This is Amendment 00001 to a U.S. Coast Guard dredging solicitation issued on October 8, 2026, by the USCG Civil Engineering Unit Providence. The amendment provides answers to six contractor questions regarding a dredging project at New London City Pier in Connecticut. Key responses include: boring logs are available in design drawings from 2010 (Appendix C) and additional information in Appendix D Table 3; the Coast Guard will not provide a chemical analysis and contractors must obtain one for disposal site inquiries; the site is open for public access without requiring facility clearance for bidder visits; sediment sampling and analytical results are provided in attached Chemical Analysis Reports #1 and #2; two government-approved upland disposal sites (Green Earth and Clean Earth) are identified with facility acceptance letters attached; and the Connecticut Department of Energy and Environmental Protection water quality certification #202509798 conditions are detailed in the attached license document. The solicitation number is 70Z0G126BSLISSW02, dated September 11, 2026, with requisition number 51283PR260024555. All other terms and conditions of the original solicitation remain unchanged. Contractors must acknowledge receipt of this amendment prior to the deadline specified in the solicitation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

00001 51283

Simon W. Leung

The purpose of this Amendment is to provide answers to questions submitted by the Contractors as follows:

Question 1 (Q1): Are there available boring logs that show what that material is made up of?

Answer 1 (A1): - Refer to the Specifications Section 35 20 23 paragraph 2.1. Boring logs are presented in the design drawings from 2010 (see Appendix C). Additional information can be found in Appendix D, Table 3.

51283 Contracting Officer USCG Civil Engineering Unit Providence 475 Kilvert St., Suite 100 Warwick, RI 02886

Amendment must be acknowledged

Contracting Officer USCG Civil Engineering Unit Providence 475 Kilvert St., Suite 100 Warwick, RI 02886

51283PR260024555

70Z0G126BSLISSW02

23946211

1 2

10/08/2026

09/11/2026

Amendment 00001 October 8, 2026

(Q2): It has come to our attention that there does not seem to be a chemical analysis included with the specifications for the material. We will need to provide one with any of the upland disposal sites we inquire with for a suitable site to dispose the dredged material. Can you provide one?

(A2): Refer to the Specifications Section 35 20 23 paragraph 1.6. No, Coast Guard will not provide one.

(Q3): Site Visit time and place?

(A3): The New London City Pier is open for public access and any bidder can visit the site without facility access.

(Q4): Could the government provide the sediment sampling and anayltical results for the dredge area?

(A4): Please see attached Chemical analysis report #1 & #2.

(Q5): Is there a Government-designated upland disposal area?

(A5): Yes, there are 2 approved disposal sites : Green Earth & Clean Earth. See attached Disposal facility acceptance letters, and the Green Earth preliminary acceptance letter.

(Q6): What are the conditions of the CT DEEP water quality certification (#202509798) that apply to the upland placement or dewatering?

(A6): Please see attached License #202509798-WQC US Coast Guard Civil, New London.