B03_DOL_Wage_Rate_-_NJ.pdf

PDF 133 KB Posted

Attached to
REPLACE WORN DOOR HARDWARE IN MIB STLI Federal contract opportunity
Solicitation number
P17PS01108
Issued by
Department of the Interior National Park Service

About this file

DOL - NJ

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE WORN DOOR HARDWARE IN MIB STLI, newest first.
File Type Posted
Sol_P17PS01108_Amd_000004.pdf PDF
Sol_P17PS01108_Amd_000001.pdf PDF
B09_Directions_to_Ellis_Island_Bridge_with_MAP.doc DOC document
05C._Product_File,_actuators.pdf PDF
Sol_P17PS01108.pdf PDF
A06_Drawings_Doors_STLI.pdf PDF
B03_DOL_Wage_Rate_-_NY.pdf PDF
A04_Rev_Specifications.pdf PDF
05B._Product_File,_bollard.pdf PDF
05A._Product_File,_hardware.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NJ170033 06/09/2017 NJ33

Superseded General Decision Number: NJ20160033

State: New Jersey

Construction Type: Building

County: Hudson County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/20/2017 2 02/10/2017 3 04/21/2017 4 05/19/2017 5 06/02/2017 6 06/09/2017

ASBE0032-008 09/19/2015

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).......................$ 47.24 31.95

BRNJ0002-014 11/01/2016

Rates Fringes

BRICKLAYER (Including

7/1/2017https://www.wdol.gov/wdol/scafiles/davisbacon/NJ33.dvb?v=6

Caulking, Cleaning and Pointing)........................$ 40.00 29.29

Work on high stacks: 22% per hour additional.

BRNJ0002-016 11/01/2016

Rates Fringes

MASON - STONE....................$ 40.00 29.29

Work on high stacks: 22% per hour additional.

BRNJ0007-003 07/01/2016

Rates Fringes

Marble setter...................$ 57.32 37.08

BRNJ0007-022 11/22/2016

Rates Fringes

Tile finisher..................$ 40.17 25.88 Tile setter....................$ 46.50 31.38

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

CARP0006-009 05/01/2017

Rates Fringes

CARPENTER (Scaffold Builder).....$ 47.28 57%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0006-010 05/01/2017

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging, Formwork, Batt and Blown Insulation...$ 47.28 57%

CARP0029-008 05/01/2017

Rates Fringes

Soft floor layer...............$ 47.28 57%

CARP0715-007 11/01/2016

Rates Fringes

Millwright.....................$ 46.55 56%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

ELEC0164-006 06/01/2015

Rates Fringes

ELECTRICIAN (Apartments over 4 units.)........................$ 49.91 62% ELECTRICIAN (Including Low Voltage Wiring) Cable splicer...............$ 57.96 62% Electrician.................$ 50.84 62%

Work on line voltage of 440 or 480 volts: 10% per hour additional.

Work from trusses, scaffolds, frames, ladders and poles, 40

ft. or more above the ground or floor (does not include work from a manlift): 20% per hour additional.

Work on radio towers, transmission towers and smokestacks:

21% per hour additional.

ENGI0825-020 01/01/2016

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 47.70 29.80

GROUP 2.....................$ 46.05 29.80

GROUP 3.....................$ 43.91 29.80

GROUP 4.....................$ 42.41 29.80

GROUP 5.....................$ 40.69 29.80

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Pump, Hydraulic

GROUP 5:

Oiler

IRON0011-012 07/01/2016

Rates Fringes

Ironworkers:

Reinforcing.................$ 39.24 42.92 Structural, Ornamental......$ 41.54 42.92

LABO0008-001 05/01/2011

Rates Fringes

Asbestos Removal Laborer.........$ 28.37 21.62

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

LABO0222-006 07/01/2012

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 29.85 23.07

LABO0222-010 07/01/2012

Rates Fringes

Laborers:

Asphalt Shoveler, Asphalt Spreader, Common or General Laborer, Landscape Laborer, Power Tool Operator and Screedman......$ 29.35 23.07

* PAIN0711-018 05/01/2017

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 39.50 23.20

* PAIN0711-019 05/01/2017

Rates Fringes

PAINTER (Brush & Roller).........$ 39.25 22.66 PAINTER (Spray)..................$ 40.28 19.98

* PAIN0711-021 05/01/2017

Rates Fringes

Glazier........................$ 44.81 23.16

Work welding or using a cutting torch:

$1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

PLAS0029-002 05/01/2017

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 43.50 22.80

PLAS0029-003 05/01/2017

Rates Fringes

PLASTERER........................$ 43.50 22.80

PLUM0024-001 05/01/2017

Rates Fringes

PLUMBER (Excluding HVAC Pipe Installation)....................$ 52.66 33.54

PLUM0274-001 05/01/2016

HUDSON COUNTY (City of Bayonne; Borough of East Newark; Towns of Guttenberg and Harrison; Cities of Hoboken and Jersey City;

Town of Kearney; Township of North Bergen; Town of Secaucus;

City of Union City; Township of Weehawken; Town of West New York)

Rates Fringes

PIPEFITTER (Including HVAC Pipe Installation)...............$ 52.06 32.04

ROOF0004-007 06/01/2015

Rates Fringes

ROOFER (Includes All Types of Roofs)...........................$ 35.52 25.03

ROOF0008-005 07/01/2016

HUDSON COUNTY (east of the Hackensack River):

Rates Fringes

ROOFER (All Types)...............$ 41.50 30.86

SFNJ0696-006 01/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 58.83 25.37

SHEE0025-005 06/01/2015

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.80 38.03

TEAM0560-002 11/01/2016

Rates Fringes

TRUCK DRIVER

Dump Truck..................$ 35.65 33.68 Off the Road Truck..........$ 35.80 33.68

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level B, C or D personal protection for any workers other than the truck driver:

$1.00 per hour additional.

PAID HOLIDAYS:

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the employee has been assigned to work, or, "shapes", one day of the calendar week during which the holiday occurs.

DEFINITION OF GROUPS:

GROUP 1:

Driver of the following types of vehicle: dump; flat;

float; pick-up; container hauler; fuel; water sprinkler;

road oil; stringer bead; hot pass; bus; dumpcrete; transit mixer; agitator mixer; half track; winch truck;

side-o-matic; dynamite; powder; x-ray; welding; skid; jeep;

station wagon; stringer; A-frame; dual-purpose truck; truck with mechanical tailgate; asphalt distributor; batch truck;

seeding; mulching; fertilizing; air compressor truck (in transit); parts chaser; escort; scissor; hi-lift;

telescope; concrete breaker; gin pole; stone, sand, asphalt distributor and spreader; nipper; fuel truck (driver of fuel truck including handling of hose and nozzle - entire unit); team driver; vacuum or vac-all trucks (entire unit);

skid truck (debris container - entire unit); concrete mobile truck (entire unit); beltcrete truck; pumpcrete truck; line truck; reel truck; wrecker; tow truck; utility truck; tack truck; cardex person; driver on the following types of vehicle: Broyhill coal tar epoxy truck, Littleford bituminous distributor, slurry seal truck or vehicle, thiokol track master pick-up (swamp cat pick-up); bucket loader dump truck and any rubber-tired tractor used in pulling and towing farm wagons and trailers of any description; on-site repair shop

GROUP 2:

Driver of 3-axle materials truck and float

GROUP 3:

Driver of all Euclid-type vehicles: Euclid; International Harvester; Wabco; Caterpillar; Koehring, tractor and wagon;

dumpster; dump; bottom, rear and side dump; carry-all and scraper (not self-loading, loading over the top); water sprinkler trailer; water pull and similar types of vehicle;

driver of tractor and trailer-type vehicle: flat, float, I-beam, low bed, water sprinkler, bituminous, transit mix, road oil, fuel, bottom dump hopper, rear dump, office, shanty, epoxy, asphalt, agitator mixer, mulching, stringing, seeding, fertilizing, pole, spread bituminous distributor, water pull (entire unit), tractor trailer, reel trailer, and similar types of vehicle

GROUP 4:

Winch trailer driver

SUNJ2004-009 01/02/2009

Rates Fringes

ELEVATOR MECHANIC................$ 40.21 11.22

LABORER: Pipelayer..............$ 38.85 0.14

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION