P16PS01479_Amendment_000002.pdf
PDF 212 KB Posted
- Attached to
- GATE 201023 Ryan Center Phase II Federal contract opportunity
- Solicitation number
- P16PS01479
About this file
P16PS01479 Amendment 000002.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P16PS01479_Amendment_000004.pdf | ||
| P16PS01479_AMD_3.pdf | ||
| P16PS01479_Amendment_000001.pdf | ||
| Att._1_Specifications.pdf | ||
| Att._3_Wage_Rates.docx | DOCX document | |
| Att._1_Specifications.pdf | ||
| Att._2_Drawings.pdf | ||
| RFP_GATE_201023_Ryan_Center_Phase_II__P16PS01479.pdf | ||
| Att._4_Proposal_Submission_Pkg.docx | DOCX document | |
| P16PS01479_GATE_201023_Ryan_Center_Phase_II_Presolicitation_Notice.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
P16PS01479
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
GATE 20102307/21/2016000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/14/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
GATE 201023 Ryan Center Phase II
The subject solicitation P16PS01479 is hereby amended as follows:
1. The sign-in from the PRE-PROPOSAL CONFERENCE / SITE VISIT held Friday, August 5, 2016 is attached.
2. Questions received prior to that date are also attached.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Pamela Mault
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1. QUESTION: Section 01 11 00 Summary of Work, Page 1 para 1.3A mentions 550 days after NTP and Solicitation, Offer, and Award Item 11, mentions 300 days after NTP, please clarify.
ANSWER: The correct construction duration should be 300 days from NTP.
2. Drawing sheets A59, A60, A61, A62, AS3, and AS12 thru AS15. refer to Building 131 scope.
Reference to an "Add Option #5" are made on these drawings, but not on the bid form. Please clarify if/how this scope is to be carried in the proposal.
ANSWER: The demolition of building 131 has been deleted from the project. Please do not bid, even as an option.
3. The Masonry conditions construction notes “Represent an approximation of the exterior work to be done on the entire building” and provide percentages of brick replacement, repointing, etc. The elevation drawings are not to scale, so we can’t measure the entire quantities and therefore determine the extent of our work, please advise.
ANSWER: This can be determined by utilizing dimensions shown on building elevations, sections and graphic scale shown on floor plans.
4. Scale on drawings A39 and A40 seems wrong, please advise.
ANSWER: Interior elevations on A39 and A40 are at ¼” = 1’-0” scale.
| P16PS01479 Amendment 000002 |
| Site Visit |
| Questions |