Cavazos_25010_TADSS_PWS (FINAL as 7-29-25).pdf
PDF 324 KB Posted
- Attached to
- Training Aids, Devices, Simulators and Simulations (TADSS) for the Training Support Center (TSC) Fort Hood
- Solicitation number
- PANMCC-25-P-0000-027699
About this file
This Performance Work Statement (PWS) details a task order for Training Aids, Devices, Simulators and Simulations (TADSS) support services for the Training Support Center (TSC) at Fort Cavazos, Texas. The contract requires the contractor to provide comprehensive support including warehouse operations, technical assistance, device fabrication, and maintenance of training equipment for approximately 211 on-post and 85 off-post account holders. The services encompass prioritizing work orders, issuing and tracking property, providing technical support, designing and fabricating training aids, performing maintenance, and developing statistical and financial reports.
The contract is structured as a fixed-firm price task order with a base year from 1 June 2026 to 31 May 2027 and four 12-month option years extending potentially to 30 November 2031. Key personnel requirements include a Program Manager, Alternate Project Manager, Quality Control Manager, and an Information Assurance Technician (IAT) Level I. The contractor must comply with multiple Army regulations, maintain government-provided facilities and equipment, and provide weekly and monthly reporting on TADSS usage and inventory. Security requirements include obtaining security clearances for certain personnel and conducting mandatory training within two weeks of contract start.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice_TADSS Follow_On.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
TRAINING AIDS, DEVICES, SIMULATORS AND SIMULATIONS (TADSS), TRAINING
SUPPORT SERVICES FOR THE TRAINING SUPPORT CENTER (TSC), FORT CAVAZOS, TX
29 July 2025
PART 1
GENERAL INFORMATION
1. GENERALINFORMATION: This is a non-personnel services task order (TO) to provide Training
Support Services at Fort Cavazos, TX (126 counties Area of Responsibility- AOR), Texas National Guard, and Installation Management Command (IMCOM). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. SCOPE OF WORK: The Contractor shall provide all personnel, supplies, transportation, tools, materials, supervision and non-personal services necessary to perform Training Aids, Devices, Simulators and Simulations (TADSS) support services for the Training Support Center (TSC) located at Fort Cavazos, Texas as defined in this Performance Work Statement. The Contractor shall perform to the standards in this TO.
1.2. BACKGROUND: Army regulation 350-52 defines responsibilities and prescribes policies of Army
Training Support System (TSS) programs on Army installations to ensure that TSS resources are allocated properly to support the Army’s training strategies. IMCOM’s Services 905 identifies the training support requirement for the installation. The TADSS support services contract fulfills that Army and Installation requirement to provide this training support.
1.3. OBJECTIVES: TADSS support services include operating warehouses: prioritizing daily work orders; issuing, tracking, receiving and shipping TSC’s Property; providing technical assistance to using organizations; design and fabrication of TADSS; performing operational and organization maintenance and repairs on TSC property and developing and maintaining statistical and financial reports.
1.4. SCOPE: TADSS training support services: Warehouse operations, technical support to users, operator/instructor training and device fabrication. The Contractor shall provide training to students in the
TADSS warehouse and other appropriate sites. TADSS support services shall be provided to TSC account holders and authorized users: On Post - Active Duty Military and Staff Agencies - approximately 211; Off
Post - Reserve, ROTC, Community and University - approximately 85; and Temporary Accounts-
(Infrequent Use- Average 17) The number of TSC account holders and authorized users may be changed throughout the term of the contract by the Contracting Officer Representative (COR). The Contractor shall provide a Weekly TADSS Usage Report to the COR, as needed, shall input TADSS utilization into TS-
MATS. The contractor shall review the Training Support System (TSS) Utilization Report for accuracy.
1.5. PERIOD OF PERFORMANCE: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:
Base Year 1 June 2026-31 May 2027
Option Year I 1 June 2027-31 May 2028
Option Year II 1 June 2028-31 May 2029
Option Year III 1 June 2029-31 May 2030
Option Year IV 1 June 2030-31 May 2031
FAR 52.217.8 optional extension 1 June 2031-30 November 2031
1.6. GENERAL INFORMATION
Quality Control Plan (QCP): The Contractor shall develop, implement, and maintain a QCP program to ensure all work described in this contract is performed at or above the standard defined in the Performance
Requirements Summary (PRS). The QCP is developed by the contractor for its internal use to ensure that it performs and delivers a high-quality service. The contractor’s QCP is how the contractor ensures all work complies with the requirements of the contract. The QCP identifies and corrects potential and actual problem areas throughout the entire scope of the contract. The QCP shall be provided to the KO for approval within 5 days after award.
1.6.1. QUALITY ASSURANCE: The Government will evaluate the contractor’s performance under this contract in accordance with a Quality Assurance Surveillance Plan (QASP) that is tailored specifically to this contract. The QASP will be used to evaluate contractor actions while implementing PWS. It is designed to provide an effective surveillance method to monitor contractor performance. This is a government only contract.
1.6.2. HOLIDAYS: The following federal holidays are observed by the Government:
New Years Day
Martin Luther King Jr. Day
President’s Day
Memorial Day
Juneteenth
Independence Day
Labor Day
Indigenous Peoples’/Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
When one of the above Federal holidays falls on a Sunday the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday the preceding Friday is observed as a holiday. This list of holidays relates to Government duty days and is not intended to supplement or otherwise alter the provisions of the Wage Determination regarding paid holidays.
1.6.3. HOURS OF OPERATION: The contractor is responsible for conducting business between the hours of 0730 to 1630, Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor should keep in mind that the stability and continuity of the workforce are essential. If Government personnel are furloughed, the
Contractor shall contact the Contracting Officer or the COR to receive directions. It is the Government's decision as to whether the contract price/cost will be affected because of Government shutdown and/or furloughed Government employees. In the event Government shutdown (Weather/Safety/Pandemic/Epidemic
Response) and/or furloughed Government employee’s absence impact contract price/cost, a negotiated settlement will be reached as deemed appropriate by the Contracting Officer.
1.6.4. PLACE OF PERFORMANCE: The work to be performed under this contract will be performed in buildings 22041 and 19031, Fort Cavazos, Texas.
1.6.5. TYPE OF CONTRACT: The government will award a Fixed Firm Price (FFP).
1.6.6. SECURITY REQUIREMENTS: Information Assurance Technicians/Systems Administrator, Program Manager and Assistant Program Manager are required to obtain and maintain a security clearance
(Secret); ALL other contractor personnel performing work under this contract doesn’t require a security clearance but shall be subjected to a National Agency Check with Local Agency Check and Credit Check
(NACLC) at time of the proposal submission. The security requirements are in accordance with DD254
(Department of Defense Contract Security Classification Specification) (SEE TECHNICAL EXHIBIT 5). All contractor employees requiring computer access shall obtain a CAC through the Mission Partner Sponsorship
Web Application (MSP) in accordance with Army Regulation (AR) 600- 8-14 and AR 190-13. All contractor employees requiring a CAC must have at least a National Agency Check trustworthy investigation submitted through the Office of Personnel Management. This is a requirement for all contractors to receive a CAC through the MPS and to have access to any Department of the Army Local Area Network (LAN).
Industrial/Company background investigations are unacceptable to receive a CAC or to have access to the
LAN.
AR 380-67 par 3–67 (PAGE 24). Personnel occupying computer positions designated automated data processing–I.
All DOD military, civilian, consultant, and contractor personnel occupying computer positions designated
ADP–I shall be the subject of a PR conducted on a 5-year recurring basis as set forth in paragraph B–5, appendix B.
The Contractor’s Facility Security Officer will provide the Installation Garrison /Ill AR Corps G-2 (ISD)
Industrial Security Program Manager Defense Information Defense Information System for Security (DISS)
Non-SCI SMO Code: W0VCAA-IMCOM-USAG FT CAVAZOS-102 with a Visit Authorization Request
(VAR) for personnel (cleared as well as uncleared) performing services under this contract.
1) Due to the routine use of VAR information for administrative actions beyond simply certification of individual contract employee Personal Security Clearance (PCL) levels, the requirement for submission of a
VAR will not be waived as provided for in the Deputy Under Secretary of Defense memorandum; Subject:
Facilitating Classified Visits within the Department of Defense, dated 01 April 2005 and/or Headquarters, Department of the Army Memorandum; Subject: Classified Visit Request Process, dated 20 May 2007. The requirement to continue use/submission of VARs will be periodically reviewed and may be discontinued once DISS is in use by 100% of the Defense Contractor base, and changes to the NISPOM are implemented to provide details once DISS is fully implemented for clearance processing, certification of contractor personnel clearances will ONLY be accepted upon receipt of a Visit Request (VR) being submitted in DISS and received by the appropriate Non-SCI SMO.
2) In addition to NISPOM requirements (Chap 6, para 6-104b), the VAR WILL include SSN, date of clearance, investigation type and investigation date for each employee listed. The VAR will also clearly identify which personnel are permanent/long-term, on-site Visit Group residents and which are intermittent visitors in the traditional sense of the term.
3) Regardless of the individual Contractor employee’s eligibility level (PCL), VARs/clearance certification on local visit group members and the resulting local access shall not exceed the clearance authorization contained.
1.6.6.1. PHYSICAL SECURITY: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.6.2. KEY CONTROL. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting
Officer Representative.
1.6.6.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the COR, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be paid by the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost will be paid by the Contractor.
1.6.6.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any person other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.
1.6.6.3. LOCK COMBINATIONS: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized people. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.
1.6.7. SPECIAL QUALIFICATIONS: The contractor is responsible for ensuring employees possess and maintain the current Information Assurance Technician (IAT) Level I professional certification during the execution of this contract.
1.6.8. POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers
Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will appraise the contractor of how the government views the contractor's performance and the contractor will appraise the
Government of problems, if any, being experienced. Appropriate action should be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.9. CONTRACTING OFFICER REPRESENTATIVE (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:
maintain written and oral communications with the Contractor concerning technical aspects of the contract:
issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of
Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially about changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10. KEY PERSONNEL: The following personnel are considered key personnel by the government:
Program Manager, Alternate Program Manager, Quality Control Manager and Information Assurance
Technician (IAT) Level I. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract. The contract manager or alternate shall be available between 7:30AM to 4:30PM, Monday through
Friday, except Federal holidays or when the government facility is closed for administrative reasons.
Qualifications for all key personnel are listed below:
1.6.10.1. The Contractor shall designate in writing an (on site) Alternate Project Manager (APM). The APM shall be present during normal operating hours and available when the PM is absent. The APM shall possess extensive experience in the Training Aids, Devices, Simulators and Simulations (TADSS) area.
1.6.10.2. The Contractor shall provide a Quality Control Manager (QCM) who shall be responsible for implementing, updating and ensuring compliance with the approved Quality Control Plan (QCP). The QCM must demonstrate a thorough knowledge of the ISO 9001, Quality Management System Standard.
1.6.10.3. The Contractor shall provide Information Assurance Technician (IAT) Level I with professional certification. The Information Assurance Technician (IAT) Level I will be responsible for administration of all computers, computer systems and associated equipment required to perform services on this contract i.e. the
Local Area Network (LAN). The Information Assurance Technician (IAT) Level I will be responsible for performing basic computer upgrades and troubleshooting services. The Information Assurance Technician (IAT) Level I must demonstrate four years’ progressive experience in computer and associated equipment operation, possess the knowledge and skills to understand Local Area Network (LAN) technology and are qualified to administer a LAN.
1.6.11. IDENTIFICATION OF CONTRACTOR EMPLOYEES: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents/files or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Files shall be securely maintained.
1.6.12. CONTRACTOR TRAVEL: Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval/authorization and notification to the COR.
1.6.13. OTHER DIRECT COSTS: This ODC is provided with equipment and supplies used in the performance of this contract. This category includes travel (outlined in 1.6.13), reproduction, and shipping expenses associated with training activities. It could also entail the renting/leasing of vehicles for training support service missions.
1.6.14. DATA RIGHTS: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose.
This right does not abrogate any other Government rights.
1.6.15. ORGANIZATIONAL CONFLICT OF INTEREST: Contractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational
Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the COR immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the COR to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the COR and in the event the COR unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the COR may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.16. PHASE IN /PHASE OUT PERIOD: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the
Ten (10) day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements to commence full performance of services on the contract start date. The contractor shall submit a Phase-In-Plan within five working days of contract award.
PART 2 DEFINITIONS &
ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such an appointment shall be in writing and shall state the scope of authority and limitations. This individual has the authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have the authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6. SUPPLIES AND MATERIEL. Supplies and Materiel that are consumed in use, such as paint, fuel, cleaning and preserving materials, etc., or that lose their identity, such as spare parts, etc. Also called consumable supplies and material.
2.1.7. FIELD MAINTENANCE. Maintenance that is routine, regular and scheduled or periodic (e.g.
service, cleaning, inspection, minor repairs and replacement). -10/-20 Standards. Maintenance which is the responsibility of and performed by a using organization on its assigned equipment. Its phases normally consist of inspecting, servicing, lubricating, adjusting, and the replacing of parts, minor assemblies, and subassemblies. Unit maintenance tasks performed by the operator, crew, and/or unit maintenance personnel to detect and correct faults.
2.1.8. GOVERNMENT-FURNISHED PROPERTY (GFP). It means property in the possession of or directly acquired by the Government and subsequently made available to the Contractor.
2.1.9. GOVERNMENT PROPERTY. All property owned by or leased to the Government or acquired by the Government under the terms of the contract. It includes both Government-furnished property and contractor-acquired property as defined in this section.
2.1.10. HAZARDOUS MATERIALS. For this PWS, are defined as any other material designated by a government technical representative as potentially hazardous and requiring safety controls. Hazardous material as defined in the latest version of the Federal Standard No. 313 is also applicable pursuant to
Federal Acquisition Regulation (FAR) 23.301 Definition. Contractor personnel shall attend hazardous materials management training within two (2) weeks of starting performance or employment, IAW Fort
Hood Regulation 200-1, Environment and Natural Resources. The Contractor manages all hazardous waste materials generated under this contract IAW applicable Federal, State, Local, or Installation laws, ordinances, regulations, court orders, or other types of rulings.
2.1.11. INSTALLATION PROPERTY. For the purposes of this PWS, it means property of high value
(including equipment, machine tools, test equipment, furniture, vehicles, and accessories and auxiliary items) used in fabricating supplies or used for any administrative purpose in the performance of services.
2.1.12. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people that are listed in the proposal.
2.1.13. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.14. PROPERTY. For the purposes of this PWS, means all property, both real and Installation. It includes facilities, material, special tooling and agency-peculiar property.
2.1.15. PROPERTY ADMINISTRATOR (PA). A property administrator may be designated, by letter of appointment from the KO, to administer the contract requirements and obligations related to Government
Furnished Property GFP). The Contractor will be provided a copy of the property administrator appointment letter.
2.1.16. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.17. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.18. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of a product or service shall meet contract requirements.
2.1.19. REAL PROPERTY. It means land and rights in land, ground improvements, utility distribution systems, and buildings and other structures. It does not include foundations or personal property.
2.1.20. REPAIR. To restore an item to a serviceable condition through correction of a specific failure or unserviceable condition and performing such action to make the equipment operable.
2.1.21. SPECIAL TOOLING. For the purpose of the PWS, means jigs, dies, fixtures, molds, patterns, taps, gauges, other equipment and fabrication aids, all components of these items, and replacement of these items which are of such a specialized nature that without substantial modification or alteration their use is limited to the development or production of particular supplies or parts thereof or to the performance of particular services. It does not include material, facilities, general or special machine tools or similar capital items.
2.1.22. TRAINING AIDS, DEVICES, SIMULATORS AND SIMULATIONS (TADSS). As used in this
PWS, means Government property issued to TSC customers for their direct use. It includes expendable supplies and materiel; installation property; and special tooling, as defined in this section.
2.1.23. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.24. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative
AFARS Army Federal Acquisition Regulation Supplement
AR Army Regulation
CCE Contracting Center of Excellence
CFR
CLIN
Code of Federal Regulations
Contract Line Item Number
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative
COTR Contracting Officer's Technical Representative
COTS Commercial-Off-the-Shelf
DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DMDC Defense Manpower Data Center
DOD Department of Defense
FAR Federal Acquisition Regulation
GFP Government Furnished Property
GP Government Property
KO Contracting Officer
OCI Organizational Conflict of Interest
OCONUS Outside Continental United States
ODC Other Direct Costs
PA Property Administrator
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Plan
TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: The Government will provide preventive maintenance and repair of government owned facilities. The Government will maintain the facilities IAW FH Reg. 420-27. Unless otherwise required maintenance will be provided IAW government prescribed maintenance schedules. The Contractor shall notify the COR in writing when facility repairs, or maintenance are required.
3.1.2. The Government will provide telephone, facsimile, and website services exclusively for the conduct of official business in the performance of this contract. The Government will not be responsible for charges for unofficial business long-distance telephone calls made or accepted by Contractor personnel. The installation, maintenance, repair, and removal of Government furnished communications, and associated instruments will be the responsibility of the Government. Telephone service will be subject to the standard monitoring requirements of the government telephone network. The two types of property used in the performance of this contract are GFP and TADSS as defined in Section 2 Definitions. The Contractor shall notify the COR whenever property becomes unserviceable or uneconomically repairable. The Government will provide disposition instructions for turn-in.
3.1.3. The Government will provide office custodial services one day per week to include vacuuming, sweep floors, clean water fountains, sinks, commodes and urinals, and mop and buff floors once monthly in
TSC buildings 22041and 19031.
3.1.4. The Government will provide refuse collection for the TSC facilities. The Government will provide containers for disposal of recycled materials.
3.1.5. The Government will provide all equipment, supplies, material and other items and services necessary for copying official reports, documents and correspondence generated in the performance of this
PWS. The contractor may purchase or charge these items under the Other Direct Cost (ODC) Contract Line
Item Number (CLIN) ONLY with specific approval by the government.
3.1.6. The Government will provide maintenance and repair due to fair wear and tear of all Government owned copiers and/or reproduction machines. The contractor shall not purchase nor charge these items under the ODC CLIN unless specifically approved by the government.
3.1.7. The Government will provide Insect and Rodent control for Government owned buildings occupied by Government employees. Insect and Rodent control for Government owned facilities occupied solely by the Contractor will be the responsibility of the Contractor.
3.1.8. Medical services for Contractor personnel are the responsibility of the Contractor. However, the
Government will provide, on an emergency basis, medical services for job-related injuries while an employee is performing under this contract. Emergency medical care is available to the Contractor employees at Carl R. Darnall Army Medical Center. Such emergency medical care will be limited to those services necessary to prevent undue suffering or loss of life and will be provided only during the period of emergency. In such circumstances, action shall be taken to transfer employees of the Contractor to a civilian health care provider as soon as the emergency period ends. The Contractor shall reimburse the
Government for emergency medical services provided upon receipt of an invoice issued by medical representative offices, Fort Cavazos, Texas, at the established Army rate. If the invoice is not paid, cost may be set-off by the KO against future payments to the Contractor.
3.1.9. The Government will provide security and police protection services by the Fort Cavazos Provost
Marshal's Office. The emergency telephone number is 287-2176 or 911.
3.2. FACILITIES: The Government will provide the Fort Cavazos Training Support Center (building
22041) and the Call for Fire Trainer (CFFT-building 19031); these facilities will have the necessary workspace for the contractor staff to provide the support outlined in PWS to include desk space, telephones, computers, and other items necessary to maintain an office environment.
3.3. UTILITIES: All the utilities currently in use in the facilities provided in conjunction with this task order will be provided by the Government through the existing connections at no expense to the Contractor.
Use of these utilities by the Contractor shall be subject to the provisions of FH Reg. 420-9 Energy
Conservation Program.
3.4. EQUIPMENT: The Government will provide all equipment needed to execute the support services outlined in this PWS. (SEE TECHNICAL EXHIBIT 3 GFP)
3.5. MATERIALS: The Government will provide all materials needed to execute the support services outlined in this PWS.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. GENERAL: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.1.1. Contractors are encouraged to make cost saving recommendations to management. Inventory
Management. The Contractor shall inventory and record issues and turn-ins of property. The Contractor shall not extend the issue of property beyond thirty days (30 days) without a written justification from the user and approval of the COR. The Contractor shall recall property from account holders to meet higher priority requirements as requested by the COR. The Contractor shall inspect and test (except main gun components for M1Tanks and Bradley Fighting Vehicles) all property for operational condition upon turn-
in. The Contractor shall inspect and test for cleanliness, damage, accountability of component parts, serviceability and the need for Maintenance or Repair. The Contractor shall coordinate removal and disposal of obsolete and unusable Property and related documents as directed by the Army Training Support Center
(ATSC). The Contractor shall conduct turn-in of property as required and directed by ATSC. Contractors conduct AT Level I, iWatch and OPSEC training within (2) weeks of starting performance or employment.
Contractor personnel shall complete all mandatory training as directed by the KO along with other in-service training that the Government may periodically provide. The Contractor shall provide a Weekly
TADSS Usage Report to the COR, as needed, shall input TADSS utilization into TS-MATS. The contractor shall review the Training Support System (TSS) Utilization Report for accuracy.
4.2. EQUIPMENT: The Contractor shall provide vehicles for on and off-road operation as required in this PWS. All Contractor vehicles should be clearly marked as required in this PWS. The Contractor shall be responsible for providing personnel, supplies, and equipment for outside maintenance of Government-provided, Contractor-occupied facilities and TSC areas. The Contractor shall maintain all Government furnished facilities, equipment, supplies, and material in a safe, organized, and clean condition. The
Contractor shall acquire only those items needed to perform tasks under this PWS. Items purchased in the direction of the Government will become Government property. The Contractor shall perform logistics functions for DPTMS TSC to include hand receipt tasks, responsibility for Class II, III, IV, VII and IX, expendable, non-expendable, and durable property on hand at the full performance start date and subsequent receipts which affect hand receipt records. Responsibility shall be accomplished IAW FAR Part45, AR 710-
2, AR 735-5, DA Pamphlet 710-2-1 and DA Pamphlet 710-2-2. The Contractor shall be responsible for inventory management of the warehouses IAW AR 710-2, Supply Policy Below the National Level; DA
PAM 710-2-1, Using Unit Supply System (Manual Procedures); DA PAM 710-2-2, Supply Support Activity Supply System: Manual Procedures; AR 725-50, Requisition, Receipt, and Issue
System; AR 735-5 Policies and Procedures for Property Accountability, and AR 25-400-2 The Army
Records Information Management System (ARIMS). Contractors are encouraged to make cost saving recommendations to management.
PART 5 SPECIFIC
TASKS
5. SPECIFIC TASKS:
5.1. BASIC SERVICES. The contractor shall provide all personnel, supplies, transportation, tools, materials, supervision and non-personal services necessary to perform Training Aids, Devices, Simulators and Simulations (TADSS) support services for the Training Support Center (TSC) located at Fort Cavazos, Texas as defined in this Performance Work Statement. TADSS support services include operating warehouses: prioritizing daily work orders; issuing, tracking, receiving, shipping, turn-in and maintaining
TSC’s Property; providing technical assistance to using organizations; design and fabrication of TADSS;
performing operational and organization maintenance and repairs on TSC property and developing and maintaining statistical and financial reports.
5.2. SCOPE: TADSS training support services: Warehouse operations, technical support to users, operator/instructor training and device fabrication. TADSS support services will be provided to TSC account holders and authorized users: On Post - Active Duty Military and Staff Agencies - approximately
211; Off Post - Reserve, ROTC, Community and University - approximately 85; and Temporary Accounts -
(Infrequent Use- Average 17) The number of TSC account holders and authorized users may be changed throughout the term of the contract by the Contracting Officer Representative (COR), hereinafter identified as the COR. The Contractor shall be responsible for all phases of work order completion (i.e. work order receipt; issuing; turn-in; allocation to appropriate personnel; tracking and finalizing workorders).
5.3. TASK HEADING: TADSS TRAINING SUPPORT SERVICES
5.3.1. PROPERTY ACCOUNTABILITY AND INVENTORIES: The Contractor shall provide personnel, management and all other logistical functions (not already provided by the Government in Section 3) necessary to provide TADSS support services. The Contractor shall establish; maintain accountability; and sustain all Government property. A joint physical inventory of GFP and TADSS equipment will be conducted by the Government Supply Personnel, PBO, the property administrator PA and the contractor prior to the beginning of the contract period. The Contractor shall establish and maintain an inventory tracking system. The system should be capable of tracking the status for all TSC property. The Contractor shall conduct inventories IAW DA PAM 710-2-1 and AR 735-5 or when required by the COR. The
Contractor shall be responsible for inventory management of the warehouses IAW AR 710-2, Supply
Policy Below the National Level; DA PAM 710-2-1, Using Unit Supply System (Manual Procedures); DA
PAM 710-2-2, Supply Support Activity Supply System: Manual Procedures; AR 725-50, Requisition, Receipt, and Issue System; AR 735-5 Policies and Procedures for Property Accountability, and AR 25-400-
2 The Army Records Information Management System (ARIMS).
5.3.2. The Contractor shall maintain the Current Warranty List (SEE TECHNICAL EXHIBIT 4
WARRANTY LIST) after inventory verification of quantities of TSC property under warranty. The
Contractor shall provide the COR a copy of the list quarterly for review beginning 30 days after contract start date.
5.3.3. The Contractor shall submit a description of the Property Control (Management) System that will be implemented in the performance of this contract IAW FAR Subpart 45.105 Contractors’ Property
Management System Compliance and & DFARS 252.245-7003, Contractor Property Management System
Administration and FAR 52.245-1, Government Property and Army Regulation 735–5, Property
Accountability. The Property Control System shall be submitted to the COR for review and acceptance within thirty (30) days of the contract start. The COR will notify the Contractor of acceptance or required modifications to the document submitted.
5.3.4. The Contractor shall be responsible for TSC property that is lost or damaged while under the
Contractor's control. The Contractor shall report lost or damaged property to the COR within four (4) hours of discovery, followed by a written statement of loss or damage within 24 hours. The Contractor shall investigate to determine the reason for the loss, damaged or destroyed equipment and provide findings to the COR within 72 hours. The Contractor shall submit monthly Government Lost, Damaged and/or
Destroyed (GLD/D) report not later than the fifth (5th) of the month. The Contractor shall inspect and test
(except main gun components for M1 and Bradley) all property for maintain condition upon turn-in. The
Contractor shall inspect and test for cleanliness, damage, accountability of component parts, serviceability and the need for Maintenance or Repair.
5.4. WAREHOUSE OPERATION. The Contractor shall operate out of the warehouses located in building 22041 provided by the Government. Accountability for GFP and TADSS Property shall be attained by as well as signed over to the Contractor; however, the Government retains responsibility as the Primary
Hand Receipt Holder (PHRH) for all TADSS Property. In addition to the PHRH, the Installation Property
Book Office (IPBO) will maintain a GFP listing as a fiduciary hand receipt for reporting purposes. The
Contractor shall provide an annual GFP report as required in Section 3 of this PWS. TADSS property shall be accounted for by using the Global Combat Support System-Army (GCSS-Army) and the Training
Support-Materiel Army wide Tracking System (TS-MATS) as directed. The Contractor shall be required to be licensed for and utilize Materials Handling Equipment (MHE) equipment for upload and download of freight from transport vehicles; in and around the warehouse for storage and maintenance of property and to assist customers as required. The Contractor shall provide a Weekly TADSS Usage Report to the COR, The report shall be provided NLT COB Thursdays’. The Contractor shall input TADSS utilization into TS-
MATS. The Contractor shall review the Training Support System (TSS) Utilization Report for accuracy. The report should include but is not limited to usage statistics (in the field, motor pools, TADSS facilities or ranges); quantities of property issued by category and work order priority. The report shall be provided NLT
COB Thursdays’. The Contractor shall establish and maintain a Monthly Sensitive, Explosive, and
Hazardous Material Report. The Report will include a list of property inventoried, location and quantity.
The Contractor shall provide the report to the COR by the fifth (5th) workday of each month. Provide Field
Maintenance on TADSS and Warehouse equipment.
5.5. TECHNICAL ASSISTANCE SUPPORT. The Contractor shall provide technical assistance during field exercises which may last up to 24 hours or longer in duration; technical assistance shall be provided verbally or in written form as required on work orders. The Contractor shall provide technical assistance involving the development of requirements, design, fabrication or evaluation of TSC support products, systems and services. Technical assistance support shall be provided at the designated sites requested by customers, i.e., command post, training area, etc. The Contractor shall provide technicians to provide training on a variety of TADSS Equipment, Engagement Skills Trainer (EST), Observed Fire Trainer
(OFT) and Multi Integrated Laser Engagement System (MILES), Medical Trainers and other additional training enablers. The Contractor may be required to provide familiarization training for any training aid issued by the TSC. The Contractor shall maintain logs detailing the type of training provided, dates and times of training for each military unit. The Contractor shall provide copies of the training logs as requested by the COR.
5.5.1. INFORMATION ASSURANCE TECHNICIAN: The Contractor shall provide Information
Assurance Technician (IAT) Level I with professional certification. The Contractor shall provide computer and automated database administration support. The Contractor shall provide the personnel necessary to ensure Information Assurance policies are established for all TSC systems connected to LAN or a stand-alone system LAN; ensure connectivity to LAN is maintained by all systems and peripherals; ensure all servers and databases are maintained, repaired, upgraded and secure and ensure that only NEC approved software, digital and print media are used in the performance of services on this contract. All systems and peripherals are connected to LAN.
5.6. FABRICATION OF TRAINING AIDS AND DEVICES. The Contractor shall provide personnel necessary to design, fabricate, modify, install and maintain TSC Training aids and Devices (i.e. howitzer tools, atropine injector, cocking devices, silhouettes and dummy blasting caps, bridges, fences, booths, human-form manikins, engineer stakes, range fans, consoles, and sandwich boards). The Contractor shall develop drawings and blueprints which may include electrical circuits, electromechanical, pneumatic, hydraulic or laser-and-radio-controlled items for functional or nonfunctional two and three-dimensional
TSC aids and devices. The Contractor shall fabricate (to include painting) TSC training aids and devices from a variety of materials (i.e. rubber, plastic, concrete, glass, paper, fiberglass, wood, Plexiglas/Lexan and metal). The Contractor shall maintain a file of all drawings, blueprints and associated documents used or developed for the fabrication of TSC training aids and devices. Additional examples of TSC fabricated property are as follows:
5.6.1. Mockups - scaled or cutaway models and may be capable of disassembly or simulated operation.
5.6.2. Models – replicas which have the characteristics and proportional dimensions of actual operational equipment. Some models may be required to be working models.
5.6.3. Terrain Models - replicas of land and/or sea with superficial characteristics and proportional dimensions.
5.6.4. Field Markers/Signs - in various sizes from 4x9 inches to 12x24 inches. Markers may be square or pointed, painted with camouflage colors or standard field colors by decalcomania or stencil and with tactical unit symbols.
5.6.5. Exhibits and Displays - exhibits and displays range from table-top displays to elaborate exhibits such as unit crests and/or unit insignia. They may be required to be static, animated, or automated.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
6.1.1. ISO 9001 Quality Management System Standard
6.1.2. AR 25-1, Army Information Technology
6.1.3. AR 25-2, Army Cybersecurity
6.1.4. AR 25-51 Official Mail and Distribution Management
6.1.5. AR 25-400-2 Army Records Information Management System (ARIMS)
6.1.6. AR 190-5 Motor Vehicle Traffic Supervision
6.1.7. AR 190-13 The Army Physical Security Program
6.1.8. AR 200-1 Environmental Protection and Enhancement
6.1.9. AR 350-38, Policies and Management for Training Aids, Devices, Simulator and Simulations
6.1.10. AR 380-5, Army Information Security Program
6.1.11. AR 385-10, Army Safety Program
6.1.12. AR 600-63 Army Health Promotion
6.1.13. AR 600-8-14 Identification Cards for Members of the Uniformed Services, Their Eligible Family
Members, and Other Eligible Personnel
6.1.14. AR 700-68 Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and
Empty Cylinders
6.1.15. AR 710-2, Supply Policy Below the National Level
6.1.16. AR 725-50, Requisition, Receipt, and Issue System
6.1.17. AR 735-5, Property Accountability Policies
6.1.18. AR 750-1 Army Material Maintenance Policy
6.1.19. DA Form 2062, Hand Receipt/Annex Number
6.1.20. DA Form 5988 Equipment Inspection and Maintenance Worksheet
6.1.23 DA Form 3161 Request for Issue or Turn-in
6.1.24 DA Form 285 Technical Report of U.S. Army Ground Accident
6.1.25 DA PAM 700-32 Packaging of Army Materiel
6.1.26 DA PAM 710-2-1, Using Unit Supply System (Manual Procedures)
6.1.27 DD Form 254, Department of Defense Contract Security Classification Specification
6.1.28 DoD 5500.07-R, Joint Ethics Regulations
6.1.29 FH Reg 190-2 Motor Vehicle Traffic Supervision
6.1.30 FH Reg 200-1, Environment and Natural Resources
6.1.31 FH Reg 420-6 Recycle Program
6.1.32 FH Reg 420-27 Care, Maintenance, Alterations of Facilities
6.2. Location of Publications and Forms.
The Contractor shall utilize the Internet to view and print electronic versions of required publications and
Forms. Fort Cavazos publications can be accessed at https://armypubs.army.mil/ProductMaps/PubForm/DAForm.aspx or https://www.dla.mil/
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1. Technical Exhibit 1 – Performance Requirements Summary
https://armypubs.army.mil/ProductMaps/PubForm/DAForm.aspx https://armypubs.army.mil/ProductMaps/PubForm/DAForm.aspx https://armypubs.army.mil/ProductMaps/PubForm/DAForm.aspx https://www.dla.mil/ https://www.dla.mil/
7.2. Technical Exhibit 2 – Deliverables Schedule
7.3. Technical Exhibit 3 – GFP
7.4. Technical Exhibit 4 – Warranty List
7.5. Technical Exhibit 5 – DD 254 (Department of Defense Contract Security Classification Specification)
TE1
2.1.10. HAZARDOUS
MATERIAL: Contractor personnel performing work under this contract shall attend hazardous materials management training.
Contractor personnel attend hazardous materials management training within two
(2) weeks of starting performance or employment, IAW Fort Cavazos Regulation
200-1, Environment and Natural
Resources.
100% Could affect CPARS rating in a Negative or Positive way.
4.1.1. TRAINING:
All Contractor personnel performing work under this contract shall conduct
Antiterrorism, iWatch, and
Operation Security (OPSEC) training.
Contractors conduct AT Level
I, iWatch and OPSEC training within (2) weeks of starting performance or employment.
Contractor personnel shall complete all mandatory training that is directed to
DoD Civilians and Military by the installation commander along with other in-service training that the Government may periodically…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .