P16PS01479_Amendment_000004.pdf

PDF 154 KB Posted

Attached to
GATE 201023 Ryan Center Phase II Federal contract opportunity
Solicitation number
P16PS01479
Issued by
Department of the Interior National Park Service National Office

About this file

P16PS01479 Amendment 000004

View the file

Other files for this federal contract opportunity

Other files attached to GATE 201023 Ryan Center Phase II, newest first.
File Type Posted
P16PS01479_AMD_3.pdf PDF
P16PS01479_Amendment_000002.pdf PDF
P16PS01479_Amendment_000001.pdf PDF
Att._1_Specifications.pdf PDF
Att._3_Wage_Rates.docx DOCX document
Att._1_Specifications.pdf PDF
Att._2_Drawings.pdf PDF
RFP_GATE_201023_Ryan_Center_Phase_II__P16PS01479.pdf PDF
Att._4_Proposal_Submission_Pkg.docx DOCX document
P16PS01479_GATE_201023_Ryan_Center_Phase_II_Presolicitation_Notice.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

P16PS01479

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

GATE 20102308/10/2016000004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/14/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

GATE 201023 Ryan Center Phase II

The subject solicitation P16PS01479 is hereby amended as follows:

1. Available answers to outstanding Requests for Information.

2. Contractor's are reminded of the proposal due date and time of August 17, 2016 at 4PM MT.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Pamela Mault

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

COMMENT:

With reference to Drawing Sheet A21-A24, ‘Note G’ on the exterior elevations should be omitted (Not Used). On the exterior elevations, lintels are referenced to photos on A27-A36 and called out for replacement with ‘Note E’.

1. Please reference drawing A49, door note D1. Which specification section applies for the new Kalamein doors?

ANSWER: Kalamein doors are a fire rated manufactured product consisting of solid wood, stile and rail, mortise and tenon, and covered with sheet metal - These doors are to replace the existing historic Kalamein doors documented as such in the HSR.

2. Please advise if the work shown on the photos on drawings A27 through A36 is part of the percentages given on Masonry conditions construction notes on drawings A21 through A25 or if they are in addition to those percentages.

ANSWER: Sheets A27-A36 are inclusive of the percentages.

3. Please confirm that the Masonry conditions construction note on drawings A21 through A25 which indicates: Metal components repair/ replacement: 5%, is required only for the lintels. For example would it apply to steel columns/ spandrels (column and spandrel steel cannot be quantified from the drawings, we would need exact sizes and locations to determine what the 5% is) or railing repair/ replacement?

ANSWER: Delete & disregard partial masonry conditions construction note #1 “Metal Components Repair/Replacement : 5%.

4. Regarding answer to Amendment 000002 Question 3: “This can be determined by utilizing dimensions shown on building elevations, sections and graphic scale shown on floor plans.” The dimensions given on the building elevations and sections are not adequate to quantify the extend of items like the cast stone cornice, water table, caulking replacement etc. We need the heights for these items. We get different scales when we utilize different dimensions shown on building elevations or the graphic scale shown on floor plans.

For example for West elevation A21:

Based on the 9’ dimension from basement floor to basement ceiling we get a scale of approximately 1” = 7.0’

Based on the 12’ dimension from 1st floor to ceiling we get a scale of approximately 1” = 7.6’

Based on the graphic scale on drawing A16 (2nd floor construction plan) the length of the building is 182.5’ from corner to corner (column lines A to N), applying that to East elevation we get a scale of approximately 1” = 8.0’

ANSWER: Elevations and sections are scaled at 1/8” = 1’-0”.

5. Exterior masonry conditions 12/A27 calls to repair coping stone. Is the location of 12/A27 indicated on column lines D/2 and note 31 on column line 1 on roof plan A17 part of part of the 35% cast/stone repair replacement?

ANSWER: Yes - refer to question 2 responses above.

6. Exterior masonry conditions 1,2,3,4,6/A27 call for repointing of interior side of parapet, roof plan A17 indicates that there is no repointing on hatched area, please advise

ANSWER: Correct – no work to be done at hatched area - Disregard details 1 -5/A27 and 6/ A27.

7. Please advise what is the extend of the repairs required at the metal steps per note 2 on A17

ANSWER: Metal steps including but not limited to treads, pans, stringers, railing posts and supports, are to be scraped, patched, sanded and primed for new paint finish - No ‘repair’ work required.

8. Please advise what is the extend of the repairs required at the columns per note 1 on A18

ANSWER: Column are to be scraped, sanded and primed for new paint finish - No ‘repair’ work required.

9. Please advise what is the extend of the repairs and restoration required at the iron latticework and ornamental rosette shown on 6/A52

ANSWER: Iron balustrade to be scraped, patched, sanded and primed for new paint finish. Missing parts and/or ornamentation are to be replicated to match existing.

10. Note 11 on A19: Assume 65% total plaster ceiling removal and replacement to accommodate new duct work, is this part of the new plaster ceiling hatched on the same drawing?

ANSWER: Yes, the new plaster ceiling hatch is a graphic representation of the scope.

11. The asbestos abatement tables don’t address the floor tile of the first floor which is part of option 1, should we assume that they are not hazardous?

ANSWER: The first floor tiles are not ACM.

12. Please confirm that details 2/A37, 3/A37, 4/A37 only apply to the 10% of sills that we are replacing/ repairing and not on all sills

ANSWER: Correct

13. Are the 50 lf of PCB caulking to be removed outside rooms 110, 115, 210, 213 indicated in the table on drawing AS2 equal or part of the 10% joint sealant replacement given on the Masonry conditions construction notes on drawings A21 through A25?

ANSWER: Scope on AS2 is inclusive of the 10% joint sealant replacement.

14. The PCB caulk table on drawing AS2 indicates that the elevation outside rooms 110, 115, 210, and 213 is the “North Elevation”. Drawing A22 indicates that this elevation is the “East Elevation.”

Please confirm which is correct.

ANSWER: East Elevation.

15. Please confirm that the Masonry conditions construction note on drawings A21 through A25 which indicates: Joint Sealant Replacement: 10%,is required for the cast stone quoins caulking? Is the quoins caulking to be considered as PCB caulk? If so, please provide exact quantities to be abated.

ANSWER: Yes, required for the cast stone quoins. If the caulking isn’t noted on the abatement drawings, then it’s not considered as PCB.

16. Please confirm that the Masonry conditions construction note on drawings A21 through A25 which indicates: Joint Sealant Replacement: 10%,is required for the window perimeter caulking? Is the window perimeter caulking to be considered as PCB caulk? If so, please provide exact quantities to be abated.

ANSWER: Yes, required for window perimeter caulking. If the caulking isn’t noted on the abatement drawings, then it’s not considered as PCB.

17. Please confirm that the masonry exterior work for the Level 3 Tower Cab Office 301 should be included as part of Option #2.

ANSWER: Yes, to be included as Option 2.

18. Please confirm that the exterior work for the Control Tower Cab should be included as part of Option #3.

ANSWER: Yes, to be included as Option 3.

19. Please refer to details 2 and 3 on drawing A25. These details indicate that the work of the Level 3 Tower Cab Office 301 to be part of Option #3. Based on detail 1 on drawing A25, this should be part of Option #2. Please clarify.

ANSWER: Detail 1 depicting add options is correct.

20. Who is the current Fire Alarm vendor for the building?

ANSWER: TBD (undetermined as of the posting but will try to provide. Bid with available information).

21. Please reference Drawing A19 (room 212), detail 4 on drawing A20 and spec 095436. The spec doesn’t seem to match up with the drawing. Spec calls out for C2 Paired Compasso, but the drawing looks like they want a Gridware system. Please clarify.

ANSWER: The open cell system is to be a USG Grid with Compasso Suspension Trim.

22. How do you quantify the area of the cornice. There is no height reference on the drawings.

ANSWER: The overall height of the cornice is 4’-7” measured from our drawings.