F I CO C E A N
WEDDERBURN
GOLD BEACH
ROGUE RIVERDOYLE POINT
OREGON
GOLD BEACH
BREAKWATER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
JE
R
EM
Y
S.
A
PP
T, P E
LE
G
EN
D
, A
BB
R
EV
IA
TI
O N
, A N
D M
AP
S
G-002
GENERAL LEGEND
C102
DETAIL AND PAGE LOCATION
PROJECT BOUNDARY
MATCHLINE
JETTY STORE
PROPERTY LINE
ABBREVIATIONS
BMP BEST MANAGEMENT PRACTICE
CO CONTRACTING OFFICER
EG EXISTING GRADE, NAVD88
EL ELEVATION
EX EXISTING
FG FINISHED GRADE, NAVD88
FNC FEDERAL NAVIGATION CHANNELS
FT FOOT/FEET
GQAR GOVERNMENT QUALITY ASSURANCE REPRESENTATIVE
H HORIZONTAL
HAT HIGHEST ASTRONOMICAL TIDE
HWY HIGHWAY
L LEFT
MAX MAXIMUM
MDAR MATERIAL DELIVERY ACCESS ROAD
MHHT MEAN HIGHER HIGH TIDE
MHHW MEAN HIGHER HIGH WATER
MHW MEAN HIGH WATER
MIN MINIMUM
MLLW MEAN LOWER LOW WATER
N NORTH
NAD83 NORTH AMERICA DATUM OF 1983
NAVD88 NORTH AMERICA VERTICAL DATUM OF 1988
NTS NOT TO SCALE
R RIGHT
RD ROAD
STA STATION
TYP TYPICAL
USACE US ARMY CORPS OF ENGINEERS
V VERTICAL
W/ WITH
DISTRICT BOUNDARY MAP
PROJECT
LOCATION
NTS
LOCAL VICINITY MAP
NTS
N
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
JE
R
EM
Y
S.
A
PP
T, P E
SU
R
VE
Y
C O
N
TR
O L
G-003
SURVEY CONTROL POINT
NAME NORTHING EASTING ELEVATION (NAVD88)
MRN_BASE_R 299671.59 3861145.28 23.24
BRUSHY AZ AK 300763.99 3865061.12 69.51
P 466 295182.71 3862577.14 54.32
SURVEY GENERAL NOTES
BATHYMETRY
CONTRACT NO. W9127N19D0001
TASK ORDER NO. W9127N24F0062
1. DATASOURCES, SURVEY METHODOLOGY, AND INSTRUMENTATION
A. AERIAL IMAGERY AND LIDAR WITH SUPPORTING AIRBORNE GNSS/IMU DATA WAS ACQUIRED.
AERIAL IMAGERY WAS AQUIRED NOVEMBERS, 2024 WITH TIDES AT +4.75 FOOT MLLW. AERIAL
LIDAR WAS AQUIRED OCTOBER 24, 2024 AT +4.16 FOOT MLLW.
B. THE PROJECT SURVEY CONTROL WAS ESTABLISHED USING POST-PHOTO ID FEATURES AND
TARGETS AS PLANNED BY GEOTERRA.
C. IMAGERY FLIGHT PLANNING WAS DEVELOPED USING TRACK'AIR SOFTWARE WITH A DEM
SURFACE TO ACQUIRE 3-BAND NATURAL COLOR (RGB) ACROSS THE 230 AC. PROJECT SITE
PER USACE PROVIDED BOUNDARY.
i. GROUND SAMPLING DISTANCE (GSD): 3 CM
ii. BANDS/BITS: 3-BAND RGB/8-BIT PER BAND
iii. FLIGHT LINES: 3
iv. SUN ANGLE: 25-27 DEGREES
v. ALTITUDE: 1655 AMSL
D. AERIAL TRIANGULATION (AT) WAS PERFORMED ON THE STEREO IMAGERY USING TRIMBLE
INPHO MATCH-AT SOFTWARE.
E. ALL 3-BAND, 8-BIT/BAND IMAGES PROCESSED IN THE AT SOLUTION WERE UTILIZED BY THE
TRIMBLE INPHO MATCHT-DSM SOFTWARE TO CREATE AND AUTOMATICALLY DERIVED POINT
CLOUD.
2. PROJECT COORDINATE SYSTEM AND DATUMS
A. COORDINATE SYSTEM: OREGON STATE PLANE, SOUTH ZONE
B. HORIZONTAL DATUM: NAD83 (2011)
C. VERTICAL DATUM: NAVD88
D. GEOID: GEOID 12B
E. UNITS: INTERNATIONAL FEET
N
0 500' 1000'
1" = 500'
SURVEY CONTROL POINT MAP
MRN_BASE_R
BRUSHY AZ MK
P 466
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
JE
R
EM
Y
S.
A
PP
T, P E
ST
AG
IN
G
P
LA
N
G-004
1" = 40'
STAGING PLAN
CONSTRUCTION ACCESS VIA OCEANSIDE DR
N
40' 80'0
PACIFIC OCEAN
STAGING AREA
ROGUE RIVER
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
EROSION CONTROL NOTES:
1. EROSION CONTROL MEASURED IDENTIFIED ON PLANS REPRESENT A POSSIBLE COURSE OF
ACTION. THE CONTRACTOR IS RESPONSIBLE FOR ADHERENCE TO ENVIRONMENTAL PERMITS
AND MUST SUBMIT AN EROSION CONTROL PLAN (ESCP) PER SPECIFICATION 01 57 19.00 25
TEMPORARY ENVIRONMENTAL CONTROLS.
2. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION
ACTIVITIES, INCLUDING MOBILIZATION.
3. SILT FENCE NOT TO BE INSTALLED BELOW MHHW.
LEGEND:
STAGING AREA
EL
EV
AT
IO
N
STATION
JETTY REHAB CENTERLINE
STA 7+00 TO 11+00
7+007+207+407+607+808+008+208+408+608+809+009+209+409+609+8010+0010+2010+4010+6010+8011+00
EL
EV
AT
IO
N
STATION
JETTY REHAB CENTERLINE
STA 7+00 TO 11+00
7+007+207+407+607+808+008+208+408+608+809+009+209+409+609+8010+0010+2010+4010+6010+8011+00
7+008+009+0010+0011+00
OPTION 2
STA 9+50 TO 10+30
MANDATORY
STA 8+50 TO 9+50
OPTION 1
STA 7+60 TO 8+50
7+008+009+0010+0011+00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
BR
AD
G
IL
LI
N
, P E
BR
AD
G
IL
LI
N
, P E
JE
R
EM
Y
S.
A
PP
T, P E
7+
T O
0+
SI
TE
P
LA
N
C-101
20' 40'0
SCALE: 1" = 20'
JETTY IMPROVEMENTS
N
CIVIL NOTES:
1. SEE SHEET C-301 TO C-303 FOR LOCATION OF CROSS SECTIONS.
2. TRANSITION FROM REPAIR AREA TO EXISTING CONDITION WITHIN 50 FEET OF
THE END OF THE REPAIR AREA.
REHAB CENTERLINE
EXISTING GRADE AT
REHAB CENTERLINE
H: 1" = 20' V:1" = 5'
PROFILE - REHAB CENTERLINE STA 7+60 TO 10+30
REPAIR DEPTH TABLE
NO. MINIMUM DEPTH MAXIMUM DEPTH COLOR
1 0 1
2 1 2
3 2 5
4 5 10
OPTION 1
STA 7+60 TO 8+50
MANDATORY
STA 8+50 TO 9+50
OPTION 2
STA 9+50 TO 10+30
LEGEND:
RECONSTRUCTION
AT
IO
N (N
AV
D
7+80
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
7+60
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
8+20
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
8+00
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
8+40
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
8+50
-20
-10
-20
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
J.
A
PP
T, P E
7+
T O
+5
O
PT
IO
N
C R
O
SS
S
EC
TI
O
N S
C-301
CIVIL CROSS SECTION NOTES:
1. JETTY NEAT LINE SHOWN FOR RECONSTRUCTION AND REPAIR WORK.
2. RECONSTRUCTION HATCH SHOWN TO ILLUSTRATE LOCATION OF RECONSTRUCTION NEEDED.
3. REPAIR OR RECONSTRUCT TO DEPTH SHOWN OR TO COMPETENT ROCK.
4. SEE SHEET C-101 FOR LOCATION OF CROSS SECTIONS.
5. RECONSTRUCTION ASSUMED TO BE ONE LAYER THICK, UNLESS ELEVATION NOTED ON CROSS
SECTION. C.O.R. TO CONFIRM IF ADDITIONAL LAYERS NEED TO BE CONSTRUCTED.
20' 40'0SCALE: 1" = 20'
CROSS SECTION (OPTION 1) 7+60 TO 8+50
2024 EXISTING GRADE, TYP.
REPAIR TEMPLATE, TYP.
REPAIR TEMPLATE
(2-FOOT OFFSET), TYP.
EL. 18.46'
EL. 18.46'EL. 18.46'
EL. 18.46'EL. 18.46'
EL. 18.46'
INSTALL ARMOR LAYER
INSTALL CORE LAYER
RECONSTRUCTION OF
ARMOR STONE
LEGEND:
AT
IO
N (N
AV
D
8+70
-20
-10
-20
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
8+50
-20
-10
-20
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
9+10
-20
-10
-20
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
8+90
-20
-10
-20
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
9+30
-20
-10
-20
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
9+50
-20
-10
-20
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
J.
A
PP
T, P E
8+
T O
+5
M
AN
D
AT
O
R Y
C R
O
SS
S
EC
TI
O
N S
C-302
CIVIL CROSS SECTION NOTES:
1. JETTY NEAT LINE SHOWN FOR RECONSTRUCTION AND REPAIR WORK.
2. RECONSTRUCTION HATCH SHOWN TO ILLUSTRATE LOCATION OF RECONSTRUCTION NEEDED.
3. REPAIR OR RECONSTRUCT TO DEPTH SHOWN OR TO COMPETENT ROCK.
4. SEE SHEET C-101 FOR LOCATION OF CROSS SECTIONS.
5. RECONSTRUCTION ASSUMED TO BE ONE LAYER THICK, UNLESS ELEVATION NOTED ON
CROSS SECTION. C.O.R. TO CONFIRM IF ADDITIONAL LAYERS NEED TO BE CONSTRUCTED.
20' 40'0SCALE: 1" = 20'
CROSS SECTION (MANDATORY) 8+50 TO 9+50
2024 EXISTING GRADE, TYP.
REPAIR
TEMPLATE, TYP.
REPAIR TEMPLATE
(2-FOOT OFFSET), TYP.
EL. 18.46'
EL. 18.46'
EL. 18.46'
EL. 18.46'EL. 18.46'
EL. 18.46'
EL. 8.00' EL. 8.00'
EL. 8.00'EL. 8.00'
EL. 8.00'
EL. 8.00'
EL. -5.00' EL. -5.00'
EL. -5.00'EL. -5.00'
EL. -5.00' EL. -5.00'
INSTALL ARMOR LAYER
INSTALL CORE LAYER
LEGEND:
EL. -5.00'EL. -5.00'
EL. -5.00'
EL. -5.00' EL. -5.00'
EL. -5.00'
AT
IO
N (N
AV
D
9+70
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
9+50
-20
-10
-20
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
10+10
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
9+90
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EL
EV
AT
IO
N (N
AV
D
10+30
-10
-10
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
J.
A
PP
T, P E
9+
T O
0+
O
PT
IO
N
C R
O
SS
S
EC
TI
O
N S
C-303
CIVIL CROSS SECTION NOTES:
1. JETTY NEAT LINE SHOWN FOR RECONSTRUCTION AND REPAIR WORK.
2. RECONSTRUCTION HATCH SHOWN TO ILLUSTRATE LOCATION OF RECONSTRUCTION NEEDED.
3. REPAIR OR RECONSTRUCT TO DEPTH SHOWN OR TO COMPETENT ROCK.
4. SEE SHEET C-101 FOR LOCATION OF CROSS SECTIONS.
5. RECONSTRUCTION ASSUMED TO BE ONE LAYER THICK, UNLESS ELEVATION NOTED ON CROSS
SECTION. C.O.R. TO CONFIRM IF ADDITIONAL LAYERS NEED TO BE CONSTRUCTED.
20' 40'0SCALE: 1" = 20'
CROSS SECTION (OPTION 2) 9+50 TO 10+30
2024 EXISTING GRADE, TYP.
REPAIR
TEMPLATE, TYP.
REPAIR TEMPLATE
(2-FOOT OFFSET), TYP.
EL. 18.46'
EL. 18.46'
EL. 18.46'
EL. 18.46'EL. 18.46'
INSTALL ARMOR LAYER
INSTALL CORE LAYER
LEGEND:
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
A.
G R
AN
AD
O S, P E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
J.
A
PP
T, P E
D
ET
AI
LS
C-501
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
A.
G R
AN
AD
O S, P E
I.
SI
N
KU
S, E
IT
B.
G
IL
LI
N , P
E
J.
A
PP
T, P E
D
ET
AI
LS
C-502
NOTES:
1. PRIOR TO TOE STONE PLACEMENT, EXCAVATE THE EXISTING BEACH TERRAIN TO ELEVATIONS SHOWN ON SHEETS
C-301 THROUGH C-302 OR UNTIL EXISTING JETTY STONE IS ENCOUNTERED.
2. PLACE 24 INCHES OF BEDDING MATERIAL (CLASS 50 RIPRAP) WHERE RELIC STONE IS NOT PRESENT.
3. PLACE STONE TO MINIMIZE VOIDS AND PROVIDE MAXIMUM STONE-TO-STONE CONTACT.
4. DRAWINGS ARE NOT DRAWN TO SCALE.
JETTY CREST - 26'
EXISTING JETTY STONE TO BE
REUSED VIA CONSTRUCTION, TYP.
NEW STONE, TYP.
NEW STONE, TYP.
CHANNEL-SIDE (NORTH)
TOE STONE
NEW STONE (TYP.)
REWORKED JETTY
STONE, TYP.
EXISTING GRADE
STONE 1
REUSED OR REWORKED STONE
ARMOR LAYER
TOE STONE
BEDDING MATERIAL
EXISTING JETTY STONE
TO BE REWORKED, TYP.
EXISTING JETTY STONE
TO REMAIN, TYP.
EXISTING GRADE
REPAIR TEMPLATE,
SHOWN FOR CLARITY
REPAIR TEMPLATE
NEW ARMOR STONE, TYP.
EXISTING GRADE
EXISTING JETTY STONE
TO REMAIN, TYP.
NEW AND RECONSTRUCTED
ARMOR STONE
REWORKED RELIC
CORE AND ARMOR STONE
EX
C
AV
AT
IO
N
D
EP
TH
SE
E
N O
TE
EXISTING BEACH TERRAIN
FG = 18.46' (NAVD88)
TYPICAL JETTY REPAIR CROSS SECTION
D12
TYPICAL JETTY REPAIR (OCEAN SIDE) TOE DETAIL
J12
TYPICAL TOE, SLOPE AND CREST STONE PLACEMENT
REPAIR TEMPLATE
REPAIR TEMPLATE
LEGEND
EXISTING GRADE
FG = 0' (NAVD88)
MHHW = 6.87' (NAVD88)
MSL = 3.62' (NAVD88)
MLLW = -0.29' (NAVD88)
NTS
NTS
STONE 1
EXCAVATED VOLUME
NTS
STONE 7
STONE 8
A3
STONE 3
STONE 7
STONE 8
OCEAN-SIDE (SOUTH)
BEDDING MATERIAL,
SEE NOTE 2
REWORKED JETTY STONE (TYP.)
STONE 10
STONE 10
STONE 11
STONE 11
STONE 15
BEDDING MATERIAL,
SEE NOTE 2
STONE
STONE
STONE
STONE
STONE
STONE
13 STONE
STONE
STONE
STONE
STONE
STONE
STONE
STONE
STONE
STONE
STONE
STONE
REWORKED JETTY
STONE, EXISTING GRADE
REPLACE EXCAVATED SAND AFTER
FINISHED TOE CONSTRUCTION
STONE LONG DIMENSION SHOULD BE
PERPENDICULAR TO REPAIR TEMPLATE, TYP.DRAFT
3+
4+
5+
6+
7+
8+
9+
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
-A pr -2 g
2e cd im s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
A.
G
R
AN
AD
O
S, P
E
I.
SI
N
KU
S, P
E
B.
G
IL
LI
N , P
E
J.
A
PP
T, P E
SI
TE
R
ES
TO
R
AT
IO
N
LS101
40' 80'0
SCALE: 1" = 40'
SITE RESTORATION
N
SITE RESTORATION NOTES:
1. RESTORE DISTURBED AREAS PER SPEC 32 90 00.00 25 "SITE RESTORATION".
2. ANY DAMAGED PAVEMENT WILL BE AT THE CONTRACTOR'S FULL EXPENSE, REPAIRED TO
PRE-CONSTRUCTION CONDITIONS OR BETTER AFTER ALL OTHER PHYSICAL WORK IS
COMPLETE, BUT PRIOR TO THE CONTRACT END DATE.
3. AFTER DEMOBILIZATION, REPAIR GRAVEL ROADS. FILL IN POTHOLES AND RUTS. PROVIDE
4% CROSS SLOPE TO PREVENT POTHOLES. ADD 2 INCHES OF SURFACE AGGREGATE ON
TOP OF ROCK USED FOR CONSTRUCTION ACCESS. INSTALL 3/4"-0 SURFACE AGGREGATE
IN ACCORDANCE WITH ODOT MATERIAL AND COMPACTION REQUIREMENTS. REMOVE
ANY CONSTRUCTION ACCESS MATERIAL PLACED OUTSIDE THE EXISTING GRAVEL ROADS.
4. PLANT SHRUBS WITH A DENSITY OF 1 PLANT PER 180 SY. 70% OF SHRUBS TO BE COYOTE
BRUSH (BACCHARIS PILULARIS), AND 30% TO BE PACIFIC WAX MYRTLE (MORELLA
CALIFORNICA).
5. PLANT GRASS BETWEEN ALL SHRUBS AND ANY DISTURBED AREA. GRASS TO BE
AMERICAN DUNE GRASS (LEYMUS MOLLIS) OR AMERICAN BEACHGRASS (AMMOPHILA
BREVILIGULATA).
RESTORATION AREA
PROTECT SHORE PINES
SEE SHEET C-501
REMOVE JETTY
ACCESS ROAD
SHRUBBERY REPLANT AREA,
SEE NOTES 4 AND 5
REPLACE BLOCKING
STONES IF REMOVED
DURING CONSTRUCTION
RESTORE PARKING
AREA LOT PER NOTE 3
LEGEND:
GRAVEL PARKING LOT RESTORATION.
SHRUBBERY REPLANTING AREA
GRASS REPLANTING AREA
GRASS REPLANT AREA,
SEE NOTE 5
| G-001 |
| ROG-1.100_General_Sheets - G-001 |
| G-002 |
| ROG-1.100_General_Sheets - G-002 |
| G-003 |
| G-003 - ROG-1.100_General_Sheets - G-003 |
| G-004 |
| ROG-1.100_General_Sheets - G-004 |
| C-101 |
| ROG-1.100_Civil_Site_Sheets - C-101 |
| C-301 |
| ROG-1.100_Civil_Cross_Section_Sheets - C-301 |
| C-302 |
| ROG-1.100_Civil_Cross_Section_Sheets - C-302 |
| C-303 |
| C-303 |
| C-501 |
| ROG-1.100_Details Sheets - C-501 |
| C-502 |
| ROG-1.100_Details Sheets - C-502 |
| LS-101 |
| ROG-1.100_Site_Restoration_Sheets - LS-101 |
File details come from the government source that posted it. Updated .