NPS_CM-16_Transmittal_Form_Use_for_Contract_Submittals.docx

DOCX document 41 KB Posted

Attached to
CONSTRUCT ONPVC ENTRANCE SIGN STRUCTURE - OLYM Federal contract opportunity
Solicitation number
P16PS02387
Issued by
Department of the Interior National Park Service

About this file

NPS Subittal Form

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT ONPVC ENTRANCE SIGN STRUCTURE - OLYM, newest first.
File Type Posted
ONPVC_Entrance_Sign_Technical_Specifications.docx DOCX document
P16PS02387_SF_-_1442.pdf PDF
Terms_and_Conditions_SECTION_C_-_M.docx DOCX document
Sol_P16PS02387.pdf PDF
Port_Angeles_VC_Entrance_Sign_Drawings.pdf PDF
SF-25A_PAYMENT_BOND_FORM.pdf PDF
Price_Schedule_SECTION_B.docx DOCX document
Wage_Determination_WA69.txt TXT text file
READ_ME_FIRST.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL - NATIONAL PARK SERVICE

Transmittal No.:

Sheet: 1 of:

Park:

Project:

Contract No.:

PMIS No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Specification Section No.

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Contractor Signature

Recommended by

Title, Date

Title

Date

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Review Comments

Action By

Date

Contracting Officer’s Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00

TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE
Transmittal No.:

Sheet: 1 of:

Park:

Project:

Contract No.:

PMIS No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Specification Section No.

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Review Comments

CM-16 Rev. 06/06 image6.wmf image7.wmf image1.wmf image2.wmf image3.wmf image4.wmf image5.wmf