Final Report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| pre-bid_sign_in.pdf | ||
| Riis_Seawall_Boundary.pdf | ||
| Notes_Site_Visit_Riis_Parking_Bathhouse_09142015.docx | DOCX document | |
| Questions_P15PS02143_09142015.docx | DOCX document | |
| Riis_Seawall_Boundary_v2_(1).pdf | ||
| Jacob_Riis_Park_Seawall_UW_Inspection_Report_DRAFT_-_KBP_comments.pdf | ||
| RIIS_parking_Fence.pdf | ||
| Jacob_Riis_Parking_Lot_Engineering_Study_Report_7-21-2014_low_res.pdf | ||
| P15PS02143FWC.pdf | ||
| PRE.docx | DOCX document | |
| P15PS02143WC.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service U.S. Department of the Interior
Gateway National Recreation Area New York
Gateway National Recreation Area Jacob Riis Parking Lot Engineering Study and Seawall Inspection Results and Recommendations
GATE 195485
Gateway National Recreation Area
Jacob RIIS Park Seawall and Parking Lot Repair
Value Workshop i
TABLE OF CONTENTS
Introduction and Background
Workshop Goal and Objectives
Project Overview Presentation
Parking Lot Repair Options Discussion
Sink hole
Storm Pipe
Check Valves
CCTV
Crack Sealing
Preferred Parking Lot Repair Determination
Seawall Repair Options Discussion
Preferred Seawall Repair Option Determination
Visitor Experience/Multi-Use Trail (MUT)
Summary of Recommended Repairs
Parking Lot:
Seawall:
Project Schedule Next Steps
APPENDICES
A. Value Workshop Agenda
B. Workshop Attendee Sign-In Sheet
C. Project Overview PowerPoint Presentation
D. Updated Cost Estimates
Gateway National Recreation Area
Jacob RIIS Park Seawall and Parking Lot Repair
Value Workshop
INTRODUCTION AND BACKGROUND
Jacob Riis Park is located within the Jamaica Bay Unit of the Gateway National Recreation Area.
The project area includes the parking lot serving the Park and the seawall facing Jamaica Bay to the north of the parking lot and Beach Channel Drive.
Jacob Riis Park Project Location
The Jacob Riis Park parking lot was inundated during Hurricane Sandy. The Park and the surrounding area sustained major damage during the storm. The parking lot served as a staging area for debris collection and removal in the months following the storm, which resulted in additional damage from associated heavy equipment. The purpose of this project is to conduct field investigations to identify existing conditions of the storm drainage system, pavement surface, and seawall, and to develop recommended repairs and estimated costs based on an engineering analysis of the existing conditions.
The repair options reviewed during the workshop were based on previously completed field investigations which identified the existing conditions of the storm drainage system, pavement surface, and seawall. At the time of the field investigations, repair options were considered and developed with estimated costs based on the preliminary engineering analysis of the site.
The prior evaluations of existing site conditions included:
Conducting a topographic survey of the parking lot and surrounding areas, Conducting a close circuit TV (CCTV) inspection of the storm drain pipes within the parking lot area and the pipes leading to Jamaica Bay, A visual inspection of the seawall to the north of the parking lot, including the top of the seawall and the face of the seawall from the water, and A visual inspection of the parking lot pavement surface
Recommendations were made for the rehabilitation of five primary components including:
Storm Drainage Piping System Sinkhole in Parking Lot Pavement Surface Seawall Multi Use Path
WORKSHOP GOAL AND OBJECTIVES
The value-based workshop was conducted at the GATE headquarters building with GATE staff and the consultant attending and NPS DSC and other GATE staff attending via telephone conference call. See Appendix A for the Value Workshop Agenda and Appendix B for the Attendee/Sign-in sheet.
The purpose of the value-based decision making workshop was to determine the preferred repair options and priorities for the parking lot and seawall that could be moved forward for design and construction. In addition, various funding sources and the eligibility of the primary work components to be funded with the funding sources were discussed, and an implementation plan developed.
PROJECT OVERVIEW PRESENTATION
An overview of the project was presented in a PowerPoint presentation, which is provided in Appendix C. The presentation focused on the parking lot sink hole and storm water piping and the seawall. The highlights of the parking lot and seawall discussions are summarized below:
PARKING LOT REPAIR OPTIONS DISCUSSION
Sink hole
The work associated with repairing the sink hole includes:
Remove portions of failing concrete slab (slab thickness approximately 6”) Remove and replace failed pipe Fill and compact sink hole area Replace concrete slab
Storm Pipe
There are three sections of storm water piping that require replacement or relining. The pipe will be relined except in cases where the pipe has completely failed. Pipes crossing under Beach Channel Drive are to be relined in order to avoid impacts to the road and vehicular access to the park.
Check Valves
Tide check valves were discussed and determined to be needed to limit the inflow of water from the bay up the pipes to the parking lot during high tide and storm events. The check valves would be installed at the parking lot outfall pipes at the seawall. The check valves would prevent water from inundating the parking lot and potentially causing the migration of fill material from around the pipes and causing subsequent future sink holes.
CCTV
Closed Circuit TV (CCTV) inspections were previously made of the parking lot pipes. Additional CCTV inspections are to be made of New York City owned pipes upon coordination with, and approval from NYC.
Crack Sealing
The sealing of the existing parking lot pavement cracks and joints was discussed. The existing cracks and joints act as a type of pervious pavement by allowing some storm water to drain through the joints and percolate into the underlying material. It was determined that the benefit of water infiltration through the joints exceeds the benefits of sealing all the joints and cracks. Furthermore, the cost of the crack sealing would likely exceed $2M.
As crack sealing has been a very low priority, and in consideration of the advantage of allowing water infiltration, crack sealing is not being considered further for inclusion in the overall work
Broken and Depressed Slab components; however, a line item with a per linear foot cost would be included in the design package so that in the event that there is a special need for crack sealing, it could be implemented.
In addition, the repair of drain inlets was also discussed. Although there is not specific inlets identified for repair, an inlet repair line item would be included in the design work package so that existing inlets or the immediate area around them could be modified to allow run-off to drain into the structure.
Currently at some structures, minor pavement upheavals prevent the flow of water to the inlets.
Preferred Parking Lot Repair Determination
The following is a summary of the preferred parking lot repair items:
Remove failing concrete slab, as required Repair/replace pipe/structure associated with sink hole Fill/compact sink hole area and replace concrete slab Slip line storm pipes and replace failed pipe Install check valves on two out fall pipes
Note: CCTV inspection of NYC owned pipes to be completed by the NPS in coordination with NYC separate from the construction work package.
SEAWALL REPAIR OPTIONS DISCUSSION
The objective of the seawall repair is to prevent washouts from occurring on the backside (landside) of the seawall due to the deteriorated condition of the seawall sheathing. There are significant washout on the backside of the seawall, as noted in the seawall inspection report. In order to stabilize the ground on the backside of the seawall, the seawall foundation or the tongue and groove (T&G) sheathing from the mudline up must be replaced or repaired. This will prevent the migration of fine backfill material through the seawall, resulting in depressions and settlement along the backside of the seawall.
Deteriorated Concrete Patch
Near Entrance
Existing Seawall Railing
The life expectancy of a complete seawall repair including new sheathing or sheet piling would be in the range of 25 to 30 years. A short term repair or the sheathing holes (such as welding steel plates over sheathing holes), including backfill the void spaces, would likely provide a temporary fix of up to three years or so. The cost per linear foot of repair would be significantly more than the cost per linear foot of a continuous repair due to the relative amount of handwork and underwater work performed by a dive team. This type of work does not have the economy of scale benefit.
Relating to the seawall work, the compliance requirements were briefly considered as they may impact the project schedule and execution. It is understood that the seawall is not likely to be a historic structure, as it was rebuilt sometime around the 1960’s. The NPS is to confirm this.
A permit for in-water seawall repair work, such as installation of sheet piling, would require permits from the New York State Department of Environmental Conservation (NYDEC) and the U.S. Army Corps of Engineers (USACOE). The NPS is to take the lead in obtaining the required permits.
PREFERRED SEAWALL REPAIR OPTION DETERMINATION
Visitor Experience/Multi-Use Trail (MUT)
Railing repair and replacement along the seawall/MUT was discussed. This is a high priority component of the work package for two important reasons:
1. It is a safety issue for visitors using the MUT as sections of the railing are completely missing. In these areas, only a chain link fence has been temporarily placed along the area of the missing railing. Other railing sections are loose and not securely connected to the seawall.
As a result, the railing does not provide the necessary strength to protect the public.
2. Aesthetically, the disrepair of the railing is an eyesore. It is within full view of visitors and has a high profile public image. As a result, it is politically sensitive to not have such a highly visible, safety issue left uncorrected.
There is approximately 750 lf of railing that needs to be repaired or replaced. Of the 750 feet, an estimated 25% (~200 lf) needs to be replaced. The existing repaired railing would also be sand or water blasted and painted to match the new railing. If the railing work is completed prior to the seawall repair work, the contractor would be required to work around the railing and protect it from damage.
In addition to the railing repair, there would also be the associated repair of the concrete as necessary to support the railing connections.
The overall restoration of the site would be accomplished by improving the landscape/hardscape items such as, MUT surface treatment of geo-grid/pervious paver trail stabilization, ground cover and benches, and associated concrete pads. Because of the high priority of this work, the above items would be included in the work package for the parking lot
SUMMARY OF RECOMMENDED REPAIRS
The work packages for the repairs would likely be Design-Bid-Build construction documents. The work would be broken down into two work packages as summarized below and as indicated in the work package cost estimates contained in Appendix D.
Existing Railing along Seawall
Parking Lot:
The work items for the parking lot bid package would include the following:
Slip line three sections of pipe as indicated in the PP presentation graphic in Appendix C.
Replace pipe sections that have failed and cannot be slip lined.
Install check valves at the seawall outfall of drain pipes Fix sink hole as described above Replace missing and damaged-beyond-repair railing (~200 lf) Repair and repaint existing railing (~550 lf) Multi-Use Trail and site restoration
Seawall:
The work items associated with the seawall bid package would include the following:
Repair seawall foundation, including new sheathing/sheet piling backfill (providing a future life expectancy of 25 to 30 years)
If the seawall work were to occur before the parking lot work, then the installation of the outfall check valves would be included in the work package.
PROJECT SCHEDULE NEXT STEPS
Draft RIIS Value Workshop Summary Report due to NPS for review by March 6, 2015 Design Advisory Board (DAB) Meeting June 2015. The schematic design plans would have to be approved and ready for submission to the DAB by mid May 2015.
As part of the next steps of the project, the NPS will likely set up scheduled conference calls to ensure the project execution and progress is made in order to meet the required funding schedules and deadlines.
Appendices
List of Appendices:
A. Value Workshop Agenda B. Workshop Attendee Sign-in Sheet C. Project Overview PowerPoint Presentation D. Updated Cost Estimate
Appendix A
Value Workshop Agenda
Date: 2/23/15 Page: 1
NATIONAL PARK SERVICE
VALUE-BASED DECISION MAKING WORKSHOP
Jacob Riis Parking Lot Engineering Study and Seawall Inspection Results and Recommendations
Gateway National Recreation Area, Jamaica Bay Unit
Superintendent's Conference Room - Call in number: 866-912-7875 Passcode: 9415333#
Video link https://plus.google.com/hangouts/_/doi.gov/jen
AGENDA
February 19, 2015
Workshop Team
Jennifer Nersesian GATE – Superintendent 718-354-4661
Jeff Kangas GATE - Chief of Maintenance / POC 718-354-4798
Dave Taft GATE – Jamaica Bay Unit Manager 718-354-4642
Richard O’Neill GATE - Facility Manager 718-338-3338
Tim Hudson Hurricane Sandy Recovery Manager 718-354-4620
Judith Smith GATE – Administrative Assistant 718-354-4568
Pat Sacks NPS / DSC Transportation - PM 303-969-2431
Michael Pisano DSC – T / Landscape Architect – PS 303-987-6887
Kristie Franzmann DSC - Transportation Supervisor 303-969-2284
Gail Stahlecker DSC – Landscape Architect 303-358-6939
Kevin Powers VHB Coastal Engineer 518-389-3600
Tim Hogan VHB Facilitator 757-592-8733
Gordon Daring VHB Project Manager 860-573-9856
Meeting Location: GATE STIS Headquarters Conference Room, Fort Wadsworth, Staten
Island, NY, DSC location TBD
The value workshop team will be presented with information relating to the project site conditions, evaluation reports and repair options considered. The information will include cost estimates, site maps and other relevant information. The goal for the workshop is for the team to review and understand of project history, inspections completed and other project information and to determine a plan to accomplish the required repairs.
12:30 pm Workshop Setup / DSC Call-in line established ...................................... .VHB/NPS
1:00 pm Workshop Start: Greetings and Introductions ......................... Tim Hogan/Pat Sacks
1:10 pm Workshop Goal and Objectives .............................................................. Tim Hogan
1:15 pm Project Overview Presentation .......................................................... Gordon Daring
1:30 pm Parking Lot Repair Options Discussion…………………….……………..… Team
1:45 pm Preferred Parking Lot Repair Determination….…………………………..… Team
2:00 pm Seawall Repair Options Discussion……………………...………………..… Team
2:15 pm Preferred Seawall Repair Option Determination………………….……....… Team
2:30 pm Summary of Recommended Repair…………….……………………..…..… Team
2:45 pm Next Steps/Project Schedule ............................................................................ Team
Close for Day: 3:00 pm
Appendix B
Workshop Attendee Sign-in
Sheet
\\vhb\proj\Wat-LD\33871.02 ERFO_Various\docs\VARIOUS\RIIS Value Meeting Feb 2015\RIIS Value Workshop Meeting Sign-In Sheet 02.19.15.doc
NATIONAL PARK SERVICE
VALUE-BASED DECISION MAKING WORKSHOP
Jacob Riis Park Seawall and Parking Lot Repair
Gateway National Recreation Area, Jamaica Bay Unit
Thursday, February 19, 2015
SIGN IN SHEET
Name Affiliation Email Phone Number
1. Tim Hogan VHB THogan@vhb.com (757) 220 0500
2. Gordon Daring VHB gdaring@vhb.com (860) 807 4354
3. Kevin Powers VHB Kpowers@vhb.com (518) 389-3602
4. Rich Dvorak NERO/ Sandy Richard_Dvorak@nps.gov (718) 619-0370
5. Jeff Kangas NPS/ GATE Jeff_Kangas@nps.gov (718) 354-4754
6. Minka Sendich GATE Minka_Sendich@nps.gov (718) 354-4628
7. Jennifer Nersesian GATE Jen_Nersesian@nps.gov (718) 354-4661
8. Gail Stahlecker* DSC Gail_Stahlecker@nps.gov (303) 969-2369
9. Mike Pisano* DSC Michael_Pisano@nps.gov (303) 987-6887
10. Ricki O’Neill* GATE Richard_O’Neill@nps.gov (718) 338-3338 Ext. 240
11. Pat Sacks* DSC Pat_Sacks@nps.gov (303) 969-2431
12. Tim Hudson* GATE Tim_Hudson@nps.gov
13. Kristie Franzmann* GATE Kristie_Franzmann@nps.gov (303) 969-2284
*Signifies people who joined by phone mailto:THogan@vhb.com mailto:gdaring@vhb.com mailto:Kpowers@vhb.com mailto:Richard_Dvorak@nps.gov mailto:Jeff_Kangas@nps.gov mailto:Minka_Sendich@nps.gov mailto:Jen_Nersesian@nps.gov mailto:Gail_Stahlecker@nps.gov mailto:Michael_Pisano@nps.gov mailto:Pat_Sacks@nps.gov mailto:Tim_Hudson@nps.gov mailto:Kristie_Franzmann@nps.gov
Appendix C
Project Overview PowerPoint
Presentation
Jacob Riis Park Seawall and Parking Lot Repair
Value Based Decision Making Workshop
Jacob Riis Park Seawall and Parking Lot Value Based Decision Making Workshop
February 19, 2015
Prepared by
Project Location
Project Location
Reports
Rehabilitation Needs
�Structural and Safety •Storm Drainage System
•Parking Lot Sinkhole
•Seawall Foundation and Facing
�Visitor Experience •Seawall Railing
•Multi-Use Path
�Infrastructure Preservation •Parking Lot Joint and Crack Repair
Storm Drainage and Sinkhole
Overview of Rehabilitation Needs
Sinkhole
Vanasse Hangen Brustlin, Inc.
\\CTMIDDAT\projects\33259.18 Riis_Parking\cad\ld\Planmisc\33259.18 Riis_Seawall rev1.dwg
Jacob Riis Parking Lot Engineering Study - Seawall Inspection 157 Rockaway Beach Boulevard Queens, New York
June 16, 2014
Sheet 1 of 6
Jacob Riis Parking Lot Engineering Study - Seawall Inspection 157 Rockaway Beach Boulevard Queens, New York
Sheet 2 of 6
Jacob Riis Parking Lot Engineering Study - Seawall Inspection 157 Rockaway Beach Boulevard Queens, New York
Sheet 3 of 6
Jacob Riis Parking Lot Engineering Study - Seawall Inspection 157 Rockaway Beach Boulevard Queens, New York
Sheet 4 of 6
Jacob Riis Parking Lot Engineering Study - Seawall Inspection 157 Rockaway Beach Boulevard Queens, New York
Sheet 5 of 6
Jacob Riis Parking Lot Engineering Study - Seawall Inspection 157 Rockaway Beach Boulevard Queens, New York
Sheet 6 of 6
Seawall Foundation and Facing mdale Text Box -21-
-22-
-23-
-24-
-25-
-26-
-27-
-28-
-29-
PHOTO 10 - Station 1+50 to 2+00, elevation view of vertical timbers, looking southeast.
PHOTO 9 - Station 1+97, heavily corroded and missing timber sheeting hardware, 18”Wx 10’Hx 6”D spall at vertical joint with exposed corroded reinforcement, looking southwest.
-40-
PHOTO 12 - Station 5+45, 2’ to 5’H x 2.5’D void starting at the mudline (typ.), looking south.
PHOTO 11 - Station 2+73, void 1’Hx up to 2.5’D, looking southeast.
-41-
PHOTO 14 - Station 10+25, 2’ to 5’H x 2.5’D void starting at the mudline (typ.), looking south.
PHOTO 13 - Station 7+40, 2’ to 5’H x 2.5’D void star ting at the mudline (typ.), looking south.
-42-
Seawall Railing and Multi Use Trail
Seawall Railing and Multi Use Trail
Parking Lot Joint and Crack Repair
Parking Lot Joint and Crack Repair
Repair Needs and Estimated Costs
Repair CategoryEstimated Cost
Structural and Safety Improvements
Storm Drainage
Replace 377 lf of 30” RCP between CB10 and Outfall$194,566
Replace 280 lf of 24” RCP between MH4 and CB9112,024
Line 294 lf of 30” RCP between CB3 and the Outfall289,470
Repair Sinkhole$131,279
Seawall
Rehabilitate Seawall Foundation1,801,195
Seawall Foundation Rehabilitation Scour Protection3,414,700
Install Check valves on NPS Outfalls on Seawall185,118
Install Check valves on Other Outfalls on Seawall814,518
Structural and Safety Improvement Sub-total$6,942,870
Visitor Experience Improvements
Seawall Railing
Concrete Repair1,542,648
Railing Repair and Replacement822,746
Remove and Reconstruct Multi Use Path$539,702
Visitor Experience Improvement Sub-total$2,905,096
Infrastructure Preservation Improvements
Joint and Crack Repair and Curb Repair2,784,849
Infrastructure Preservation Improvement Sub-total$2,784,849
Grand Total$12,632,815
Discussion
Appendix D
Updated Cost Estimate
Vannasse Hangen Brustlin, Inc.
Engineers.Scientists.Planners.Designers Project # 33259.18 351 Mc Laws Circle Date: 2/27/2015 Suite 3 Calc. By: K Powers Williamsburg, VA 23185 Checked By: T Hogan
Item Qty Unit Cost Total
WORK PACKAGE #1
Parking Lot Repair
Repair Sinkhole 1 ls $ 131,279 $ 131,279
Reline/Replace 30" RCP between CB10 & the
Outfall 377 lf $ 985 $ 371,345
Replace 24" RCP between MH4 & CB9 280 lf $ 400 $ 112,000
Line 30" RCP between CB3 & the Outfall 294 lf $ 985 $ 289,590
Install Check Valves on NPS Outfalls on Seawall 1 ls $ 185,118 $ 185,118
Seawall Railing Repair & Replacement 1 ls $ 822,746 $ 822,746
Concrete Repair at Seawall Railing 1 ls $ 1,542,648 $ 1,542,648
Remove & Reconstruct Multi Use Path 1 ls $ 539,702 $ 539,702
Landscape/Hardscape Site Restoration 1 ls $ 200,000 $ 200,000
$ 4,194,428
$ 4,194,428
WORK PACKAGE #2
Seawall Repair
Rehabilitate Seawall Foundation 1 ls $ 1,801,195 $ 1,801,195
Sewall Foundation Rehabilitation Scour Protection 1 ls $ 3,414,700 $ 3,414,700
Remove Timber Tongue & Groove Sheathing 1 ls $ 350,000 $ 350,000
$ 5,565,895
5,565,895$
$ 9,760,323
Install Check Valves on NYC Outfalls on Seawall 1 ls $ 814,518 $ 814,518
SEAWALL REPAIR TOTAL
WORK PACKAGE #2 SUBTOTAL
TOTAL PROJECT NET CONSTRUCTION COST
Jacob Riis Park Seawall & Parking Lot Repair
WORK PACKAGE #1 SUBTOTAL
Opinin of Probable Construction Costs
Value Based Decision Making Workshop
PARKING LOT REPAIR TOTAL
\\vhb\proj\Wat-LD\33871.02 ERFO_Various\ssheets\RIIS Seawall and Parking Lot Repair VA Cost Estimate 02.27.2015
As the nation’s principal conservation agency, the Department of the Interior has responsibilities for most of our nationally owned public lands and natural resources.
This includes fostering wise use of our land and water resources, protecting our fish and wildlife, preserving the environmental and cultural values of our national parks and historic places, and providing for the enjoyment of life through outdoor recreation. The department assesses our energy and mineral resources and works to ensure that their development is in the best interests of all our people. The department also promotes the goals of the Take Pride in America campaign by encouraging stewardship and citizen responsibility for American Indian reservation communities and for people who live in island territories under U.S. administration.
February 2015