QASP_24MAR2016.docx
DOCX document 56 KB Posted
- Attached to
- Cultural Advisor
- Solicitation number
- PAN408-16-P-0000-002276
About this file
HNCC Revised QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_-_HNCC_Cultural_Advisors_24March2016.docx | DOCX document | |
| HNCC_Cultural_Advisors_Review.docx | DOCX document | |
| Cultural_Advisor_PWS.xml | XML file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CULTURAL AND BUSINESS ADVISOR SERVICES
(COMMAND PERSONNEL)
HOST NATION COORDINATION CELL – JORDAN
Quality Assurance Surveillance Plan
Contract #:
Month xx, 20xx
NOTE: THIS QASP IS PROVIDED AS AN ATTACHMENT TO THE SOLICITATION FOR INFORMATIONAL PURPOSES ONLY. IT WILL NOT BECOME PART OF THIS CONTRACT.
TABLE OF CONTENTS
Subject
1. Overview
2. Description of Services
3. Roles and Responsibilities
4. Contract Quality Requirements
5. Government Surveillance
6. Non-Conforming Performance
7. Data Analysis
8. Acceptance of Services
9. Monthly COR Activity Report
10. Contractor Manpower Reporting (CMR)
11. Quality Assurance Surveillance File
12. Contractor Performance Assessment Reporting System (CPARS)
13. Record Retention
14. QASP Changes
15. Combating Trafficking in Persons (CTIP)
1. OVERVIEW
1.1 Purpose. The purpose of this plan is to identify the methods and procedures the Government will use to ensure it receives the services/products under this contract as identified in the Performance Work Statement (PWS).
1.2 Intent. The intent of this plan is to hold the Contractor accountable for quality control and to encourage the contractor to take appropriate steps to control and improve quality. Contractor is responsible to develop an efficient methodology to ensure they meet and/or exceed the required thresholds of service as outlined in this acquisition. The Government intends to perform surveillance on this contract in accordance with this Quality Assurance Surveillance Plan (QASP), but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary to ensure that the rendered services conform to contract requirements. The Government reserves the right to perform quality assurance at the subcontract level and perform quality assurance at the contractor's place of business, if applicable. Non-conforming services discovered with subcontractors will be addressed with the prime contractor for resolution.
2. DESCRIPTION OF SERVICES
2.1 Scope of Work. Contractor shall provide personnel, equipment, tools, materials, supervision, and other items and services necessary to locate, screen, hire and maintain personnel capable of understanding and speaking modern standard Arabic and Standard English. The standard for language is individuals tested and receive an Interagency Language Roundtable - http://.govtilr.org/; congruous to the language rating US Soldiers receive from DLI, with an Arabic:English rating 3:2+. Personnel shall be assigned to the Host Nation Coordination Cell – Jordan (HNCC-J) and its higher assigned headquarters in Jordan. At initiation of this contract, the contractor will provide one US hire and one Jordan hire per the qualifications listed in the PWS. Additional hires will be assessed periodically by the Commander, or designated representative, with no less than 30 day notification to the contractor of additional hiring requirements. Contract is not to exceed five total hires (four US and one JO or three US and two JO hires) to support operations in Jordan.
2.2 Contract. The government anticipates award of a Firm Fixed Price Contract.
3. ROLES AND RESPONSIBILITIES.
Contracting Officer (KO) - A person duly appointed with the authority to enter into, administer and terminate contracts on behalf of the Government. The KO is the only person who can legally commit the Government and only the KO, as the Government’s agent, can modify the contract/order. The KO is the final authority for determining the adequacy of the Contractor’s performance. KO decisions arising under or relating to the contact are final.
Contracting Officer’s Representative (COR) – An individual designated in writing by the KO to perform specific technical and administrative functions within the scope and limitations of their written appointment (e.g., surveillance of Contractor’s performance, accept services). The COR is not empowered to make any contractual commitments or authorize any changes to the order/contract or in any way obligate additional funds by the Government; such authority rests solely with the KO.
Contract Administrator (CA) – A person that oversee the specific mandates in a contract and make sure that all parties involved fulfill obligations to which they agreed. The contract administrator must know the ins and outs of a contract and ensure all sides adhere to its specific terms, conditions, rights, and obligations. It is also the administrator's responsibility to coordinate any changes that may transpire, and to make sure that those changes are agreed upon by all involved. When the contract has been fulfilled, the contract administrator will complete a closeout process to ensure that the contract has been ended in an appropriate manner.
Property Administrator (PA) – A person who organizes the necessary team members and specializes in facilitating, reporting and analyzing projects under the supervision of a project manager. This position requires great responsibility and proper time management because the job entails constant monitoring and control of all project variables. The PA's role is not only to ensure that the project is finished on time and on budget, but also may involve acquiring more contracts.
4. CONTRACT QUALITY REQUIREMENTS
4.1. Quality Control Program. The Contractor's Quality Control Program requirements are defined in Part 3.1. of the PWS. The Contractor shall develop, maintain, enforce and document a Quality Control Plan (QCP) which complies with the requirements of this contract and outlines how they will ensure the Government will receive all the services required by the contract at the specified quality level.
4.2. Government Quality Assurance. The Government will perform Quality Assurance oversight of the Contractor and Contractor’s QCP IAW with this QASP to ensure acceptable levels of contract performance are achieved and that the contractor is performing acceptable levels of Quality Control to ensure fully acceptable services are provided.
5. GOVERNMENT SURVIELLANCE
5.1. Methods of Surveillance include but are not limited to:
· 100% Inspection - Reserved for the highest risk areas where consequence of failure is high (i.e. life or limb are threatened) or there is likelihood of mission failure.
· Random Sampling - When a service is performed relatively frequently and a statistically valid sample can be selected for audit. The most appropriate method for frequently recurring tasks.
· Periodic Sampling - Planned sampling of a service at specific predetermined dates and times. May be appropriate for tasks that occur infrequently.
· Customer Feedback – Not necessarily a valid method of surveillance but a good indicator for areas surveillance should be conducted or intensified.
5.2. Monthly Surveillance Schedule. The COR will develop a monthly schedule of surveillance activities based on the Performance Standards as outlined in the Performance Requirements Summary (PRS)(PRS will be an attachment to this QASP) as well as any other critical contractual requirements determined to be higher risk requiring oversight. The surveillance outlined in the monthly schedule will be as detailed and in-depth as necessary to provide the Government with the objective quality evidence required to support acceptance of the services provided by the Contractor. The schedule will provide planned periodic surveillance during all required hours of the Contractor’s operation. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. The schedule will identify the method of surveillance, the date of inspection, place of inspection, activity to be monitored, and who will conduct the surveillance (dates and times can be altered without a formal change to the schedule as long as all inspections are performed). The 410th CSB surveillance schedule shall be used to plan and scheduled monthly surveillance. The monthly schedule will be completed no later than seven calendar days prior to the beginning of the period it covers and a copy uploaded into VCE.
5.3. Inspection instructions/checklists. The COR will develop inspection instructions/checklists for all planned inspections which may require special instructions on how to perform the inspection, what observations should be made with specific details of what to look for acceptable performance. The 410th Surveillance Checklist shall be used for the above purpose.
5.4. Documentation of Inspections. All inspections/observations will be documented and will include as a minimum date and time, who performed the inspection, what was inspected, to what standard and the results. Successful or exceptional performance will be documented as well as deficiencies in Contractor performance. Documentation will be maintained for future reference, audit, proof of inspection and past performance documentation. The 410th Surveillance Checklist shall be used for the above purpose.
6. Non-Conforming Performance. The COR will notify the Contractor, in person, each time an unacceptable observation has been recorded and ask the Contractor to correct the problem or re-accomplish the service. All valid non-conformances observed by the Government will be documented! The COR will record the contract requirement, the specific deficiency to the requirement, the date and time it was discovered, and have the Contractor initial the entry. The Contractor will be given a time line after notification to correct the deficiency in accordance with requirements of the contract. Deficiencies that cannot be corrected within the indentified time line will be reported to the KO. The approved 410th CSB nonconformance report (NCR) form shall be used to document all contractual nonconformance’ to include issues. All NCRs shall be logged into the NCR Log. Only KOs shall issue NCRs to the contractor.
6.1. Customer Feedback. For customer feedback or complaints it is recommended that the Customer Complaint Record DA Form 5477 http://armypubs.army.mil/eforms/pdf/A5477.PDF be used. However customer feedback can be in any form, verbal or written but no matter the format the COR will maintain a record of the feedback positive or negative.
a. If immediate response to a complaint is required, the COR will provide the response to the requester as soon as practical.
b. The COR will conduct an investigation to determine the validity of any negative comments received.
c. If the negative comment is determined not to be valid, if possible, the COR will inform customer of the reason(s) as soon as practical.
d. For validated negative comments that are true contractual non-conformances see paragraph 6. If this non-conformance is a more serious (systemic in nature) deficiency or recurring deficiency that could indicate a trend the COR should see paragraph 6.2.
e. The COR will follow up with the customer of the corrective action taken by the contractor, if applicable.
6.2. Non-Conformance Reports (NCR). The COR will report more serious (systemic in nature) deficiencies or recurring deficiencies that could indicate a trend by using the 410th CSB non-conformance report. The Non-Conformance Report will state the Contract Requirement, the specific contract reference and the specific violation (s) to the requirement. The COR will forward copies of Non-Conformance Report to the KO within one working day. The KO will notify the Contractor and request corrective action to the specific non-conformance, identification of the root cause and corrective action for the root cause with a required suspense date. The KO may require the Contractor to re-perform any services that do not meet contract requirements at no additional cost to the Government. The Contractor will return a copy of the completed and signed Non-Conformance Report along with their Corrective Action Plan (CAP) to the KO for review, approval and inclusion in the contract/order file. The KO should include the COR in the review of the CAP and re-inspection of services that were found deficient to ensure the CAP included adequate root cause analysis, corrective action for the root cause and that it was accomplished in the timeframe agreed upon. The KO and COR will not consider the NCR closed until all deficiencies have been corrected and all agreed upon actions of the CAP have been completed. Contractor’s failure to follow through and complete corrective actions will be reported immediately to the KO for further action. (Note: if the COR has to repeatedly perform re-inspection there could be a Government re-inspection cost which could be recovered from the Contractor). The COR will also follow-up after the Contractor has completed the corrective action to ensure that the Contractor’s corrective action was sufficient to preclude recurrence.
7. Data Analysis. COR shall perform and document analysis of available data monthly and make adjustments to surveillance schedule as required based on results of analysis. Analysis shall be used to look for and document trends in performance which may indicate shifts in performance risk that could result in increased or reduced surveillance. Data can be based on Government observations or Contractor observations. Negative trends noted using Government observations could result in issuing Contractor a Contract Deficiency Report (CDR). Trends noted using Contractor data should never result in a CDR unless the Contractor is not addressing the negative trend. Documentation of data analysis will be in the Monthly COR Activity Report.
8. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment upon satisfactory completion of the work. This is done by approving the Contractor’s invoice in Wide Area Workflow https://wawf.eb.mil/.
9. COR Monthly Status Report. By the last working day of the month, the COR will complete the VCE Online Monthly Report for KO review and acceptance or rejection. The COR will use the criteria listed below when rating the Contactor’s Quality of Work. In the Contactor’s Quality of Work comment box the COR will include a summary of inspections performed, summary of customer complaints, summary of contract discrepancies, recommended adjustments to surveillance and any other pertinent contract activities. In the individual question comments box, the COR will include a detailed summary of observations as it pertains to the individual question.
Contractors Quality Of Work Contractor quality of work ratings and criteria are described below:
Performance Rating Criteria
| Exceptional |
| Performance meets contractual requirements and exceeds many of the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some of the government benefits. The contractual performance element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were highly effective. |
| Satisfactory |
| Performance meets all minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
10. Contractor Manpower Reporting. The COR shall verify Contactor has complied with the required contractor manpower reporting and document any observations.
11. Quality Assurance Surveillance File: The official COR Quality Assurance Surveillance File will be maintained in the on-line COR Management Tool https://arc.army.mil/COR per ACC PAM 70-1. The Quality Assurance, or COR Surveillance file shall contain the following as applicable:
a. Copy of the COR designation letter from the KO, any changes to that letter, and any termination letters.
b. Training Certifications for COR and refresher training.
c. Copy of the contract and all contract modifications.
d. Copy of the applicable Quality Assurance Surveillance Plan (QASP).
e. Copy of the contractor’s Quality Control Plan (QCP)
f. All correspondence initiated by authorized representatives (Contractor or Government) concerning performance of the contract.
g. Names, position titles and contact information of all key personnel assigned to this contract both Government and Contractor.
h. Monthly surveillance schedules.
i. Surveillance Checklists
j. Records of all inspections performed and the results.
k. Customer Feedback.
l. Memoranda for record of minutes of any meeting, telephone conversations and discussions with the contractor or others pertaining to the contract or contract performance.
m. Documentation pertaining to acceptance of services, reports or data
12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data IAW this QASP will be used as objective data to support CPARS ratings. The inclusion of detailed documented inspection results provides objectivity to CPARS reporting. CPARS will be accomplished annually or at the end of a Task Order whichever occurs first.
13. Record Retention. All records will be retained for the life of this contract. The COR/QAE shall ensure all record are uploaded into VCE and all hard copies will be forward to the KO upon completion of the contract/order.
14. Combating Trafficking in Persons (CTIP). See US Department of State website, http://www.state.gov/j/tip/rls/tiprpt/2012/192363.htm for Tier location requirements. The COR shall ensure that contractors comply with FAR 52.222-50 at CTIP Tier 1 locations. For Tier 2, Tier 2 Watch List (WL), and Tier 3 locations, CORs shall ensure that contractors comply with Tier 1 requirements in addition to performing spot checks, reviews, and assessments of contractor and subcontractor employees to identify indicators of CTIP. In the event indicators are identified, the COR shall notify the KO immediately.
The COR shall use the 410th CSB checklist when conducting CTIP surveillance. The COR will complete CTIP surveillance reporting biannually and submitted to the KO NLT the last working day of the months of June and November.
15. QASP Changes. The QASP is a living document and, as such, may be changed as needed. However, the KO must approve changes. The COR will submit recommended changes to the KO for approval. Once approved, the COR will upload the newest version into VCE.
Requirements Table Contractor service requirements summarized into performance objectives. These relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each standard.
Performance Objective (The Service required)
| Standard |
| Performance Threshold (maximum error rate) |
| Method |
of Surveillance
% Deduction from monthly invoice for not meeting Performance Standards
PRS-1 Combating Trafficking in Persons FAR 52.222-50 c
PWS 1.6.8.3
The Contractor shall Notify its employees of
(a) The United States Government's zero tolerance policy described in paragraph
(b) This clause, including the actions taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment
| 100% Compliance |
| 100% Inspection, COR Validation |
| 5% of total monthly price will be deducted |
PRS-2 Contracting Manpower Reporting PWS 5.3 and CLIN 2
| The Contractor shall completely fill in all the information in the format using the following web address https://cmra.army.mil. The contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. If contract period of performance ends prior to September 30, the contractor has 30 day from end date of the contract to complete the CMR requirement. |
| 100% Compliance |
| 100% Inspection, COR Validation |
| 5% of total monthly price will be deducted |
PRS-3 Contractor shall provide personnel capable of understanding and speaking modern standard Arabic and Standard English.
PWS 1.1
| Performance level 3 (listening /speaking and reading) Arabic and a 2+ in English. |
| 100% Compliance |
| Verification of language abilities through ILR or DLI / 100% monthly observation |
| 10% of total monthly price will be deducted |
PRS-4 Cultural Advisor shall Maintain Host Nation relationships
PWS 5.1.1.b and assist in HNCC personnel transitions.
| Maintain Host Nation relationships supporting HNCC operations with GoJ, Jordan cultural knowledge and assist in HNCC personnel transitions. |
| 100% Compliance and documented IAW 5.1.2.e |
| Periodic Surveillance, 100% monthly observation, Continuity book assessment |
| 5% of total monthly price will be deducted |
PRS-5 Cultural Advisor shall train HNCC personnel PWS 5.1.1c
| Assist in training new HNCC personnel on processes and cultural effects of US actions supporting HNCC operational continuity |
| 95% of HNCC services are uninterrupted through relief-in-place operations as assessed by the inbound Commander’s post-relief assessment |
| Periodic Surveillance/ Customer complaints by email notification |
| 5% of total monthly price will be deducted |
PRS-6 Cultural Advisor shall Conduct work assignments IAW standard
PWS 5.1.1d, k
| Perform duties within the laws of Jordan, standards of conduct of the US military and bring credit to US interest |
| Zero legal actions under Jordan law resulting in jail time, Zero incidence where named as at fault in a commander’s inquiry, Zero embarrassment to USG |
| Jordan legal action, |
Fault in 15-6 investigation, reported complaint raising to the Ambassador level in the US Embassy 10% of total annual price will be deducted
PRS-7 one Cultural Advisor must be available full time to support the HNCC Director or authorized designated representative.
PWS 5.1.2a, c, e, f; 1.6.1.3 Act as a liaison on behalf of HNCC Director, interacting and coordinating with Host Nation personnel and providing continuity for HNCC operations
| 100% standard, weekly activity reports on time, maintenance of Advisor’s continuity book, maintain SECRET clearance |
| Customer complaints by email notification / 100% monthly observation and quarterly inspection |
| 10% of total monthly price will be deducted |
PRS-8 At least one Cultural Advisor will manage Host Nation sponsorship procedures and facilitate the sponsorship process
PWS 5.1.5
| Facilitate the Host Nation sponsorship process for both military and civilian personnel. |
| 95% of services are |
satisfactorily completed within required time
| Customer complaints by email notification / 100% monthly inspection |
| 5% of total monthly price will be deducted |
PRS-9 At least one Cultural Advisor will manage Host Nation sponsorship procedures and facilitate the sponsorship process
PWS 5.1.5
| Maintains sponsorship records, documentation, and accountability of sponsored personnel. |
| 95% of services are |
satisfactorily completed within required time
| Customer complaints by email notification / 100% monthly inspection |
| 5% of total monthly price will be deducted |
PRS-10
Provide Cultural Awareness Training
PWS 5.1.6
| Provide weekly Jordan focused Cultural Awareness class |
| 96% (50 of 52) of classes completed |
satisfactorily per year; Class content submitted on time for approval; All completed surveys submitted to the COR Customer surveys, email notification of complaints
5% of total monthly price will be deducted
PRS-11
Respond within 60 minutes during crisis
PWS 5.2
| Reports within required time limit |
| Reports within required time limit in every crisis event rehearsal and in actual crisis |
| Periodic Surveillance / crisis event response |
| 10% of total monthly price will be deducted |
PRS-12
Complete contingent requirements as identified
| Comply with 5.1.1.a, e, f, g, h, i, j; 5.1.2.b, d; 5.1.3; 5.1.4. as required |
| 100% requirements completed upon request or upon identification |
| Annual review of contingent actions required vs completed or complied with |
| 5% of total annual price will be deducted |