Att._4_Proposal_Submission_Pkg.docx

DOCX document 18 KB Posted

Attached to
GATE 201023 Ryan Center Phase II Federal contract opportunity
Solicitation number
P16PS01479
Issued by
Department of the Interior National Park Service National Office

About this file

Att. 4 Submission

View the file

Other files for this federal contract opportunity

Other files attached to GATE 201023 Ryan Center Phase II, newest first.
File Type Posted
P16PS01479_Amendment_000004.pdf PDF
P16PS01479_AMD_3.pdf PDF
P16PS01479_Amendment_000002.pdf PDF
P16PS01479_Amendment_000001.pdf PDF
Att._1_Specifications.pdf PDF
Att._3_Wage_Rates.docx DOCX document
Att._1_Specifications.pdf PDF
Att._2_Drawings.pdf PDF
RFP_GATE_201023_Ryan_Center_Phase_II__P16PS01479.pdf PDF
P16PS01479_GATE_201023_Ryan_Center_Phase_II_Presolicitation_Notice.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior FAR Clause 52.219-14, Limitation of Subcontracting Subcontracting Percentage Worksheet

CONTRACT NUMBER:

PRIME CONTRACTOR:

DATE OF SUBMISSION:

Complete the following calculations and submit to the Contracting Officer with each pay application.

(1)
Prime Contract Value (minus) Prime Contractor’s expenditures on Materials
(2)
Each Individual Subcontractor Costs (minus) Each Individual Subcontractor’s expenditures on Materials
(3)
Sum Total of Subcontractor calculation (2)
(4)
Divide (3) by (1) to get percentage of self-performance

* For an 8(a) sole source, you can consider any subcontractor that is an 8(a) in #1 of your calculation vs. #2. (See Small Business Act Sec. 46 (b)) This is considered a similarly situated concern. The same would apply for other socio-economic categories such as SDVOSB, Hubzone and WOSB.

The Prime shall certify their calculation is accurate and current to the best of their knowledge.

PROPOSED EQUALS

In accordance with provision 52.211-06, the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No.
Paragraph No.
Product/Model No.
Proposed Product/Model No.
A.By submitting the proposed equal, the contractor certifies that it:
1.Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2.Will provide, as a minimum, the same warranties for the proposed item as for the item specified.
3.Has determined that the proposed item is compatible with interfacing items.
4.Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5.Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

HAZARDOUS MATERIALS IDENTIFICATION LISTING

In accordance with Clause 52.223-3, Hazardous Material Identification and Material Safety Data, of the Contract, contractor is required to identify any hazardous materials that will be delivered under this contract.

List below all known hazardous materials to be used in performance of the work and submit with the proposal/bid. If material components are unknown at the time of submission, respond with a statement to that effect.

File details come from the government source that posted it. Updated .