This is a Sources Sought Notice for a Military Construction (MILCON) Project P-481 Energy Resilience Phases 3 & 4 at the Mountain Warfare Training Center (MWTC) in Bridgeport, California. The project aims to enhance the base's energy infrastructure resilience through a comprehensive microgrid upgrade, including a 1 MW generator, 500 kW of solar photovoltaics, electrical infrastructure improvements, advanced control systems, and an Energy Management Information System (EMIS). The project has five optional add-on components, including additional solar capacity, a dedicated control building, and a 500 kW Battery Energy Storage System (BESS).

The Sources Sought Notice is targeted at small businesses, including SBA certified 8(a), HUBZone, Service-Disabled Veteran-Owned, and Women-Owned Small Businesses. The estimated contract value ranges from $25 million to $100 million, with a NAICS code of 237130 and a small business size standard of $45 million. Interested contractors must submit a response by March 27, 2025, at 2:00 PM PT, providing company information, business type, bonding capacity, and demonstrating experience with advanced microgrid projects completed within the last five years. The Navy will use the responses to determine whether to set aside the procurement for small businesses or conduct a full and open competition.

View the file

Other files

File Type Posted
Sources Sought Information Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT NOTICE

MILCON Project P-481 Energy Resilience Phases 3 & 4, at Mountain Warfare Training Center (MWTC), Bridgeport, California

1. Action Code: Sources Sought

2. Date: March 06, 2025

3. Year: 2026

4. Contracting Office Zip Code: 92132-5190

5. Classification Code: Z2NZ -- REPAIR OR ALTERATION OF OTHER UTILITIES

6. Contracting Office Address: 750 Pacific Highway, San Diego, California, 92132-5190

7. Proposed Action: Sources Sought Notice for Design-Build MILCON Project P-481 Energy Resilience Phases 3 & 4, at Mountain Warfare Training Center (MWTC), Bridgeport, California

8. Solicitation Number: N62473-25-R-P481

9. Response Closing Date: March 27, 2025 (2:00PM PT)

10. Contact Point: Kelli Cox, Contract Specialist, email Kelli.L.Cox3.civ@us.navy.mil

11. Sources Sought Notice: This Notice does NOT constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to identify potential offerors for market research purposes.

This is not a solicitation announcement. This is a Sources Sought Synopsis announcement only.

This synopsis is a market research tool being utilized for information to be used for preliminary planning purposes. The information received will be used within Naval Facilities Engineering Systems Command (NAVFAC) Southwest to facilitate the decision-making process.

This is a survey of the market of potential qualified Small Businesses, U.S. Small Business Administration (SBA) certified 8(a) Businesses, SBA certified HUBZone Small Businesses, Service-Disabled Veteran-Owned Small Businesses (SDVOSB), and SBA certified Women- Owned Small Businesses (WOSB). Based upon this survey, a decision will be made whether to issue the proposed solicitation to the types of firms indicated above, or to issue as full and open competition (unrestricted).

This Notice does not constitute a Request for Proposal. It is not to be construed as a commitment by the Government for any purpose other than market research and is not restricted to a particular acquisition approach. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests.

Respondents will not be notified of the evaluation and any information submitted by respondents to this notice is strictly voluntary.

The North American Industry Classification System (NAICS) Code is 237130 (Power and Communication Line and Related Structures Construction) with a Small Business Size Standard of $45 million.

The estimated total contract price range, in accordance with DFARS 236.204 is between $25,000,000 and $100,000,000.

All Small Businesses, Service-Disabled Veteran-Owned Small Businesses, SBA certified HUBZone Small Businesses, SBA certified Women-Owned Small Businesses, and SBA certified 8(a) Businesses are encouraged to respond. Upon review of industry response to this Sources Sought Synopsis, the Government will determine whether a set-aside acquisition in lieu of full and open competition is in the Government’s best interest.

This is a new procurement. It does not replace an existing contract. No prior contract information exists.

Offerors can view and/or download the solicitation, and any attachments, at https://www.sam.gov when it becomes available.

Large business concerns will be required to submit a Subcontracting Plan prior to award of the contract.

THIS SYNOPSIS IS NOT A REQUEST FOR PROPOSAL. It is a market research tool being used to determine the availability and adequacy of potential small business sources prior to determining the method of acquisition and issuance of an award. The Government is not obligated to and will not pay for any information received from potential sources as a result of this synopsis. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation at this time. In order to protect the procurement integrity of any future procurement, if any, that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made.

PROJECT DESCRIPTION:

The Marine Corps Mountain Warfare Training Center Bridgeport (MWTC) is a mountain warfare training center whose mission is to conduct Marine Air Ground Task Force exercises, develop warfighting doctrine, and support research, development, testing, and evaluation (RDT&E) of equipment for use in mountain warfare operations. Readiness is dependent on having a reliable and resilient energy infrastructure.

Achieving energy readiness in Bridgeport is challenging for two (2) primary reasons. First, the installation is the last customer on the Southern California Edison (SCE) utility feed. Second, the base is located in an unforgiving, remote, and arduous area of the Sierra Mountains in California.

Every year, the base experiences power outages due to extreme snowfall, sub-zero temperatures, forest fires, heat waves, power quality issues, and other planned and unplanned utility grid events. The base regularly operates for minutes up to weeks, off a single generator with aged infrastructure and inadequate controls. This is a significant vulnerability.

https://www.sam.gov/

Bridgeport is addressing these issues with project P-480. The project focuses on enhancing the reliability and redundancy of the electrical distribution system and enhancing resiliency. The end state of this project is a reliable, resilient, efficient, and cybersecure microgrid that will provide the base the ability to operate critical installation services and mission essential functions off the grid for several weeks with N+1 redundancy. Below is the project:

P-481

The project must provide a 1 MW generator to increase resilience of base-wide backup system.

This generator will augment the renewable energy system, meet the complete power needs of the installation, and provide N+1 redundancy to the existing 1 MW generator. This1 MW generator will primarily run during times of extended island mode, and in support of the DERs, to maximize renewable production and extend available fuel supply. This level of redundancy is crucial to ensure continuity of operations during sub-zero temperature events and during fires when SCE has grid outages.

The project must provide 500 kW of solar photovoltaics. The PV systems must connect to the microgrid. The PV must work in conjunction with the BESS to maximize the use of renewable power. In addition, the configuration will allow the base to continue producing, consuming, and charging the BESS with PV-generated electricity, even when MWTC is disconnected from the SCE grid.

The project must supply additional electrical infrastructure to accommodate the additional distributed sources throughout the installation. This includes providing conductors, coordinating with SCE, installing disconnects and other requirements to successfully interconnect the additional sources to the grid. These upgrades are required for the installation of the additional PV assets described above to connect to the grid and offset utility costs or extend duration while islanded.

The control system that modernizes the equipment must permit synchronization of the SCE power source, two (2) generators, and the BESS along with the PV; the control system must improve power quality and must allow for the installation to remain off SCE power (island) by utilizing power generated from the generators, BESS, and photovoltaic systems on the installation. Currently, photovoltaic systems are not utilized when SCE power is removed and must be manually turned on. The control system must automatically utilize PV even upon loss of SCE power. The control system shall integrate with the point of common coupling and allow for transition between sources of power in order to minimize the installation’s loss of power from a utility outage. During periods which the installation is not connected to SCE (islanded), the control system must regulate the output of the photovoltaic systems at the multipurpose building (Building 4044) to stabilize the installation’s distribution grid and maintain a minimum load on the generator. In order to utilize the multipurpose building’s (Building 4044) photovoltaic systems output after loss of utility power, a fiber optic cable connection must be provided from the controls in Building 2003 to the photovoltaic system.

The project must provide microgrid control functions and equipment required to perform these functions. Advanced controls on all DERs must be provided to expand the microgrid and increase system telemetry throughout buildings to increase efficiency and control loads during grid-tied and islanded operations. The controls will provide capabilities including, but not limited to, the following:

(a) “Smart” controls capable of taking input from the upstream sensors and automatically engaging the necessary DERs to detect, signal and automatically engage the necessary controls and equipment to ensure a continuous flow of “clean” electric power to the installation, preventing outages and power fluctuations that can be damaging to electrical and electronic equipment, thereby reducing maintenance and repair costs.

(b) providing grid-interactive economic opportunities to produce savings by taking advantage of varying utility rates throughout the day and year.

(c) Implement programmed operation modes to optimize base operations based on conditions such as maximum duration, mission-support or normal day-to-day operations.

(d) Communications capabilities to promptly and automatically notify personnel if the control system changes system operations, such as when responding to an incoming power fluctuation and engaging installation DERs.

The project is to provide and Energy Management Information System (EMIS). The energy management information system (EMIS) must integrate the DDC, AMI, and, microgrid monitoring and control in a single historian, with access to a single software suite for visualization, analytics, and fault detection. This will allow operators to view data in a customized way and be alerted to maintenance needs, energy savings opportunities, and understand interactions between systems that would be otherwise unknown.

The project must provide a building to house all of the associated microgrid, building, AMI and any other related utility controls, control/monitoring stations, databases/servers and support personnel. This building is to provide central monitoring/control area for all facility related control systems and equipment including servers, communication nodes and operator interfaces.

This project includes engineering calculations and studies as required by FC1-300-09N.

However, the coordination, load flow and arc flash studies must determine the best scheme and protection of the entire microgrid for both grid-tied and islanded operations during the design.

These studies inform the required electrical upgrades, generate required arc-flash labels, and provide documentation for SCE.

This project must provide training, simulation, and documentation. This includes a complete package of standard operating procedures (SOPs) and emergency operating procedures (EOPs) and in-depth training on the system capabilities, operations, functions, etc. Electronic operation, maintenance, and sustainment instruction (eOMSI) manuals for the EMIS and microgrid system, detailing the operation, commissioning, and maintenance of the system must be proviced. The contractor will also provide a simulated environment for the system for training operators, testing upgrades and performing what-if scenarios. The contractors will prepare maintenance schemes, providing maintenance cost, energy cost, manpower and expected equipment reliability data for all developed maintenance schemes. MWTC facilities leadership will determine which scheme to implement, but all developed schemes will be detailed and delivered to MWTC facilities leadership. The manuals will detail system modes from fully automatic to manual, describe how to perform outage drills, and provide detailed information on efficiency when operating in a prescribed mode. A complete mirrored system, "sandbox" environment will be provided to assist with training and to ensure that system changes (such as patching) will not affect system operation. These documents will help ensure the installation maintains the best possible technologically-advanced maintenance plan at the lowest possible cost while maintaining equipment and system reliability and energy conservation.

Cybersecurity is critical to implementing this project. Certification and Accreditation is required for all FRCSs included in this project. The control systems (including systems separate from an energy management control system) will be designed, acquired and executed in accordance with DoDI 8500.01, DoDI 8510.01, Department of Defense Risk Management Framework (RMF) per UFC 4-010-06, Cybersecurity of Facility-Related Control systems, and UFC 1-200-01, General Building Requirements Section 3-6.5, and other relevant FRCS cybersecurity requirements. All equipment installed (hardware and software) will be open protocol, have the ability to connect to existing and future systems, and will include the proper firewalls. Upon project completion, the MWTC will have an authority to operate (ATO), and a functional and cybersecure FRCSs.

Option 1: Provide an additional 500kW of solar photovoltaics. This would increase the Base Bid solar photovoltaic production from 500kW to 1MW.

Option 2: Provide an additional 500kW of solar photovoltaics. This would increase the Base Bid (500kW) and Option 1 (500kW) solar photovoltaic production to 1.5MW.

Option 3: Provide an additional 500kW of solar photovoltaics. This would increase the Base Bid (500kW), Option 1 (500kW), and Option 2 (500kW) solar photovoltaic production to 2MW.

Option 4: Provide a building to house all of the associated microgrid, building controls, AMI and any other related utility controls, control/monitoring stations, databases/servers and support personnel. This building is to provide central monitoring/control area for all facility related control systems and equipment including servers, communication nodes and operator interfaces.

Option 5: The project must Provide 500 kW Battery Energy Storage System (BESS) to augment the BESS installed from another project. Provide an additional 3 MWh of energy. Expand grid-facing energy storage system, which will work in conjunction with distributed energy resources (DERs), to allow the continuous flow of clean power to the MWTC grid. The BESS must allow the MWTC to be entirely powered by renewable energy during most daylight hours, making MWTC a model of resilience in a cold weather environment. During a multi-day winter outage, the storage will balance load and generation between the PV and the new 1 MW generator. While grid connected, the storage will be used to manage peak demand and support the SCE grid by responding to frequency and voltage transients. Furthermore, stabilizing the grid locally might reduce the likelihood of an outage. The system will disconnect if an unstable grid is detected.

SUBMISSION REQUIREMENTS:

Interested sources are invited to respond to this Sources Sought announcement. The following information shall be provided:

1) Contractor information: Provide your company’s contact information, including Unique Entity ID number and CAGE Code.

2) Type of Business: Identify whether your company is an SBA certified 8(a), SBA certified HUBZone, Service-Disabled Veteran-Owned Small Business, SBA certified Women- Owned Small Business, Small Business or Large Business. For more information on the definitions or requirements for these small business programs, refer to http://www.sba.gov/.

3) Bonding Capacity: Provide your surety’s name, your maximum bonding capacity per project, and your aggregate maximum bonding capacity.

4) Experience: Submit a minimum of two (2) and a maximum of five (5) recent specific government or commercial contracts/projects your company has completed to demonstrate your experience in advanced microgrids (BESS, hybrid renewable energy, and conventional generation microgrid) leveraging existing generation and distribution assets construction as indicated in this announcement. A “specific” project is a single project or a single task order under an indefinite quantity contract or on-call type contract. “Recent” is defined as having been completed within the five years prior to the submission due date of this announcement.

All projects shall have a minimum construction cost of $2,000,000.

http://www.sba.gov/

Projects which do not meet these requirements may not be considered relevant. Additional submission requirements:

− For each of the projects submitted for experience evaluation, provide the following:

o Title and Location o Award and completion dates o Contract or subcontract value o Type of work for overall project and type of work your company self-performed o Customer information including point of contact, phone number, and email address o Whether the work was performed as a prime or a subcontractor o Type of contract (Design-Build or Design-Bid-Build – see Sources Sought

Information form) o Narrative project description o Description of the work that was self-performed by your firm, including the percentage of contract value your firm self-performed.

For design-build projects, identify the name and address of the A-E firm used to provide design or specify if design was performed in-house.

All experience will be evaluated for market research purposes only. Firms are advised that while experience older than five years or not yet 100% complete may demonstrate capability to perform the scope of work, it may not indicate that the firm could be competitive during a future solicitation where only the most recent five years of experience will be accepted. NAVFAC may make an acquisition strategy determination based on the likelihood that a sufficient pool of qualified contractors will be competitive on a future solicitation.

Responses to items 1 through 4 above shall be submitted via the “Sources Sought Information Form.” The minimum font size is 10 point.

Interested parties should provide submissions no later than 2:00 PM Pacific Time on March 27, 2025. The package can be emailed to Kelli.L.Cox3.civ@us.navy.mil. Questions or comments regarding this notice may be addressed to Kelli Cox via email to Kelli.L.Cox3.civ@us.navy.mil.

12. Place of Performance: MWTC Bridgeport, California