subcontracting_WorkSheet_HUBZone.docx

DOCX document 23 KB Posted

Attached to
Rehabilitate historic farmhouse, Minidoka NHS, near Twin Falls ID
Solicitation number
P16PS00653
Issued by

About this file

Subcontracting worksheet (return with offer)

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior North Cascades NPS Complex FAR Clause 52.219-3, Notice of HUBZone Set-Aside or Sole Source Award Subcontracting Percentage Worksheet

PRIME CONTRACTOR: ____________________________________

SUBCONTRACTORS: _______________________________________________________________________ (list separately here and combine values in appropriate column(s) below) Wage determination number and revision: ___________________

PRIME CONTRACTOR
HUBZone SUBCONTRACTORS
OTHER [footnoteRef:1] SUBCONTRACTORS [1: Include all non-HUBZone subcontractors.]
DIRECT LABOR
$
$

FRINGE BENEFITS [footnoteRef:2] [2: The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205-6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.]

$
$
SUB TOTAL
(A) $
(B) $
(C) $

LABOR G&A [footnoteRef:3] @_____% [3: G&A denotes General and Administrative Costs.]

$
$
$
TOTAL LABOR COSTS
(D) $
(E) $
(F) $

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractors (if available) [footnoteRef:4] in space (B). [4: You will need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.]

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor's G&A by multiplying the G&A subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and D) respectively.

Next, calculate the subcontracting labor percentages:

Prime Contractor Labor Cost Percentage:(D) / [(D) + (E) + (F)] = __________________%
HUBZone Subcontractors Labor Cost Percentage:(E) / [(D) + (E) + (F)] = __________________%
Other Subcontractors Labor Cost Percentage:(F) / [(D) + (E) + (F)] = __________________%

Prepared by: _________________________________ Date submitted: _______________

File details come from the government source that posted it. Updated .