This is a Request for Qualifications (RFQ) issued by Rogue Community College District in Oregon for architectural and engineering services for Transportation Technology Buildings at their Redwood Campus and Table Rock Campus. The project involves designing a new 14,000-square-foot facility at the Redwood Campus and renovating/expanding approximately 14,000 square feet at the Table Rock Campus for transportation technology training programs. A non-mandatory pre-proposal meeting is scheduled for January 16, 2025, at 11:00 AM at the Redwood Campus. Proposals are due February 6, 2025, by 10:00 AM local time, with anticipated Board of Education approval by April 15, 2025. The project completion is targeted for April 2027.

The total construction budget for this project is $13 million, which includes site preparations, infrastructure, parking, landscaping, irrigation, and other site improvements but excludes A&E fees, furniture and equipment, owner contingency, SDCs, permitting, and other soft costs. The project is funded through college funding and a state grant. While LEED certification is not required, the design should shadow LEED Silver standards and incorporate sustainable building practices. The selected firm will work with a Construction Manager/General Contractor (CMGC) delivery method and must coordinate design with existing campus facilities to maintain congruent campus settings and efficient circulation between buildings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Qualifications

Architectural and Engineering Services

Transportation Technology Buildings

Redwood Campus and Table Rock Campus

REQUEST FOR QUALIFICATIONS (RFQ)

NO. P17926-2025-02-06

RFQ CLOSING (DUE) DATE: February 6, 2025, 10:00 AM Local Time

NO LATE RESPONSES WILL BE ACCEPTED

SUBMIT TO:

Rogue Community College

Attn: Contract and Procurement Director 3345 Redwood Highway, JO Bldg., Rm 12

Grants Pass, Oregon 97527

Non-Mandatory Pre-Proposal Meeting Interested parties may participate in a pre-proposal meeting on Thursday, January 16, 2025, beginning at 11:00 am at the Redwood Campus of Rogue Community College Building L Room 2, 3345 Redwood Highway, Grants Pass OR 97527. Please call (541) 955-7576 to confirm your attendance and receive location directions.

PROFESSIONAL, TECHNICAL AND EXPERT SERVICES

Rogue Community College District

REQUEST FOR QUALIFICATIONS

For

Architectural and Engineering (A/E) Services for the design of Transportation Technology Buildings

PROPOSALS DUE: February 6, 2025, by 10:00 AM local time.

Envelope(s) shall be sealed and marked with RFQ Project Title.

Submit one (1) original plus one (1) thumb drive with a digital copy of the Proposal to:

Contract and Procurement Director Contract and Procurement Office – Josephine Building 3345 Redwood Hwy Grants Pass, OR 97527

(541) 955-7576

Questions should be submitted in writing at bidquestions@roguecc.edu and will be answered by written addenda.

mailto:bidquestions@roguecc.edu

Page | 3

GENERAL INSTRUCTIONS AND CONDITIONS

INVESTIGATION – The Proposer shall make all investigations necessary to be informed regarding the service(s) to be performed under this request for proposal.

SPECIAL CONDITIONS – Where special conditions are written in the Request for Proposal, these special conditions shall take precedence over any conditions listed under the Professional, Technical and Expert Service “General Instructions and Conditions".

CLARIFICATION OF REQUEST FOR QUALIFICATIONS –

Proposers who request a clarification of the RFQ requirements must submit questions in writing to the person(s) shown in the QUESTIONS section on the cover of this RFQ, or present them verbally at a scheduled pre-proposal meeting, if one has been scheduled. The College will issue a response in the form of an addendum to the RFQ if a substantive clarification is in order.

Oral instructions or information concerning the Request for Qualifications given out by College employees or agents to prospective Proposers shall not bind the College.

ADDENDUM - Any change to this RFQ shall be made by written addendum issued no later than 72 hours prior to the proposal due date. The College is not responsible for any explanation, clarification or approval made or given in any manner except by addendum.

COST OF PROPOSAL – This Request for Qualifications does not commit the College to pay any costs incurred by any Proposer in the submission of a proposal or in making necessary studies or designs for the preparation thereof, or for procuring or contracting for the services to be furnished under the Request for Qualifications.

CANCELLATION - The College reserves the right to modify, revise or cancel this RFQ. Receipt and evaluation of proposals or the completion of interviews do not obligate the College to award a contract.

LATE PROPOSALS – Proposals received after the scheduled closing time for filing will be returned to the Proposer unopened.

REJECTION OF PROPOSALS – The College reserves the right to reject any or all responses to the Request for Qualifications if found in the College’s best interest to do so. At the College’s discretion, litigation between the College and a Proposer may be cause for proposal rejection, regardless of when that litigation comes to the College’s attention and regardless how the Proposer’s proposal may have been scored.

Proposals may also be rejected if they use subcontractors or subconsultants who are involved in litigation with the College.

Proposers who are concerned about possible rejection on this basis should contact the College before submission of a proposal for a preliminary determination of whether its proposal will be rejected.

BUSINESS LICENSE – Successful Proposer shall obtain a current Business License prior to initiation of contract and commencement of the work.

WORKERS’ COMPENSATION INSURANCE - Successful Proposer shall be covered by Workers’ Compensation Insurance or shall provide evidence that State law does not require such coverage.

CERTIFICATION AS AN EEO AFFIRMATIVE ACTION

EMPLOYER – Successful Proposers must abide by a policy of Equal Employment Opportunity Affirmative Action.

LOCAL CONTRACTING – If the final evaluation scores are otherwise equal, the College prefers goods or services that have been manufactured or produced by a Local Business. The College desires to employ local businesses in the purchase, lease, or sale of any personal property, public improvements or services. The College wants the residents of the State of Oregon to benefit from optimizing local commerce and services, and the local employment opportunities they generate.

RESIDENT RESPONDENT - Respondents will be required to attest as to whether they are resident or nonresident Respondents in accordance with provision of ORS 279C.365.

Please use the College’s form.

CONFLICT OF INTEREST – A Proposer filing a proposal thereby certifies that no officer, agent or employee of the College who has a pecuniary interest in this Request for Qualification has participated in the contract negotiations on the part of the College, that the proposal is made in good faith without fraud, collusion or connection of any kind with any other Proposer of the same request for proposals, and that the Proposer is competing solely in its own behalf without connection with or obligation to, any undisclosed person or firm.

TYPE OF CONTRACT – A sample professional services contract for the College is attached hereto as Exhibit B;

conditions and terms may be modified at the time of contract negotiations.

AWARD – Proposer selection may include, but is not limited to, negotiation with the highest ranked Respondent, competitive negotiations, multiple-tiered competition designed to identify a class of Respondents that fall within a competitive range or to otherwise eliminate from consideration a class of lower ranked responders, or any combination of methods, as authorized or prescribed by rules adopted under 279A.065.

CONFIDENTIALITY – All information submitted by Proposers shall be public record and subject to disclosure pursuant to the Oregon Public Records Act (ORS 192.410 et seq.), except such portions of the proposals for which Proposer requests exception from disclosure consistent with Oregon Law. Any portion of a proposal that the Proposer claims constitutes a “trade secret” or is “confidential” must meet the requirements of ORS 192.501, ORS 192.502 and/or ORS 646.461 et seq. If the entire proposal is marked as constituting a “trade secret” or being “confidential,” at the College’s sole discretion, such a proposal may be rejected as non-responsive.

The College has the authority to waive minor irregularities and discrepancies that will not affect the competitiveness or fairness of the solicitation and selection process.

These Professional, Technical and Expert Services Request for Proposal “General Terms and Conditions" are not to be construed as exclusive remedies or as a limitation upon rights or remedies that may be or may become available under ORS Chapter 279.

PART I CONTRACT REQUIREMENTS

SECTION A GENERAL INFORMATION

Rogue Community College District (RCC) received match-grant funding from the State of Oregon to assist in the construction of Transportation Training facilities, which are referred to in this RFQ as Transportation Training Buildings. The project will provide flexible facilities for RCC’s Transportation programs and will be constructed on the RCC Redwood Campus located in Grants Pass, Oregon and the Table Rock Campus located in White City, Oregon.

The project includes building a new facility on the Redwood Campus and renovation/expansion of the existing Table Rock Campus for instruction and training in transportation technology. The facilities will include inventory management, project storage, vehicle and equipment bays, lab preparation areas, faculty offices, student study areas, support staff offices and work areas. The project will also include purchase of instructional technology and technology infrastructure to enable connectivity to the existing technology network and expand the current capability for technology-based instruction to meet the projected growth of the community and the College through 2035.

Building construction is projected to require additional parking spaces than present, replace parking that will be lost by new or modified building footprint, meet ADA requirements, meet the requirements of a diverse workforce and student population, and be designed as a “green”, energy efficient structure. The College will not seek a LEED designation for this project; however, the design should shadow LEED Silver and include many of the efficiencies and sustainable building practices expected on a LEED project.

Additionally, the College seeks an overall design that integrates new and renovated transportation training facilities into the existing Campus. Consequently, a building integration might also require the design to include minor renovations to adjacent Campus buildings. The purpose of existing building renovations, if necessary, would be to maintain a congruent campus setting that is efficient for student and staff circulation between each building.

However, design and construction must conform to the funding available for this project, which could require a design reduction in the total building space identified through the planning process. Rogue Community College District (College or Owner) plans to enter into a contract with an architect firm for the design of Transportation Training Building space on both campuses.

The Rogue Community College Transportation Training program currently occupies approximately 11,525 square feet of total assignable building space at the Redwood Campus and approximately 9,000 square feet at the Table Rock Campus. Both locations have limited paved yard space for service vehicle parking.

Redwood Campus: The existing three-level configuration of Building-S provides limited program growth and functional spaces, including ADA challenges. While legally compliant with added lifts in place between each level, student movement between vehicle bays and classrooms takes much longer when two separate lifts must be utilized in order to move between work areas, tool rooms, classrooms, and labs. The current building also requires students to use computers and trainers in the same spaces where engines are being assembled and disassembled; the current facility has no room to separate learning activities. Existing and potential partnerships with nearby industry providers, and potential enrollment base throughout Josephine County, support this

1. INTRODUCTION

2. BACKGROUND

Page | 5 conclusion. The Transportation Training building project includes a new 14,000 square foot building on the Redwood Campus that will address the training facility need of the community and industry by constructing a new state of the art transportation technology training center and that is co-located with industrial technology training on campus. The new building will also include college standards for safety and security, accessibility, wayfinding, energy management and building automation. Once vacated, approximately 6,915 square feet of the current automotive Building-S and related site will be demolished for added student parking at the core of campus and will be considered phase 1 of RWC- Building-S work. Design and construction for phase 1 of RWC-S building are part of this project scope of work for the A/E and Construction Manager General Contractor (CMGC).

The remaining 5,610 square foot portion of the building and related site will be repurposed and renovated at a later date for expanded CTE programs on campus and will be considered Phase 2 of the RWC-S building modifications.

Table Rock Campus: Presently, RCC does not offer automotive technology courses in the Medford area, compelling students to commute to the Redwood Campus. Many potential students may not enroll in automotive technology classes due to the geographic distance of the Redwood Campus. To alleviate this access issue, the Academic Master Plan for Table Rock Campus includes renovation/expansion of existing building space at TRC to offer, at minimum, the first year of the AAS program in automotive technology.

This activity will allow RCC to expand and grow the program, providing space for current needs and accommodate future growth. The project will create space for automotive training programs, which are currently unavailable at that site. It will also provide an opportunity to enhance the diesel technology facilities at TRC. These programs are in high demand as students pursue degrees and certificates for careers in transportation fields. Expanded Transportation Technology programs will offer short-term training and skill updates in alternate fuels for both students and the workforce. This project is aligned with the RCC Academic Master Plan. The project could require staging the work in phases to minimize impact on the current program operations. The project requires a renovation/expansion of existing campus facilities to create approximately 14,000sft of flexible transportation technology training space. Deferred maintenance, including security, accessibility, energy and building system upgrades will be incorporated into the renovation work. Site improvements around the building will improve accessibility and campus wayfinding.

Rogue Community College District is seeking proposals from individuals, firms, teams or consultants, hereafter called “Proposer(s)”, with demonstrated experience in projects of this type, size and complexity to provide Architectural and Engineering services for the construction of new and renovated facilities for Transportation Technology Training on the Redwood and Table Rock Campuses. The scope of work will maximize communication and interaction between campus programs, to maximize storage and lab space, to minimize distractions and room conflict from more active functions of the program, and to properly welcome the public to the facility. Transportation program needs, electronic communications, and facility security are also important aspects of the programming work. The buildings will also be designed to incorporate parking and pedestrian circulation that accommodate a campus setting. The College also wishes to maximize the design’s flexibility to be able to best accommodate future modification or expansion. The successful Proposer chosen by the evaluation committee shall provide pre-design, schematic design, design development, construction documentation and construction administration services in coordination with a CMGC and the College to:

1. Design construction plans and specifications for College Transportation Training Buildings aligned with the funding available for this project.

2. Provide necessary parking for student and staff vehicles.

3. Provide site lighting for security and safe use while minimizing visibility of light sources. Provide lighting which is dark-sky friendly.

4. The design shall achieve energy efficiency and sustainability that emulates a

3. SCOPE OF WORK

Page | 6 design following the “LEED Silver” level or greater of the Leadership in Energy and Environmental Design (LEED) rating system, certifiable by the Green Building Certification Institute (GBCI). LEED is a reference only for this project scope of work. The College’s intent is to construct a facility that exceeds the minimum energy code requirement, but the College will not seek a LEED certification for this project.

5. Coordinate with the College’s Representative, referenced in this document as “Project Manager”, and the Transportation Technology Project Design Team to prepare project proposals designed to meet permit requirements and the College’s desire for public involvement.

6. Complete a boundary and topographic survey of the site sufficient to meet all permit, land use, design and construction needs.

7. Complete a geotechnical analysis of the site sufficient to meet permit, design and construction needs. Ensure the building will meet the seismic requirements for an educational facility.

8. Complete Civil Engineering plans for on-site and off-site private and public utilities consistent with permit, programmatic and land use requirements.

Coordinate those plans with the architect contracted Traffic Engineer, Mechanical Engineer, Structural Engineer, Acoustical Engineer, Landscape Architect, Geotechnical Engineer, Land use planning firm, and other members of the A/E team.

9. Attend public hearings and make presentations as needed, including presentations to the Transportation Training Project Team, County Planning Commission and College Board of Education.

10. Prepare materials for an appeal, if one is required.

11. Assist in development of all planning and implementation steps to comply with environmental regulations. Complete the City and County application and submittal as necessary to meet all land use requirements.

12. Provide and incorporate all permit conditions, AHJ decisions and requirements into contract documents.

The successful Proposer will promote a multi-disciplinary, integrated approach to design and construction that uses material, energy and water resources efficiently, minimizes site impacts, maximizes on-site storm water management, addresses the health issues relating to construction and indoor environments, and supports the use of “environmentally preferable” and local products while meeting the College’s fiscal and programmatic responsibilities.

Following an agreement to the fee negotiation period between the College and highest-ranking Proposer, the Proposer will be expected to enter into a not-to-exceed personal services contract. A sample contract is attached to this RFQ as Exhibit B.

The College has determined an anticipated cost for the requested services. After selection of the most qualified firm based upon the RFQ’s Evaluation Criteria, the fee negotiation phase of the procurement will begin and shall include the Proposer's true estimated cost to perform the work irrespective of the College’s budgeted funds for this work. The estimated total construction budget for this project is 13M. In addition to new and renovated/expanded building space, this figure includes site preparations, infrastructure, parking, landscaping, irrigation, and other necessary site improvements. The construction GMP must be within the estimated budget, which includes preconstruction services, estimated cost of the work, and CMGC fees. The estimated construction budget does not include A&E fees, furniture and equipment, owner contingency, SDCs, permitting, and other “soft costs” associated with the project.

4. PROJECT FUNDING

Page | 7

The project will be designed and constructed through college funding and a state grant. As a result of a strict budget, the pre-construction design phase will need to value engineer as necessary to create a design within the funding available for construction. A Professional Services Contract with a not-to-exceed amount will be negotiated with the successful Proposer.

The following dates are proposed as a timeline for the selection process:

Solicitation Schedule

Request for Qualifications Posted January 8, 2025 Pre-Proposal Meeting 11:00 A.M. January 16, 2025 Deadline for Questions 5:00 P.M. January 29, 2025 Proposal Due 10:00 A.M. February 6, 2025 Selection Committee Review Complete** February 13, 2025 Interviews Week of** March 3, 2025 Notice of Intent to Negotiate** March 12, 2025 Notice of Intent to Award** March 21, 2025 Deadline for Protests of Award 12:00 P.M.** March 28, 2025 Board of Education Approval** April 15, 2025

**Tentative Schedule. The College reserves the right to adjust the above noted schedule.

Anticipated Project Schedule

TBD End of Schematic and Design Development Phase January, 2026 End of Construction Documents Phase February, 2026 Establish a GMP for Construction April, 2026 Start Construction March, 2027 Project Substantial Completion April, 2027 Project Final Completion\Closure

5. TIMELINE FOR

SELECTION

Page | 8

WORK REQUIREMENTS

The successful Proposer (A/E team) shall perform the tasks listed below for this project, and shall be expected to work closely with designated College personnel to accomplish these goals:

A. Green Design Requirements:

1. The A/E team will conduct an “Eco-Charrette” attended by the design team, College staff and some citizens with the purpose of identifying project goals and options to meet the project’s green design and construction requirements.

2. Throughout the design and construction of the project the successful A/E team shall work with the project CMGC to provide the Project Manager with periodic updates of the constructability costs and related documentation to achieve a higher than minimum energy code building.

B. Pre-Design: Program Development and Documentation Review

1 . Review all available documents regarding previous studies and proposals. Some of the available studies may be preliminary in nature or incomplete and further investigation may be required for an adequate design response. Notify the Project Manager of the information needed.

2 . Review the completed preliminary programming information and make recommendations for improvement. The tasks associated with the review/revision process may include identifying and recommending improvements to currently listed space usage and preparing a revised program. Space planning and furniture planning for procurement will be a component of required work.

3 . Prepare a more detailed project schedule from the preliminary project schedule required for this RFP that identifies the necessary major tasks and/or benchmarks during the design process. Include the County’s design review process required for a building permit. Estimate the time required to accomplish each major task, including those associated with design review. The project schedule shall be updated throughout the design process.

4 . Prepare a companion document that identifies potential risk issues that could negatively impact the project budget or schedule. The successful Proposer shall help develop strategies to mitigate these risk impacts. The risk assessment document shall be updated throughout the design and construction process.

5 . Participate in a project kick-off meeting with the Project Team to formulate a design statement in which major project goals and the means of implementation are identified. The Project Team is at a minimum the A/E design team, the College’s Project Manager and the Transportation Training Project Team. Other College staff may also be included as members of the Project Team, as necessary.

C. Schematic Design Phase (SD)

1. Building on the information collected by the A/E team during program review, develop adjacency diagrams, bubble diagrams, and block diagrams as necessary to fully understand the relationships between the various functions and operational spaces of the Transportation Training program, and of any other components of the project and their surrounds. These diagrams should illustrate how the programmatic and operational requirements of the project will be met.

SECTION B

1. TECHNICAL OR

REQUIRED SERVICES

Page | 9

2. Develop at least two distinct, well thought out, and complete preliminary Schematic Designs that satisfy the program requirements for the project. The successful Proposer will present both alternatives to the full Project Team, which includes CMGC, with complete explanations for how each was derived. It is expected that both alternatives will be good solutions to the design problem. Include discussions of cost in relation to budget adherence in the presentation of each design. Show or otherwise describe preliminary selections of major building systems and construction materials.

3. From the responses to the preliminary Schematic Designs, prepare a semifinal Schematic Design for the project and review it with the Project Team.

4. Provide information as necessary to the CMGC so the contractor can provide a preliminary cost estimate with a value engineering (VE) proposal, simple life cycle analysis (LCA) and cost information that addresses durability and maintenance of major materials for review by the Project Team at the same time as the final Schematic Design.

5. Provide design and project management services as required to assist and support the effort to obtain a building permit. The College will pay charges for the Planning Department pre-application conference, land use permit and the Building Department plan check and building permit. Participate in any public meetings as required.

6. The successful Proposer may suggest additional appropriate green design strategies for consideration by the Project Team and shall report on implementation of green strategies at design meetings.

D. Design Development Phase (DD)

1. Upon approval of the Schematic Design by the College’s Project Manager (after public process and Board review), proceed with Design Development documents.

2. Conduct a Value Engineering Charrette as necessary to insure the project will meet budget requirements and assist the CMGC in the development of a construction phase GMP. Coordinate with the College’s CMGC to provide input into project staging, building systems, materials, methods of construction, constructability, schedule, construction access and other elements that will affect project cost, quality and schedule.

3. Provide all documentation necessary to describe the scope, existing systems and new system relationships, appearance of the project, and all landscape, architectural, structural, mechanical and electrical systems by means of plans, sections, elevations, typical construction details, and equipment layouts.

4. In cooperation with the CMGC, develop specifications that identify major materials and systems, and establish, in general, their quality levels.

5. Prepare a semi-final set of DD documents and review with the College’s Project Manager and Project Team.

6. Integrate information from the College’s Project Manager and Project Team review into final DD documents and present to the Project Team.

7. Collaborate with Project team and CMGC to develop costs. On-going constructability and VE reviews shall occur during this phase as necessary to assure budget compliance.

8. Obtain approval from the College’s Project Manager before proceeding with

Construction Documents.

Page | 10

E. Construction Documents Phase (CD)

1. Provide Construction Documents, drawings and specifications, based upon the DD documents approved by the College, including all requirements that may be required as part of the land use approval.

2. These documents shall describe in adequate detail all aspects of the construction of the project. CD’s should be clear and complete in order to keep change orders to a minimum.

3. CD’s shall be submitted for review to Project Manager at 50% and 95% completion.

At the time of submittals, the successful Proposer shall submit a list of issues needing resolution and what information is needed. Successful Proposer shall submit a minimum of 4 drawing sets and specifications for review.

4. Collaborate with CMGC to provide a 95% cost estimate for review by the College’s

Project Manager at the same time as the 95% Construction Document submittal.

F. Bid Phase for GMP (B)

1. The successful Proposer shall submit the final and complete CD’s to the College’s Project Manager and shall be responsible for printing the number of sets determined by the Design Team to be necessary. Printing costs to be paid by the College as a reimbursable expense to the Proposer.

2. The CMGC will competitively bid out and provide costs of the construction phase for a GMP. The successful Proposer shall attend the pre-bid and pre-construction meetings. Successful Proposer shall collaborate with CMGC on responses to any substitution requests and may be asked to respond to questions and to provide additional support during the bid phase.

G. Construction Administration Phase (CA)

1. The successful Proposer shall perform timely site visits and observe construction to the degree necessary and as required to ensure conformance with the CDs.

2. The successful Proposer shall attend weekly construction meetings and perform on-going A/E tasks (requests for information, review change order requests, assist in approving CMGC payment applications using standard forms as required by AIA, prepare field reports, etc.) during construction as required to implement the project.

3. Work with the CMGC to provide the College a Traffic Control Plan that will protect the public from the potential impacts of construction access and schedule conflicts.

4. The successful Proposer shall prepare meeting notes for electronic distribution no later than 48 hours after the meeting. Meeting notes shall contain, at a minimum, adequate detail to document construction progress, action items, decisions, and risk issues that could negatively impact schedule or budget.

5. Provide a full record drawing set (“as-built”) with latest AutoCAD release or compatible version or thumb drive, and also provide copies of public utilities associated with the project. Co-ordination with the CMGC will likely be required; however, provided the design documents are complete and accurate the successful Proposer will not be held liable for the accuracy of the information received from the CMGC and Subcontractors regarding the site and building improvements, but shall to the best of their ability ensure that information is correct and true. These drawings will become the property of the College at the end of the project. Successful Proposer shall be released from responsibility for future work done using these drawings not directly involving the successful Proposer. Drawing files shall conform to County standards

Page | 11 and file naming conventions. Drawings illustrating as-built utilities shall be certified by a registered civil engineer and require acceptance by the County Building Department/Engineer.

6. At the end of the CA phase, provide the College with all back-up documentation showing compliance to stated goals for sustainability and energy efficiency.

7. Provide an “Owner’s Manual” at project completion containing all building element sources, subcontractor and manufacturer contact information, manufacturer owner’s manuals, warranty information, as-built plans, and other relevant data.

The College has assigned a project manager to oversee the successful Proposer’s work and provide support as needed.

The College Information Technology Services Department (IT) will provide to the successful Proposer requirements for connectivity and information sharing necessary for the project. The IT Manager will be available for coordination of the work as requested.

Other College personnel in the IT Department, Facilities Department, and the Transportation Technology Department will be available to review building system design, landscaping and irrigation, and utilities. These staff members will assist the Project Manager to represent the College as the project Owner.

Deliverables shall be considered those tangible resulting work products that are to be delivered to the College such as reports, draft documents, data, interim findings, drawings, schematics, training, meeting presentations, final drawings and reports.

Deliverables and schedule for this project shall include:

A. Specific deliverables are described in Part 1, Section B.1. They include:

1. Green Design Requirements:

a. An “eco-charrette” meeting attended by the entire design team with the purpose of identifying project goals as they relate to green design and construction

b. Meeting notes distributed to attendees

c. Sustainability and efficiency, periodically updated throughout the project

2. Pre-Design Phase: Program Development and Documentation Review:

a. Program document

b. Detailed project schedule

c. Prepare risk issues and mitigation document

d. Project kick-off meeting. This meeting will be prior to the eco- Charrette, conducted shortly after the Notice to Proceed.

e. Meeting notes for the project kick-off meeting distributed to attendees

3. Schematic Design Phase:

a. Two schematic design options based on the final Program.

b. Prepare and submit pre-application conference applications with Planning AHJ

c. Provide information necessary for the CMGC to provide preliminary cost estimate at end of SD. Conduct VE Charrette if over budget.

2. WORK PERFORMED

BY THE COLLEGE

3. DELIVERABLES

AND SCHEDULE

Page | 12

4. Design Development Phase:

a. Attend design review and process meetings as previously described and distribute meeting notes to attendees.

b. In coordination with CMGC for construction GMP, provide information necessary for the CMGC to cost estimate at end of DD with VE proposal if over budget. Conduct Value Engineering Charrette.

c. Complete and file application for Land Use permit as necessary. Attend design, review and process meetings as previously described, and distribute meeting notes to attendees.

5. Construction Documents Phase:

a. Submit review documents at 50% and 95% complete.

b. Final cost estimate at 95% complete

c. Submit applications for permits to all plan review authorities, respond to check sheet comments, and make changes to CDs as required.

d. Update schedule

6. Bid Phase for GMP:

a. Make final revisions to CD’s and prepare the Bid Sets.

b. Attend Pre-Bid meeting, take and distribute notes.

c. Respond to substitution requests and bid document clarification requests.

d. Generate draft addenda.

7. Contract Administration/Construction:

a. Attend Pre-Bid meeting and all subsequent weekly construction meetings, take and distribute notes.

b. Review and approve all project documents from the Contractor and issue additional project information and documentation.

c. Respond to Requests for Information (RFI’s) and Change Order requests.

d. Provide a Traffic Control Plan.

B. Successful Proposer shall provide Project Team design meeting minutes during the design phases, construction meeting minutes, and site visit reports during the CA phase.

C. Full electronic record per County CAD standards and drawings for public utilities.

D. Submit a Monthly Subconsultant Payment and Utilization Report.

E. All deliverables and resulting work products from this contract will become the property of Rogue Community College District.

The College anticipates having the successful Proposer begin work immediately upon contract execution with submittal of final deliverables to the College occurring by no later than January 16, 2026.

Proposals containing earlier completion of the deliverables are acceptable and encouraged.

4. PERIOD OF

PERFORMANCE

Page | 13

The College may require limiting access to public work sites. The College may request, and the successful Proposer shall assist, the Contractor to implement steps to ensure the security of the College Facility. Employees of the Proposer, Subconsultants and the Contractor may be subject to background checks. The successful Proposer’s employees and agents shall carry sufficient identification to show by whom they are employed and display it upon request to security personnel.

The successful Proposer(s) shall agree to maintain continuous, uninterrupted coverage of all insurance as required by the College. Such insurance shall cover all activities of the Proposer arising directly or indirectly out of the Proposer’s work, including the operations of its subconsultants of any tier. An insurance company deemed acceptable by the College must underwrite coverage provided by the Proposer. The College reserves the right to reject all or any insurance carrier(s) with an unacceptable financial rating. There shall be no cancellation, material change, reduction of limits or intent not to renew the insurance coverage(s) without a 30-day written notice provided to the College. Any failure to comply with this provision will not affect the insurance coverage provided to the College. Certificates of such insurance shall be provided to the College prior to commencement of the work. No contract shall become effective until the required insurance certificates have been received and approved by the College. A renewal certificate shall be sent to the College 10 days prior to coverage expiration. The procuring of such required insurance shall not be construed to limit the Proposer’s liability hereunder. Notwithstanding such insurance, the Proposer shall be obligated for the total amount of any damage, injury, or loss caused by negligence or neglect of any consultant connected with the contract. The Sample Contract, attached as Exhibit B, contains the required limits and coverage for Commercial General Liability Insurance, Commercial Automobile Insurance, Workers’ Compensation Insurance and Professional Liability Insurance.

The Commercial General Liability Insurance and Commercial Automobile Insurance policies and other policies the College deems necessary shall include the College as an additional insured.

5. CAMPUS SAFETY

6. INSURANCE

Page | 14

SECTION ATTACHMENTS

1. INDEX Exhibit A Evaluation Criteria

` Exhibit B Sample College Contract** Exhibit C Sample In-Kind Donation Form

Attachment I Non-Collusion Affidavit Attachment II Resident Bidder Form Attachment III Compliance with Tax laws **The Architectural Services Contract is the College’s standard consulting services/professional services contract and will be used as a result of this selection process.

Page | 15

PART II PROPOSAL PREPARATION AND SUBMITTAL

PRE-PROPOSAL MEETING/CLARIFICATION

A pre-proposal meeting and/or site visit is scheduled for this project on January 16, 2025.

This is a non-mandatory meeting; therefore, all Proposers are not required to attend the meeting if they intend to submit a proposal.

Questions and requests for clarification regarding this Request for Qualifications must be directed to the email listed below. The deadline for submitting such questions/clarifications is 5:00 p.m. on January 29, 2025. An addendum will be issued no later than seventy-two (72) hours prior to the proposal due date to all recorded holders of the RFQ if a substantive clarification is in order.

bidquestions@roguecc.edu

PROPOSAL SUBMISSION

Sealed proposals must be received no later than the date and time, and at the location, specified on the cover of this solicitation. The outside of the envelope shall plainly identify the subject of the proposal. It is the Proposer’s responsibility to ensure that proposals are received prior to the specified closing date and time, and at the location specified. Proposals received after the specified closing date and/or time shall not be considered and will be returned to the Proposer unopened. The College shall not be responsible for the proper identification and handling of any proposals submitted to an incorrect location.

Proposals must be clear, succinct, and shall not exceed twenty-five (25) pages (8 1/2” X 11”) and use a font size for type no smaller than 12 pt. Section dividers, title page, and table of contents do not count in the overall page count of the proposal. Proposers who submit more than the pages indicated may not have the additional pages of the proposal read or considered. Upon selection for an Oral Interview, Proposers may bring larger format presentation boards or alternate forms of presentation, but all materials submitted shall be reproducible to 8 1/2” X 11” formatting and shall become the property of the College.

For purposes of review and in the interest of the College’s goals for sustainability, Proposers are encouraged to use submittal materials (i.e. paper, dividers, binders, brochures, etc.) that contain post-consumer recycled products. The College discourages but does not prohibit the use of materials that cannot be readily recycled such as PVC (vinyl) binders, spiral bindings, and plastic or glossy covers or dividers. Alternative bindings such as reusable/recyclable binding posts, reusable binder clips or binder rings, and recyclable cardboard/paperboard binders are examples of preferable submittal materials.

Proposers are encouraged to print/copy on both sides of a single sheet of paper wherever applicable; if sheets are printed on both sides, it is considered to be two pages. Color is acceptable, but black and white printing or copying should not lose content. All submittals will be evaluated on the completeness and quality of the content. Only those Proposers providing complete information as required will be considered for evaluation. The ability to follow these instructions demonstrates attention to detail.

Proposers must provide all information as requested in this Request for Qualifications (RFQ). Responses must follow the format outlined in this RFQ. Additional materials in other formats or pages beyond the stated page limit(s) may not be considered. The College may reject as non-responsive, at its sole discretion, any proposal or any part thereof, which is incomplete, inadequate in its response, or departs in any substantive way from the required format. Proposal responses shall be organized in the following manner and shall address each item listed in the Evaluation Criteria (Exhibit A):

1. Cover Letter

2. Background/ Experience (including experience with LEED certification)

3. Project Team (including Project Scope and team member responsibility) mailto:bidquestions@roguecc.edu

Page | 16

4. Approach, Cost Controls, Quality and Innovation and Schedule

5. Communication, Public Involvement / Public Information strategies

EVALUATION CRITERIA

By submitting a response, the Proposer is accepting the terms of this Request for Qualifications and its attachments.

In addition to the requirements listed to satisfy the evaluation criteria a cover letter shall be submitted.

The Cover Letter must include the following:

• RFQ project title

• name(s) of the person(s) authorized to represent the Proposer in any negotiations

• name(s) of the person(s) authorized to sign any contract that may result

• contact person’s name, mailing or street addresses, phone and fax numbers and email address

PART III PROPOSAL EVALUATION

SECTION A PROPOSAL REVIEW AND SELECTION

1. EVALUATION CRITERIA Each proposal shall be evaluated on the evaluation criteria, as shown in the Evaluation

Criteria attachment (Exhibit A).

2. PROPOSAL REVIEW An evaluation review committee will be appointed to evaluate the proposals received.

For the purpose of scoring proposals, each committee member will evaluate each proposal in accordance with the criteria and point factors listed in Exhibit A. The evaluation committee may seek outside expertise, including but not limited to input from technical advisors, to assist in the evaluation process.

The successful Proposer shall be selected by the following process:

a. An evaluation committee will be appointed to evaluate submitted written proposals.

b. The committee will score the written proposals based on the information submitted according to the evaluation criteria.

c. The committee will require a minimum of five (5) working days to evaluate and score the written proposals.

d. A short list of Proposers, based on the highest scores, will be selected for oral interviews.

e. Final scores, based on the same evaluation criteria, will be determined following the oral interviews.

All communications shall be through the contact(s) referenced in this RFQ.

For contracts over $250,000, the evaluation committee's recommendation for contract award will be submitted to the College’s Board of Education for approval. The College has the right to reject any or all proposals for good cause, in the public interest.

At any point during the evaluation process, the College is permitted but is not required to seek clarification of a proposal. However, a request for clarification does not permit changes to a proposal.

3. CLARIFYING PROPOSAL

DURING EVALUATION

Page | 17

SECTION B CONTRACT AWARD

As a matter of qualifications-based selection (QBS) the College will attempt to reach a final agreement with the highest scoring Proposer. However, the College may, at its sole discretion, terminate negotiations and reject the proposal if it appears agreement cannot be reached. The College may then attempt to reach a final agreement with the second highest scoring Proposer and may continue on, in the same manner, with remaining proposers until an agreement is reached.

The proposal and all responses provided by the successful Proposer may become part of the final contract. The form of contract shall be the College's Standard Professional Services Contract.

REVIEW:

Following the Notice of Intent to Award, the public may view proposal documents.

However, any proprietary information so designated by the Proposer as a trade secret or confidential and meeting the requirements of ORS 192.501, 192.502 and/or ORS 646.461 et seq., will not be disclosed unless the County District Attorney determines that disclosure is required. At this time, Proposers not awarded the contract may seek additional clarification or debriefing, request time to review the selection procedures or discuss the scoring methods utilized by the evaluation committee.

PROTESTS OF CONTRACT AWARDS:

Protests may be submitted to the College only for formal solicitations resulting in contract(s) only from those Proposers who would receive the contract if their protest was successful.

Protests must be in writing and received by the College within seven (7) calendar days, UNLESS OTHERWISE NOTED, following the date the College’s Notice of Intent to Award was issued. The protest must specifically state the reason for the protest and show how its proposal or the winning proposal was mis-scored or show how the selection process deviated from that described in the solicitation document. No contract will be awarded until the protest has been resolved.

Protests must be timely and must include all legal and factual information regarding the protest, and a statement of the form of relief requested. Protests received later than specified or from other than the Proposer who would receive the contract if the protest was successful will not be considered. The exercise of judgment used by the evaluators in scoring the written proposals and interviews, including the use of outside expertise, is not grounds for appeal.

The College may waive any procedural irregularities that had no material effect on the selection of the proposed contractor, invalidate the proposed award, amend the award decision, request that the evaluation committee re-evaluate any proposal, or require the College to cancel the solicitation and begin again to solicit new proposals. The College shall create a written opinion on the protest and forward the opinion to the evaluation committee for further action. in the event the evaluation committee determines the protest to be valid, the College shall issue a notice canceling the Notice of Intent to Award.

Decisions of the evaluation committee are final and conclude the protest process.

1. CONSULTANT

SELECTION

2. CONTRACT

3. AWARD REVIEW AND

PROTESTS

Page | 18

Exhibit A

ARCHITECT AND ENGINEERING EVALUATION CRITERIA

Proposals will be evaluated on the basis of the following weighted categories:

Evaluation Criteria

Cover Letter

Background / Experience

Project Team

Approach, Cost Control, Quality & Innovation / Schedule

Communication, Public Involvement / Public Information

A. Background / Experience 32%

1. All of the elements of design services including;

• Architecture

• Landscape Architecture

• Civil Engineering

• Structural Engineering

• Mechanical Engineering

• Electrical Engineering

• Traffic Engineering

• Planning (land use permitting)

• Construction Manager/General Contractor (CMGC) Coordination and Integration

Provide a description of the proposing firm(s) which include(s) the type of work in which the firm specializes; the number of College Transportation Training facilities designed within the last ten (10) years; and the number of LEED certified projects designed. Also describe the design style(s) that is emblematic of the firm’s work. List the names of all persons with an ownership interest in the company(s), the primary bank, insurer, accounting firm, and legal office used by the contracting firm and include names and contact information for each

2. State whether the firm is or has been named as a plaintiff, or defendant, in any mediation, arbitration, litigation or other legal action with an owner, client or contractor, in the previous ten (10) years, regardless of the outcome. State whether, during the last ten (10) years, the firm has made a settlement, or been ordered to make a payment to a plaintiff or claimant, or has been found in violation of a regulatory statute which has resulted in a fine, disbarment or other action by regulatory agencies (information required to be kept confidential in any settlement agreement need not be disclosed in the proposal).

3. List and briefly describe a minimum of five (5) relevant College facilities designed by the firm within the last ten

(10) years, with respective client references and their phone numbers, and E-mail addresses. Provide general

Page | 19 contractor references for the respective projects with construction project manager names, including the phone number, and E-mail address for each reference. List key personnel for each of those projects and indicate whether they are on the current proposing team for this project. Firms with more recent experience will be given preference.

B. Project Team 26%

1. Identify the project team, which includes all joint venture or partnering firms for this project.