DCR Fleet Charging Station Site Blackstone River and Canal SP P26-3632-X3A RFP Attachment.pdf
PDF 2 MB Posted
- Solicitation number
- BD-26-1020-DCRCU-DC250-126957
- Issued by
- Massachusetts
About this file
This is an RFP attachment issued by the Massachusetts Department of Conservation and Recreation (DCR) for the procurement of electric vehicle (EV) charging equipment installation and commissioning services at the Blackstone River and Canal State Park site for fleet use. The project encompasses the purchase, installation, and commissioning of EV charging stations designed to support DCR fleet operations. The RFP document serves as a technical specification and requirements attachment outlining the scope of work, equipment standards, and installation specifications necessary for successful project completion. Specific response dates, bid submission deadlines, site visit schedules, and bidders' conference information are contained within the associated RFP materials; award timelines and contract terms including any renewal or extension options would be detailed in the primary RFP document and are not specified in this attachment alone.
The attachment likely contains detailed technical requirements, equipment specifications, installation standards, performance criteria, and site-specific conditions necessary for vendors to prepare accurate proposals and pricing. Pricing terms, payment schedules, funding sources, and any applicable set-asides or preferences would be documented in the complete RFP package. Information regarding incumbent contractors, current charging infrastructure at the site, and environmental or operational considerations relevant to the Blackstone River and Canal State Park location would inform vendor planning and cost estimations. Additional salient details regarding performance bonds, insurance requirements, warranty provisions, and maintenance responsibilities during and after the contract term would be addressed in the full RFP documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
Blackstone River and Canal SP, Park Office, 271 Oak Street, Uxbridge, MA 01569
EQUIPMENT
• (1) Level 2 EV Charging Station – ChargePoint CT4000, Dual Port, Networked, Wall Mounted (or approved alternative)
• (1) EVSE Subpanel, 100A
• (1) Disconnect Switch, Labeled as per requirements of the Electrical Code
• (1) Wall Mount Guard – evCHARGEsolutions – Part no. EVCS-GRD-A-01 or (1) evCHARGEsolutions Part no. Mini Wall Guard - if previous part number will not fit (or approved alternative)
• Conduit, Wiring, Circuit Breakers, Junction Boxes, and all other associated equipment/parts needed for a complete operational system
GENERAL
• EV Charging Station to be mounted on building exterior at the designated location
• Disconnect Switch to be mounted on building exterior at the designated location, in line of sight of the EV Charging Station, and at a minimum distance of 20ft from the EV Charging Station
• EVSE Subpanel to be mounted in building interior
• All wiring to be run in conduit
• All wiring to be Copper
• Contractor is responsible for inspection, permitting, and equipment commissioning
• All work performed to be in accordance with the latest recognized National Electrical Code and applicable local codes
BLACKSTONE RIVER AND CANAL HERITAGE STATE PARK
PARK OFFICE
271 OAK STREET
UXBRIDGE, MA 01569
EXISTING
PROPOSED
SCOPE OF PROJECT
- INSTALL ONE EVSE [ELECTRICAL VEHICLE SUPPLY EQUIPMENT].
- EVSE TO BE POWERED BY NEW SUB PANEL LOCATED INSIDE OF BUILDING.
- EVSE TO HAVE DISCONNECT SWITCH MOUNTED ON EXTERIOR WALL.
- ALL CONDUIT TO BE RUN IN THE INTERIOR OF BUILDING.
- EVSE TO BE DOUBLE PORT.
- EVSE TO BE WALL MOUNTED.
- EVSE TO HAVE WALL MOUNT GUARD FOR PROTECTION.
ChargePoint CT4000 Family
2 chargepoint.com
CT4000 Mechanical Drawings
16.9” (430 mm)
3.5” (88 mm)
13.7” (347 mm)
46.7” (1186 mm)
9.2” (233 mm)
71.1” 06 mm)
13.7” (347 mm)
46.7” (1186 mm)
9.2” (233 mm)
71.0” (1805 mm)
17.3” (440 mm)
11.8” (299 mm)
CT4021 Bollard CT4023 Wall Mount
R
500 Canal View Blvd, Suite 100 | Rochester, NY 14623 | www.evCHARGEsolutions.com 585 • 533 • 4051 | Monday-Friday, 8am-5pm ET
LEADING EV CHARGING EQUIPMENT DISTRIBUTOR IN NORTH AMERICA
Typical installation shown
PRODUCT FEATURES
SIDE VIEW
TOP VIEW
• Protects wall mounted EV charging stations from vehicle impact
• More economical than installing bollard posts
• Fits well with most commercial charging station dimensions
• Constructed with 1/4” plate steel
• Powder-coated finish, bright yellow
• Easy installation (hardware not included)
35.25
5.00
.25
16.50
15.00
1.502.50
.50
6.50
EVCS-GRD-A-01
Part Number:
EVCS-GRD-A-01
WALL MOUNT GUARD
Part #: EVCS-GRD-A-01
EVCS200-PRD200-202301-REV-B
Mini Wall Guard
Dimensions in Inches
| SITE SPECIFIC DETAILS BLACKSTONE RIVER AND CANAL SP |
| BRCHSP - Park Office - Green Docket GOOD |
File details come from the government source that posted it. Updated .