Att_004_Specifications_Fire_Alarm_Rev_(04-20-2017).pdf

PDF 245 KB Posted

Attached to
Rodeo Valley Stables Fire Suppression Federal contract opportunity
Solicitation number
P17PS01038
Issued by
Department of the Interior National Park Service

About this file

Specifications Fire Alarm System

View the file

Other files for this federal contract opportunity

Other files attached to Rodeo Valley Stables Fire Suppression, newest first.
File Type Posted
Att_011_PROPOSAL_INQUIRY_FORM.docx DOCX document
Att_002_SOW_Stable_Fire_Protection_04-10-2017.doc DOC document
Att_003_Specifications_Water_Based_system__Rev._(04-20-2017).pdf PDF
Att_009_Subcontractor_Reference_Form.docx DOCX document
Att_008_Key_Personnel_Qualifications_Form.docx DOCX document
Att_001_Contract_Price_Schedule.xlsx XLSX spreadsheet
Att_006_MAP_-The_Presidio_Riding_Club.pdf PDF
Att_005_Drawings_(informational_only).pdf PDF
Att_010_General_References_Form.docx DOCX document
Sol_P17PS01038.pdf PDF
Att_007_Wage_Determination.docx DOCX document
B01_PRESOLICITATION_NOTICE_Fire_Surpression_Stables.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Specifications for Fire Alarm Installation

Rodeo Valley Stables

Golden Gate National Recreation Area Buildings 901 & 902 Bunker Road Fort Barry, Marin Headlands Sausalito, California

Installation of a New BOSCH 9412 Fire Panel, Life Safety components, and Burglar alarm system in the NPS’s Rodeo Valley Horse Stables.

NATIONAL PARK SERVICE

PACIFIC WEST REGION

1.1 PROJECT INTRODUCTION

Project Name: Installation of a New: BOSCH 9412 Fire Panel, Life Safety components, and Burglar alarm system.

Project Management Information System (PMIS) Number: 241814 Park Name and Address:

Golden Gate National Recreation Area Fort Mason Building 201 San Francisco, CA 94123

1.2 Short Project Description

The project consists of the design and installation of a New BOSCH 9412 Fire Panel, Life Safety components (Smoke detection, Heat detection, Horn strobes, Manual pull station, and Burglar alarm system in the Presidio Riding Club / NPS Horse Stables.

All components will be in new condition, all wiring will be in Plenum Rated PCVC conduit and all surface screws will be stainless steel to prevent corrosion of the system. Submit proposed design, accessories and fixture list to NPS Fire Marshall for approval prior to installation.

1.3 NPS Points of Contact

Fred C. Picavet Contracting Officer Golden Gate National Recreation Area Building 201, Fort Mason San Francisco CA, 94123 402-661-1582 fred_picavet@nps.gov

J. Richard Melbostad Project Manager & Contracting Officers Representative Building 201, Fort Mason San Francisco CA, 94123 Golden Gate National Recreation Area 415-289-1869 richard_melbostad@nps.gov

2.1 PROJECT REQUIREMENTS

2.2 Project Summary/Requirements

The work of this project consists of installing/ upgrading a Class A Power Addressable, Power Limited, Combination Manual/ Automatic Fire Detection System and Burglar alarm.

A set of as-builts will be provided by the installer prior to project completion to note changes. The installation of a complete Fire and Burglary system is required. This installation shall be accordance to the most current NFPA 101, NFPA 72, NEC, IBC, IFC codes, and approved by the NPS Fire Marshal.

2.3 Minimize Construction Impacts

Minimize dust and fumes during the construction project. Protect the surrounding areas in the project area from removal of old system as required.

2.4 Staging Areas

Staging is limited to in or near the working area. All staging areas shall be returned to pre- Construction conditions once project is complete.

2.5 Construction Coordination

The Contracting Officer (CO) will provide all necessary written notification and/or direction to the contractor.

2.6 Quality Control

The quality of all work shall be the responsibility of the Contractor.

2.7 Working Hour Restrictions

All work and deliveries shall be limited to the weekday hours of 7:00 am to 5:00 pm unless otherwise approved by the Contracting Officer. No work shall occur on National Park Service holidays or weekends without prior approval.

2.8 Hazard Control

Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing structures. Provide adequate ventilation during use of volatile or noxious substances.

2.9 Smoking

Smoking anywhere on the project is prohibited.

2.10 Site Visit

A site visit is required for this project and will be scheduled by the Contracting Officer.

3.1 PERFORMANCE REQUIREMENTS

3.2 Protection

Protect any areas adjacent to the project site from construction debris. Keep dust and dirt to a minimum. Use suitable methods to limit dust and dirt from rising and scattering in air to lowest practical level. Comply with governing regulations pertaining to environmental protection. Ensure safety of persons in the work area. Provide temporary barricades as required to protect park personnel and general public from injury due to construction work. Provide adequate fire protection. Keep area clear of hazardous substances and debris. Project site will be cleaned and secured on a daily basis to ensure the safety of the general public and park personnel. All project debris will be cleaned up/removed at the end of the work day.

Project areas will be flagged/cordoned off to ensure the safety of the general public and park personnel.

3.3 Vendor Support

Vendor will provide a set of as-built drawing showing the work completed.

4.1 PROJECT DESCRIPTION

4.2 Existing Building and Site Description

Two single story horse facilities with attached hay and feed storage.

4.3 Existing Project Condition

The building currently does have a fire detection/ burglar alarm system installed. The removal of conduit or other components are planned in this work. The alarm system will be extended to adjacent structure and tied together in a single 9412 Series Bosch panel.

4.4 Detailed Project Description

Contractor will install new Fire, Life Safety, and Burglar System with the required smoke or heat detector components in all areas as required per NFPA 72 and as approved by the NPS Fire Marshal. The components are a Fire Alarm/ Burglar Control Panel, Smoke Detectors, Manual Pull Stations, Ceiling Strobe Lights, Horn with Strobe Lights, Motion Sensors in administration office, Feed storage and Tacking rooms.

A site walk through should be conducted by all bidders to ensure the submitted bid meets the needs of the government and to aid in project layout and cost proposal.

Upon project completion, provide a standard one year F.A.R. warranty on all work and materials installed.