ONPVC_Entrance_Sign_Technical_Specifications.docx
DOCX document 308 KB Posted
- Attached to
- CONSTRUCT ONPVC ENTRANCE SIGN STRUCTURE - OLYM Federal contract opportunity
- Solicitation number
- P16PS02387
About this file
Technical Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Price_Schedule_SECTION_B.docx | DOCX document | |
| NPS_CM-16_Transmittal_Form_Use_for_Contract_Submittals.docx | DOCX document | |
| Wage_Determination_WA69.txt | TXT text file | |
| READ_ME_FIRST.docx | DOCX document | |
| Sol_P16PS02387.pdf | ||
| Port_Angeles_VC_Entrance_Sign_Drawings.pdf | ||
| SF-25A_PAYMENT_BOND_FORM.pdf | ||
| P16PS02387_SF_-_1442.pdf | ||
| Terms_and_Conditions_SECTION_C_-_M.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OLYMPIC NATIONAL PARK
Olympic National Park Port Angeles Visitor Center Entrance Sign Project
TECHNICAL SPECIFICATIONS
for Contract P16……………….
June 16, 2016
INDEX
Scope of Project 3
Project Representatives 3
Section 1 – General 4
Section 2 – Entrance Sign Support Structure and Related Improvements 8
Section 3 – Traffic Control 10
Section 4 – Protection of Resources 10
Index to Supplemental Technical Specifications 15
Scope of Project
The intent of this project is to construct a new entrance sign support structure consisting of a 350 square foot reinforced concrete base on compacted crushed rock with river rock-in-mortar surface in addition to supplying and installing hand-peeled pressure treated logs, which will be attached to the concrete base with a double-galvanized welded steel connector device designed specifically for this project. The project also includes installation of a new entrance sign to be supplied by the National Park Service. The project includes removal and disposal of the existing entrance sign with concrete and stone support structure and seeding of all disturbed areas with grass seed.
The Contractor shall recognize that this project work site is within Olympic National Park. The Contractor, in accepting the award of this project, accepts responsibility in fulfilling the mission of the National Park Service. Specifically, the Contractor shall be responsible for;
· protecting, through efforts at every level of the organization, the natural and cultural resources within park which are impacted by work on this project
· maintaining, through efforts at every level of the organization, including sub-contractors and suppliers, excellent relations with Park visitors and staff
The Contractor, upon accepting this contract, becomes a representative of the National Park Service and will join with the National Park Service in maintaining the experience available to the visiting public within Olympic National Park.
OLYMPIC NATIONAL PARK Project Representatives
Mickey Hopkins, Contracting Officer (CO) / Office Phone: 360-565-3025 / Cell Phone: 360-461-8013 / Email: Mickey_Hopkins@nps.gov
Jeff Doryland, Contracting Officer’s Representative (COR) / Office Phone: 360-565-3151 / Email: Jeff_Doryland@nps.gov@nps.gov
Jack Galloway, Project Landscape Architect / Cell Phone: 360-477-9005 / Email: Jack_Galloway@nps.gov
SECTION 1 – GENERAL
1.01 PROJECT REVIEW
Specifications, Line Items, Drawings, and solicitation/contract Terms and Conditions, are all integral and critical parts of this project. Many items are detailed in the specifications. The contractor shall be fully aware of the contents of the specifications, drawings, and solicitation/contract terms and conditions, as they will be held to these requirements during construction.
1.02 Coordination
The Contractor shall work closely with the CO and COR to assure that adequate inspection and quality control is maintained. Failure to do so will result in an immediate stop of work, without compensation to the Contractor for any delays encountered or claimed.
1.03 REFERENCES
References herein to WSDOT shall be deemed to refer to the latest printing of the Washington Department of Transportation Standard Specifications.
1.04 WEEKLY PROGRESS MEETINGS
After work begins, a weekly meeting shall be scheduled for the purpose of providing a quick debrief of the week’s happenings, with as little impact on everyone’s time as possible. Contractor to provide progress updates (indicating work completed to date and the schedule for future activities) and discuss any issues/concerns.
Contractor and COR shall decide on which day per week and time for the meetings, so they occur on a routine, weekly basis. Most likely the meetings will be conducted via teleconference call.
Attending shall be the CO, COR, project Landscape Architect (as available), Contractor’s site Superintendent, and other contractor or subcontractor key personnel as contractor deems necessary.
The COR shall send out meeting minutes via email each week after the meeting to the site Superintendent and cc: CO and project Landscape Architect.
1.05 SUBMITTALS
Refer to Section F.4 in the attached Terms and Conditions for complete list of submittals (solicitation/contract Attachment no. 2).
1.06 CONSTRUCTION SCHEDULE
Refer to Section I.19 in the attached Terms and Conditions for schedule requirements (solicitation/contract Attachment no. 2). In accordance with the clause 52.23-15, the schedule can be presented at the pre-construction meeting, but is required to be submitted within 5 days after the work commences. The schedule can be sent by email to the CO and cc: COR and project Landscape Architect, and should also include hours and days of the week the Contractor proposes to carry out the work. The schedule shall be in the form of a progress chart to indicate appropriately the percentage of work scheduled for completion by any given date during the period.
Typically, heavy equipment work is scheduled with at least two days off in any two week period. Heavy equipment work is only permitted during daylight hours. Work outside of the days and hours specified in the construction schedule may be performed only with prior consent of the COR, with notification at least 48 hours in advance.
In the event of an emergency, the COR may require equipment to continue operating if the operations may prevent resource damage that seems likely but preventable.
1.07 HOURS OF WORK
Except as discussed in Mitigations, work hours shall be strictly conformed to. The start of work shall be no earlier than 7:00am and the end of work shall be no later than 6:30 pm, Monday through Friday, excluding holidays. Variations may be granted by the Contracting Officer in writing, following written request by the Contractor.
1.08 INSPECTION
All work shall be inspected on an ongoing basis by the COR and/or project Landscape Architect. The Contractor shall provide for and allow complete and unobstructed access to all work areas, processes, and elements of the project.
1.09 TIME OF COMPLETION
As stated in Section F.2 of the attached Terms and Conditions, the Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than *30 calendar days. The time stated for completion shall include final cleanup of the premises.
*Target start date is November 1, 2016. Target completion date is February 28, 2017. The contractor shall look for reasonable weather windows during that time period to accomplish the work.
1.10 COMPLETION - SUBSTANTIAL OR FINAL
Contractor shall notify the CO in writing via email of substantial completion, and cc: COR and project Landscape Architect. The COR will be responsible for conducting the final inspection, and notify the CO in writing via email of any punch list items remaining. The CO will send the contractor a letter of substantial completion, providing a timeline for accomplishing any identified remaining work.
Contractor shall notify the same parties when the punch list items are completed, and COR will re-inspect and notify the CO in writing via email whether the punch list items are considered 100% complete and accepted. Upon COR’s written acceptance, the CO will send a letter of completion to the contractor containing information for preparing for final payment and the required CPARS on-line performance evaluation.
Contractor shall be aware that all items of work must be considered 100% inspected and accepted by the CO prior to final payment. This includes final cleanup, walk-through(s) with the COR, completion of punch list items, and having sent in all daily logs and payrolls.
1.11 Overnight In The park
The Contractor, subcontractors, suppliers or others directly or indirectly involved with the project will not be allowed to camp or stay overnight at the construction site, except as approved in writing or if such a stay is within an established campground under the rules and fees established in that campground. If approved in writing, the Contractor may station a watchman at the construction yard for the purpose of security and protection of equipment and stockpiled materials.
1.12 VANDALISM
Any damage to work or equipment resulting from vandalism shall be the Contractor's responsibility to repair or replace.
1.13 Theft
Any damage or loss of equipment or materials resulting from theft shall be the Contractor's responsibility. While the NPS may patrol the area of work, such patrols by the NPS do not imply absolute or permanent security of the Contractor’s resources or responsibility for the protection of the Contractor’s resources.
1.14 Mobilization and Demobilization
1.14A Mobilization There is space available in the parking area (see Drawings) for the Contractor to prepare a construction yard with approval of the COR. The Contractor shall move equipment and materials to the site in preparation for beginning work. All materials shall be stockpiled within the project area limits, unless placed at time of delivery
The Contractor shall not store any equipment or materials on any private parcel, commercial or residential, unless a written agreement between the owner of said parcel and the Contractor, acceptable to the CO, is approved in advance by the CO or COR.
Security of all materials and equipment is the sole responsibility of the Contractor.
1.14B Identification of Site As identified by the COR, the contractor will clearly delineate the construction limits to prevent damage to surrounding vegetation and trees. Before the beginning of construction, construction limits shall be staked and marked with construction fencing, tape, flagging, snow fencing, or some similar material, as necessary. The construction limits identify and limit the area of construction activity. The contractor is responsible for ensuring that all work stays inside the construction limits. Workers shall be instructed to avoid conducting activities beyond the construction zone.
Also refer to the clause 52.236-17, Layout of Work, incorporated into the solicitation/contract by full text in Secton I.20 of Attachment No. 2.
1.14C Demobilization The Contractor shall remove all equipment, materials and debris from the site.
The Contractor shall grade ruts smooth, remove equipment and Contractor-generated debris and other non-native materials from the roadway and site. All such materials shall become the property of the Contractor and shall be removed from the park. At the completion of work the site shall be restored to a condition equal to or better than that present prior to the start of work.
All marking material and devices shall be removed by the contractor at the completion of work.
1.14 Payment
The proposed lump sum price for Line Item No. 1 (Mobilization and Demobilization) shall include all work as indicated herein necessary for the Contractor to fully mobilize for the project and to demobilize at the completion of the work, removing all equipment and materials from the park.
1.15 Survey
The Contractor shall provide for the necessary surveying requirements. Surveying is required to establish the limits of construction, establish elevations, lines and grades, and confirm quantities.
Also refer to the clause 52.236-16, Quantity Surveys, incorporated into the solicitation/contract by full text in Secton I.20 of Attachment No. 2.
1.15 PAYMENT
The proposed lump sum price for Line Item No.2 (Survey) shall include all necessary labor, equipment, material and incidentals necessary to perform the work.
1.16 Removal of Materials
The Contractor shall remove the existing entrance sign including the concrete and stone support structure and shrubbery as noted on drawings. The Contractor will take possession and ownership of concrete and stone debris, unsuitable and excess material from the project and remove such material from the Park. It is the contractor’s sole responsibility to safely and legally dispose of all materials removed as a part of this project. Recycling of all recyclable materials is encouraged. Disposal fees are included in this item.
1.16 PAYMENT
The proposed lump sum price for Line Item No. 3 (Removal of Materials) shall include all necessary labor, equipment, material and incidentals necessary to perform the work, including disposal of materials generated during clearing, and including dump fees.
1.17 erosion control Prior to the commencement of work on-site, the Contractor shall have submitted for approval to the Contracting Officer, an Erosion Control Plan.
The Contractor shall put in place erosion control devices before work begins. Erosion control devices left in place will be removed by the contractor at the completion of the work.
Do not use hay or straw bales for erosion control.
Use best management erosion-control practices for drainage and sediment control to prevent or reduce nonpoint source pollution and minimize soil loss and sedimentation in drainage areas. These practices may include but are not limited to, pole peelings, wood straw, or other certified weed-free mulch products preapproved by Olympic National Park’s chief botanist, silt fencing, filter fabric, temporary sediment ponds, check dams of pea gravel-filled burlap bags or other material, and/or immediate mulching of exposed areas to minimize sedimentation and turbidity impacts as a result of construction activities. Silt fencing fabric would be inspected daily during project work and weekly after project completion, until removed. Accumulated sediments would be removed when the fabric is estimated to be approximately 75% full. Silt removal would be accomplished in such a way as to avoid introduction into any flowing water bodies.
During periods of heavy rainfall as determined by the COR, the CO will issue a temporary stop work order. During these work stoppage periods, the contractor shall monitor the effectiveness of the erosion control devices and maintain all such devices sufficient to prevent the transport of sediments to outside the project area.
1.17 PAYMENT
The proposed lump sum price for Line Item No. 4 (Erosion Control) shall include all work required to prepare and implement an erosion control plan as indicated herein necessary for the Contractor.
1.18 DELAYS
During periods of heavy rainfall as determined by the Contracting Officer may issue a temporary stop work order. During these work stoppage periods, the contractor shall monitor the effectiveness of the erosion control devices and maintain all such devices sufficient to prevent the transport of sediments from the project area. The Contractor may request, in writing to the CO, additional contract time for work stoppage(s) as a result of weather shut-downs, which if approved, will add time (additional days) to the contract schedule, with no increase to contract price. Also refer to Section H.3, Notice to the Government of Delays, in the attached solicitation/contract Terms and Conditions (Attachment no. 2).
SECTION 2 – construct new entrance sign
AND RELATED IMPROVEMENTS
2.01A General This project includes removal disposal of the existing entrance sign and construction of a new entrance sign support structure. The new sign support structure will include a 350 square foot reinforced concrete base on compacted crushed rock with river rock-in-mortar surface in addition to hand-peeled pressure treated logs, which will be attached to the concrete base with a double-galvanized welded steel connector device designed specifically for this project. The project also includes installation of a new routed and painted entrance sign, and two metal road signs which will be supplied to the Contractor by the National Park Service. This project also includes seeding of all disturbed areas with grass seed.
The project description is intended to include all elements necessary to complete the work. If during the preparation of proposals the contractor discovers elements of work which are not necessarily included in the Price Schedule, these additional items of work shall be included as a part of other items.
2.01B Work Window This work may be completed as detailed in Section 1.07, above. Work which occurs after March 31 to May 15th may occur from two hours after sunrise to two hours before sunset.
2.01C Visitor & NPS EMployee Impacts The Olympic National Park Visitor Center will be open to the public during this project. Traffic control well be needed to direct visitors away from areas in the parking lot that may be used for a construction yard by the Contractor. Also, the asphalt path located in close proximity to the new entrance sign must remain open for use by the public.
2.01D Mobilization & Demobilization Mobilization shall be according to the requirements of Section 1.14, above, and as modified herein.
2.01E Erosion Control Erosion control shall include all work necessary for the contractor to complete the work according to the drawings and these specifications.
2.01F Removal of Materials Removal of materials shall include concrete, stone facing, wood sign, and shrubbery currently located immediately behind the existing sign in accordance with these specification and the drawings and includes associated dump fees.
2.01G Site Clearing The Contractor and Park will identify boundaries of clearing and grubbing in advance of the work. As per Section 311000 of these specifications, the Contractor shall clear vegetation, surface debris and other materials from the defined construction area, which avoids removal of any trees. Sufficient debris shall be removed to limit the contamination of the underlying material during excavation. Sod within the footprint of the concrete sign support structure base shall be removed and disposed of by the Contractor. All trash shall be removed from the park and disposed of by the contractor.
2.01G PAYMENT
The proposed lump sum price for Line Item No. 5 (Site Clearing) shall include all necessary labor, equipment, material and incidentals necessary to perform the work, including disposal of materials generated during clearing.
2.01H Site Excavation and Grading Excavation and grading shall be as per the drawings and as per Section 312000 of these specifications as necessary to prepare for receiving the crushed rock base course prior to placing the reinforced concrete base for the new entrance sign.
Excess excavation soil shall be removed from the park and disposed of by the contractor.
2.01H PAYMENT
The proposed price per square foot for Line Item No. 6 (Excavation and Grading) shall include all necessary labor, equipment, material and incidentals necessary to perform the work, complete and in place, including disposal of materials generated during excavation.
23.01I Crushed Crushed Rock Base Course Placement The Contractor shall supply and place 3/4-inch minus crushed rock base course according to the drawings and WSDOT specifications (Section 4.04.2) including sub-grade preparation, material supply, placement and compaction.
2.01I PAYMENT
The proposed price per ton for Line Item No. 7 (Crushed Rock Base Course) shall include all necessary labor, equipment, material and incidentals necessary to perform the work, complete and in place, including grade preparation, material supply, placement and compaction.
2.01J Concrete placement The contractor shall supply, deliver and place concrete to a thickness of 12 inches over the prepared crushed rock base course according to the drawings and Section 321313.
2.01J PAYMENT
The proposed price per square foot for Line Item No. 8 (Concrete) shall include all necessary labor, equipment, material and incidentals necessary to perform the work, complete and in place, including grade preparation.
2.01K Welded Steel Connector Devices The double hot-dipped welded mild steel log-to-concrete connector devices shall be as per the drawings and attached to individual logs and then to the concrete slab as per drawings.
2.01K PAYMENT
The proposed price per square foot for Line Item No. 9 (Steel Connector Devices) shall include all necessary labor, equipment, material and incidentals necessary to perform the work, complete and in place.
2.01L Hand-Peeled Pressure Treated Logs Hand-peeled pressure treated pine logs shall be as per the drawings.
Excess excavation soil shall be removed from the park and disposed of by the contractor.
2.01L PAYMENT
The proposed lump sum price for Line Item No.10 (Hand-Peeled Pressure Treated Logs) shall include all necessary labor, equipment, material and incidentals necessary to perform the work, complete and in place.
2.01M River Rock Surfacing The river rock surface over the concrete shall be as per the drawing.
2.01M PAYMENT
The proposed price per square foot for Line Item No. 11 (River Rock Surfacing) shall include all necessary labor, equipment, material and incidentals necessary to perform the work.
2.01N Turf and Grasses The Contractor shall supply and broadcast grass seed in accordance with these the drawings and Section 329200 of these specifications.
2.01N PAYMENT
The proposed lump sum price for Line Item No. 12 (Turf and Grasses), shall include all necessary labor, equipment, material and incidentals necessary to perform the work, complete and in place.
2.01O Install Sign Boards Installation of the routed and painted entrance sign and two metal road signs shall be as per the drawings.
2.01O PAYMENT
The proposed lump sum price for Line Item No. 13 (Install Three Signs) shall include all necessary labor, equipment, material and incidentals necessary to perform the work, complete and in place.
SECTION 3– Traffic Control And signage
3.01A Traffic Control and Signage Traffic control requirements are part of the elements of construction contained in this contract. Traffic control shall conform to the applicable paragraphs of WSDOT Section 1-10 and the Manual of Uniform Traffic Control Devices. At the pre-construction meeting, the Contractor shall submit in writing a Traffic Control Plan delineating length, configuration, signing and duration for the COR's review. The contractor shall provide adequate signage and barricades as necessary to close the close the parking area to visitor traffic, both vehicular and non-vehicular during the period of construction.
3.01A Payment The proposed lump sum price for Line Item No. 14 (Traffic Control and Signage) shall include all work as indicated herein necessary for the Contractor to perform traffic control and traffic signage and to remove all traffic control devices at the completion of the work.
SECTION 4 – Protection of Resources
4.01 GENERAL
This section consists of furnishing all labor, equipment and materials necessary to complete the listed measures intended to protect the natural and cultural resources in the project area. The mission of the national Park Service includes such protection.
4.02 Wildlife and Habitat
4.02A Bird Species To protect bird habitat, the following work windows will be adhered to;
4.02A(1) Ambient level noise - Year-round Work producing noise within ambient levels (naturally occurring sound levels) for the existing project corridor may occur year-round. This includes such work effort as installing erosion control devices, survey work, installing signs or other work that does not include the use of heavy equipment.
No construction activities producing noise above ambient noise levels may occur between March 1st and August 5.
4.02A(2) Any work, any noise level - April 1 to September 15th Work occurring between April 1 and September 15th will be scheduled between two hours after sunrise and two hours before sunset.
4.02A(3) Noise above ambient, below 92dB - August 6th to February 28th Work that produces noise above ambient levels but below 92 db may occur from August 6th to February 28th (see 5.02A(2), above).
4.02A(4) Noise above 92dB - September 16th to February 28th Work that would produce noise above 92 db may occur from September 16th to February 28th.
4.02A(5) Measurement Measure noise levels at a distance of fifty feet from the noise producing mechanism with no objects between the noise source and the measuring device.
4.02B Bird Habitat To protect bird habitat, the following habitat protections will be adhered to;
4.02B(1) Approvals for tree removal – project start-up The contractor shall meet with the Park during the project start-up and in advance of the initiation of any work involving the removal and/or damage to any trees. The Contractor shall identify to the Park any trees deemed necessary for the completion of work as outlined herein. All such trees approved by the Park for removal will be clearly marked by the Park as such. No trees which are not marked for removal shall be removed or otherwise damaged.
4.02B(2) Approvals for tree removal – during construction If any trees are identified as necessary for removal after completion of the initial tree inventory according to 5.02B(1), above, the contractor shall notify the CO prior to any action. Trees not previously identified in 5.02B(1) shall not be removed or damaged, without approval by the CO.
4.02B(3) Tree damage Damage to trees is defined as any action which is likely to result in a reduced lifespan or the degradation of the health of a tree. Damage does not necessarily indicate actions leading to the immediate death of a tree. Damage can be cutting, trimming, hitting or running into the tree with equipment, including excavator buckets, creating or interfering with naturally-occurring drainages which direct water to or away from the tree, undermining the root structure, cutting root systems and burying root systems with fill.
Temporary barriers may be necessary to protect existing trees, plants, and root zones
4.02B(4) Trash control A strict garbage control regimen will be maintained to prevent scavengers (e.g. corvids), which are predators on murrelet nests, from being attracted to the project area. No food scraps will be discarded or fed to wildlife.
4.02C Exotic, non-native plants and seeds To prevent the introduction of non-native species into the project area, the following protections will be adhered to;
4.02C(1) Material sources All imported material entering the Park must be certified by the Park to be free from noxious weeds or invasive plant materials and other deleterious material before entering the Park. To determine if a potential material source meets the weed-free requirement, the contractor shall submit a list of sources to be inspected by the Park. Proposed material source inspections may be requested in advance of submittal of proposals. No assurance is made nor implied that the Park can complete such inspections in a manner which will allow the results to be used as a part of the bidding process.
In addition to the source name and location, submit potential mitigation measures to make the source weed-free, if necessary. Weather permitting, the Park will furnish an inspection report within 14 days of a submission of potential materials sources, listing the status of the source and any mitigation measures that would need to be accomplished before use.
4.02C(2) Protection against seed introduction At project start-up, the Park will inspect all contractors’ vehicles and equipment for mud, weeds, weed seed and other unwanted substances prior to entering the Park. Notify the CO a minimum of 48 hours prior to the entry of vehicles to the Park. The CO will make arrangements for the inspections. Prior to inspection, pressure wash all earth-moving equipment before entering the Park. Pressure wash hauling vehicles before entering the park for the first time. Subsequent entries of equipment haulers will not require a pressure wash unless the vehicles show signs of mud, plant material, or other substances which the CO considers harmful.
Cover all trucks hauling materials into the Park to prevent the transport of weed seeds and other foreign material.
Clean all tools and clothing of seeds and plant parts before entering the construction site.
Completely cover all stockpiled material with canvas, plastic or other material acceptable to the CO. Covering material shall be secured against wind and other weather conditions.
4.02D Equipment use To protect the environment, the following protections will be adhered to;
4.02D(1) Equipment idling Eliminate vehicle idling whenever possible.
No person operating a vehicle while on government business (i.e. this contract) will allow a vehicle to idle in excess of one (1) continuous minute in gasoline-powered vehicles and three (3) continuous minutes in diesel-powered vehicles and in no case shall not idle more than 5 minutes per hour, cumulative. This applies to all vehicles driven by internal combustion engines.
4.02D(1)a Engine Startup Warm up your engine by driving it, not by idling.
4.02D(1)b Engine Shutdown After parking, immediately turn off the engine.
4.02D(1)c Mid-Drive Stopping Park entrance stations, drive-thrus, flagger controlled traffic construction stops and other locations where a driver might stop the vehicle for some time are to be considered no-Idling zones. Turn off the engine at these types of areas.
4.02D(1)d Exceptions:
Law enforcement, fire, ambulance, or public safety vehicles may remain running to operate lights, circulate water in tanks or maintain accessories needed during emergency or enforcement activities.
Vehicles may remain running when required by a federal, state, or local law or official, but only to the extent necessary to comply with such requirement.
Vehicles may remain running when running the vehicle’s engine is necessary for maintenance, servicing, repair, diagnostic purposes or under conditions specifically called out in owner’s/maintenance manuals.
Idling is allowed to operate defrosters (following scraping and until there is clear visibility for safe vehicle operation), and heaters or air conditioners to prevent a safety or health emergency.
Vehicles may remain running when the engine is providing auxiliary power for work-related mechanical operations (e.g. operating lifts, power take-offs, cable winches, etc).
Vehicles may remain running when the ambient air temperature is below 20 degrees Fahrenheit for gasoline-powered vehicles; below 32 degrees Fahrenheit for diesel-powered vehicles; or over 90 degrees Fahrenheit and idling of the vehicle is necessary to ensure the safety or health of the passengers or driver.
4.02D(2) Equipment condition Prior to starting work each day, all machinery will be in inspected for leaks (e.g., fuel, oil, and hydraulic fluid) and all necessary repairs will be made before the commencement of work. This measure is designed to avoid/minimize the introduction of chemical contaminates associated with machinery used in project implementation.
4.02D(3) Equipment maintenance Any machinery maintenance involving potential contaminates (e.g., fuel, oil and hydraulic fluid) will occur outside the riparian area, defined as the entire channel migration zone or a distance greater than 150 feet from the stream edge. This measure is designed to avoid/minimize the introduction of chemical contaminants associated with machinery used in project implementation.
4.02D(4) Hazardous Materials Hazardous spill clean-up materials will be on-site at all times. This measure is designed to avoid/minimize the introduction of chemical contaminants associated with machinery used in project implementation.
4.02E Cultural restrictions To protect the cultural landscape, the following protections will be adhered to;
4.02E(1) Discovery of artifacts If any archaeological resources are discovered, work will be halted and the CO will be contacted for further instructions.
Park cultural resources staff will be available during construction to advise or take appropriate actions should any archeological resources be uncovered during construction. In the unlikely event that human remains are discovered during construction, provisions outlined in the Native American Graves Protection and Repatriation Act (1990) will be followed.
4.02E(2) Education of employees The NPS will ensure that all contacts and subcontractors are informed of the penalties for illegally collecting artifacts or intentionally damaging archeological sites or historic properties. Contractors and subcontractors also will be instructed on procedures to follow in case previously unknown archeological resources are uncovered during construction.
4.03 PAYMENT
Payment for Mitigations as detailed above, and any actions necessitated by complying with these mitigations, shall be considered as being included in the proposed price for other items of work and no separate payment will be made for Mitigations.
INDEX TO SUPPLEMENTAL TECHNICAL SPECIFICATIONS
Page
SECTION 01570 TEMPORARY CONTROLS 16
SECTION 01720 FIELD ENGINEERING 17
SECTION 02725 CRUSHED ROCK BASE COURSE 19
SECTION 311000 SITE CLEARING 21
SECTION 312000 EARTH MOVING 24
SECTION 329200 TURF AND GRASSES 28
SECTION 321313 CONCRETE PAVING 31
| 1. PART 1 | GENERAL | ||
| SECTION 01570 | |||
| TEMPORARY CONTROLS | |||
| PART 1 | GENERAL |
0. DESCRIPTION
0. The work of this section consists of providing temporary controls.
| 1. PART 2 | PRODUCTS | Not used. |
| 1. PART 3 | EXECUTION | |
| PART 3 | EXECUTION |
2. HOUSEKEEPING
0. Keep project neat, orderly, and in a safe condition at all times.
0. Provide enough containers for collecting construction debris and construction materials to be recycled.
0. Provide individually marked containers for recycling personal items, such as aluminum cans, newspapers, glass, plastic, corrugated cardboard. These items may be recycled by the Contractor or turned over to the Park recycling committee.
0. Wet down dry materials and rubbish to prevent blowing dust.
0. Keep volatile wastes in covered containers.
0. Utilize excavated material as soon as possible.
2. DISPOSAL
1. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the park.
1. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the park. Do not burn or bury refuse inside the park.
2. AIR AND WATER POLLUTION CONTROL
2. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
2. Do not dispose of volatile wastes or oils in storm or sanitary drains.
2. Do not allow waste materials to be washed into streams or bodies of water.
| 1. PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
3. TEMPORARY CONTROLS
0. Payment will be included in the bid item to which this work relates.
END OF SECTION
SECTION 01720
FIELD ENGINEERING
| 1. PART 1 | GENERAL |
| PART 1 | GENERAL |
4. LAYOUT OF WORK
0. Contractor shall establish construction stakes as needed to establish lines, slopes, and grades for the crushed rock surfacing top course and blue tops as necessary for the asphalt paving course. The width of the new road paving shall match the width of the existing road pavement. In the area where no paving exists, the horizontal alignment of the new road pavement will be staked to fit with the existing road prism, such that the new paving transitions into and fits with lines and grades of the existing road on either approach.
4. QUANTITY SURVEYS NOT USED
| 1. PART 2 | PRODUCTS | NOT USED. |
| PART 2 | PRODUCTS | NOT USED. |
| 1. PART 3 | EXECUTION | NOT USED. |
| PART 3 | EXECUTION NOT USED. |
| 1. PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
0. FIELD ENGINEERING
A. Payment will be included in the bid item to which this work relates.
SECTION 02725
CRUSHED ROCK BASE COURSE
| 1. PART 1 | GENERAL |
| PART 1 | GENERAL |
8. DESCRIPTION
0. The work of this section consists of furnishing and placing aggregate on undisturbed compacted subgrade. The thickness shall be as shown on drawings under the concrete slabs. .
8. SUBMITTALS
1. If materials are obtained from a commercial source, submit certification from the supplier certifying that aggregate base course meets the requirements of this section.
8. QUALITY ASSURANCE
2. Testing required to determine compliance with the requirements for the work of this section will be the responsibility of the Government. The Contractor shall cooperate by rerouting equipment or by temporarily closing the immediate work area being tested.
| 1. PART 2 | PRODUCTS |
| PART 2 | PRODUCTS |
9. AGGREGATE
0. Clean, hard, durable fragments or particles of crushed stone, crushed slag, or crushed or natural gravel. Materials that break up due to freezethaw or wetdry cycling shall not be used.
0. Coarse Aggregate: AASHTO T9677, percentage of wear of not more than 50.
0. Fraction passing No. 40 sieve shall have a liquid limit not to exceed 25 and a plasticity index of not more than 6, as determined by AASHTO T8981 and T9081, respectively.
0. Material, inclusive of filler, shall meet following screen analysis requirements by weight:
| Sieve Size |
| Percent Passing |
| 3/4-inch |
| 100 |
| No. 4 |
| 30 - 65 |
| No. 8 |
| 25 - 50 |
| No. 200 |
| 3 - 15 |
9. FILLER
1. Finely divided mineral matter such as rock or slag dust, hydrated lime, hydraulic cement, or other suitable mineral matter free from organic impurities and clay.
| 1. PART 3 | EXECUTION |
| PART 3 | EXECUTION |
10. PLACING
0. If the required compacted depth exceeds 6 inches, place course in two or more layers of approximately equal thickness. The maximum compacted thickness of any one layer shall not exceed 6 inches.
10. MIXING
1. Mix the aggregate by any one of the three following methods.
0. Stationary Plant Method: Mix aggregate base course and appropriate amount of water for compaction in an approved mixer. After mixing, transport aggregate to the job site while it contains the proper moisture content and place on the roadbed with an approved aggregate spreader. Before compaction, remove excess moisture.
0. Travel Plant Method: After the material for each layer has been placed through an aggregate spreader or windrow sizing device, it shall be uniformly mixed by a traveling mixing plant.
0. Road Mix Method: After placing each layer, mix materials at optimum moisture content using motor graders or other approved equipment until the moisture is uniform throughout.
1. When commercial binders or fillers are used with aggregate, mix with a central mixing plant of the twinpugmill type. Other methods that ensure a thorough and homogenous mixture may be used on written approval.
10. COMPACTION
2. Compact each layer to a density of not less than 95 percent of the maximum density, as determined by AASHTO T18074, Method D. Contracting Officer will test density inplace, in accordance with AASHTO T19161, T20564, or other recognized method. Random tests for compacted depth will be made during the progress of the work.
10. SURFACE FINISHING
3. Use a smooth steel wheel roller for the final rolling of top surface base course. Water surface and evenly spread loose stones before final rolling. Make minimum of two complete passes over area to embed stones. Correct soft spots developed during rolling.
3. Compacted base course surface shall be smooth and free from waves and other irregularities. Unsatisfactory portions of base course shall be torn up, reworked, relaid, and rerolled, at no additional expense to the Government.
10. MATERIAL ACCEPTANCE REQUIREMENTS
4. Acceptance will be based on periodic samples and tests taken following mixing and before laying.
10. TOLERANCES
5. Surface: The Contracting Officer will test finished surface of the base course with a 10foot straightedge or other device. The variation between any two contacts with the surface shall not exceed 1/2 inch. Any areas not complying with these tolerances shall be reworked to obtain conformity.
5. Width: Plan dimension, plus or minus 2 inches.
5. Thickness: Plan dimension, plus or minus 1/2 inch.
10. MAINTENANCE
6. Maintain base course in a satisfactory condition until surfaced or until final acceptance.
| 1. PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
11. AGGREGATE BASE COURSE
0. Payment for this work will be included in the bid item to which the work relates.
Copyright 2007 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 311000
SITE CLEARING
Revise this Section by deleting and inserting text to meet Project-specific requirements.
This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
1. GENERAL
0. SUMMARY
0. Section Includes:
0. Protecting existing vegetation to remain.
0. Removing existing vegetation.
0. Clearing and grubbing.
0. Temporary erosion- and sedimentation-control measures.
0. MATERIAL OWNERSHIP
1. Except for stripped topsoil and other materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.
0. PROJECT CONDITIONS
2. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.
0. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Contracting Officer.
0. Provide alternate routes around closed or obstructed traffic ways if required by Contracting Officer.
2. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing.
2. Do not commence site clearing operations until temporary erosion- and sedimentation-control and plant-protection measures are in place.
2. The following practices are prohibited within protection zones:
3. Storage of construction materials, debris, or excavated material.
3. Parking vehicles or equipment.
3. Foot traffic.
3. Erection of sheds or structures.
3. Impoundment of water.
3. Excavation or other digging unless otherwise indicated.
3. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.
1. PRODUCTS
0. MATERIALS
Retain this article if soil backfill is required in below-grade areas after site clearing.
0. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Section 312000 "Earth Moving."
0. Obtain approved borrow soil material off-site when satisfactory soil material is not available on-site.
0. Tree Protection Fence: 36” high plastic construction limits fence in a bright orange color. Silt fence used for sediment and erosion control may also be used where silt fence and tree protection fence overlap.
1. EXECUTION
0. PREPARATION
0. Protect and maintain benchmarks and survey control points from disturbance during construction.
0. Locate and clearly identify trees, shrubs, and other vegetation to remain or to be relocated.
0. Protect existing site improvements to remain from damage during construction.
2. Restore damaged improvements to their original condition, as acceptable to Owner.
0. TEMPORARY EROSION AND SEDIMENTATION CONTROL
Retain this article if erosion- and sedimentation-control measures are not included in Section 015000 "Temporary Facilities and Controls."
Insert specific procedures or installation requirements for temporary soil protection and stabilization, erosion controls, stormwater runoff controls, and sedimentation controls.
1. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- and sedimentation-control Drawings and requirements of authorities having jurisdiction.
1. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.
1. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.
1. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.
1. Cover exposed soil on site with 3” thick layer of weed-free straw or erosion control blankets after 14 days of exposure.
0. TREE AND PLANT PROTECTION
Retain this article if required. If retaining, Drawings should show tree- and plant-protection zones and protection-zone fencing.
2. General: Protect trees and plants remaining on-site with tree protection fencing as designated in Drawings.
2. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations, in a manner approved by Architect.
0. EXISTING UTILITIES
3. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.
0. Arrange with utility companies to shut off indicated utilities.
Generally retain first paragraph below unless there are no existing utilities. Coordinate with requirements in Section 015000 "Temporary Facilities and Controls" for temporary utilities.
3. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Olympic Park Institute unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
Revise subparagraphs below to suit Project.
1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
1. Do not proceed with utility interruptions without Contracting Officer's written permission.
0. CLEARING AND GRUBBING
4. Remove obstructions, lawn, and other vegetation to permit installation of new construction.
0. Use only hand methods for grubbing within drip line of protected trees.
Retain paragraph below if required. Coordinate with Section 312000 "Earth Moving."
4. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.
0. SITE IMPROVEMENTS
Revise paragraph below and add specific items to suit Project.
5. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.
0. DISPOSAL OF SURPLUS AND WASTE MATERIALS
6. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them outside of park.
Retain paragraph below where recycling programs exist and recycling facilities can accept materials such as concrete or asphalt paving.
6. Separate recyclable materials produced during site clearing from other nonrecyclable materials. Store or stockpile without intermixing with other materials and transport them to recycling facilities. Do not interfere with other Project work.
END OF SECTION 311000
SECTION 312000
EARTH MOVING
Revise this Section by deleting and inserting text to meet Project-specific requirements.
This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
1. GENERAL
0. SUMMARY
0. Section Includes:
0. Preparing subgrades for pavement and turf and grasses.
0. Fine grading.
0. DEFINITIONS
1. Backfill: Soil material used to fill an excavation.
0. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.
0. Final Backfill: Backfill placed over initial backfill to fill a trench.
1. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.
1. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.
Consider revising the term "drainage course" in first paragraph below and throughout this Section to suit Project or office standard.
1. Drainage Course: Aggregate layer supporting the slab-on-grade that also minimizes upward capillary flow of pore water.
1. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.
1. Fill: Soil materials used to raise existing grades.
1. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.
1. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.
1. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.
0. PROJECT CONDITIONS
Retain first paragraph below if required and not specified in Section 311000 "Site Clearing;" revise to suit Project.
2. Utility Locator Service: Notify utility locator service for area where Project is located before beginning earth moving operations.
Delete paragraph below if no protection zones and protection-zone fencing.
2. Do not commence earth moving operations until plant-protection measures specified in Section 311000 Site Clearing and Drawing L1 “Tree Protection Plan” are in place.
1. PRODUCTS
0. SOIL MATERIALS
0. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations. All material must come from a certified weed free source that is approved by the park.
Revise first two paragraphs below and identify soil materials according to geotechnical engineer's written recommendations. Revise soil groups and size of stone to suit Project. Most soils are classified according to ASTM D 2487. Heavy civil or highway projects may use AASHTO M 145.
0. Satisfactory Soils: Soils free of rock or gravel larger than 2 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.
Retain subparagraphs below if required to further qualify satisfactory soil groups.
Terms, descriptions, and gradations of granular soil materials in remaining paragraphs are examples only. Revise to comply with local practices and to suit Project.
This is the start of the file's text. The full file is on GovTribe.