P16PS00262
x x
3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
YOSE 20643104/04/2016000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/04/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Yosemite National Park - YOSE 206431
Mariposa Grove Restoration Phase 5
Mariposa County, CA
This amendment documents the site visit, corrects specifications and drawings, and establishes a deadline for questions. See attached pages.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Sarah Mcmahon
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
P16PS00262
Amendment One
In order to document the site visit, correct specifications and drawing sheets, and establish a deadline for questions, the above numbered solicitation is hereby amended as follows:
1. The site visit was held as scheduled on 13 April 2016. Minutes from the site visit (3 pages) and the list of attendees (4 pages) are attached.
2. In Section C of the solicitation document, page 12 of 141, the second paragraph of the project description is corrected to clarify that the Grizzly Giant parking lot includes only striping and signage installation. The paragraph is deleted and replaced with the following:
This current project is for Phase 5 of the Mariposa Grove Restoration Project.
The specific Phase 5 work items include installation of the Stormwater Pollution Prevention Plan and associated BMP’s, construction of Lower Grove Area restroom/utility building and shuttle stop shelter, installation of SCADA system for utility systems, paving of the Lower Grove concrete plaza and walkway area, placement of pavement markings and signs in the Lower Grove and Grizzly Giant parking areas, installation of Lower Grove Area shuttle furnishings, repair of Upper Grove Area water line, replacement of South Entrance water line, construction of a new water tank, construction of South Entrance parking complex, restroom and visitor contact building, construction of South Entrance septic system and leach fields, and surfacing the Four Mile Road which provides access to the new leach field.”
3. The following changes have been made to the project drawings:
a. Sheet C7.64 – Correct note 31 from “PMC Versatile Model VL1000” to “Ashcroft Model K1”
b. Sheet E6.07 – Sheet is deleted and replaced with the attached.
c. Sheets L5.50 and L5.51 – Contractor shall design and construct a temporary irrigation system for the middle parking lot island in the South Entrance parking lot. Sheets are deleted and replaced with the attached.
4. The following changes have been made to the project specifications:
a. Section 01 33 23, paragraph 1.3.C – Delete and replace with the following:
Submittal List: A list with the informational submittals is included in Paragraph
2.2. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the provided submittal list. Contractor shall provide a comprehensive submittal list within 30 days from notice to proceed.
b. Section 01 33 23, paragraph 1.3.F.1 – Add the following paragraph:
All submittals shall include an index indicating each item that is being submitted for approval. Special care shall be exercised to ensure proper listing of the Specification paragraph and/or sheet number of the Contract Drawings pertinent to the data submitted for each item.
5. All questions must be submitted in writing. The due date for questions has been established as 27 April 2016.
6. All other terms and conditions of the solicitation remain unchanged.
Mariposa Grove Restoration Phase 5 Site Visit Meeting Minutes
Wednesday, April 13, 2016 at 10 am
INTRUDUCTION:
Project Description
This project is to rehabilitate and restore the health of the Mariposa Grove of Giant Sequoias (MG) while enhancing the visitor experience. The Grove is a major visitor destination for the park’s annual 4+ million visitors. The project is divided up into five phases that address long-standing issues associated with parking and roads within the Grove. In 2014, the NPS developed the Mariposa Grove Final Environmental Impact Statement (FEIS) in response to conditions in the Grove (including the park’s South Entrance) that adversely affect the ecological health of the Grove and diminish the quality of the visitor experience.
This current project is for Phase 5 of the Mariposa Grove Restoration Project. The specific Phase 5 work items include installation of the Stormwater Pollution Prevention Plan and associated BMP’s, construction of Lower Grove Area restroom/utility building and shuttle stop shelter, installation of SCADA system for utility systems, paving of the Lower Grove concrete plaza and walkway area, placement of pavement markings & signs in the Lower Grove and Grizzly Giant parking areas, installation of Lower Grove Area shuttle furnishings, repair of Upper Grove Area water line, replacement of South Entrance water line, construction of a new water tank, construction of South Entrance parking complex, restroom and visitor contact building, construction of South Entrance septic system and leach fields, and surfacing the Four Mile Road which provides access to the new leach field.
REMINDERS:
• Submit all your questions online to the Contracting Officer and Contract Specialist as identified in the solicitation.
• Remember to refer to the solicitation for the most accurate information for this project.
The drawings and specifications are attached as part of the solicitation.
• This site visit is to help you become familiar with this project site and any existing field conditions.
NEW South Entrance Parking Lot:
• Slash: All logs will be removed from the site prior to the start of construction. The rest of the slash and the stumps are going to be left on the site.
• Cultural Sensitivity: The whole site is sensitive, but some areas are more than others.
There will be archeological monitoring during stump removal and culvert excavation in the vicinity of the most sensitive areas.
4-Mile Leach Field Site:
• Shooting range: Will be used as a turn around and possibly as a staging area (please refer to plans). You will need to coordinate with the NPS staff, this area will continue to be used during construction. If it does not specify in the plans please submit the question on-line.
• Trees that have not been removed are in an archeological site that is under investigation.
Once the area has been properly analyzed and documented the trees will be removed prior to the start of construction (Notice to Proceed for this solicitation).
• There is an existing Service road on the south and west side of leach field which provides access for PG&E to service their utility poles.
• The road leading to the site is where the sewer line and other associated utilities will be installed. This existing road will also be resurfaced when finished.
• This new leach field area will be the disposal field for all the sewage from the existing and new bathrooms as well as from the existing residents.
Y-Intersection Utilities:
• Night work: The amount of delays will determine whether the activities through the intersection will happen during the day or at night. There is a lot of traffic and movement through this area during the day; therefore nights are typically the most efficient time to work.
• Existing Utility Interruptions: Utility service (water, power, and sewer) to the Park office, residence, and entrance kiosks cannot be interrupted prior to arranging temporary services, as specified in contract documents.
NEW Plaza Area for Lower Grove:
• Concrete plaza, sidewalk and bus stop shelter is part of the contract.
• A Sequoia cookie (footprint of a sequoia) has to be constructed in the middle of the plaza as specified in the construction drawings and specifications.
Lower Grove Restrooms:
• Utilities: Martin Brothers is currently performing the work included in Phase 4 of the project. The Phase 4 work includes stubbing out conduits for this new restroom, such as water, sewer, telecom and power conduits, will be installed prior to construction of this Phase 5 project.
• The Restroom Structure is part of this Phase 5 contract.
• Tesco Control Panel is part of Phase 4 contract and will be already in installed. Most of the septic and leach field system instrumentation is part of the prior phase and is not included in this contract.
• Striping: The paving will be completed by Martin Brothers. This contract only includes striping and signage installation from lower Grove Area to Grizzly Giant parking lot.
Wrap-up:
• Overlapping of Contracts: The existing Phase 4 Contract work is scheduled to be complete prior to the Notice to Proceed for the Phase 5 project. However there will still be some coordination between NPS Crews who will continue working on the accessible trails and roads between the Lower and Upper Groves of Giant Sequoia’s. Coordination will also be required between the future FHWA road project Contractor, who will be working on the Mariposa Grove and Wawona Road starting October 1, 2016.
• Submittals: You must be on top of submittals for this project. When you prepare your proposal, highlight how you plan to complete the submittal process. Refer to the submittal specifications to better understand what is required.
• Michael Pieper and Romina Pasten will be part of the daily field staff for this project.
2/29/2016 12/18/2015
6. CONTRACTOR SHALL DESIGN AND CONSTRUCT A TEMPORARY
IRRIGATION SYSTEM IN THE MIDDLE PARKING LOT ISLAND.
SYTEM SHALL FOLLOW THE SAME REQUIREEMETS FOR
TEMPORARY SYSTEM SHOWN IN OTHER PLANTING AREAS IN
THIS SHEET.
Addendun No.1 Middle island temporary irrigation system
4-14-16 M.P
RPastenGamboa Polygon
RPastenGamboa Line
RPastenGamboa Text Box
SEE NOTE 6
RPastenGamboa Line
RPastenGamboa Text Box
SEE NOTE 6
RPastenGamboa Text Box
RPastenGamboa Text Box
2/29/2016 12/18/2015
5. CONTRACTOR SHALL DESIGN AND CONSTRUCT A TEMPORARY
IRRIGATION SYSTEM IN THE MIDDLE PARKING LOT ISLAND. SYTEM
SHALL FOLLOW THE SAME REQUIREEMETS FOR THE TEMPORARY
SYSTEM SHOWN ON SHEET L.5.50.
1 183 Addendun No.1: Middle island temporary irrigation system 4-14-16 M.P
RPastenGamboa Polygon
RPastenGamboa Polygon
RPastenGamboa Line
RPastenGamboa Text Box
SEE NOTE 5
RPastenGamboa Text Box
SEE NOTE 5
RPastenGamboa Line
RPastenGamboa Line
RPastenGamboa Line
| P16PS00262.pdf |
| Amendment One Pages 2 to 13 |
| P16PS00262 Amendment 1 text |
| Phase 5 Site Visit_Meeting Minutes |
| Site Visit_Signing Sheet |
| Addendum 1_E6.07 |
| Addendum 1_L5.50 |
| Addendum 1_L5.51 |
File details come from the government source that posted it. Updated .