PAC IDIQ (WMSL 418) - Blank SOSS.xls
XLS spreadsheet 80 KB Posted
- Solicitation number
- 70Z08526SSN_USCG_DD_FY28_FY33
About this file
This is a blank Statement of Services and Supplies (SOS&S) pricing schedule template for the Pacific Area WMSL-418 Drydock IDIQ contract covering fiscal years 2028-2033. The schedule contains 128 line items (D-01 through D-128, with optional items marked "O") representing drydocking services and maintenance tasks for the USCG's Maritime Security Cutter, Large (WMSL) vessels homeported in Alameda, California and Honolulu, Hawaii. All line items are currently priced at $0.00 per job, indicating this is an unfilled template awaiting contractor pricing submissions.
The pricing schedule encompasses comprehensive drydocking and vessel maintenance services including tenting, air conditioning systems, hull inspections, propulsion components, cathodic protection, deck coverings, hydraulic systems, steering systems, and preservation work across multiple vessel compartments and systems. The template includes provisions for composite labor rates (currently set at 55 hours), G&A factors (15% assumed), and profit factors (10% assumed), with a detailed labor breakdown by trade classification (engineering technician, machinist/pipe fitter, electrician, shipfitter, welder, firewatch, insulator/lagger, painter, general labor, and superintendent/QA/NDT personnel). The template also references geographic labor rate areas including Baltimore, Honolulu, Los Angeles, San Diego, and other coastal shipyard locations, with rates ranging from 45 to 67 depending on location. This template is designed for contractors to input their proposed unit prices and labor hour requirements for the anticipated six planned drydocks and one emergent drydock during the 2028-2033 performance period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PAC WMSL DD FY28_Sources Sought Notice 10 Sept 2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| PACIFIC AREA WMSL-418 DRYDOCK IDIQ 2028 - 2033 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-01 | Tenting (Drydock), Provide | $0.00 | JOB | 1 | $0.00 |
| D-02 | Tenting (Flight Deck), Provide | $0.00 | JOB | 1 | $0.00 |
| D-03 | Tenting (Mast), Provide | $0.00 | JOB | 1 | $0.00 |
| D-04 | Tenting (Weather Decks), Provide | $0.00 | JOB | 1 | $0.00 |
| D-05 | Air Conditioning Units Flex Hoses And Expansion Joints, Renew | $0.00 | JOB | 1 | $0.00 |
| D-06 | Air Conditioning Plants, Groom | $0.00 | JOB | 1 | $0.00 |
| D-07 | Anchor Windlass Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-08 | Anchor Windlass Level 2, Inspect and Repair | $0.00 | JOB | 1 | $0.00 |
| D-09 | Anchors Chains and Ground Tackles, Inspect and Preserve | $0.00 | JOB | 1 | $0.00 |
| D-10 | Sea Valves and Waster Pieces, Overhaul | $0.00 | JOB | 1 | $0.00 |
| O-11 | Bilges, Preserve (Partial) | $0.00 | JOB | 1 | $0.00 |
| D-12 | Bow Thruster Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-13 | Bow Thruster Unit (General), Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-14 | Cargo Handling Elevator, Annual Inspection and Test, Perform | $0.00 | JOB | 1 | $0.00 |
| D-15 | Cargo Handling Elevator, Level 2 | $0.00 | JOB | 1 | $0.00 |
| D-16 | Cascade Orificial Resistive Device, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-17 | Cathodic Protection (Zincs), Renew | $0.00 | JOB | 1 | $0.00 |
| D-18 | Chain Lockers and Sump, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| O-19 | Chain Lockers and Sump, 100% Preserve | $0.00 | JOB | 1 | $0.00 |
| O-20 | Chain Lockers and Sump, Partial Preserve | $0.00 | JOB | 1 | $0.00 |
| D-21 | Propulsion Shaft Alignment & Bearings (External) Clearances, Check | $0.00 | JOB | 1 | $0.00 |
| D-22 | Circuit Breakers (Draw Out), Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-23 | Chill Water System, Clean and Flush | $0.00 | JOB | 1 | $0.00 |
| D-24 | Controllable Pitch Propeller Hub Assembly, General Maintenance | $0.00 | JOB | 1 | $0.00 |
| D-25 | Controllable Pitch Propeller Hub, Renew | $0.00 | JOB | 1 | $0.00 |
| D-26 | Controllable Pitch Propeller System, Perform General Maintenance | $0.00 | JOB | 1 | $0.00 |
| D-27 | Deck Covering (Polymeric), Renew | $0.00 | JOB | 1 | $0.00 |
| D-28 | Deck Covering (Polymeric), Repair and Seal | $0.00 | JOB | 1 | $0.00 |
| D-29 | Deck Covering (Slip-Resistant) Flight Deck, Renew | $0.00 | JOB | 1 | $0.00 |
| D-30 | Deck Covering (Slip-Resistant) Hangars, Renew | $0.00 | JOB | 1 | $0.00 |
| D-31 | Deck Covering (Slip-Resistant) Mast, Repair/Patch | $0.00 | JOB | 1 | $0.00 |
| D-32 | Deck Covering (Slip-Resistant), Renew | $0.00 | JOB | 1 | $0.00 |
| D-33 | Doppler Speed Log Valve, Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-34 | Doppler Speed Log, General Maintenance | $0.00 | JOB | 1 | $0.00 |
| D-35 | Dry Provision Storeroom, Modify | $0.00 | JOB | 1 | $0.00 |
| D-36 | Drydocking, Accomplish | $0.00 | JOB | 1 | $0.00 |
| D-37 | Dual Point Davit Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-38 | Dual Point Davit, Biennial Maintenance, Perform | $0.00 | JOB | 1 | $0.00 |
| D-39 | Twin Pivot Davit, Level 2 Maintenance, Perform | $0.00 | JOB | 1 | $0.00 |
| D-40 | Side Boat Davit, Renew | $0.00 | JOB | 1 | $0.00 |
| D-41 | Fall Arrest D-Rings, Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-42 | Fathometer Transducer, General Maintenance | $0.00 | JOB | 1 | $0.00 |
| D-43 | Fathometer Transducer, Renew | $0.00 | JOB | 1 | $0.00 |
| D-44 | Fire Detection System, Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-45 | Fire Prevention, Provide | $0.00 | JOB | 1 | $0.00 |
| D-46 | Flight Deck Nets, Overhaul, Five Year | $0.00 | JOB | 1 | $0.00 |
| D-47 | Folding Boom Cranes, Biennial Maintenance, Perform | $0.00 | JOB | 1 | $0.00 |
| D-48 | Forward And Aft Capstans, Level 2 Overhaul | $0.00 | JOB | 1 | $0.00 |
| O-49 | Freeboard, Preserve (Full) | $0.00 | JOB | 1 | $0.00 |
| O-50 | Freeboard, Preserve (Partial) | $0.00 | JOB | 1 | $0.00 |
| D-51 | Fuel Oil Purifier Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-52 | FWD Gray Water Tank Strainers, Install | $0.00 | JOB | 1 | $0.00 |
| D-53 | Helo Hangar Door, Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-54 | High Purity Water Tank, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-55 | Hull Plates (Freeboard), Inspect | $0.00 | JOB | 1 | $0.00 |
| D-56 | U/W Body, Diver Clean | $0.00 | JOB | 1 | $0.00 |
| D-57 | U/W Body, Diver Inspect | $0.00 | JOB | 1 | $0.00 |
| D-58 | Hull Plates (U/W Body), Inspect | $0.00 | JOB | 1 | $0.00 |
| D-59 | Hull 3D, Laser Scan | $0.00 | JOB | 1 | $0.00 |
| D-60 | Hydraulic Oil Power Module (HOPM) Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-61 | Impressed Current Cathodic Protection System, Inspect and Maintain | $0.00 | JOB | 1 | $0.00 |
| D-62 | Impressed Current, Cathodic Protection System Anodes, Renew | $0.00 | JOB | 1 | $0.00 |
| D-63 | Impressed Current, Cathodic Protection System, Dielectric Shield, Capastic Fairing, Renew | $0.00 | JOB | 1 | $0.00 |
| D-64 | Impressed Current, Cathodic Protection System, Reference Cells, Renew | $0.00 | JOB | 1 | $0.00 |
| D-65 | Incinerator, Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-66 | Lube Oil Purifier Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-67 | Main Diesel Engine Sea Chest Suction Pipe, Modify | $0.00 | JOB | 1 | $0.00 |
| O-68 | Mast, Preserve (Full) | $0.00 | JOB | 1 | $0.00 |
| D-69 | Mast, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-70 | Mast, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-71 | Miscellaneous System Relief Valves, 5 Year Certification | $0.00 | JOB | 1 | $0.00 |
| D-72 | Oily Water Separator (OWS) System, Inspect and Groom | $0.00 | JOB | 1 | $0.00 |
| D-73 | Potable Water Pneumatic Tank, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-74 | Tanks (Potable Water), Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-75 | Propeller Shaft Sleeve, Skim Cut | $0.00 | JOB | 1 | $0.00 |
| D-76 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-77 | Propulsion Shaft GRP Coating, Inspect and Repair (Shaft In Place) | $0.00 | JOB | 1 | $0.00 |
| D-78 | Decks, Preserve (Partial) | $0.00 | JOB | 1 | $0.00 |
| O-79 | Decks, Preserve 100% | $0.00 | JOB | 1 | $0.00 |
| D-80 | Propulsion Shaft Seals (Mechanical), Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-81 | Propulsion Shafting, Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-82 | Refrigeration Plant, System Groom | $0.00 | JOB | 1 | $0.00 |
| D-83 | Propulsion Shaft Bearing (Strut and Stern Tube) Stave, Renew | $0.00 | JOB | 1 | $0.00 |
| D-84 | Rescue Sideport Door Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-85 | Reverse Osmosis, System Groom | $0.00 | JOB | 1 | $0.00 |
| D-86 | Reverse Osmosis Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-87 | Rudder Stock Bearings, Check Clearances | $0.00 | JOB | 1 | $0.00 |
| D-88 | Rudder Stock Seals, Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-89 | Rudder, Inspect and Repair | $0.00 | JOB | 1 | $0.00 |
| D-90 | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 |
| D-91 | Seawater Strainers (All Sizes), Overhaul and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-92 | Sewage System, Modify | $0.00 | JOB | 1 | $0.00 |
| D-93 | Ship Service Diesel Generator (No. 3) Exhaust Piping, Modify | $0.00 | JOB | 1 | $0.00 |
| D-94 | Ship Service Diesel Generator, Engine Major Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-95 | Sideport Shell Door, Level 2, Inspect and Repair | $0.00 | JOB | 1 | $0.00 |
| D-96 | Small Boat Ramp, Level II | $0.00 | JOB | 1 | $0.00 |
| D-97 | SSDG #3 Exhaust Trunk, Renew | $0.00 | JOB | 1 | $0.00 |
| D-98 | SSDG Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-99 | Steering Actuator, Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-100 | Steering Gear Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-101 | Steering System Hydraulic Power Unit (HPU), Inspect and Service | $0.00 | JOB | 1 | $0.00 |
| D-102 | Transom Doors, Inspect and Service | $0.00 | JOB | 1 | $0.00 |
| D-103 | Stern Door Hydraulic and Control System, Modify | $0.00 | JOB | 1 | $0.00 |
| D-104 | Stern Ramp Rails, Modify | $0.00 | JOB | 1 | $0.00 |
| D-105 | Stern Notch Pads, Renew | $0.00 | JOB | 1 | $0.00 |
| D-106 | Stern Tube Brackets, Install | $0.00 | JOB | 1 | $0.00 |
| D-107 | Superstructure, Inspect | $0.00 | JOB | 1 | $0.00 |
| O-108 | Superstructure, Preserve (Partial) | $0.00 | JOB | 1 | $0.00 |
| O-109 | Superstructure, Preserve (Full) | $0.00 | JOB | 1 | $0.00 |
| D-110 | Talon Grid (Type 18-08), Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-111 | Tank Level Indicator (Gray Water Tanks), Install | $0.00 | JOB | 1 | $0.00 |
| O-112 | Tanks, Preserve (100%) | $0.00 | JOB | 1 | $0.00 |
| O-113 | Tanks, Preserve Partial | $0.00 | JOB | 1 | $0.00 |
| D-114 | Speed Log Transducer, Upgrade | $0.00 | JOB | 1 | $0.00 |
| D-115 | Ship Service Switchboards, Upgrade | $0.00 | JOB | 1 | $0.00 |
| D-116 | Transom Double Doors and Tow Outfits, Modify | $0.00 | JOB | 1 | $0.00 |
| O-117 | U/W Body Hull, Preserve (Full) | $0.00 | JOB | 1 | $0.00 |
| O-118 | U/W Body, Preserve (Partial-Condition C) | $0.00 | JOB | 1 | $0.00 |
| O-119 | U/W Body, Preserve (Partial-Condition B) | $0.00 | JOB | 1 | $0.00 |
| O-120 | U/W Body Hull, Preserve (Partial-Condition A) | $0.00 | JOB | 1 | $0.00 |
| O-121 | Voids (Non-Accessible), Preserve | $0.00 | JOB | 1 | $0.00 |
| D-122 | Voids (Non-Accessible), Leak Test | $0.00 | JOB | 1 | $0.00 |
| D-123 | Wave Guide Dryer Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-124 | Welding, Provide (General) | $0.00 | JOB | 1 | $0.00 |
| D-125 | Sewage Holding Tank(s), Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-126 | Vessel in Drydock Temporary Services, Provide | $0.00 | JOB | 1 | $0.00 |
| D-127 | Tanks, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-128 | Stern Tube Shaft Sleeve, Skim Cut | $0.00 | JOB | 1 | $0.00 |
| O-00A | Composite Labor Rate | 0 | Hour | 0 | 0 |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $500.00 | JOB | $0.00 | |
| O-00Z | Laydays | 0 | Day | 5 | $0.00 |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(3/2/2026) Draft-00 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .