Pages_from_Reference_project_design_-_abandonded_at_95%CD.pdf

PDF 2 MB Posted

Attached to
Request for Proposal - RCCC - Buildings 555 & 570 - Replace HVAC Units with Chilled Water-Hot Water System, CC-080079-00
Solicitation number
94844
Issued by
Sacramento County, San Francisco City, California

About this file

This is a reference project design document for the County of Sacramento's Rio Cosumnes Correctional Center (RCCC) Central Chilled Water Plant project. The document consists of 95% construction documents that were abandoned before completion and are provided as a reference guide for proposing consultants on the forthcoming contract award. The project involves replacing twenty (20) rooftop HVAC units with a new hydronic system utilizing chilled water coils and unit-level gas heating, with a new HVAC plant to be located between buildings 550 and 570. The design incorporates new rooftop air handlers connected to a centralized chilled/hot water plant at the same location shown in the reference plans, utilizing the same electrical pathway. The technical drawings include partial roof plans, electrical remodels, site and roof plans, one-line power diagrams, and AC unit connection details, all prepared by AC - IS C A Engineering Consultants, Inc. with project management by Stuart Lindsay, dated November 19, 2021.

The reference design demonstrates the County's intention to replace the existing packaged gas-electric rooftop units with individual rooftop chilled water and hot water air handlers paired with a new grade-level chilled water and heating hot water heat pump plant. The electrical infrastructure includes connections to existing main switchboards (MSA and MSB), emergency switchboards (EMSA and EMSB), and distribution panels with 277/480 volt, 3-phase, 4-wire systems. The document specifies that contractors must locate existing utilities along the new raceway path, note traffic-rated areas, and coordinate all grounding and electrical requirements per California Electrical Code standards. This reference design provides proposing consultants with the technical foundation and electrical pathway information necessary for developing designs compliant with Chapter 11 of the 2025 California Mechanical Code for the upcoming all-electric system implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment H - Reference Project Design - abandoned at 95%CD (page 1 of 4):

Background:

This project design incorporated a chilled water only Hydronic plant with new rooftop air handlers using chilled water coils and unit level gas heating.

The proposed design on the forthcoming contract award will locate the chilled/hot water plant at the same location as shown in this set, and utilize the same electrical pathway.

This set of plans showcases to the proposing consultant that the county wishes to replace these 20 rooftop HVAC units and locate a new HVAC plant between buildings 550 and 570.

Reference also attachment G content.

95% CONSTRUCTION

DOCUMENTS

SCALE : 1/16" = 1'-0"

PARTIAL ROOF PLAN - ELECTRICAL REMODEL

E1.2

CH

(E)

AC

C10

AC

C6

AC

C7

AC

C9

AC

C8

AC

S5

AC

S4

AC

S3

AC

S2

AC

S1

AC

C5

AC

C4

AC

C3

AC

C2

AC

C1

AC

S7

AC

S9

AC

S8

AC

S6

AC

S10

CWP

S2-3

CWP

S2-2

CWP

S2-1

CH

CWP

P2-1

CWP

P2-2

SF

S3

(E)

SF

S1

(E)

RV

S1

(E)

EF

S7

(E)

EF

S10

(E)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)(N)(N)

(N)

(N)(N)(N)(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

EF

S6

(E)

EF

S2

(E)

EF

S13

(E)

EF

S11

(E)

EF

S9

(E)

EF

S5

(E)

EF

S4

(E)

EF

S2

(E)

EF

S8

(E)

EF

S3

(E)

SF

S4

AC

S11

(E)

SF

C1

(E)

(E)

SF

C1

(E)

RV

C1

(E)

SF

C3

(E)

EF

C7

(E)

EF

C6

(E)

EF

C13

(E)

SF

C2

(E)

EF

C8

(E)

EF

C9

(E)

EF

C10

(E)

EF

C11

(E)

EF

C5

(E)

EF

C4

(E)

SF

C4

(E)

AC

C11

EF

C2

(E)

(E)

SF

C1

(E)

EF

C3

(E)

NUMBERED NOTES

LOCATE AND INTERCEPT (E) AC UNIT POWER CIRCUIT AND EXTEND TO NEW AC UNIT. FAN AND

ECONOMIZER. SEE AC UNIT CONNECTION DETAIL "2/E3-1"

UP EXTERIOR OF WALL.

CONNECT TO NEAREST ROOF MOUNTED CONVENIENCE RECEPTACLE.

1 1 1

(N) PANEL "HECPA"

HECPA-1,3,5

HECPA-7,9,11

HECPA-2,4,6

HECPA-8,10,12

HECPA-14,16,18

ROOF MOUNTED AIR CONDITIONING

REPLACEMENT NOT IN CONTRACT. SHOWN

FOR REFERENCE ONLY

ROOF MOUNTED AIR CONDITIONING

REPLACEMENT NOT IN CONTRACT. SHOWN

FOR REFERENCE ONLY

GFCI

GFCI

1/2"C., TO NETWORK

EQUIPMENT ROOM

WP

WP

GFCI

WP

PROVIDE POWER FOR

SERVICE RECEPTACLES

Department of General Services Administrative Services

Sacramento, Ca. 95827 9660 Ecology Lane

P. 916.876.6192

Architectural Services Division

DATE

REVISIONS:

DESIGN BY:

DRAWN BY:

DESCRIPTIONNO.

FACILITY NO.

SHEET NO.

PROJECT TITLE:

SHEET TITLE:

LOG NO.

100% CD

CONSTRUCTION DOCUMENTS

11.19.2021

12500 BRUCEVILLE ROAD

RIO COSUMNES

CORRECTIONAL CENTER

00080

CENTRAL CHILLED

WATER PLANT

SKL

BJ

210513.00

PM - DESIGN TEAM

PROJECT NO.

AC - IS

C A

ENGINEERING CONSULTANTS, INC.

RANCHO CORDOVA, CALIFORNIA

P I T A L

Electrical Engineers Lighting Designers

100 Howe Ave., Suite 235N

Sacramento, CA 95825-8217

PROJECT #:

www.mneilsengineering.com

Tel: (916) 923-4400

PROJECT MGR: STUART LINDSAY

11/19/2021

21146.21

E1.2

Attachment H - Reference Project Design - abandoned at 95%CD (page 2 of 4):

Background:

This project design incorporated a chilled water only Hydronic plant with new rooftop air handlers using chilled water coils and unit level gas heating.

The proposed design on the forthcoming contract award will locate the chilled/hot water plant at the same location as shown in this set, and utilize the same electrical pathway.

This set of plans showcases to the proposing consultant that the county wishes to replace these 20 rooftop HVAC units and locate a new HVAC plant between buildings 550 and 570.

Reference also attachment G content.

SCALE : 1" = 20'-0"

PARTIAL SITE AND ROOF PLAN - ELECTRICAL REMODEL

E1.0

CH

(N)

(N) PANEL "HECPA"

(E) MAIN SWITCHBOARD "EMSA"

(E) MAIN SWITCHBOARD "EMSB"

PB24

PB24

SEE ONE-LINE POWER DIAGRAM

SEE ONE-LINE POWER DIAGRAM

NEW CHILLER

PB24

MAIN ELECTRICAL

SWITCHGEAR

(KBF) (JFK)

STUART

BAIRD

FACILITY

(SBF)

CHRISTOPHER

BOONE

FACILITY

(CBF)

PB24

SEE ONE-LINE

POWER DIAGRAM

NUMBERED NOTES

1 CONTRACTOR SHALL LOCATE EXISTING UTILITIES ALONG PATH OF NEW RACEWAY TO NEW

PANELS. POTHOLE RACEWAY ROUTING. EXISTING ELECTRICAL CIRCUITS ARE ROUTED ACROSS

THE ROADWAY IN VICINITY OF THE MAIN ELECTRICAL SWITCHGEAR

TRAFFIC RATED

TRAFFIC

RATED

TRAFFIC RATED

TRAFFIC RATED

Department of General Services Administrative Services

Sacramento, Ca. 95827 9660 Ecology Lane

P. 916.876.6192

Architectural Services Division

DATE

REVISIONS:

DESIGN BY:

DRAWN BY:

DESCRIPTIONNO.

FACILITY NO.

SHEET NO.

PROJECT TITLE:

SHEET TITLE:

LOG NO.

100% CD

CONSTRUCTION DOCUMENTS

11.19.2021

12500 BRUCEVILLE ROAD

RIO COSUMNES

CORRECTIONAL CENTER

00080

CENTRAL CHILLED

WATER PLANT

SKL

BJ

210513.00

PM - DESIGN TEAM

PROJECT NO.

AC - IS

C A

ENGINEERING CONSULTANTS, INC.

RANCHO CORDOVA, CALIFORNIA

P I T A L

Electrical Engineers Lighting Designers

100 Howe Ave., Suite 235N

Sacramento, CA 95825-8217

PROJECT #:

www.mneilsengineering.com

Tel: (916) 923-4400

PROJECT MGR: STUART LINDSAY

11/19/2021

21146.21

E1.0

Attachment H - Reference Project Design - abandoned at 95%CD (page 3 of 4):

Background:

This project design incorporated a chilled water only Hydronic plant with new rooftop air handlers using chilled water coils and unit level gas heating.

The proposed design on the forthcoming contract award will locate the chilled/hot water plant at the same location as shown in this set, and utilize the same electrical pathway.

This set of plans showcases to the proposing consultant that the county wishes to replace these 20 rooftop HVAC units and locate a new HVAC plant between buildings 550 and 570.

Reference also attachment G content.

NO SCALE

PARTIAL ONE LINE POWER DIAGRAM - "MSA", "MSB", "EMSA", "EMSB"

E3.1

GROUND

NEUTRAL

(E) GND.

U.G. TERMINATION

SERVICE LUGS

U.G. SECONDARY SERVICE.

SEE "MSB" SCHEDULE

SMUD PAD MOUNTED

TRANSFORMER

(E) UNDERGROUND

PRIMARY SERVICE

(E) NEUTRAL

DISCONNECT

LINK

277/480 VOLT, 3 PHASE, 4 WIRE, 4000A BUSSING, 34kAIC

MAIN CIRCUIT BREAKER

PNL

"HA"

PNL

"PA"

DIST

PNL

"DPHS"

(E) MAIN SWITCHBOARD "MSA"

(E) SMUD PAD FOR (F)

TRANSFORMER

(E) 400/3

(E) SMUD #337446

(E) SMUD #670615

(E) VOLT METER

SP

SP

(E) AMP METER

GF MR

(E) 20/2

(E) SWBD

HEATER AND

THERMOSTAT

T

(E) 225/3 (E) 225/3

(E)

SPACE/3

(E)

SPACE/3

(E) 800/3 (E) 800/3

(E) 300KW,

277/480V

3P, 4W

GENERATOR

(E) MAIN SWITCHBOARD "MSB"

N

G

(E) GND.

TO (E) DIST

PANEL "HDP"

(E) 1200/3 (E) 800/3

(E) 400KW,

277/480V

3P, 4W

GENERATOR

(E) PFB/3

(E) 20/3

(E) CONTROL

POWER TO

GENERATOR

(E) PFB/3

(E) 20/3

(E) ATS

SPACE

HEATER

(E) ATS

(E) ATS

(E) 20/2

(E) SWBD

HEATER AND

THERMOSTAT

T

PROVISION FOR FUTURE

EXTENSION

(E) EMERGENCY MAIN SWITCHBOARD "EMSA"

277/480 VOLT, 3 PHASE, 4 WIRE, 4000A BUSSING, 34kAIC

(E) 20/2

(E) SWBD

HEATER AND

THERMOSTAT

T

PNL

"MP"

(E) 70/3

PNL

"AA"

(E) 100/3

PNL

"HEA"

(E) 400/3

PNL

"A"

(E) 225/3

PNL

"HEC"

(E) 400/3

(N)

PANEL

"HECPA"

(N) 400/3

CH

(N) 200/3

(E) EMERGENCY SWITCHBOARD "EMSB"

277/480 VOLT, 3 PHASE, 4 WIRE, 800A BUSSING, 34kAIC

(E) GND.

G

TO (E) DIST

PANEL "HDP"

(E) 800/3

277/480 VOLT, 3 PHASE, 4 WIRE, 800A BUSSING, 34kAIC

(E) PFB/3 (E) PFB/3

(E) 20/3

(E) SWBD

HEATER AND

THERMOSTAT

T

(E) (4) 4" C.O.

STUB AND CAP

(E) (4) 4" C.O.

STUB AND CAP

(E) (1) 2"

C.O. TO

TTBC

(E) (E) (E) (E) (E) (E) (E) (E)

400AF

NO SCALE

AC UNIT CONNECTION DETAIL

E3.1

(E) AU/C UNIT CURB.

(E) ROOF

NEW AC UNIT

PROVIDE NEW 30AF FUSED DISCONNECT

SWITCH FOR NEW POWER EXHAUST

ECONOMIZER. COORDINATE FUSE SIZE

WITH AIR CONDITIONER UNIT SCHEDULE

ON SHEET M0.2

PROVIDE NEW 30AF FUSED DISCONNECT

SWITCH FOR AC UNIT FAN. COORDINATE

FUSE SIZE WITH AIR CONDITIONING UNIT

SCHEDULE ON SHEET M0.2

DISCONNECT AND REMOVE (E)

DISCONNECT SWITCH. PROVIDE NEW WP

J-BOX TO INTERCEPT (E) CIRCUIT

(E) AC UNIT FEEDER

J

FLEXIBLE CONDUIT

N GND

PROVIDE ISOLATED

NEUTRAL. DO NOT

BOND NEUTRAL BAR

TO GROUND BAR AT

THIS LOCATION

PROVIDE GROUND

ROD PER DETAIL

"6/E4.1"

ADDITIONAL BUILDING DISCONNECTING

MEANS LOCATION. PROVIDE GROUNDING

PER CEC-250.32 PROVIDE IDENTIFICATION

PER CEC-225.37 AT NEW DISCONNECT

LOCATION AND ALL APPLICABLE EXISTING

DISCONNECT LOCATIONS. COORDINATE

ALL REQUIREMENTS WITH OWNER.

Department of General Services Administrative Services

Sacramento, Ca. 95827 9660 Ecology Lane

P. 916.876.6192

Architectural Services Division

DATE

REVISIONS:

DESIGN BY:

DRAWN BY:

DESCRIPTIONNO.

FACILITY NO.

SHEET NO.

PROJECT TITLE:

SHEET TITLE:

LOG NO.

100% CD

CONSTRUCTION DOCUMENTS

11.19.2021

12500 BRUCEVILLE ROAD

RIO COSUMNES

CORRECTIONAL CENTER

00080

CENTRAL CHILLED

WATER PLANT

SKL

BJ

210513.00

PM - DESIGN TEAM

PROJECT NO.

AC - IS

C A

ENGINEERING CONSULTANTS, INC.

RANCHO CORDOVA, CALIFORNIA

P I T A L

Electrical Engineers Lighting Designers

100 Howe Ave., Suite 235N

Sacramento, CA 95825-8217

PROJECT #:

www.mneilsengineering.com

Tel: (916) 923-4400

PROJECT MGR: STUART LINDSAY

11/19/2021

21146.21

E3.1

Attachment H - Reference Project Design - abandoned at 95%CD (page 4 of 4):

Background:

This project design incorporated a chilled water only Hydronic plant with new rooftop air handlers using chilled water coils and unit level gas heating.

The proposed design on the forthcoming contract award will locate the chilled/hot water plant at the same location as shown in this set, and utilize the same electrical pathway.

This set of plans showcases to the proposing consultant that the county wishes to replace these 20 rooftop HVAC units and locate a new HVAC plant between buildings 550 and 570.

Reference also attachment G content.

File details come from the government source that posted it. Updated .