EXHIBIT D- “SEED PROJECT”

GOLDEN GATE NATIONAL RECREATION AREA

Specific Statement of Work

Site Investigation at Fort Barry Building 841 - Former Fuel Underground Storage Tank Site Solicitation No: P15PS00181

Contract No. TBD Task Order No. TBD

5.26.14

1.0 BACKGROUND

2.0 TASK ITEMS

A. TASK A: Project Management and Review Existing Documentation And Data

B. TASK B: Develop UST Site Investigation Workplan and Health and Safety Plan

C. TASK C: Conduct Field Work

D. TASK D: Final Reporting and Submittals

3.0 SCOPE OF WORK

3.1 General Requirements

3.2 SCOPE OF WORK - Definition of TASK ITEMS

4.0. APPLICABLE REQUIREMENTS

4.1 Schedule Review

4.2 Products

5.0 STANDARD SERVICES

5.1 Supporting Documentation Provided by the Government

5.2 NPS Documents Deliverable with SOW

6.0. SUBMITTALS

6.1 Required Submittals

6.2 Incorporation of Review Comments

7.0 SUBMITTAL SCHEDULE

8.0 PROJECT CLOSOUT

9.0 PAYMENT

1.0 BACKGROUND

Golden Gate National Recreation Area requires consulting, design, field work and other services to develop a Site Investigation for three former fuel Underground Storage Tanks (USTs) sites. The Site Investigations will require environmental engineering plans, designs to support field work necessary to collect soil and groundwater samples via geoprope (or similar technology) and characterize sub surface environmental conditions.

This Task Order Scope of Work provides technical information, including portions from previous scopes of works, reports and government specifications that will allow the Contractor to develop workplans this calendar year and to conduct field work next calendar year.

The site is located within Golden Gate National Recreation Area. Golden Gate National Recreation area is both a congressionally designated boundary (GGNRA) and an administrative unit (GOGA) of the National Park Service and is referred in the SOW as GOGA. The primary work site is in the Marin Headlands at Fort Barry.

See EXHIBIT A for a park map.

1.1 Scope of Services

Conduct Subsurface Investigation of Three former fuel Underground Storage Tank Sites

The Contractor shall provide workplan (including Field Sampling Plan and Quality Assurance Plan), Health and Safety plan, submittals and services necessary to design and implement a Site Assessment (Soil and Groundwater Investigation) of a former underground storage tank site.

The objective of this task is to develop a Conceptual Site Model based on the Site Assessment (Soil and Groundwater Investigation) to determine if additional site characterization or remediation is necessary and gain expedient regulatory closure for the site if additional characterization or remediation is not required. If necessary, next phases may include removal of remaining soil contamination (if any), characterization and site remediation (if necessary) up to site closure.

The Contractor shall ensure that the site assessment includes both a soil investigation and groundwater investigation that meet all provisions of the 2012 California Leaking Underground Fuels Tank Manual (LUFT Manual) and regulatory implementation of that manual and any newer provisions required by the San Francisco Bay Regional Water Quality Control Board.

1.2 Project History

In 2009 a NPS Contractor, ERRG, removed underground storage tanks (one each) at six different sites.

Underground Storage Tank Removal Summary and Closure Report, National Park Service - Golden Gate National Recreation Area, Marin Headlands, California.

May 2010, ERRG

Results for soil at all sites indicated no analytes were detected at concentrations exceeding screening criteria in samples collected from any of the UST excavations. No analytes were detected at concentrations exceeding screening criteria in groundwater samples collected from the excavations for three UST Sites (572, 659, and 840).

However, concentrations of TPH-d and TPH-mo (Motor Oil) in groundwater samples collected from the excavations for USTs 841, 931, and 1043 exceeded screening criteria.

The San Francisco Bay Regional Water Quality Control Board (RWQCB) reviewed the report. The RWQCB recommendations, based on the findings of the confirmation samples, was that no further action is recommended for soil at the UST sites, and no further action is recommended for groundwater at USTs 572, 659, or 840, 931, and 1043.

However, because TPH-d and TPH-mo concentrations were elevated in groundwater at UST 841, the RWQCB requires the National Park Service (NPS) conduct further action to determine whether elevated concentrations of TPH are present at the site and in down gradient groundwater as a result of leaks from the former UST.

The NPS currently has no additional information regarding this site other than previously provided material and material supplied herein as APPENDIX B. Site information is subject to change based upon discovery of more recent information.

The Contractor shall follow the State of California Leaking Underground Fuel Tank guidance manual, other related state and federal Environmental Protection Agency guidance, IDIQ governing requirements and all other applicable state and federal regulation while developing and implementing investigation design and workplan.

The Contractor shall conduct all necessary reporting via the Ca GEOTRACKER system through Site Closure.

1.3 Compliance

The work described in this Scope of Service has received or will receive all necessary NPS environmental compliance documentation per the National Environmental Policy Act and National Historic Preservation Act. The NPS is responsible for conducting compliance review and implementing mitigation measures per the National Environmental Policy Act and National Historic Preservation Act.

The Contractor will need to ensure project workplan will support NPS compliance determination. To this end, Contractor must prepare a Power Point file that includes a subset of Workplan content which the NPS project manager may use to present to the compliance board(s).

The Contractor is responsible for ensuring its actions required per scope comport with all governing federal, state and local laws, regulations and decision rules. The Contactor shall consider in project design all requirements necessary to conduct work and acquire such permits.

2.0 TASK ITEMS

The Contractor shall provide the CO with a letter workplan which establishes and document that the contractor understands all intent, task elements, and schedule and methodology for completing each task item.

The Contractor shall estimate and include in the letter workplan all costs necessary to complete these items.

A. TASK A: Project Management and Review Existing Documentation and Data

Subtask 1: Review NPS-supplied documents (see Appendix B)

2. Subtask 2: Pre-performance and Staff Meetings

3. Subtask 2: Site Visit (Time and Travel and Logistics

B. TASK B: Develop UST Site Investigation Workplan and Health and Safety Plan

1. Subtask 1: Develop Site Specific Health and Safety Plan for NPS acceptance.

2. Subtask 2: Develop 25% Submittal

3. Subtask 3: Develop 60% and 90% Workplan for NPS Review

4. Subtask 4: Compile letter response to NPS comments at 60% and 90% drafts.

5. Subtask 5: Develop 100% draft final Workplan for NPS Review

6. Subtask 6: Compile letter response to NPS comments at 100% draft.

7. Subtask 7: Submit 100% draft Final Workplan to NPS/RWQCB for comments.

8. Subtask 8: Compile letter response to RWQCB comments on 100% draft Final workplan.

9. Subtask 9: Develop and Submit Final Site Investigation Workplan to NPS and RWQCB

C. TASK C: Conduct Field Work

1. Subtask 1: Complete Field Work at Site 841

D. TASK D: Final Reporting and Submittals

1. Subtask 1: Develop 60% draft Site Investigation Report

2. Subtask 2: Compile letter response to NPS comments at 60% draft.

3. Subtask 3: Develop 100% draft Site Investigation Report

4. Subtask 4: Compile letter response to NPS comments on 100% draft

5. Subtask 5: Develop and Submit 100% draft Final Report to NPS/RWQCB

6. Subtask 6: Compile letter response to RWQCB comments on 100% draft final report

7. Subtask 7: Develop and Submit Final Site Investigation Report to NPS and RWQCB

3.0 SCOPE OF WORK

The Contractor shall include in the Offer Items all estimated costs necessary to complete these items.

Costs that the Contractor may consider in estimating this Offer Item include, but are not limited to:

personnel, labor, testing, transportation, material, packaging, detailed analysis (if required for disposal), equipment, surface clearing prior to excavation, the rental of field screening services, excavation, transportation, and remediation of contaminated soils and reporting costs.

3.1 General Requirements

All trips and any work efforts by the Contractor will be authorized by the NPS Contracting Officer before the Contractor shall proceed. The Contractor is required to conduct other works or tasks not specifically covered herein but considered relevant and essential for completion of the task items. The Contractor shall provide all services to complete tasks according to requirements outlined below.

3.1.1 Work Site: The NPS will not allow the Contractor to establish a service yard. However, the NPS will allow minor equipment staging at the site. On-site staging of equipment will be based upon available space and by approval of the Contracting Officer's Representative (COR).

3.1.2 Facility Closures: The Contractor shall at all times conduct its operations to ensure the least inconvenience to the public and NPS. The NPS will allow temporary road closures and utility interruptions. However, the Contractor must obtain specific approval from the COR before initiating such closures or interruptions. The Contractor shall supply the NPS a minimum of seventy-two hours’ notice prior to any road or utility interruption.

3.1.3 Special Requirements: The Contractor shall comply with all State and Federal regulations and any other stipulations governing the safe handling, transportation, storage, and disposal of hazardous or possibly hazardous materials.

3.1.4 Permits/Manifests: The Contractor is responsible for obtaining the appropriate permits, manifests, or other documents required for completion of the contract. The Contractor shall forward to the NPS copies of all correspondence with any regulatory agency. A copy of all permits must be on-site during all field activities.

3.1.5 Contractor Furnished Items: The Contractor shall furnish all materials and services from sources outside the park, unless specifically mentioned otherwise within these requirements.

3.1.6 Government Equipment: The Government shall not furnish any equipment, except that which is expressly listed in the Scope of Service, or assist the Contractor in performance of the contract. The Contractor understands that any offers by Government Personnel to use Government equipment for handling, processing, and disposal of the property are unauthorized and the Contractor shall not accept such offers.

3.1.7 Government Personnel: The Government shall not furnish personnel to assist the Contractor in performance of the contract. The Contractor understands that any offers of assistance by Government Personnel are unauthorized and the Contractor shall not accept such offers.

3.1.8 Archeological Findings:

A) If the Contractor, or any other party, discovers any features of archaeological significance, the CO shall have the right to stop work until the NPS can determine the significance of the findings. If any findings result in delays or additional work for the Contractor, the Contractor will be compensated by an equitable adjustment under the General Provisions of the contract.

B) All items discovered which, in the opinion of the CO or COR, have historic significance shall be delivered by the Contractor to the CO or stored where directed by him or her.

3.2 Definition of TASK ITEMS

This section describes the work required under section 2.0: Task Items.

TASK A: Project Management and Review Existing Documentation and Data

The work to be completed under this contract is time-sensitive, and requires the Contractor to be responsible and responsive at all times. The following items assist this process.

1. Subtask 1: Review NPS-supplied documents (see Appendix B)

Determine and acquire additional information required to complete other tasks.

2. Subtask 2: Pre-performance and Staff Meetings

A) Pre-performance Meeting

Initially meet with GOGA CO and Project Team to discuss the scope of work and pertinent details of the project and to receive background information.

The meeting agenda will include the following:

Correspondence procedures

Designation of responsible personnel

Payments to Contractor

Subcontractors

National Park Service regulations

Documents required under the contract

Submittal drawings and project data

B) Staff Meetings

Coordinate administrative functions with the GGNRA Contracting Officer and/or Project Team.

Meet with NPS staff at 50/60% and 80% stage to review progress and adequacy. Staff meetings (assume two separate two-hour meetings) typically include the following:

Approval of minutes of previous meetings

Review of work progress

Identification of problems, which impede planned progress

Review of submittals schedule and status of submittals

Maintenance of progress schedule

Corrective measures to regain projected schedules

Planned progress during succeeding work period

Coordination of projected progress

Maintenance of quality and work standards

Effect of proposed changes on progress schedule

Other business relating to work

Submittal: Meeting Notes

3. Subtask 2: Site Visits (Time and Travel and Logistics)

The Contractor shall coordinate with COR to conduct an on-site visit to each site in order to design, estimate, and provide specification for the design of borings and implementation of site investigation.

TASK B: Develop UST Site Investigation Workplan and Health and Safety Plan

Within 15 calendar days of the Contract award date, the Contractor shall submit a Site-Specific Health and Safety Plan for acceptance by the CO.

Submittals: 100% Health and Safety Plan

Within 30 calendar days Contractor shall submit a project outline to ensure NPS and Contractor agree with proposed scope and level of effort. Outline should include a figure showing number and proposed sample locations and a table of proposed analytical suites as attachments.

Submittals: Project Outline, Sample Locations and Analytical Suites

3. Subtask 3: Develop 60% and 90% draft UST Site Investigation Workplan for NPS Review

3.2.1 Workplan: Within 45 days working days of the Contract’s award date, the Contractor shall submit a draft Site Investigation Workplan for a review by the CO. The Plan submitted shall be in both digital (text file format [both Word and Adobe .pdf]) and hard copy format.

Upon receiving the draft plan, CO or COR shall provide the Contractor with written comments within 30 working days. The Contractor shall submit a final Workplan to the Contracting Officer within 15 working days of receiving comments. The final plan shall be in both digital (text and .pdf file format) and hard copy format.

The work plan shall contain the following information:

1) Background, Purpose and Need, Regulatory Issues,

2) Scope of Work including specifics of site assessment and soil and water investigations such as boring number and location and required sampling,

3) Proposed Schedule of Work,

4) Proposed project management,

5) Field Design, Field Sampling Plan, Quality Assurance Plan, Field Schedule and Work Practices, and

6) Other sections common to reports of this nature per regulatory requirements and industry practice

Submittals: 60% and 90% Workplan

Submittals: Response to Comments Form; Revised Workplan

Submittals: 100% draft final Workplan

6. Subtask 6: Compile letter response to NPS comments at 100% draft.

Submittals: Response to Comment Form, Revised 100% draft final Workplan

7. Subtask 7: Submit 100% draft Final Workplan to NPS/RWQCB for comments.

Submittals: 100% draft final Workplan, revised per NPS comments

Submittals: Response to Comment Form

Submittals: Final Workplan

TASK C: Conduct Field Work

3.2.2 Site Work: The Contractor shall design and conduct all fieldwork to occur on lands administered by the National Park Service as listed in the offer schedule and in accordance with all terms and conditions of this request, the terms and specifications of the IDIQ and as specified by Federal, State, and local regulations.

A) For purposes of bidding Offer Item assume each site will require a minimum of six and maximum of eight Geoprobe or equivalent borings (one day boring equipment rental) with collection of soil and groundwater at each boring location.

3.2.3 Soils Collection:

A) The Contractor shall ensure that soil samples are collected according to recommendations and provisions specified in Appendix A - Reports, of the document Tri- Regional Recommendations for Preliminary Investigation and Evaluation of Underground Tank sites, 30 August 1991 and as updated in the 2012 LUFT Manual and per any more recent RWQCB promulgation and requirements and workplan comments.

B) The Contractor shall ensure that all soils collection, including location depth, and number, are conducted as specified by State of California UST Regulations and as directed by Local Implementing Agency requirements. The Contractor shall ensure that all samples are collected according to standard industry protocol and meet all standard industry quality assurance and quality control.

3.2.4 Sample Analyses

A) The Contractor shall ensure that analyses performed on the soil samples include EPA method 8015 modified for Diesel (Total Petrohydrocarbons as diesel [TPH-D]); EPA method 8020, Total Petroyhydrocarbons as gasoline (TPH-G); Benzene, Toluene, Ethylbenzene, and Xylenes (BTEXM); and, if oxygenates are detected via EPA 8020, then EPA 8260 for detection of Methyl Tert Butyl Ether (MTBE) and other oxygenates.

B) The Contractor shall ensure that all analytical results are conducted as specified by State of California UST Regulations and as directed by Local Implementing Agency requirements. The Contractor shall ensure that analyses are performed by an analytical laboratory approved and certified by the State of California, and according to US EPA and State of California approved methods and according to RWQCB requirements. The NPS may require additional sample collection and analyses, if necessary, at the discretion of the CO.

3.2.5 Determination of Soil Contamination:

A) During boring development Contractor shall field screen the soils underneath the former UST for contaminants using portable hand-held photo ionization detectors, flame ionization detectors, organic vapor detectors, or other industry standard and CO approved methods to help define existence and limits of contamination. To complete this element the contractor shall examine soils using analytical field equipment on soils collected by the Geoprobe or equivalent, removed from the probe but still in sampling sleeves. The Contractor shall log field analytical results in boring logs.

B) Following collection of soil samples from beneath the former UST and associated piping, the Contractor shall, under the direction of the NPS and the Marin County Health Department or Regional Water Quality Control Board, analyze the excavation perimeter and bottom for detection of hydrocarbon contamination using a field monitoring device such as a photoionization detector (PID), organic vapor monitor (OVA), flame ionization detector (FID), or comparable equipment.

3.2.6 Soil Disposal:

A) The Contractor shall consider governing regulations and requirements when developing workplan methodology regarding treatment of investigation derived wastes (IDW), specifically Geoprobe or equivalent spoils/soils.

B) The Contractor shall accomplish recovery of material for site re-use per governing requirements and workplan at the Contractor's expense within all reporting and legal requirements and with NPS input. The Contractor shall provide documentation certifying that all soils are disposed properly and legally.

C) The Contractor shall dispose of all investigation derived as waste, with NPS input and concurrence regarding profiling and disposal.

D) The Contractor shall dispose of wastes in a way that meets all state and federal standards. The Contractor shall consider all excavated soils derived from the project as potentially hazardous and shall handle such materials in accordance with governing requirements.

3.2.7 Site Restoration: The Contractor shall provide all services necessary to restore the investigation areas to original conditions, including back-filling the borings and contouring of surface soils to the original conditions; and replacement of any impacted pavement or concrete materials and replacement or repair of any impacted fencing, facilities or utilities, (water, sewer, electric etc). The Contractor shall not use removed pavement as back-fill. Note: The restore services are not to exceed, or go above and beyond, restoration of in- kind replacement requirements; this is not a construction contract.

1. Subtask 1: Complete Field Work at Site 841

TASK D: Final Reporting and Submittals

1. Subtask 1 and 3: Develop 60% and 100% draft Site Investigation Reports, comment response documents, and revised Reports.

Upon completion of all work, a summary of work performed shall be submitted to CO. A summary shall contain the following information: 1) A summary of work performed, 2) Description of the data and information collected for each site, 3) Copies of all Bills of Lading, Permits, Waste Manifests and similar documents generated during the project as the part of the summary document.

3.2.9 Site Assessment/Site Investigation/Closure Report.

The Contractor shall provide a Site Assessment/Site Investigation Report (Report) for the three former UST sites. The Contractor shall ensure that this Report is completed in accordance with all applicable technical reporting regulations and recommendations of the State of California, Regional Water Quality Control Board (RWQCB). The Contractor shall submit four separately bound copies of the Site Assessment /Closure Report and all other associated reports, plans, blueprints, specifications and other submittal.

The Contractor shall provide, at a minimum, in the report:

A) A Site Background and Brief History of Events to Date.

B) A Description of Activities Section Including but Not Limited to:

Site Development;

Copies of pictures taken of field activities, including mobilization, demobilization, emplaced equipment, and equipment operations.

A written log of site activities.

3.2.10 Soils Disposal;

The Contractor shall provide in the report a Certificate of Disposal for contaminated soils which shall include:

1) the date of soils disposal,

2) the location where soils are disposed,

3) land ban, if necessary

4) any additional relevant comments that may affect soils disposal.

3.2.11 Definition of Soils Disposal:

A) For the purposes of this contract, disposal shall mean: First, the processing of waste soils, at a facility approved for such by the appropriate State or Federal agency, in a manner that renders it no longer hazardous waste as defined by 40 CFR 260 et seq. These processes would include but are not limited to: biological treatment or remediation, chemical treatment such as neutralization and detoxification, thermal treatment such as incineration or pyrolysis, and recycling, reprocessing or recovery. Second, the long-term internment (burial) in a facility approved for such materials by the appropriate State or Federal agency.

B) The mere acceptance of the hazardous waste at a properly permitted treatment, storage or disposal facility does not meet the definition of disposal under the contract. Furthermore, it is the prime Contractor's responsibility to obtain all necessary documentation to prove that the appropriate disposal of all soils has been accomplished. The Contractor shall attach this documentation to the certificate of disposal and submit with, or prior to, the invoice.

C) The Contractor shall select a disposal site in advance of field activities. The Contractor shall provide to the Contracting Officer, for approval, the credentials from the disposal facility prior to initiation of site activities. Credentials include: documentation that the facilities are currently permitted by the appropriate state and Federal agencies to accept the type of wastes generated from the site activities, proof that there are no outstanding relevant violations against the facility, and a copy of the most recent state and/or Federal inspection agency inspection report.

3.2.12 Unauthorized Releases Reports.

For those sites, where the Site Assessment identifies that a release of hydrocarbons from the former fuel tank into the environmental occurred, the Contractor shall prepare an Unauthorized Releases Report for the site via GEOTRACKER.

3.2.13 Spills

A) Spill Reporting Requirements: The detection by any entity of any unauthorized hydrocarbon release or leak caused by Contractor activity shall require compliance with the reporting requirements of all state and federal regulations. The Contractor shall provide evidence of releases (leaks) and subsequent clean up measures to the CO.

B) The Contractor is responsible for reporting to the Contracting Officer all spills regardless of quantity and all personnel exposures. The Contractor shall follow up verbal reports in writing no later than seven days after the initial verbal report.

C) When reporting a spill, the Contractor shall furnish the following information:

1. Item spilled (Identification, Quantity and Manifest Numbers).

2. Whether the amount spilled is EPA reportable and, if reported, a copy of the report.

3. Exact location of the spill.

4. Containment procedures initiated and/or completed.

5. Anticipated cleanup and disposal procedures.

6. Disposal location of spill residue.

3.2.14 Analytical Reports: Upon completion of soil sample analyses, the Contractor shall provide final typed reports of the analytical results describing the date, time, location, depth, and any other conditions that existed at the time the sample was taken that might have bearing on sample results.

The Contractor shall include a discussion of any perceived procedural or protocol laboratory errors that may affect reported results. The contractor is responsible for Chain of Custody and quality control/quality assurance documents and shall submit these with the final analytical reports.

3.2.15 A Discussion of Results on:

A) Results and a discussion of soil and groundwater analytical results, including any exceedances of screening levels;

B) Health and safety risk analysis.

3.2.16 Conclusions

All information must be submitted in hard copy and electronically. The Contractor must generate electronic information, including all laboratory results, in a manner suitable for entry into the State GEOTRACKER system.

3.2.17 Site Closure Letter

If no significant soil or water contamination is confirmed following the initial site investigation UST removal, the Contractor shall prepare a Site Closure Letter that NPS may submit to the regulatory agency.

3.2.18 Cost Estimate for Next Phase of Work

The Contractor shall provide all design, plans, specifications, cost estimate for the required services, including labor, equipment, machinery, materials, recommendations, and testing necessary for the NPS necessary to completely implement recommendations developed in the report.

2. Subtask 2 and 4: Compile letter response to NPS comments at 60% and 90 draft.

4.0. APPLICABLE REQUIREMENTS

Confidentiality The information developed under this task order is the property of the U. S. government and shall be kept in strict confidence.

Performance Period The work of this task order shall be provided from approximately March 2015 through the completion of the contract documents in August 2015.

Stamping This report must be stamped by a registered Geologist and/or Engineer in accordance with California Professional Code

4.1 Schedule Review

Contractor shall identify resource constraints, scheduling conflicts, material and equipment deliveries and coordination needs. Contractor shall provide document schedule utilizing MS Project (or other approved software).

Quality Assurance The construction documents produced shall have a thorough internal review by the Contractor prior to submission to the National Park Service for review by park and GGNRA staff. The Contractor shall review plans, specifications and schedules for adherence to good environmental service and construction practices.

4.2 Products

4.2.1 General Support Documentation

Provide all general support information which documents the products being recommended, operating parameters, and any other information which may be necessary for the review team to conceptualize all proposals.

5.0 STANDARD SERVICES

5.1 Supporting Documentation Provided by the Government

The NPS provides the following material expressly to assist Contractor development of task items. These supplied documents and materials shall be returned to the NPS upon project closeout. The Contractor is responsible for verifying all information within subject documents as the NPS does not warranty or guarantee accuracy, precision or completeness of said documents and material.

The NPS shall provide the following:

Attached APPENDICES

NPS requirements and specifications for generators

Completion of NEPA and NHPA compliance review and authorization

The NPS shall provide the following services:

Review and comment on draft products.

Supply any necessary Right of Way required.

The Contractor is required to perform all other considerations within this SOW.

5.2 NPS Documents Deliverable with SOW

The NPS provides attached APPENDICES.

5.3 Other Documents available for Review at GOGA

The Contractor will need to query the NPS for any additional information necessary to complete elements of this SOW.

6.0. SUBMITTALS

6.1 The following submittal packages are required per TASK ITEMS:

Task A Submittal: Meeting Notes

Task B

The Contractor will submit one document and all attachments as an electronic product and hard copy for National Park Service Acceptance. The NPS accepts, but does not review or approve Health and Safety Plans. The NPS may reject plan if materially insufficient.

Submittal: Site Specific Health and Safety Plan

Contractor shall submit a project outline to ensure NPS and Contractor agree with proposed scope and level of effort. Outline should include a figure showing number and proposed sample locations and a table of proposed analytical suites as attachments. The Contractor will submit document and all figures, diagrams, plates, sheets, models, and topographic presentations as electronic products and hard copies.

Submittal: 25% Package (Outline, Sample Location, Analytical Suites)

3. Subtasks 3 and 5: Develop 60% and 90% draft Workplan

The Contractor will submit document and all figures, diagrams, plates, sheets, models, and topographic presentations as electronic products and hard copies. Product expected includes such work effort with sufficient detail that affords full understanding of project to allow detailed review by NPS staff, stakeholders, and regulatory agency, if required. The Contractor will conduct comment response and make according changes reflected in Subtask 2 Submittal.

Provide three (3) hard copies and one electronic copy of submittal including drawings, figures, plates and schematics.

Submittals: 60% and 90% draft Workplans

The Contractor will supply comments and Contractor response to 60% and 90% document as separate Subtask Four. The 90% document shall have incorporated comments made at the 60% level effort. The final document shall include a product updated to reflect those comments on the 90% document that met concurrence by the Contractor. Comments considered otherwise shall also be provided in comment response. Provide one electronic copy.

Submittal: 60% and 90% Letter Comment Response Documents

The Contractor will submit document and all figures, diagrams, plates, sheets, models, and topographic presentations as electronic products and hard copies. The 100%draft document shall include a product updated to reflect those comments on the 90% document that met concurrence by the Contractor. Comments considered otherwise shall also be provided along with Contractor comment response. The Contractor will conduct comment response and make according changes reflected in Subtask 4 Submittal.

Submittal: 100% draft final Workplan

6. Subtask 6: Compile letter response to NPS comments at 100% draft

The Contractor shall submit specified number of final product along with predecessor documentation, comments, and response. The 100% final document shall include a product updated to reflect those comments on the 90% document

Submittal: 100% Letter NPS Comment Response Document

7. Subtask 7: Submit 100% draft Final Workplan to NPS/RWQCB for comment.

The draft final document shall include a product updated to reflect those NPS comments on the 100% document that met concurrence by the Contractor. Comments considered otherwise shall also be provided in comment response. The NPS will forward the 100% draft Final Workplan to the RWQCB for comment.

Submittal: 100% draft Final Workplan. After incorporating all NPS review comments, provide three (3) hard sets and one electronic of final product

Submittal: 100% Letter RWQCB Comment Response Document

Final Submittal: After incorporating all RWQCB and NPS review comments, provide four (4) hard sets and one electronic copy of final product.

Task C Field Work Submittal: None

Task D Submittals:

All Contractor-developed submittals per Task D shall meet substantive provisions and requirements of Task B regarding Report and Letter content, provisions and standards.

1. Subtask 1: Develop 60% draft Site Investigation Report

Submittals: 60% draft Report

2. Subtask 2: Compile letter response to NPS comments at 60% draft.

Submittal: 60% Letter NPS Comment Response Document

3. Subtask 3: Develop 100% draft Site Investigation Report

Submittal: 100% draft Report

4. Subtask 4: Compile letter response to NPS comments on 100% draft

Submittal: 100% Letter NPS Comment Response Document

Submittal: 100% draft Final Report

Submittal: 100% draft Final Letter RWQCB Comment Response Document

Final Submittal: After incorporating all RWQCB and NPS review comments, provide four (4) hard sets and one electronic copy of final product.

Quality Control. Contractor shall review all submittals to eliminate typographical or arithmetic errors, conflicts between sheets or plans and document, technical errors and the like. Inordinate amount of submittal errors are grounds for non-acceptance.

For schematics: provide four (4) sets photocopy or blue-line prints, and one set of half-size drawings. Provide electronic files for all submittals using software formats compatible with NPS standards (AutoCAD 14, MS Word, MS Excel, Adobe .pdfs) and submitted on CD-ROM disks with label noting the files included.

6.2 Incorporation of Review Comments

The Contractor shall make all additions, alterations or deletions to the submitted materials indicated by the Contracting Officer at the close of each Government review period at no additional expense to the Government before resuming work on further contract requirements.

Submittal Review Meetings The Contractor shall attend a submittal review as part of the regular task meetings to discuss NPS and stakeholder review comments following both the 60% and 90% draft submittals.

Documentation of Project Discussions and Meetings The Contractor shall maintain project file to include a written record of project discussions, work sessions, and salient phone conversations or interviews. The Contractor shall supply a copy of these notes upon request of the CO and upon project closeout.

7.0 SUBMITTAL SCHEDULE

As soon as possible after Notice of Award and before beginning any work, the Contractor shall submit Progress Schedule and as a package. Contracting Officer will review the Progress Schedule for format and content.

Progress Schedule: The Contractor shall submit four copies of Progress Schedule showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted.

The Contractor will ensure that sufficient technical, supervisory, and administrative personnel are assigned to this task, consistent with the level of effort to completion this task. The Contractor will advise the CO of any delays or difficulties that may impact completion and delivery of the products specified in this SOW.

The schedule listed below governs all submittal work products. All other work product and task schedules shall be created and approved by NPS such that they coincide with the sequencing necessary to meet the schedule of submittal schedule. The schedule is based upon CO Notice to Proceed (NTP) and presented in calendar days.

Health and Safety Plan NTP + 15 days 25% Submittal NTP + 30 days 60% Draft Submittals NTP + 45 days 60% NPS Review NTP + 75 days 60% Response to Comments NTP + 90 days

90% Draft Submittals NTP + 105 days 90% NPS Review NTP + 135 days 90% Response to Comments NTP + 150 days

100% Draft Submittals NTP + 165 days 100% NPS Review NTP + 195 days 100% Response to Comments NTP + 210 days

100% Final Submittals NTP + 225 days

100% Response to Comments NTP + 225 days

8.0 PROJECT CLOSEOUT

Receipt of Submittals The Contractor is responsible for, and shall verify, that the NPS has received all submittals. The CO will not provide written receipt of submittals.

Return of Government-Furnished Material The Contractor is responsible for, and shall verify, that the NPS has received all materials furnished by the Government to the Contractor. The CO will not provide Letter of Acceptance until the Contractor returns such items.

Letter of Acceptance The Contracting Officer will provide the Contractor with a Letter of Acceptance upon final receipt of acceptable work products defined under TASK ITEMS and SUBMITTALS.

9.0 PAYMENT

9.1. The cost of all Contractor travel relating to the performance of services under this task order shall be included in the Contractor’s fee proposal without additional reimbursement beyond this task order.

Progress payments to the Contractor shall be made on the basis of proper and acceptable invoices submitted quarterly, each payment for one quarter of total Offer.

The Government reserves the right to withhold the final payment until work has been completed and accepted by the Government.

The Government shall pay the Contractor upon submission of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract. Payment shall be made as indicated in the contract's Payment Schedule, not on percentage of completion. Deliverables as defined in the Payment Schedule of the contract must be accepted by the Government before payment will be made.

After completion of the work and as a prerequisite to the final payment, the Contractor shall furnish to the Contracting Officer a Release of Claims. Such claims as are asserted by the Contractor. Those items excepted from operation of the Release shall be provided by the Contractor in writing denoted by the word "except" and shall be referenced to correspondence or other identifying data, together with monetary amount for each major claim item.

9.2. Electronic Invoicing and Payment Requirements-Internet Payment Platform (IPP) (SEP

2011) APR 2012

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP). "Payment Request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause 52.232-27 Prompt Payment for Construction contracts included in the contract; or the clause 52.212-4 Contract Terms and Condition - Commercial Items including in commercial item contracts; or 52.232-1 Payments for a fixed price service contract. The IPP website address is: https://www.ipp.gov. Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Document required per contract clause: FAR Subpart 52.232-1 Payments (APR 1984)

The Contractor must use the IPP website to register, access, and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Clause)

9.3. Contracting Office. The Contracting Office responsible for receipt of the Contractor’s proposals for each task order unless otherwise specified in the task order Request for Proposal is:

National Park Service Golden Gate National Recreation Area (GOGA) Attn: Contracting & Procurement Building 201, Fort Mason San Francisco, CA 94123-1301

9.4. 1489.242.100 Contract Administration (APR 1984)

Contracting Officer's Representative(s) (COR) for this contract will be established for each Task Order.

Contract Specialist responsible for administering this contract:

Nathanial Wills, National Park Service, Golden Gate National Recreation Area, Fort Mason, Bldg 201 San

Francisco, CA 94123 Phone: (415) 561-4707 Email: Nathanial_Wills@nps.gov

9.5. Contracting Officer Authority. The Contracting Officer for the basic contract shall be the only individual authorized to direct/redirect the efforts under the basic contract and task orders issued or in any way modify the items or terms of this contract. This contract is to be shared among the NPS San Francisco Bay Network of Parks within the state of California. Distribution of contract capacity to the San Francisco Bay Network of Parks, and Contracting Officer authority, will be provided to the awardee at time of contract award.

9.6. Designation of Responsible Individual/Agency. Individual task orders issued will designate the agency responsible for acceptance of services performed. This designation is for the purpose of technical surveillance of the work performed including details of performance and quality of work under this contract. This clause in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract.

(END)