P23946211_SPEC_15JUL26.pdf

PDF 20 MB Posted

Attached to
USCG Cutter Eagle New Dredging for Berthing at New London City Pier
Solicitation number
70Z0G126BSLISSW02
Issued by
Not on record

About this file

This is a Specifications document for the USCG Cutter Eagle New Dredging Project at New London City Pier in Connecticut. The project involves dredging approximately 3,663 cubic yards of material (including a 2-foot over-dredge allowance) from the south side of New London City Pier to a design elevation of -17' Mean Lower Low Water (MLLW) to accommodate tugboat operations assisting the USCG Cutter Eagle. Major work items include mobilization and setup, pre-dredge hazard surveys, pre-dredge bathymetric surveys, demolition and removal of pile debris within the dredge footprint, dredging operations, interim surveys as required, placement of dredge material in an approved Dredge Material Placement Area (DMPA), post-dredge surveys, and demobilization. The contract includes one Base Bid Item (BBI #1) for dredging and placement of dredge material plus removal and disposal of existing non-coated/non-treated buried piling, and one Optional Bid Item (OBI #1) for removal of existing coated/treated piling if encountered.

The specifications establish comprehensive requirements for contractor qualifications, safety compliance, environmental protection, and project management. The contractor must maintain continuous work with no appreciable shutdowns, obtain approvals for each work phase, and coordinate with active USCG facility operations to maintain access for emergency response vessels. The contractor must provide a qualified Site Safety and Health Officer (SSHO), Supervisor, and Quality Control Manager; develop an Accident Prevention Plan and Activity Hazard Analyses compliant with USACE EM 385-1-1; submit a Construction Schedule in Gantt-chart format with Schedule of Values before work begins; and comply with federal, state, and local environmental regulations including NPDES permits and hazardous waste management requirements. The dredging operation is subject to an environmental time-of-year restriction allowing work only between October 1st and March 1st. The contractor must submit pre-construction submittals including insurance certificates, surety bonds, construction schedules, quality control plans, and environmental protection plans, with approval required prior to mobilization and commencement of work.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

SHORE INFRASTRUCTURE LOGISTICS CENTER

SPECIFICATIONS FOR

EAGLE NEW DREDGING

PSN: 239462 11

AT

USCG PROVIDENCE

New London , New London County , Connecticut

LT. JUSTIN BECK DAVID N. GLASS, P.E.

DESIGN PROJECT MANAGER DESIGN TEAM 2 SUPERVISOR

_____Michael P. Carosotto, PE _____

TECHNICAL DIRECTOR

by direction of the

COMMANDING OFFICER

UNITED STATES COAST GUARD

CIVIL ENGINEERING UNIT PROVIDENCE

475 KILVERT ST REET, SUITE 100

WARWICK, RHODE ISLAND 02886

Docusign Envelope ID: 9C0EAAC4-8FE2-8AD3-80A6-56588E46C211

THIS PAGE INTENTIONALLY LEFT BLANK

EAGLE New Dredging PSN 23946211 USCG Providence, New London, CT

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 32 00 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 77 00 CLOSEOUT SUBMITTALS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

LIST OF APPENDICES

APPENDIX A Federal & State Permits APPENDIX B Hydrographic Survey, Side Scan, and Magnetometer Surveys APPENDIX C City of New London - City Pier Rehabilitation Plans APPENDIX D Propeller Wash Analysis Memorandum

-- End of Project Table of Contents --

DOCUMENT PROJECT Page 1

7/13/2026

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 DEFINITIONS

COR: Contracting Officer Representative

FURNISH: After submittal approval (when required), deliver specified materials, components, equipment, and/or systems to the project site and protect until installed.

KTR: Contractor

KO: Contracting Officer

NEW: As used in these specifications, "new" is indicated for the convenience of the KTR. Unless the word "existing" is used as a qualifier, all devices, components, and equipment indicated shall be new from the manufacturer.

REMOVE AND DISPOSE: Completely remove materials, components, equipment, and/or systems identified; dispose of legally; repair remaining surfaces damaged as a result of removal.

SHALL: Mandatory.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The project is defined by the Contract Documents and consists of all work, including all equipment, materials, labor and supervision, necessary to fully complete the work for USCG EAGLE New Dredging Project (the "PROJECT"). The PROJECT consists of dredging the South side of the New London City Pier to accommodate the EAGLE CUTTER at the pier. Dredging for the EAGLE slip area will not be performed. The PROJECT consists solely of dredging the supplemental area for the proposed tugs at the South side of the New London City Pier to a design elevation of -17' MLLW.

The work includes dredging of 3,663 cubic yards ("CY") of material (including a 2-ft over-dredge allowance)and placement in the approved Dredge Material Placement Area (DMPA)in accordance with federal, state, and local permits being obtained by the USCG. Major work items include the following:

1. Mobilization and set-up.

2. Pre-dredge Hazard Survey of all areas where dredging will occur.

3. Pre-dredge bathymetric survey.

4. Demolition and removal of pile debris within the dredge footprint in accordance with the Contract documents, and local, state, and federal regulations.

5. Dredging as shown on the Contract Drawings.

6. Interim surveys, as required, to confirm areas have been dredged to the design elevations specified in the contract drawings in the event of an interruption or a sudden change in dredged volume.

SECTION 01 11 00 Page 1

7. Placement of dredge material in the approved DMPA.

8. Post-Dredge Survey of all areas where dredging occurred.

9. Demobilization and cleanup.

The sequence of work shall be determined by the successful KTR, unless otherwise restricted by the USCG or permit conditions. Work shall be continuous from start to finish with no appreciable shut down periods.

The project includes one (1) Base Bid Item (BBI) and one (1) Optional Bid Item (OBI) as summarized below.

BBI #1

RPUID 854465, New London City Pier: Dredging and placement of dredge material in accordance with the contract documents. Removal and disposal of existing, non-coated/non-treated buried piling in accordance with the contract documents.

OBI #1

Existing coated/treated pile removal (likely with creosote): If coated/ treated piling is encountered, provide as an optional bid submittal to BBI #1 for removal of existing, coated/treated buried piling in accordance with the contract documents.

1.2.2 Location

USCG Providence New London City Pier New London, Connecticut, 06320

The work shall be located at the above location, approximately as indicated. The exact location is provided on the Contract Drawings and shall be provided by the KO.

1.3 CONTRACT DRAWINGS

The following drawings accompany this specification and are a part thereof.

Drawing No. 23946211 Sheets 01 through 08

Drawings for the project have been prepared using AutoCAD. One set of the original files will be provided to the successful KTR for the sole purpose of facilitating the execution of the work specified, including the preparation of record drawings, and other submittals. Refer to Section 01 77 00, CLOSEOUT SUBMITTALS, Paragraph SOURCE DRAWING FILES for limitation.

The KTR shall verify all information as required to successfully provide the work specified.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Dredging will occur adjacent to the existing City Pier and adjacent private property. The successful KTR shall take the necessary allowances and precautions to avoid damaging public and private

SECTION 01 11 00 Page 2 property. Any damage to existing utilities, structures, or unauthorized removal of plant life shall be repaired by the KTR at no expense to the USCG.

b. The Government is aware of the presence of cables and pipes in the dredge area. It is the responsibility of the Contractor to contact local utilities and confirm the location and presence of cables or pipelines in the dredge area prior to the commencement of work. The Contractor shall verify the condition of existing utilities and/or the presence of any underground pipelines or cabling before proceeding with work. Additionally, debris such as metal bands, pallets, broken cable pieces, and broken piles may be present in the area. The Contractor is also responsible for the safe handling and disposal of such debris as outlined in the Best Management Practices (BMPs) provided in the specification.

c. Pipelines and/or other existing underground installations in the vicinity of the Work may be present. The contractor shall contact local utility companies and notify them of the work in advance of mobilization. The successful KTR shall make every effort to locate all underground obstacles and/or pipelines by prospecting in advance of dredging. Any damage to pipelines, including any resulting environmental contamination, caused by the dredging activities shall be repaired / cleaned up by the KTR. Any delay or cost incurred by the KTR with respect to repairing / cleaning up with respect to pipeline or existing utility damage shall not constitute a claim for extra work, additional payment, or damages.

d. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the KO. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 FEDERAL AND OTHER AUTHORITIES HAVING JURISDICTION

All work shall be in compliance with Federal, State, and local regulations and requirements, including but not limited to the environmental regulatory permits received for this project.

1.6 SUPERVISION

Have at least one qualified Supervisor, Contractor Quality Control (CQC) System Manager, and Site Safety and Health Officer (SSHO) capable of reading, writing, and conversing fluently in the English language on the job site during working hours. For this Contract, the Supervisor, CQC System Manager, and SSHO may be the same individual, provided that they possess the minimum qualifications required as specified herein.

1.7 MEETINGS

The KTR shall attend the Pre-Construction Conference and Construction Progress Meetings with the KO, COR, USCG Construction Inspector, and other project personnel in accordance with the requirements specified herein.

1.8 INSPECTION

The KTR shall keep the KO or duly appointed representative fully informed

SECTION 01 11 00 Page 3 of contract operations and plans so that a representative may arrange to be present at various times that work is being performed.

1.8.1 KTR's Daily Log

The KTR shall complete the USCG Daily Log form at the end of each working day and deliver it to the Government Inspector and COR. The Government Inspector will attest to its accuracy by initialing the form and forwarding that form to CEU Providence. The form template will be provided to the KTR by the COR.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 4

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.1 SPECIAL SCHEDULING REQUIREMENTS

a. The USCG Unit is an active USCG installation and will maintain continuous operation throughout the completion of this project.

Accordingly, the KTR shall not interfere with Unit operations or impede upland or water-based access. Access to emergency response vessels and the ability to go underway shall be continuously maintained.

b. The KTR shall be responsible for obtaining approval to begin each phase of work in coordination with the COR and USCG Unit.

c. The KTR shall have all materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

d. Areas of the facility not under construction shall remain in operation during construction. Keep all construction activities and personnel clear of facility operations.

e. Permission to interrupt any channels, access, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

f. The KTR shall identify on the construction schedule each factor which constitutes a potential interruption to Unit operations.

g. The KTR shall be responsible for issuing the pre- and post-construction notifications required by the State and Federal Permits.

h. The KTR shall coordinate the removal of all debris and piling within the dredge area prior to dredging work.

1.2 KTR ACCESS AND USE OF PREMISES

1.2.1 Activity Regulations

Ensure that KTR personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all KTR equipment, including delivery vehicles and personnel are clearly identified/marked for identification.

1.2.1.1 No Smoking Policy

Smoking/Vaping (use of electronic nicotine delivery systems) of any kind is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, SECTION 01 14 00 Page 1 buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The COR will identify designated smoking areas.

1.2.2 Working Hours

The Contractor can work a maximum of 8-hour shifts. If the Contractor wishes to work beyond 8 hours per shift, prior approval must be obtained from the Contracting Officer (KO). At no time shall the Contractor work less than 8 hours per day until the work is complete, unless during extreme weather events.

1.3 SECURITY REQUIREMENTS

1.3.1 Subcontractors and Personnel Contactss

Provide a list of contact personnel of the KTR and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.2 Employee List

The KTR shall provide, in writing, the names of two (2) designated representatives authorized to request personnel and vehicle passes for employees and subcontractor's employees prior to commencement of work under this contract to the KO.

1.3.3 Personnel Entry Approval

Failure to obtain entry approval will not affect the contract price or time of completion.

1.3.4 Areas Not Covered by Contract

The KTR will not be permitted to enter buildings or areas not covered by the work included in this contract, except by prior approval of the COR.

1.4 SITE PHYSICAL DATA

Information furnished below is for the KTR's review. However, it is expressly understood that the USCG and Engineer are not responsible for any interpretation or conclusion drawn therefrom by the KTR. USCG and Engineer are also not responsible for any lack of information herein pertaining to the physical conditions at the PROJECT site. KTR shall make every effort possible to familiarize themselves with and research the conditions to be expected at the PROJECT site.

1.4.1 Tidal Conditions

Under ordinary conditions, the tidal range is approximately 3-ft. However, the tide elevation is largely dependent on the speed, direction, and duration of the wind at the site.

1.4.2 Currents

Strong currents may at times be present in and adjacent to the Project site.

SECTION 01 14 00 Page 2

1.4.3 Marine Conditions

In addition to tidal fluctuations and current velocities mentioned herein, the water at the Project site may, at times, be rough. The KTR should familiarize themselves with the daily and extreme conditions that might be expected throughout the duration of the Project. Impact and rework of partially completed work components or areas shall not be just cause for increased compensation, if due to marine conditions.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 14 00 Page 3

SECTION 01 32 00

PROJECT SCHEDULE

PART 1 GENERAL

1.1 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

1.1.1 SD-01 Preconstruction Submittals

Schedule Of Values;

Construction Schedule;

Approval of the above submittals is required prior to the start of construction.

1.2 CONSTRUCTION SCHEDULE AND SCHEDULE OF VALUES

At the Pre-Construction Conference, submit a Construction Schedule and Schedule of Values in accordance with FAR Clause 52.236.15. The Schedule of Values shall be based on the actual breakdown of the bid price. The cost of insurance shall not be listed as a separate item but included as part of each item of work. The actual cost of bonds may be paid as the first progress payment when a receipt from the bonding company is presented to the KO. In addition, keep the Government Inspector informed daily of the expected delivery dates for major pieces of equipment and materials.

1.2.1 Contents

The Construction Schedule and the Schedule of Values shall be incorporated into separate forms which clearly indicate the start and completion dates and unit value of all major work components. Include the following project specific items at a minimum:

a. Bonds

b. Pre-Construction Submittals

c. Mobilization

d. Work Activities

e. Factors which constitute Potenital Interruptions to Unit Operations

f. Potential Interruptions to Unit Operations

g. Quality Control

h. In-Progress Submittals

i. Final USCG Inspection

SECTION 01 32 00 Page 1

j. Close-out Submittals, i.e. post-dredge survey

k. Demobilization

1.2.1.1 Definitions

a. Pre-Construction Submittals: Pre-Construction Submittals are those activities which encompass the obtaining, submission, review and approval of submittals necessary prior to the start of the related site work. KTR shall annotate all such activities into the progress schedule with their forecasted time periods. These activity periods shall not be exclusive of the contract performance period. No sitework shall commence until the respective submittals have been approved.

b. Mobilization: Mobilization is defined as having equipment AND having a physical presence of at least one person from the KTR's team on the jobsite.

c. Work Activities: The value of all major work components within the project shall be identified on the Schedule of Values on a unit quantity and unit cost basis, e.g. cost per CY of dredge material,cost per pile removal, and cost for treated piles.

1.2.2 Format

The Construction Schedule shall be provided in a horizontal Gantt-chart format and prepared using MS PROJECT or approved equal. Subdivide schedule into sufficient number of work activities to accurately display the work schedule, sequence of work, activity duration, and interdependence of each activity. Clearly show the activities of the critical path. The critical path is defined as the longest path.

The Schedule of Values shall be provided on the attached KTR's Schedule of Values Form.

Provide one (1) electronic copy of both the Construction Schedule and Schedule of Values in PDF format as well as one (1) electronic copy of the Construction Schedule in MS PROJECT format prior to the start of construction. Provide updated versions in accordance with paragraph Updated Schedules.

1.2.3 KTR Schedule Responsibilities

The Construction Schedule and Schedule of Values as approved by the Government is not a substitute for quantities conveyed by the specification and drawings and those required for a complete job.

Omissions and errors on the Construction Schedule and Schedule of Values are the responsibility of the KTR. Payments will not be made until the schedule of prices has been submitted to and approved by the KO.

1.2.4 Updated Schedules

Update the Construction Schedule, Schedule of Values, and equipment delivery schedule at monthly intervals or when schedule has been revised.

Reflect any changes occurring once the last update. Submit copies of the purchase orders and confirmation of the delivery dates as directed.

1.3 PROJECT SCHEDULER QUALIFICATIONS

SECTION 01 32 00 Page 2

Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative must have a minimum of 2 years of experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative must have a comprehensive knowledge of CPM scheduling principles and application. Qualifications shall be submitted upon request of the COR.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.1.1 Withholdings / Payment Rejection

Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial or periodic schedule updates and subsequent rejection of payment requests until compliance is met.

In the event that the KO directs schedule revisions and those revisions have not been included in subsequent Project Schedule revisions or updates, the KO may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.

3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS

3.2.1 Level of Detail Required

Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The KO will consider, but is not limited to, the following characteristics and requirements, defined in the following sections, to determine appropriate level of detail.

3.2.2 Government Activities

Show Government and other agency activities that could impact progress.

These activities include, but are not limited to: approvals, environmental permit approvals by State and/or Federal regulators, inspections, utility tie-in, Government Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements.

3.2.3 Added and Deleted Activities

Do not delete activities from the project schedule or add new activities to the schedule without approval from the KO. Activity number and description changes are considered new activities and cannot be changed without KO approval.

3.2.4 Percent Complete

Update the percent complete for each activity started, based on the realistic assessment of earned value.

SECTION 01 32 00 Page 3

3.2.5 Remaining Duration

Update the remaining duration for each activity based on the number of estimated workdays it will take to complete the activity.

3.3 REQUESTS FOR TIME EXTENSIONS

Provide a justification of delay to the KO in accordance with the contract provisions and clauses for approval within 10 days of a delay occurring.

Also prepare a time impact analysis for each Government request for proposal (RFP) to justify time extensions.

3.3.1 Justification of Delay

Provide a description of the event(s) that caused the delay and/or impact to the work. As part of the description, identify all schedule activities impacted. Show that the event that caused the delay/impact was the responsibility of the Government. Provide a time impact analysis that demonstrates the effects of the delay or impact on the project completion date or interim completion date(s).

3.3.2 Time Extension

No time extension will be granted without KO approval of the Justification of Delay and time impact analysis. Approval will not be granted unless the delay consumes all available Project Float and extends the projected finish date ("End Project" milestone) beyond the Contract Completion Date. The time extension will be in calendar days.

Actual delays that are found to be caused by the KTR's own actions, which result in a calculated schedule delay will not be a cause for an extension to the performance period, completion date, or any interim milestone date.

3.4 FAILURE TO ACHIEVE PROGRESS

Should the progress fall behind the approved project schedule for reasons other than those that are excusable within the terms of the contract, the KO may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.

3.4.1 Failure to Perform

Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the KO pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.

3.5 MODIFICATIONS

When a modification is issued by the Government, record the modification as the last activity of the Construction Schedule and Schedule of Values and include the value of the modification. Adjust the Schedule of Values to reflect the inclusion of the modification. Revise the Construction Schedule portion of the form to annotate the progress change. Enter all

SECTION 01 32 00 Page 4 modifications in this manner in sequential order.

-- End of Section --

SECTION 01 32 00 Page 5

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Submittal Information

The KO may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

1.1.2 Submission of Submittals

Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.

1.2 DEFINITIONS

1.2.1 Submittals

Shop drawings, product data, samples, and administrative submittals presented for review and approval. Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and

(f) apply to all "submittals."

1.2.2 Types of Submittals

All submittals are classified as indicated in paragraph "Submittal Descriptions (SD)". Submittals also are grouped as follows:

a. Administrative submittals: Data presented for reviews and approval to ensure that administrative requirements of project are adequately met but not to ensure directly that work is in accordance with design concept and in compliance with contract documents.

1.2.3 Submittal Descriptions (SD)

Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:

SD-01 Preconstruction Submittals

The following shall be submitted within 10 calendar days of contract award unless specified elsewhere in the specifications:

Certificate of insurance Surety Bonds

SECTION 01 33 00 Page 1

The following Division 01 preconstruction submittals are required prior to mobilization or commencing on site work:

Construction Progress Schedule List of proposed subcontractors List of proposed products Submittal Register Accident prevention plan Health and safety plan Work plan Quality control plan Environmental protection plan pre-dredge hazard survey Pre-dredge bathymetric survey

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism. Special requirements necessary to properly close out a construction contract.

Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

1.2.4 Approving Authority

Person authorized to approve submittal.

1.2.5 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce construction and materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.3 SUBMITTALS

Government approval is required for submittals in accordance with this section. Submit the following in accordance with the requirements of this section.

1.3.1 SD-01 Preconstruction Submittals

Submittal Register

Approval of the above submittal is required prior to mobilization or commencing on site work.

1.4 USE OF SUBMITTAL REGISTER

Prepare and maintain submittal register, as the work progresses. Do not change data in columns (a), (b), (c), and (d) as delivered by government.

1.4.1 Submittal Register Updates

Prepare and submit monthly updates of submittal register or at COR's discretion.

SECTION 01 33 00 Page 2

1.4.2 Submittal Register

Submit submittal register. Verify that all submittals required for project are listed and add missing submittals. Complete the following on the register:

Column (e) Contractor Submit Date: Scheduled date for approving authority to received submittals

Column (f) Date Forwarded to Approving Authority: Actual date submittal is forwarded to Approving Authority.

1.5 PROCEDURES FOR SUBMITTALS

1.5.1 Reviewing, Certifying, Approving Authority

Government organization shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals is the Project Manager unless otherwise specified for specific submittal.

1.5.2 Constraints

a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.

b. Submittals shall be complete for each definable feature of work;

components of definable feature interrelated as a system shall be submitted at same time.

c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.

d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.

1.5.3 Scheduling

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.

b. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 10 working days. Period of review for each resubmittal is the same as for initial submittal. Allow longer time periods where processing must be coordinated with subsequent submittals.

c. No time extensions shall be authorized because of the Contractor's failure to transmit submittals to the USCG sufficiently in advance of the work.

1.5.4 Variations

Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to government.

SECTION 01 33 00 Page 3

1.5.4.1 Proposing Variations

When proposing variation, deliver written request to the contracting officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to government. If lower cost is a benefit, also include an estimate of the cost saving. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

1.5.4.2 Warranting That Variation Are Compatible

When delivering a variation for approval, contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work, and deliver the same service life and performance.

1.5.4.3 Review Schedule is Modified

In addition to normal submittal review period, a period of 5 working days will be allowed for consideration by the Government of submittals with variations.

1.5.5 Contractor's Responsibilities

a. Determine and verify field measurements, materials, field construction criteria; review each submittal; and check and coordinate each submittal with requirements of the work and contract documents.

b. Transmit submittals to Contracting Officer in accordance with schedule on approved Submittal Register, and to prevent delays in the work, delays to government, or delays to separate contractors.

c. Advise contracting officer of variation, as required by paragraph entitled "Variations".

d. Correct and resubmit submittal as directed by approving authority. When resubmitting disapproved transmittals or transmittals noted for resubmittal, the contractor shall provide copy of that previously submitted transmittal including all reviewer comments for use by approving authority. Direct specific attention in writing or on resubmitted submittal, to revisions not requested by approving authority on previous submissions.

e. Furnish additional copies of submittal when requested by contracting officer, to a limit of 4 copies per submittal.

f. Complete work which must be accomplished as basis of a submittal in time to allow submittal to occur as scheduled.

g. Ensure no work has begun until submittals for that work have been returned as "approved," except to the extent that a portion of work must be accomplished as basis of submittal.

1.5.6 Government Responsibilities

a. Note date on which submittal was received from contractor on each

SECTION 01 33 00 Page 4

Contract Item Approval Request Form.

b. Review each submittal; and check and coordinate each submittal with requirements of work and contract documents.

c. Review submittals for conformance with project design concepts and compliance with contract documents.

d. Ensure that material is clearly legible.

e. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

f. Identify returned submittals with one of the actions defined in paragraph entitled "Actions Possible" and with markings appropriate for action indicated.

1.5.7 Actions Possible

Submittals will be returned with one of the following notations:

a. Submittals marked "approved", "approved as submitted" authorize contractor to proceed with work covered.

b. Submittals marked "approved", "see below" authorize contractor to proceed with work as noted provided contractor takes no exception to the notations.

c. Submittals marked "disapproved" indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.

1.6 FORMAT OF SUBMITTALS

1.6.1 Transmittal Form

Transmit each submittal electronically, unless otherwise noted in the submittal register and/or where electronic submission is not feasible (i.e. samples), to office of approving authority. Transmit submittals with transmittal form prescribed by contracting officer and standard for project. The transmittal form shall identify contractor, indicate date of submittal, and include information prescribed by transmittal form and required in paragraph entitled "Identifying Submittals." Process transmittal forms to record actions regarding sample panels and sample installations.

1.6.2 Electronic File Format

Provide submittals in electronic format. In addition to the electronic submittal, provide one hard copy of the submittals if required by K.O..

Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, and coordinate the file naming convention with the Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Use PDF as the electronic format, unless otherwise specified or directed by the

SECTION 01 33 00 Page 5

Contracting Officer. Generate PDF files from original documents with bookmarks so that the text included in the PDF file is searchable and can be copied. If documents are scanned, optical character resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature or a scan of a signature.

E-mail electronic submittal documents smaller than 10MB to an e-mail address as directed by the Contracting Officer. Provide electronic documents over 10 MB on an optical disc or through an electronic file sharing system such as DoD Safe, in which the link will be provided by the

COR.

1.6.3 Identifying Submittals

Identify submittals, except sample panel and sample installation, with the following information on each separate component of each submittal and transmittal form. Identify each copy of each submittal identically, with the following:

a. Project title and location.

b. Construction contract number.

c. Dates of the drawings and revisions

d. Section number of the specification section by which submittal is required.

e. Submittal description (SD) number of each component of submittal.

f. When a resubmission, alphabetic suffix on submittal description, for example, SD-10A, to indicate resubmission.

g. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier contractor associated with submittal.

h. Location in project.

1.6.4 Format of SD-01 Pre-Construction Submittals

When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply contractor's approval stamp to document, but to a separate sheet accompanying document.

1.6.5 Format of SD-11 Closeout Submittals

When the submittal includes a document that is to be used in the project or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.

Provide data in the unit of measure used in the contract documents.

1.7 QUANTITY OF SUBMITTALS

SECTION 01 33 00 Page 6

1.7.1 Number of Copies of Submittals

When hard copy submission is required, submit one copy of submittals unless otherwise specified.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 33 00 Page 7

SECTION 01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP Z244.1 (2016) The Control of Hazardous Energy Lockout, Tagout and Alternative Methods

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA

20-1; TIA 20-2; TIA 20-3; TIA 20-4)

National Electrical Code

NFPA 70E (2021) Standard for Electrical Safety in the Workplace

NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1910.333 Selection and Use of Work Practices

29 CFR 1915.89 Control of Hazardous Energy (Lockout/Tags-Plus)

29 CFR 1926.16 Rules of Construction

1.2 DEFINITIONS

1.2.1 Competent Person (CP)

The CP is a person designated in writing, who, through documented training, knowledge and experience, is capable of identifying, evaluating, and addressing existing and predictable hazards in the working environment or working conditions that are dangerous to personnel, and who has authorization to take prompt corrective measures with regards to such hazards.

SECTION 01 35 26 Page 1

1.2.2 Competent Person (CP) Trainer

A competent person trainer as defined in EM 385-1-1 Appendix Q, who is qualified in the training material presented, and who possesses a working knowledge of applicable technical regulations, standards, equipment and systems related to the subject matter on which they are training Competent Persons. A competent person trainer must be familiar with the typical hazards and the equipment used in the industry they are instructing. The training provided by the competent person trainer must be appropriate to that specific industry. The competent person trainer must evaluate the knowledge and skills of the competent persons as part of the training process.

1.2.3 High Visibility Accident

A High Visibility Accident is any mishap which may generate publicity or high visibility.

1.2.4 Medical Treatment

Medical Treatment is treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even when provided by a physician or registered personnel.

1.2.5 Near Miss

A Near Miss is a mishap resulting in no personal injury and zero property damage, but given a shift in time or position, damage or injury may have occurred (e.g., a worker falls off a scaffold and is not injured; a crane swings around to move the load and narrowly misses a parked vehicle).

1.2.6 Qualified Person (QP)

The QP is a person designated in writing, who, by possession of a recognized degree, certificate, or professional standing, or extensive knowledge, training, and experience, has successfully demonstrated their ability to solve or resolve problems related to the subject matter, the work, or the project.

1.2.7 Recordable Injuries or Illnesses

Recordable Injuries or Illnesses are any work-related injury or illness that results in:

a. Death, regardless of the time between the injury and death, or the length of the illness;

b. Days away from work (any time lost after day of injury/illness onset);

c. Restricted work;

d. Transfer to another job;

e. Medical treatment beyond first aid;

f. Loss of consciousness; or

SECTION 01 35 26 Page 2

g. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (a) through (f) above

1.2.8 Government Property and Equipment

Interpret "USACE" property and equipment specified in USACE EM 385-1-1 as Government property and equipment.

1.3 SUBMITTALS

Government approval is required for submittals in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

1.3.1 SD-01 Preconstruction Submittals

Accident Prevention Plan (APP)

Approval of the above submittals is required prior to the start of construction.

1.3.2 SD-07 Certificates

Contractor Safety Self-Evaluation Checklist

Third Party Certification of Barge-Mounted Mobile Cranes

License Certificates

Machinery & Mechanized Equipment Certification Form

Approval of the above submittals is required prior to commencing the subject activities.

1.4 MONTHLY EXPOSURE REPORTS

Provide a Monthly Exposure Report when required and attach to the monthly billing request. This report is a compilation of employee-hours worked each month for all site workers, both Prime and subcontractor. Failure to submit the report may result in retention of up to 10 percent of payment.

1.5 CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST

Not used.

1.6 REGULATORY REQUIREMENTS

In addition to the detailed requirements included in the provisions of this Contract, comply with the most recent edition of USACE EM 385-1-1, and the following federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.

1.6.1 Subcontractor Safety Requirements

For this Contract, neither KTR nor any subcontractor may enter into

SECTION 01 35 26 Page 3

Contract with any subcontractor that fails to meet the following requirements. The term subcontractor in this and the following paragraphs means any entity holding a Contract with the KTR or with a subcontractor at any tier.

1.7 SITE QUALIFICATIONS, DUTIES, AND MEETINGS

1.7.1 Personnel Qualifications

1.7.1.1 Site Safety and Health Officer (SSHO)

Provide an SSHO that meets the requirements of EM 385-1-1 Section 1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one person at each project site to function as the SSHO. The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the KTR's safety program and government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs.

If the SSHO is off-site for a period longer than 24 hours, an equally-qualified alternate SSHO must be provided and must fulfill the same roles and responsibilities as the primary SSHO. When the SSHO is temporarily (up to 24 hours) off-site, a Designated Representative (DR), as identified in the AHA may be used in lieu of an Alternate SSHO, and must be on the project site at all times when work is being performed.

Note that the DR is a collateral duty safety position, with safety duties in addition to their full time occupation.

1.7.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties

For this Contract, the SSHO may alsoserve as the Quality Control Manager and Superintendent, provided that this individual meets the qualification requirements as specified herein.

1.7.1.2 Competent Person Qualifications

Provide Competent Persons in accordance with EM 385-1-1 , Appendix Q and herein. Competent Persons for high-risk activities include confined space, cranes and rigging, excavation/trenching, fall protection, and electrical work. The CP for these activities must be designated in writing and meet the requirements for the specific activity (i.e.

competent person, fall protection).

The Competent Person identified in the KTR's Safety and Health Program and accepted Accident Prevention Plan, must be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the KO for information in consultation with the Safety Office.

1.7.1.3 Requirements for all KTR Jobsite Personnel Holding H-1B or H-2B Visas:

All KTR jobsite workers holding an H-1B or H-2B visa must complete a minimum 16 hours of classroom training on the requirements of the latest version of EM 385-1-1 prior to their first day on the jobsite to include

SECTION 01 35 26 Page 4 but not limited to the following topics: Sanitation; Medical and First Aid Requirements; Temporary Facilities; Personal Protective Equipment;

Electrical; Hand and Power Tools; Material Handling and Storage; Motor Vehicles; Fall Protection; Work Platforms and Scaffoldings; Demolition;

Safe Access, Ladders, Floor & Wall Openings, Stairs and Railing Systems;

Excavations and Trenching; and Confined Spaces, prior to reporting to the jobsite.

Submit a list of workers who have completed the training to the KO prior to them reporting to the jobsite. Update the list as additional workers are added. Maintain the updated list at the jobsite for review by the Government's designated authority. Include the name and qualifications of qualified trainer(s) that provided the training. Personnel who have taken the 40 Hour Construction Safety Hazard Awareness Training Course for Contractors or similar course that includes emphasis on EM 385-1-1 compliance, are not required to take the 16 hours of classroom training on the requirements of the latest version of the EM 385-1-1. The 16 hours classroom training may be provided by the Guam Contractors Association (GCA), Trades Academy, or other qualified trainers as outlined in paragraph QUALIFIED TRAINER REQUIREMENTS.

1.7.1.4 Dredging Contract Requirements

1.7.1.4.1 Dredging Safety Personnel Requirements

a. Provide a minimum of one full time SSHO assigned per project site for the primary working shift.

b. For a project involving multiple work shifts, provide one full-time SSHO for each additional shift.

c. For individual dredging projects or sites with a dredge crew and fill crew on watch of eight employees or less, a CDSO must be appointed, instead of an SSHO. The CDSO assumes the same responsibilities as a full-time SSHO.

d. An example of one dredging project site is reflected in each of the following:

(1) a mechanical dredge, tug(s) and scow(s), scow route, and material placement site; or

1.7.1.4.2 SSHO Requirements for Dredging

a. In addition to requirements stated elsewhere in this specification, an individual serving as a SSHO must be present at the project site, located so that they have full mobility and reasonable access to all major work operations, for at least one shift in each 24-hour period when work is being performed. The SSHO must be available during their shift for immediate verbal consultation and notification, either by phone or radio.

b. The SSHO is a full-time, dedicated position, except as noted above, who must report to a senior project (or corporate) official. When the SSHO is permitted to be a collateral duty, the SSHO is not permitted to be in another position requiring continuous mechanical or equipment operations, such as equipment operators.

c. The SSHO must inspect all work areas and operations during initial

SECTION 01 35 26 Page 5 set-up and at least monthly observe and provide personal oversight on each shift during dredging operations for projects with many work sites, more often for those with less work sites.

1.7.1.4.3 Safety Personnel Training Requirements for Dredging

A SSHO and a CDSO for dredging Contracts must take either a formal classroom or online OSHA 30-hour Construction Safety Course, or an equivalent 30 hours of formal classroom or online safety and health training covering the subjects of the OSHA 30-hour Course in accordance with EM 385-1-1 Appendix A, paragraph 3.d.(3), applicable to dredging work, and given by qualified instructors. In exception to EM 385-1-1 , Section 01.A.17, comply with the following:

a. The SSHO must maintain competency through having taken 8 hours of formal classroom or online safety and health related coursework every year. Hours spent as an instructor in such courses will be considered the same as attending them, but each course only gets credit once (for example, instructing a 1-hour asbestos awareness course five times in a year provides one hour credit for training).

b. The SSHO and a CDSO must have a minimum of three years of experience within the past five years in one of the following:

(1) Supervising/managing dredging activities

(2) Supervising/managing marine construction activities

(3) Supervising/managing land-based construction activities

(4) Work managing safety programs or processes

(5) Conducting hazard analyses and developing controls in activities or environments with similar hazards

1.7.1.5 Crane Operators/Riggers

Provide Operators, Signal Persons, and Riggers meeting the requirements in EM 385-1-1 , Section 15.B for Riggers and Section 16.B for Crane Operators and Signal Persons. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacities of 50,000 pounds or greater, designate crane operators qualified by a source that qualifies crane operators (i.e., union, a Government agency, or an organization that tests and qualifies crane operators). Provide proof of current qualification.

1.7.2 Personnel Duties

1.7.2.1 Duties of the Site Safety and Health Officer (SSHO)

The SSHO must:

a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the KTRs' daily production report.

b. Conduct mishap…