This document is a design guide template for the Department of Veterans Affairs (VA) Enterprise Data Center and Infrastructure Collaboration Team, specifically focusing on telecommunications infrastructure standards. The document provides detailed technical specifications and visual diagrams for various data center components, including:
- UTP (Unshielded Twisted Pair) media details, featuring recommended copper trunk cables with specific part numbers, connector types, and cable assemblies. 2. Network rack designs, including vertical cable management systems with dimensions of 76.94" height and 10.26" width, featuring security door options and cable management capabilities. 3. Power Distribution Unit (PDU) specifications for different zones and rooms, including 30A and 60A three-phase zone PDUs with detailed input/output voltage requirements. 4. Uninterruptible Power Supply (UPS) options for computer rooms, telecom, and entrance rooms, showcasing modular UPS systems from manufacturers like Eaton and APC with varying capacities and mounting configurations. 5. Temperature and humidity monitoring equipment, including rack-mounted sensors and placement guidelines for environmental monitoring in data center infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24W25Q0276_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT:
DRAWING No:
DATE
ISSUE:
DESCRIPTIONMARK
FILE:
OIT_DESIGN_GUIDE_TEMPLATES-V4 -
TD.VSDX
DESIGN BY: KEVIN GRZELKA, CTDC
VERIFIED BY:
DOC VERSION No:
PROJECT NO:
SHEET TITLE
ISSUE DATE: June 1, 2023
SHEET: 46 OF 57
MICHAEL JULIAN, RCDD
JOHN WERNAU, KELLY BATES
4.0
OIT DESIGN GUIDE TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
UTP MEDIA DETAILS
DEPARTMENT OF VETERANS
AFFAIRS
ENTERPRISE DATA CENTER
INFRASTRUCTURE COLLABORATION TEAM
OFFICE OF INFORMATION AND
TECHNOLOGY
INFRASTRUCTURE OPERATIONS –
APPLICATION HOSTING, CLOUD AND
EDGE SOLUTIONS
ENTERPRISE DATA CENTER AND
INFRASTRUCTURE ENGINEERING
RECOMMENDED UTP PATCH PANEL
LEVITON E2XHD-BLK HIGH-DENSITY ANGLED
48 POSITION
ONE RU PER PANEL
WITH REAR CABLE MANAGER
ANGLED PANEL COVERS
A-SIDE JACK COLOR: BLUE
A-SIDE UTP TRUNK CABLES
UTP PATCH PANEL
PART NUMBER: CTA-U6AP06LXXXF-CLNXA24N-CLNXA24N-CB01E WHERE XXX IS THE LENGTH IN FT
DESCRIPTION:
CAT 6A UTP CMP CABLE ASSEMBLY; BUNDLE OF 6 BLUE CABLES
BERK-TEK - LANMARK-10G2 (UTP) BRANDED CABLE USED, TIA/EIA WIRING T568B
TESTED TO ANSI/TIA 568.2-D
CUSTOM LABELING, NO PULLING EYE
FIRST END TERMINATION: ATLAS-X1 E2XHD CONNECTOR WITH BLUE JACK 24 IN. BREAKOUT LENGTH. SECOND
END TERMINATION: ATLAS-X1 E2XHD CONNECTOR WITH BLUE JACK 24 IN. BREAKOUT LENGTH
B-SIDE UTP TRUNK CABLES
B-SIDE JACK COLOR: YELLOW
PART NUMBER: CTA-U6AP06LXXXF-CYNXA24N-CYNXA24N-CB01E WHERE XXX IS THE LENGTH IN FT
DESCRIPTION:
CAT 6A UTP CMP CABLE ASSEMBLY; BUNDLE OF 6 BLUE CABLES
BERK-TEK - LANMARK-10G2 (UTP) BRANDED CABLE USED, TIA/EIA WIRING T568B
TESTED TO ANSI/TIA 568.2-D
CUSTOM LABELING, NO PULLING EYE
FIRST END TERMINATION: ATLAS-X1 E2XHD CONNECTOR WITH YELLOW JACK 24 IN. BREAKOUT LENGTH. SECOND
END TERMINATION: ATLAS-X1 E2XHD CONNECTOR WITH YELLOW JACK 24 IN. BREAKOUT LENGTH
PART NUMBER: CTA-U6AP06LXXXF-CLNXA24N-CYNXA24N-CB01E WHERE XXX IS THE LENGTH IN FT
DESCRIPTION:
CAT 6A UTP CMP CABLE ASSEMBLY; BUNDLE OF 6 BLUE CABLES
BERK-TEK - LANMARK-10G2 (UTP) BRANDED CABLE USED, TIA/EIA WIRING T568B
TESTED TO ANSI/TIA 568.2-D
CUSTOM LABELING, NO PULLING EYE
FIRST END TERMINATION: ATLAS-X1 E2XHD CONNECTOR WITH BLUE JACK 24 IN. BREAKOUT LENGTH. SECOND END
TERMINATION: ATLAS-X1 E2XHD CONNECTOR WITH YELLOW JACK 24 IN. BREAKOUT LENGTH
A-SIDE TO B-SIDE CROSS CONNECT UTP TRUNK CABLES
B-SIDE JACK COLOR: YELLOWB-SIDE JACK COLOR: YELLOWA-SIDE JACK COLOR: BLUEA-SIDE JACK COLOR: BLUE
RECOMMENDED UTP MEDIA: ATLAS-X1 COPPER TRUNKS
RECOMMENDED UTP MEDIA: ATLAS-X1 COPPER TRUNKS
RECOMMENDED UTP MEDIA: ATLAS-X1 COPPER TRUNKS
VHAHONOshirL Rectangle
DATE
ISSUE:
DESCRIPTIONMARK
FILE:
OIT_DESIGN_GUIDE_TEMPLATES-V4 -
TD.VSDX
DESIGN BY: KEVIN GRZELKA, CTDC
VERIFIED BY:
DOC VERSION No:
PROJECT NO:
SHEET TITLE
ISSUE DATE: June 1, 2023
SHEET: 53 OF 57
MICHAEL JULIAN, RCDD
JOHN WERNAU, KELLY BATES
4.0
OIT DESIGN GUIDE TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TYPICAL NETWORK RACK
DEPARTMENT OF VETERANS
AFFAIRS
ENTERPRISE DATA CENTER
INFRASTRUCTURE COLLABORATION TEAM
OFFICE OF INFORMATION AND
TECHNOLOGY
INFRASTRUCTURE OPERATIONS –
APPLICATION HOSTING, CLOUD AND
EDGE SOLUTIONS
ENTERPRISE DATA CENTER AND
INFRASTRUCTURE ENGINEERING
6 IN. WIDE VERTICAL CABLE MANAGEMENT3
P/N: OR-MM20VMD706 (OR EQUIVALENT)
MM20 VERTICAL CABLE MANAGEMENT "CAGE", WITH DOOR,
6.45 IN. X 10.26 IN. X 76.94 IN. WHITE
CAPACITY: 350 CATEGORY 6A PATCH CORDS OR 245
CATEGORY 6A PATCH CORDS
LARGER VCM AUTHORIZED IN ACCORDANCE WITH CABLING
REQUIREMENT
6 IN
TYPICAL RACK DIMENSIONS AND SPECIFICATIONS2
FRONT AND REAR HEAVY DUTY PERFORATED SECURITY DOOR (OR-MM20724PDHD-W) (OPTIONAL)
SECURITY DOOR FRONT MOUNTAING HARDWARE
(OR-MM2024DMFHD-W)
SECURITY DOOR REAR MOUNTING HARDWARE
(OR-MM2024DMRHD-W)
PDU MOUNTING BRAACKET KIT (TWO KITS
PER RACK)
P/N: OR-MM20PDUMB1D2W-W
NOTE: TELECOMMUNICATION CHANNEL RACKS ARE REQUIRED IN ALL
TELECOMMUNICATION ROOMS. TELECOMMUNICATION CHANNEL RACKS OR
TELECOMMUNICATION CABINETS MAY BE USED IN THE HORIZONTAL AND
MAIN DISTRIBUTION AREAS.
P/N: OR-MM2073038-W (OR EQUIVALENT)
MIGHTY MO 20 CABLE MANAGEMENT RACK
30 IN. CHANNEL DEPTH, 7 FT HIGH, WHITE FINISH OR EQUIVALENT
DIMENSIONS:
USABLE HEIGHT: 45 RU
DEPTH (US): 30 IN.
HEIGHT (US): 7 FT
WIDTH (US): 23.75 IN.
STATIC LOAD CAPACITY: 2000 LB
SQUARE HOLE
DATE
ISSUE:
DESCRIPTIONMARK
FILE:
OIT_DESIGN_GUIDE_TEMPLATES-V4 -
TD.VSDX
DESIGN BY: KEVIN GRZELKA, CTDC
VERIFIED BY:
DOC VERSION No:
PROJECT NO:
SHEET TITLE
ISSUE DATE: June 1, 2023
SHEET: 55 OF 57
MICHAEL JULIAN, RCDD
JOHN WERNAU, KELLY BATES
4.0
OIT DESIGN GUIDE TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TYPICAL RACK AND ZONE PDUS
DEPARTMENT OF VETERANS
AFFAIRS
ENTERPRISE DATA CENTER
INFRASTRUCTURE COLLABORATION TEAM
OFFICE OF INFORMATION AND
TECHNOLOGY
INFRASTRUCTURE OPERATIONS –
APPLICATION HOSTING, CLOUD AND
EDGE SOLUTIONS
ENTERPRISE DATA CENTER AND
INFRASTRUCTURE ENGINEERING
CHATSWORTH ECONNECT PDU OR EQUIVALENT; VERTICAL; MONITORED;
L21-20 PLUG; THREE-PHASE; 120/208 V INPUT; 20 A; (30) C13 (6)
C19 OUTLETS; 208 V OUTPUT; 3 X 2P 20 A; LCD; ETHERNET, USB,
AND ENVIRONMENTAL SENSOR PORTS; IP AND SERIAL MONITORING; IP
CONSOLIDATION (PDU LINKING); TOOL-LESS MOUNTING; 70.5 IN. H (1791
MM) X 2.2 IN. W (56 MM) X 2.2 IN. D (56 MM)
30 A THREE-PHASE ZONE PDU BASE UNIT – REAR CIRCUITS WITH FOUR L21-20R AND SIX
NEMA 5-20 OUTLETS AND TWO 10 FT POWER CORDS TERMINATING IN L21-30P
ZONIT ZPDS-208V30A-L21-4L21-20R-CR OR EQUIVALENT
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2
C H
A T
S W
O R
T H
P R
O D
U C
T
T e m p
/H u m id ity O u t
In
/ IO
IO
IO
/1
R e s e t
W a rn in g
O K
C ritic a l
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O F
F
O
O
NI
C B
O F
F
O
O
NI
C B
O F
F
O
O
NI
C B
60 A THREE-PHASE ZONE PDU BASE UNIT - REAR SIX L21-20R OUTPUT RECEPTACLES WITH 10 FT POWER CORDS
TERMINATING IN HARDWIRE BOX
ZONIT ZPDS-208V60A-HW-6L21-20R OR EQUIVALENT
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
LEG 2LEG 1
APC AP8861 RPDU OR EQUIVALENT; RACK PDU 2G,
METERED; L21-20 PLUG; THREE-PHASE; 120/208 V INPUT;
20 A; ZERO U; 5.7 KW, 208V, (36) C13 & (6) C19 & (2)
5-20 OUTLETS; FOR USE IN TELECOMMUNICATIONS ROOMS
AND LOCATIONS WITH LEGACY 110 V ONLY EQUIPMENT
R A
C K
P D
U R
A C
K P
D U
REQUIRES ONE L21-20R
20A
120/ 208V
Y
REQUIRES ONE L21-20R
20A
120/ 208V
Y
REQUIRES ONE L21-20R
20A
120/ 208V
Y
REQUIRES ONE L21-20R
20A
120/ 208V
Y
THE CORRECT SPECIFICATION FOR THE ZONE PDU IS TO ENERGIZE IT FROM TWO INDEPENDENT POWER SOURCES.
EACH INPUT WILL USE IDENTICAL SPECS: WYE (5-WIRE), 208 V, 30 A, THREE-PHASE, TERMINATING IN A NEMA L21-30R LOCKING RECEPTACLE. THE NEUTRAL CONDUCTOR SHOULD BE UPSIZED ONE GAUGE TO MATCH THE UPSIZED NEUTRAL CONDUCTORS IN THE ZONE PDU UNITS. THE NEUTRAL "UPSIZING" SHOULD IDEALLY BE CONTINUED IN THE POWER DISTRIBUTION SYSTEM BACK TO THE UPS OR TRANSFORMER WINDING POLE. THIS INCREASES THE EFFICIENCY OF THE POWER DISTRIBUTION SYSTEM AND SUPPRESSES HARMONICS IN THE SYSTEM.
NOTE: THE CORRECT SPECIFICATION FOR THE ZONE PDU IS TO ENERGIZE IT FROM TWO INDEPENDENT POWER SOURCES.
EACH INPUT WILL USE IDENTICAL SPECS: WYE (5-WIRE), 208 V, 30 A, THREE-PHASE, TERMINATING IN A NEMA L21-30R LOCKING RECEPTACLE. THE NEUTRAL CONDUCTOR SHOULD BE UPSIZED ONE GAUGE TO MATCH THE UPSIZED NEUTRAL CONDUCTORS IN THE ZONE PDU UNITS. THE NEUTRAL "UPSIZING" SHOULD IDEALLY BE CONTINUED IN THE POWER DISTRIBUTION SYSTEM BACK TO THE UPS OR TRANSFORMER WINDING POLE. THIS INCREASES THE EFFICIENCY OF THE POWER DISTRIBUTION SYSTEM AND SUPPRESSES HARMONICS IN THE SYSTEM.
NOTE: NOTE: THE CORRECT SPECIFICATION FOR THE ZONE PDU IS TO ENERGIZE IT FROM TWO INDEPENDENT POWER SOURCES. EACH
INPUT WILL USE IDENTICAL SPECS: WYE (5-WIRE), 208 V, 60 A, THREE-PHASE, TERMINATING IN A JUNCTION BOX TO BE HARDWIRED INTO THE ZONE PDU. THE NEUTRAL CONDUCTOR SHOULD BE UPSIZED ONE GAUGE TO MATCH THE UPSIZED NEUTRAL CONDUCTORS IN THE ZONE PDU UNITS. THE NEUTRAL "UPSIZING" SHOULD IDEALLY BE CONTINUED IN THE POWER DISTRIBUTION SYSTEM BACK TO THE UPS OR TRANSFORMER WINDING POLE. THIS INCREASES THE EFFICIENCY OF THE POWER DISTRIBUTION SYSTEM AND SUPPRESSES HARMONICS IN THE SYSTEM.
NOTE: THE CORRECT SPECIFICATION FOR THE ZONE PDU IS TO ENERGIZE IT FROM TWO INDEPENDENT POWER SOURCES. EACH
INPUT WILL USE IDENTICAL SPECS: WYE (5-WIRE), 208 V, 60 A, THREE-PHASE, TERMINATING IN A JUNCTION BOX TO BE HARDWIRED INTO THE ZONE PDU. THE NEUTRAL CONDUCTOR SHOULD BE UPSIZED ONE GAUGE TO MATCH THE UPSIZED NEUTRAL CONDUCTORS IN THE ZONE PDU UNITS. THE NEUTRAL "UPSIZING" SHOULD IDEALLY BE CONTINUED IN THE POWER DISTRIBUTION SYSTEM BACK TO THE UPS OR TRANSFORMER WINDING POLE. THIS INCREASES THE EFFICIENCY OF THE POWER DISTRIBUTION SYSTEM AND SUPPRESSES HARMONICS IN THE SYSTEM.
APC AP9560 OR EQUIVALENT RACK MOUNT PDU; L5-30 PLUG;
(10) NEMA 5-20 OUTLETS; 1 RU; TWO PER ENCLOSURE;
ONE ENERGIZED BY UPS; ONE ENERGIZED BY WALL OUTLET
SPECIFICATIONS: RATED INPUT VOLTAGE: 208 V THREE-PHASE; AMPERAGE: 60 A
INPUT CORD TERMINATION: HARDWIRE BOX
OUTPUT RECEPTACLES: SIX L21-20R
OUTPUT BRANCH CIRCUIT PROTECTION:
INDIVIDUAL 20 A CIRCUIT BREAKERS PROTECT EACH OUTPUT PHASE
OF EACH OUTPUT RECEPTACLE
SPECIFICATIONS: RATED INPUT VOLTAGE: 208 V THREE-PHASE; AMPERAGE: 60 A
INPUT CORD TERMINATION: HARDWIRE BOX
OUTPUT RECEPTACLES: SIX L21-20R
OUTPUT BRANCH CIRCUIT PROTECTION:
INDIVIDUAL 20 A CIRCUIT BREAKERS PROTECT EACH OUTPUT PHASE
OF EACH OUTPUT RECEPTACLE
ZONE PDU INPUTS
REQUIRE TWO L21-30RS
ZONE PDU INPUTS
REQUIRE TWO L21-30RS
TYPICAL 30A ZONE PDU
TYPICAL 30A ZONE PDU
4 TYPICAL 60A ZONE PDU
TYPICAL 60A ZONE PDU
USED IN TELECOMMUNICATIONS ROOMS AND ENTRANCE
ROOMS WHERE 110 V DISTRIBUTION USING NEMA 5-15 OR
NEMA 5-20 RECEPTACLES ARE REQUIRED IN ADDITION TO
THE STANDARD 208 V
NOTE: USED IN TELECOMMUNICATIONS ROOMS AND ENTRANCE
ROOMS WHERE 110 V DISTRIBUTION USING NEMA 5-15 OR
NEMA 5-20 RECEPTACLES ARE REQUIRED IN ADDITION TO
THE STANDARD 208 V
NOTE:
208V RACK PDU FOR COMPUTER ROOMS
208V RACK PDU FOR COMPUTER ROOMS
208V RACK PDU FOR TRS AND ENTRANCE ROOMS2120V RACK PDU FOR TES
120V RACK PDU FOR TES
USED IN TELECOMMUNICATIONS ENCLOSURES ONLYNOTE: USED IN TELECOMMUNICATIONS ENCLOSURES ONLYNOTE:
REQUIRES ONE L5-30RREQUIRES ONE L5-30R
DATE
ISSUE:
DESCRIPTIONMARK
FILE:
OIT_DESIGN_GUIDE_TEMPLATES-V4 -
TD.VSDX
DESIGN BY: KEVIN GRZELKA, CTDC
VERIFIED BY:
DOC VERSION No:
PROJECT NO:
SHEET TITLE
ISSUE DATE: June 1, 2023
SHEET: 56 OF 57
MICHAEL JULIAN, RCDD
JOHN WERNAU, KELLY BATES
4.0
OIT DESIGN GUIDE TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TYPICAL UPSS
DEPARTMENT OF VETERANS
AFFAIRS
ENTERPRISE DATA CENTER
INFRASTRUCTURE COLLABORATION TEAM
OFFICE OF INFORMATION AND
TECHNOLOGY
INFRASTRUCTURE OPERATIONS –
APPLICATION HOSTING, CLOUD AND
EDGE SOLUTIONS
ENTERPRISE DATA CENTER AND
INFRASTRUCTURE ENGINEERING
EATON 93PM (93PM-L FOR 208 V MODEL)
• CLEARANCE
• FRONT: 36 IN.
• BACK (TOP EXHAUST): 0 IN.
• BACK (REAR EXHAUST): 10 IN.
• BATTERY CABINET
• 16.7 IN. FOR SMALL
• 34.2 IN. FOR LARGE
• DISTRIBUTION PANEL
31.3 IN.
APC SYMMETRA PX 10-100
1 RACK-MOUNT 5 KW UPS FOR TRS AND ENTRANCE ROOMS
RACK MOUNT UPS.
CAPACITY: 5 KW (EXTERNAL BATTERY MODULES AVAILABLE)
INPUT VOLTAGE: 208 V
INPUT CONNECTION: L21-20P, THREE-PHASE, FOUR-WIRE +
GROUND
OUTPUT CONNECTION: L21-20R
SIZE: 6 RU, 19 IN. RACK-MOUNTABLE
RUNTIME: 16.5 MINUTES AT 50% LOAD
(EATON BLADEUPS ZC0517700110000
OR EQUIVALENT)
Smart-UPS 3000
Esc
• CLEARANCE
• FRONT: 36 IN.
• REAR: 40 IN.
• BATTERY CABINET
• 23.62 IN.
• DISTRIBUTION PANEL
• 11.8 IN.
• BYPASS
• 11.8 IN.
• POWER MODULES
23.62 IN.
P O
W E
R M
O D
U
LE
B Y
P A
S S
B A
T
TE
R Y
C
A B
IN
E
T
D
IS
T R
O
P O
W E
R M
O D
U
LE
B Y
P A
S S
B A
T
TE
B
IN
E
T
D
IS
T R
O
• CLEARANCE
• FRONT: 36 IN.
• REAR: 40 IN.
• BATTERY CABINET
• 23.62 IN.
• DISTRIBUTION PANEL
• 11.8 IN.
• BYPASS
• 11.8 IN.
• POWER MODULES
23.62 IN.
P O
W E
R M
O D
U
LE
B Y
P A
S S
B A
T
TE
B
IN
E
T
D
IS
T R
O
D
IS
TR
O
P
N
E L
B A
TTE
B
IN
E T
P O
W E
M
D U
LE
S
B Y
P A
S S
D
IS
N
E L
B A
TTE
B
IN
E T
P O
W
D U
LE
S
B Y
P A
S S
B A
TTE
B
IN
E T
P O
W
D U
LE
S
B Y
P A
S S
D
IS
N
E L
B A
TTE
B
IN
E T
P O
W
D U
LE
S
B Y
P A
S S
D
IS
N
E L
• BYPASS
• 14.69 IN. FOR 480 V
• 12.45 IN. FOR 208 V
• POWER MODULES
• 480 V
• 30-150 KW – 22 IN.
• 160-200 KW – 32 IN.
• 208 V
• 10-120 KW – 22 IN.
• 10-160 KW – 34.4 IN.
10-200 KW – 43.3 IN
20A 120/ 208V
Y
2 RACK-MOUNT 2.88 KW UPS FOR TES
4 MODULAR UPS OPTION SFOR COMPUTER ROOMS3 MODULAR UPS OPTION FOR COMPUTER ROOMS
RACK MOUNT UPS. L5-30 INPUT. L5-30 OUTPUT.
CAPACITY NTE 2880 VA. 2 RU. METERED
(APC SMX3000RMLV2U OR EQUIVALENT)
10-100 KW MODULAR UPS
FRAME COMMENSURATE WITH COMPUTER ROOM
ULTIMATE CAPACITY; POWER MODULES BUILT OUT
TO N+1 INTERNAL REDUNDANCY BASED ON
CRITICAL LOAD
REQUIRES FRONT AND REAR CLEARANCE
10-200 KW MODULAR UPS
FRAME COMMENSURATE WITH COMPUTER ROOM ULTIMATE CAPACITY; POWER MODULES
BUILT OUT TO N+1 INTERNAL REDUNDANCY BASED ON CRITICAL LOAD
ONLY REQUIRES FRONT CLEARANCE
DATE
ISSUE:
DESCRIPTIONMARK
FILE:
OIT_DESIGN_GUIDE_TEMPLATES-V4 -
TD.VSDX
DESIGN BY: KEVIN GRZELKA, CTDC
VERIFIED BY:
DOC VERSION No:
PROJECT NO:
SHEET TITLE
ISSUE DATE: June 1, 2023
SHEET: 57 OF 57
MICHAEL JULIAN, RCDD
JOHN WERNAU, KELLY BATES
4.0
OIT DESIGN GUIDE TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TYPICAL TEMPERATURE AND
HUMIDITY MONITORING
DEPARTMENT OF VETERANS
AFFAIRS
ENTERPRISE DATA CENTER
INFRASTRUCTURE COLLABORATION TEAM
OFFICE OF INFORMATION AND
TECHNOLOGY
INFRASTRUCTURE OPERATIONS –
APPLICATION HOSTING, CLOUD AND
EDGE SOLUTIONS
ENTERPRISE DATA CENTER AND
INFRASTRUCTURE ENGINEERING
CHATSWORTH 14665-001
USB TEMPERATURE AND
HUMIDITY SENSOR (OR
EQUIVALENT)
EcoControl4
A u x
A u x
R e s e t
Console 2
O K
W a rn in g
C ritic a l
/1
/1
C o n s o le
O u t
In
/ IO
IO
IO
Secure Array
EcoControl4
A u x
A u x
R e s e t
Console 2
O K
W a rn in g
C ritic a l
/1
/1
C o n s o le
O u t
In
/ IO
IO
IO
Secure Array
FRONT OF RACK
BACK OF RACK
TEMPERATURE AND HUMIDITY SENSOR
TEMPERATURE AND HUMIDITY SENSOR LOCATIONS AND CONNECTIONS
File details come from the government source that posted it. Updated .