ASBESTOS-CONTAINING MATERIALS
SURVEY REPORT
FOR
NATIONAL PARK SERVICE
UNITED STATES DEPARTMENT OF THE INTERIOR
MINIDOKA INTERNMENT NATIONAL MONUMENT
JEROME COUNTY, IDAHO
Prepared For:
NATIONAL PARK SERVICE
1201 Eye Street NW, 10th Floor
Washington, DC 20006
Prepared By:
MACTEC ENGINEERING AND CONSULTING, INC.
396 Plasters Avenue, Atlanta, Georgia 30324
December 6, 2010
MACTEC Project Number 6141-10-0016
National Park Service; MINN, Jerome County, Idaho Asbestos-Containing Materials Survey Report MACTEC Project 6141-10-0016 December 6, 2010
Page i
TTAABBLLEE OOFF CCOONNTTEENNTTSS
Table of Contents ............................................................................................................................................... i
1.0 Executive Summary
2.0 Background Information
2.1 Facility Description
3.0 Summary of Review of Existing Data and Interview of On-Site Personnel
3.1 Interview of Onsite Personnel
3.2 Review of Previous Asbestos-Related Information
4.0 Survey of Suspect Asbestos-Containing Materials Scope
4.1 Visual Survey
4.2 Methodology
4.3 Existing Data
4.4 Supplemental Sample Collection and Analysis
5.0 Findings
5.1 Located ACM
6.0 Opinion of Abatement Costs of Located ACM
6.1 Previous Asbestos-Related Costs
6.2 Current Asbestos-Containing Material Cleanup and Management
6.3 Future Asbestos-Containing Material Cleanup Costs
7.0 Conclusions and Recommendations
Attachments:
Tables: 1. Summary of Suspect ACM Observed
2. Summary of ACM Located
Appendices: A. Photographs of Buildings included in this Survey B. Photographs and Supplemental Information for Non-ACM C. Photographs and Supplemental Information for Located ACM D. Laboratory Results of Bulk Samples E. Inspector and Laboratory Accreditations
11..00 EEXXEECCUUTTIIVVEE SSUUMMMMAARRYY
The National Park Service (NPS) contracted MACTEC Engineering and Consulting, Inc. (MACTEC) to provide asbestos assessment services at select Parks to assist NPS with establishing an Asbestos Assessment
Program (AAP). The intent of the AAP is to evaluate and supplement existing asbestos related data to assist
NPS with complying with existing applicable Federal, State and local regulations related to asbestos. The
AAP will provide objective data related to the impact of asbestos-containing materials (ACM) for the planning and execution of future maintenance, renovation, construction, and demolition efforts related to
Park facilities. Additionally, information obtained through the asbestos assessment and survey effort will be used by the NPS Washington Support Office to compile the necessary data to respond to the Federal
Accounting Standards Advisory Board Technical Bulletin 2006-1, Recognition and Measurement of
Asbestos-Related Cleanup Costs.
The site specific asbestos survey assessment of Minidoka Internment National Monument, in Jerome
County, Idaho was performed on March 9, 2010. The asbestos survey and sampling was performed by accredited asbestos inspectors from MACTEC. Asbestos surveys were performed on 14 buildings/structures at the Park.
During the interview with the NPS representative, it was learned that the building list provided to MACTEC by NPS included two buildings that are no longer at the site. These two buildings were not surveyed. Eight buildings not on the building list provided to MACTEC by NPS were also included in the survey.
Additionally, it was learned during the interview that no previous or existing asbestos related information or data is available for the Park.
During the survey efforts, 95 bulk samples were collected of suspect asbestos-containing materials. These samples were analyzed by a laboratory accredited by the National Voluntary Laboratory Accreditation
Program. The samples were analyzed by polarized light microscopy and reported as percent asbestos in each sample.
The survey located asbestos-containing materials in seven buildings. Asbestos-containing window glazing on the exterior of the Motor Repair & Tire Shop, wallboard joint compound throughout the Hx Barrack
Administrative building, and floor tile and mastic located in the Restroom of the Hx Barrack Administrative building were noted to be damaged. The remaining asbestos-containing materials were assessed as being undamaged at the time of the survey. MACTEC recommends that the damaged materials be removed.
Additionally, it is recommended that due to the likely significant mobilization costs to the site the other asbestos-containing materials be removed at that time.
Due to the lack of existing data/information, no previous asbestos related expenses were identified. The current asbestos related expenses are $10,670. The opinion of cost for asbestos cleanup is estimated to be
$48,659.
22..00 BBAACCKKGGRROOUUNNDD IINNFFOORRMMAATTIIOONN
The National Park Service (NPS) contracted MACTEC Engineering and Consulting, Inc. (MACTEC) to provide asbestos assessment services at select Parks to assist NPS with establishing an Asbestos Assessment
Program (AAP). The intent of the AAP is to evaluate and supplement existing asbestos related data to assist
NPS with complying with existing applicable Federal, State, and local regulations related to asbestos. The
AAP will provide objective data related to the impact of asbestos-containing materials (ACM) for the planning and execution of future maintenance, renovation, construction, and demolition efforts related to
Park facilities. Additionally, information obtained through the asbestos assessment and survey effort will be used by the NPS Washington Support Office to compile the necessary data to respond to the Federal
Accounting Standards Advisory Board Technical Bulletin 2006-1, Recognition and Measurement of
Asbestos-Related Cleanup Costs.
The scope of work for this project included asbestos related survey and assessment efforts to evaluate existing survey information and perform supplemental sampling as necessary to comply with established sampling guidance and protocols. The asbestos survey process included a review of existing asbestos survey information (if provided), an interview of appropriate Park site personnel, visual surveys of readily accessible interior and exterior areas of the various structures to locate suspect ACM, and the collection and laboratory analyses of bulk samples of located suspect ACM.
Following identification, delineation, and quantification of ACM within structures at the Park, an opinion of abatement cost was prepared for each structure where ACM was located and summarized for the Park as a whole. To the extent possible, the opinion of costs included asbestos-related costs incurred by the Park to date when documentation of the expenditure of funds was provided for review. However, when documentation of actual costs was not provided, these expenditures were not reported.
2.1 FACILITY DESCRIPTION
The Minidoka Internment National Monument (MINN) is located in Hagerman, Idaho. NPS initially reported to MACTEC that 8 structures were present at the Park. During the interview with the head of
Maintenance, Ray Vader, it was learned that two structures were no longer at the site. Assessments and surveys were not performed for these two structures. Eight buildings not on the building list provided to
MACTEC by NPS were also included in the survey. Therefore, 14 structures were surveyed for ACM;
however only one-half of the Hx Barrack Administrative buildings (109044) was accessible for inspection.
Appendix A provides a summary of the buildings included in the survey.
33..00 SSUUMMMMAARRYY OOFF RREEVVIIEEWW OOFF EEXXIISSTTIINNGG DDAATTAA AANNDD IINNTTEERRVVIIEEWW OOFF
OONN--SSIITTEE PPEERRSSOONNNNEELL
MACTEC requested and, when provided by NPS, reviewed general types of asbestos information as follows:
1. Information related to the construction of facilities and structures at the site. The intent of this review was to gain an understanding if asbestos was specified and/or installed during construction.
2. Existing asbestos survey data, asbestos Operations and Maintenance Programs, and other asbestos related information. The intent of the review was to gain an understanding of the scope and extent of previous survey efforts including locations, quantities and condition of previously located ACM and non-ACM. The purpose of reviewing this information would be to assess the need for supplemental sampling and analyses.
3. Previous asbestos abatement actions or monitoring. The purpose of reviewing previous asbestos abatement efforts and evaluation of replacement materials was to assess the need for supplemental sampling and analyses.
4. Information related to any previous expenditure of funds related to asbestos for the above referenced information. The purpose of reviewing this information was to provide NPS with a summary of past asbestos-related costs.
5. Information obtained from interviews of onsite personnel familiar with the history of the Park’s construction and operation. The purpose of the interviews was to obtain pertinent information related to building construction/materials, previous and current uses, and previous or planned renovations/modifications to the facilities.
3.1 INTERVIEW OF ONSITE PERSONNEL
MACTEC interviewed Ray Vader, while onsite. Mr. Vader stated that he had been employed at the Park for approximately one-year. During the interview, Mr. Vader stated that there were no immediate plans for renovation or demolition at the MINN Park.
3.2 REVIEW OF PREVIOUS ASBESTOS-RELATED INFORMATION
No asbestos related documents were provided. MACTEC was informed by NPS personnel that no previous asbestos related data or information for the Park exists.
44..00 SSUURRVVEEYY OOFF SSUUSSPPEECCTT AASSBBEESSTTOOSS--CCOONNTTAAIINNIINNGG MMAATTEERRIIAALLSS
SSCCOOPPEE
The United States Environmental Protection Agency (EPA) and the Occupational Safety and Health
Administration (OSHA) have published regulations, guidelines, and recommendations regarding inspection and sampling for installed ACM. These regulations, guidelines, and recommendations were adhered to as appropriate within the scope of this survey. The State of Idaho does not have any specific Asbestos inspector licensing or survey requirements beyond those of the Federal Government.
Current EPA and OSHA guidelines allow accredited asbestos Inspectors to categorize certain materials as non-suspect asbestos-containing materials based on visual evaluation. Examples of these non-suspect ACM include fiberglass, rubber, Styrofoam©, cork, foam glass, wood, concrete, glass, and metal. MACTEC did not inventory, sample, or otherwise assess these non-suspect materials when encountered.
Current EPA and OSHA guidelines allow accredited asbestos Inspectors to assume suspect materials contain asbestos. MACTEC’s survey protocol relative to NPS facilities included sampling and analyses of composite shingled roof materials, where safe access could be obtained. However, in order to preserve the integrity of roofing systems, when roofing materials other than composite shingled materials were observed, these suspect materials were assumed to be ACM.
4.1 Visual Survey
The visual survey consisted of a walk-through of each structure included to be surveyed at the Park to locate, inventory, quantify and document the condition of suspect ACM. The survey efforts included reasonably accessible interior and exterior areas of each structure at the Park. Destructive evaluation was not performed to evaluate for concealed suspect ACM located beneath multiple layers of flooring, within wall/ceiling cavities and/or chases, or other locations that were not readily accessible. Suspect materials observed during the survey were grouped into “homogeneous materials”. A homogeneous material is one that appears to be uniform in color and texture and appears to have been applied or installed during the same general time period. Homogeneous materials can be friable or nonfriable. Friable materials are those that when dry can be crumbled, pulverized or reduced to powder by hand pressure. Nonfriable materials are those which when dry cannot be crumbled, pulverized or reduced to powder by hand pressure. Nonfriable materials can become friable when they are disturbed, become deteriorated, or are aggressively contacted.
For reference, MACTEC developed room designations during our visual survey. Each room, area, or groups of rooms were assigned a unique (arbitrary) number. For the purposes of this survey effort, a room is a discrete area within the surveyed structure that may correspond to physical rooms (e.g., doors and walls), a discrete space (e.g., mezzanine or roof), or other identifiable space such as a department, suite, or group of rooms. When drawings for a building/structure were not provided by NPS, MACTEC may have designated an entire building as a single room and referenced areas/rooms within that building/structure based on the physical lay-out of the structure (i.e., northwest office, entrance, storage, kitchen, restroom, etc.).
4.2 Methodology
When supplemental sampling and analyses were performed, representative bulk samples (some with multiple layers) were collected of homogeneous suspect asbestos-containing materials located during the visual survey. The sampling was performed in general accordance with the sampling requirements of the
Asbestos Hazard Emergency Response Act (AHERA) regulation [40 CFR 763.86] for each homogeneous material. The bulk samples were sealed in airtight containers, labeled, and delivered to MACTEC’s
National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory in Atlanta, Georgia.
Samples were analyzed for asbestos content by Polarized Light Microscopy (PLM) in general accordance with EPA method 600/R-93/116.
4.3 Existing Data
There was no existing data or information related to asbestos provided to MACTEC for this Park.
4.4 Supplemental Sample Collection and Analysis
Sampling and analyses of suspect asbestos-containing materials were performed. The asbestos survey and sample collection were performed by R. Greg Henley and Tod A. Dawson of MACTEC. Mr. Henley and
Mr. Dawson are accredited asbestos Inspectors; evidence of accreditation is provided in Appendix E. The site evaluation services were performed on March 9, 2010.
A total of 95 samples were collected from structures at the Park. All samples were analyzed by PLM with no additional analytical evaluation.
55..00 FFIINNDDIINNGGSS
The detailed findings of the survey are provided in the tables, appendices, and attachments following the body of this report. Each of these sections is presented by building name and NPS building identification number and is described below. Refer to these sections for detailed information associated with the materials located during the survey efforts.
Table 1.0 - Summary of Suspect ACM Observed includes the following for each material observed during our survey:
Homogeneous material identification number;
A physical description of each suspect ACM observed;
The associated substrate or component and associated building system;
The AHERA category (material type), and;
Suspect Material Classification (previously sampled, sampled, assumed).
Table 2.0 - Summary of Identified ACM includes the following for each ACM material:
Homogeneous material identification number;
A physical description of the ACM located;
The associated substrate or component and associated building system;
The AHERA category (material type);
Documentation of friability, and;
Material classification.
Appendix A – Building Summary:
Presents a picture of the building/structure (if available);
Building number and name (as defined by NPS);
Building use;
Building size;
Construction date;
Reference to ACM;
Asbestos related costs.
Appendix B – Non-ACM Detail and Photographs:
Building/structure identification number;
A representative photograph of the non-ACM homogeneous material;
The information summarized in Table 1, and;
Bulk sample information including sample location and sample results.
Appendix C - ACM Detail and Photographs:
Building/structure identification number;
A representative photograph of the ACM homogeneous material;
The information summarized in Table 2, and;
Bulk sample information including sample location, sample results, homogeneous material locations, quantity and condition.
Laboratory results of bulk samples are included in Appendix D. Inspector and Laboratory Accreditations and
Certifications are included in Appendix E.
5.1 LOCATED ACM
Asbestos-containing materials were located in the following buildings: Administrative Office/Visitor Center
(108342), Motor Repair & Tire Shop (108343), Hx Barrack Administrative (109044), Herman North Barn
(Unk54), Herman House (Unk55), Firestation (Unk56), and Bathroom (Unk61). Asbestos-containing window glazing on the exterior of the Motor Repair & Tire Shop, wallboard joint compound throughout the
Hx Barrack Administrative, and floor tile and mastic located in the Restroom of the Hx Barrack
Administrative were assessed to be damaged. The window glazing and joint compound were observed to be friable. The Herman North Barn contains vermiculite insulation within the walls which contains asbestos.
66..00 OOPPIINNIIOONN OOFF AABBAATTEEMMEENNTT CCOOSSTTSS OOFF LLOOCCAATTEEDD AACCMM
6.1 PREVIOUS ASBESTOS-RELATED COSTS
Previous asbestos related data was not located or provided for the Park.
6.2 CURRENT ASBESTOS-CONTAINING MATERIAL CLEANUP AND MANAGEMENT
The cost to perform this survey at this Park, including analytical efforts, reporting, expenses, and management, is $10,670. This expense is provided in Appendix A and has been allocated proportionally by square feet per building/structure area.
6.3 FUTURE ASBESTOS-CONTAINING MATERIAL CLEANUP COSTS
The total estimated cost for the removal of ACM identified at this Park is $48,659. These expenses are provided by building in Appendix A. This total cleanup cost includes asbestos removal and disposal. The cost does not include management of the ACM prior to removal.
77..00 CCOONNCCLLUUSSIIOONNSS AANNDD RREECCOOMMMMEENNDDAATTIIOONNSS
Based on findings presented in this report, MACTEC offers the following conclusions and recommendations:
1. MACTEC recommends that the damaged materials be removed. Due to location of the Park and likely significant mobilization cost, it is recommended that the other ACM be removed at the same time. The identified ACM should not be disturbed until removal is complete.
2. Avoid disturbance of ACM presented in this report. Inadvertent or improper disturbance of ACM can create exposures to asbestos at or above the permissible exposure limits established by OSHA.
MACTEC has recommended that the ACM at the site be removed. In the event that these materials are not removed, they should be included in an Asbestos Operations and Maintenance Program (O&M), which provides policies and work practices for the performance of work on or around asbestos-containing materials presented in Table 2. The O&M Program should contain the necessary elements to comply with and document compliance with the OSHA Asbestos General Industry Standard [29 CFR 1910.1001] and the OSHA Construction Asbestos Standard [29 CFR 1926.1101].
3. Prior to disturbing materials assumed to be ACM, MACTEC recommends that an accredited asbestos Inspector evaluate the materials and collect representative bulk samples if applicable to be appropriately analyzed to evaluate for asbestos content.
4. If any suspect materials are discovered that have not been addressed in this report, MACTEC recommends that work activities that may disturb the materials be halted and the materials be assumed to be asbestos-containing until an appropriate evaluation (which may include sampling and analysis) of the materials is performed by an accredited asbestos Inspector to confirm or rebut the presence of asbestos.
5. Due to the non-destructive nature of the survey performed by MACTEC, it may be necessary to perform additional destructive evaluations of areas of the facility prior to renovation and/or demolition activities. The additional evaluations should focus on locating materials that were concealed and not accessible during these survey activities.
Minidoka Internment National Monument Jerome County, Idaho
December 6, 2010
Table 1.0 - Page 3 of 5
TABLE 1.0 - SUMMARY OF SUSPECT ACM
Building Unk54 - Herman North Barn (Field Assigned By MACTEC)
Homogeneous Material ID
Suspect Material Description
Substrate/Component
Associated Facility System
Material Category
Suspect Material Classification
MIIN-Unk54-001a Wallboard, White Wall Studs Wall/Ceiling Misc. Sampled
MIIN-Unk54-002a Window Glazing, Gray Windows Windows Misc. Sampled
MIIN-Unk54-003a Felt Paper, Black Wood Building Exterior Misc. Sampled
MIIN-Unk54-004a Wall Insulation, Behind Existing Finishes Wall Studs Perimeter Wall Misc. Sampled
Building Unk55 - Herman House (Field Assigned By MACTEC)
Homogeneous Material ID
Suspect Material Description
Substrate/Component
Associated Facility System
Material Category
Suspect Material Classification
MIIN-Unk55-001a Resilient Sheet Flooring, Tan, Square Pattern Floor Tile Floor Misc. Sampled
MIIN-Unk55-001b Sheet Flooring Adhesive, Yellow Floor Tile Floor Misc. Sampled
MIIN-Unk55-002a 9" x 9" Floor Tile, Green, Under Existing Finishes Wood Floor Misc. Sampled
MIIN-Unk55-002b Floor Tile Mastic, Black Wood Floor Misc. Sampled
MIIN-Unk55-003a Resilient Sheet Flooring, Green/White, Square Pattern Wood Floor Misc. Sampled
MIIN-Unk55-003b Sheet Flooring Adhesive, Yellow Wood Floor Misc. Sampled
MIIN-Unk55-004a Wallboard, White Walls/Ceilings Wall/Ceiling Misc. Sampled
MIIN-Unk55-004b Wallboard Joint Compound, White Walls/Ceilings Wall/Ceiling Misc. Sampled
MIIN-Unk55-005a Mastic/Adhesive, Tan Wallboard Wall Misc. Sampled
MIIN-Unk55-006a Roof Shingles, Brown Wood Roof Misc. Sampled
MIIN-Unk55-007a Window Glazing, White Windows Windows Misc. Sampled
MIIN-Unk55-008a Roof Shingles, Gray Wood Roof Misc. Sampled
APPENDIX A - BUILDING SUMMARY
Jerome County, Idaho
December 6, 2010 Building Summary Page 5 of 8
Building Size: 495 SF
ACM Identified
Building Use: Herman North Barn (Field Assigned By MACTEC)
Building Unk54 - Herman North Barn (Field Assigned By
MACTEC)
Previous Expense:
Current Expense:
Future Asbestos Clean-up Costs:
$0
$249
$10,000
Building Size: 925 SF
ACM Identified
Building Use: Herman House (Field Assigned By MACTEC)
Building Unk55 - Herman House (Field Assigned By MACTEC)
Previous Expense:
Current Expense:
Future Asbestos Clean-up Costs:
$0
$465
$11,089
APPENDIX B - NON-ACM DETAIL AND PHOTOGRAPHS
Jerome County, Idaho
December 6, 2010 Non-ACM Detail Page 20 of 44
Building Unk55 - Homogeneous Material MIIN-Unk55-001
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (001a) Resilient Sheet Flooring, Tan, Square
Pattern Floor Tile Floor SampledMIIN-Unk55-001a
(001b) Sheet Flooring Adhesive, Yellow Floor Tile Floor SampledMIIN-Unk55-001b
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Level 1 - Northeast None Detected 001aBUnk55.001
Level 1 - Northeast None Detected 001bBUnk55.001
Level 1 - North Center Entry None Detected 001aBUnk55.002
Level 1 - North Center Entry None Detected 001bBUnk55.002
Jerome County, Idaho
December 6, 2010 Non-ACM Detail Page 21 of 44
Building Unk55 - Homogeneous Material MIIN-Unk55-002
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (002a) 9" x 9" Floor Tile, Green, Under Existing
Finishes Wood Floor SampledMIIN-Unk55-002a
(002b) Floor Tile Mastic, Black Wood Floor SampledMIIN-Unk55-002b
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Level 1 - Northeast None Detected 002aBUnk55.003
Level 1 - Northeast None Detected 002bBUnk55.003
Level 1 - North Center Entry None Detected 002aBUnk55.004
Level 1 - North Center Entry None Detected 002bBUnk55.004
Jerome County, Idaho
December 6, 2010 Non-ACM Detail Page 22 of 44
Building Unk55 - Homogeneous Material MIIN-Unk55-003
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (003a) Resilient Sheet Flooring, Green/White, Square Pattern Wood Floor SampledMIIN-Unk55-003a
(003b) Sheet Flooring Adhesive, Yellow Wood Floor SampledMIIN-Unk55-003b
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Level 1 - West Center None Detected 003aBUnk55.007
Level 1 - West Center None Detected 003bBUnk55.007
Level 1 - West Center None Detected 003aBUnk55.008
Level 1 - West Center None Detected 003bBUnk55.008
Jerome County, Idaho
December 6, 2010 Non-ACM Detail Page 23 of 44
Building Unk55 - Homogeneous Material MIIN-Unk55-004
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (004a) Wallboard, White Walls/Ceilings Wall/Ceiling SampledMIIN-Unk55-004a
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Level 1 - North Center Entry None Detected 004aBUnk55.005
Level 1 - Southwest None Detected 004aBUnk55.006
Jerome County, Idaho
December 6, 2010 Non-ACM Detail Page 24 of 44
Building Unk55 - Homogeneous Material MIIN-Unk55-005
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (005a) Mastic/Adhesive, Tan Wallboard Wall SampledMIIN-Unk55-005a
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Level 1 - West Center None Detected 005aBUnk55.009
Level 1 - West Center None Detected 005aBUnk55.010
Jerome County, Idaho
December 6, 2010 Non-ACM Detail Page 25 of 44
Building Unk55 - Homogeneous Material MIIN-Unk55-006
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (006a) Roof Shingles, Brown Wood Roof SampledMIIN-Unk55-006a
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Roof None Detected 006aBUnk55.011
Roof None Detected 006aBUnk55.012
Jerome County, Idaho
December 6, 2010 Non-ACM Detail Page 26 of 44
Building Unk55 - Homogeneous Material MIIN-Unk55-007
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (007a) Window Glazing, White Windows Windows SampledMIIN-Unk55-007a
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Level 1 - Exterior None Detected 007aBUnk55.015
Level 1 - Exterior None Detected 007aBUnk55.016
Jerome County, Idaho
December 6, 2010 Non-ACM Detail Page 27 of 44
Building Unk55 - Homogeneous Material MIIN-Unk55-008
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (008a) Roof Shingles, Gray Wood Roof SampledMIIN-Unk55-008a
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Roof None Detected 008aBUnk55.013
Roof None Detected 008aBUnk55.014
APPENDIX C - ACM DETAIL AND PHOTOGRAPHS
Jerome County, Idaho
December 6, 2010 ACM Detail Page 9 of 11
Building Unk55 - Homogeneous Material MIIN-Unk55-004
Material Description Associated System Sampled/Assumed
Material Information
HM ID
Substrate/
Component (004b) Wallboard Joint Compound, White Walls/Ceilings Wall/Ceiling SampledMIIN-Unk55-004b
HM # Sample Location Lab Results
Bulk Sample Data
Sample ID Level 1 - North Center Entry 2% Chrysotile004bBUnk55.005
Level 1 - Southwest 2% Chrysotile004bBUnk55.006
Material Locations and Condition
Material Location Quantity ConditionHM Level 1 - North Center Entry Good233 S.F.004b
Level 1 - Northeast Good472 S.F.004b
Level 1 - Southeast Good780 S.F.004b
Level 1 - Southwest Good556 S.F.004b
Level 1 - West Center Good204 S.F.004b
Level 1 - Northwest Good472 S.F.004b
Level 1 - North Center Good112 S.F.004b
Level 1 - North Center Good112 S.F.004b
Level 1 - South Center Good112 S.F.004b
Level 1 - South Center Good227 S.F.004b