This is a Bid Amendment Notice to Vendors issued by the Massachusetts Department of Conservation and Recreation (DCR) for contract P26-3632-X3A related to the procurement of EV charging equipment at Blackstone River and Canal State Park for fleet use. The amendment modifies the terms of the original Request for Proposal and notifies all prospective bidders of changes to the solicitation requirements. The document serves as an official notice to ensure that all vendors interested in submitting proposals are aware of the amendments prior to the submission deadline and can adjust their bids accordingly.
The amendment document provides guidance to vendors on how the original RFP specifications, timelines, or evaluation criteria have been modified. Vendors are required to acknowledge receipt of this amendment and incorporate any changes into their proposals. The specific details regarding pricing, technical specifications, site visit requirements, bid submission deadlines, and other contractual terms should be referenced within the original RFP documents and this amendment notice to ensure full compliance with the revised solicitation requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice to Vendors Project Number: P26-3632-X3A
DCR Fleet EV Charging Station Site Blackstone River and Canal SP Thank you to the vendors who attended the April 2nd Site Visit for Blackstone River and Canal SP. Based on the information collected during the site visit and feedback from prospective bidders, DCR is issuing the following amendment and clarification to the bid
EV Charging Station proposed location
• The light located directly above where the EV Charging Station will be located needs to be moved upward to allow for the proper installation of the EV Charging Station
Relocate existing light directly above new EV charging station Patch hole
EVSE Subpanel
• EVSE Subpanel is no longer required – see attached revised Electrical Sketch
Disconnect Switch
• As this is a full power EV Charging station – (2) disconnect switches may be required (to be mounted at the same location as previously shown)
Please ensure that these updates are reflected in your final bid submission.
| P26-3632-X3A Bid Ammendment - Notice to Vendors |
| DCR Fleet EV Charging Stations Blackstone River and Canal SP Electrical Sketch REVISED |