VANDERBILT MANSION NATIONAL
HISTORIC SITE
HYDE PARK, NEW YORK
COMPLETE THE EXTERIOR RENOVATION OF THE
VANDERBILT MANSION NATIONAL HISTORIC SITE
VAMA
PMIS NO. 152373
APPENDIX
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
JULY 18, 2014
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
VAMA - 152373 TOC-1
TABLE OF CONTENTS
APPENDIX
Statement of Structural Tests and Special Inspections ................................................................................... A.
Contract Price Schedule- Blank ...................................................................................................................... B.
Contract Price Schedule- Complete ................................................................................................................ C.
Final Submittal List ........................................................................................................................................ D.
Closeout and Operation and Maintenance Requirements .............................................................................. E.
NPS Project Sustainability Checklist .............................................................................................................. F.
Updated Class A Construction Cost Estimate ................................................................................................ G.
Design Calculations ....................................................................................................................................... H.
Mortar Analysis Report .................................................................................................................................... I.
Exterior Cleaning Test Report ......................................................................................................................... J.
Asbestos Test Report. ...................................................................................................................................... K.
Radon Test Results Report .............................................................................................................................. L.
Petrographic Analysis Report ........................................................................................................................ M.
Responses to 100% Draft CD Comments ....................................................................................................... N.
PARK/PMIS Statement of Structural Tests and Special Inspections Page 1 of 11
Statement of Structural Tests and Special Inspections Denver Service Center
National Park Service
Park: Vanderbilt Mansion National Historic Park
PMIS: 152373
Project Name: Rehabilitate the Exterior of Historic Vanderbilt Mansion
Structural Engineering Firm: Robert Silman Associates
This Statement of Structural Tests and Special Inspections (STSI) is being submitted as required by Chapter 17 of the 2012 International Building Code (IBC-12). It includes the following:
1. Seismic requirements
2. Wind requirements
3. Qualification requirements for Inspectors and Testing Technicians
4. Listing of Required Structural Tests and Special Inspections
The Construction Contractor’s Quality Control Supervisor will provide copies of all special inspection reports and associated documentation to the Contracting Officer. The Construction
Contractor will be required to correct all deficiencies discovered in the Special Inspection and
Structural Testing program.
Prepared by:
Edmund Meade
(Type or print name)
6/5/2014
Signature Date PE or SE Stamp
PARK/PMIS Statement of Structural Tests and Special Inspections Page 2 of 11
Seismic and Wind Requirements
Seismic Requirements, IBC-09 Section 1704.3
Description of seismic-force-resisting system and designated seismic systems subject to special inspections:
Vanderbilt Mansion is an existing unreinforced masonry building, with a lateral system classified as an ordinary plain masonry shear wall per ASCE 7. Per the 2012 International
Building Code, the scope of work is classified as repairs. Seismic evaluation or retrofit is not required. No seismic special inspections are required by code.
Wind Requirements, IBC-09 Section 1704.3
Description of wind-force-resisting system and designated wind systems subject to special inspections:
Vanderbilt Mansion is an existing unreinforced masonry building. Per the 2012 International
Building Code, the scope of work is classified as repairs. No new wind-force resisting system is being added. No wind special inspections are required by code.
PARK/PMIS Statement of Structural Tests and Special Inspections Page 3 of 11
Instructions:
1. Place an “X” in the column titled “Required?” for all Special Inspections and Tests required for this project.
2. In the column marked “Required Qualifications” provide the qualifications for the special inspector, using the list beginning on page 4, for all required Structural Tests and Special
Inspections.
3. For those items listed as “Continuous,” continuous special inspection shall be as defined in Section 1702, IBC-12.
4. For those items listed as “Periodic” provide the minimum number of tests, i.e. 20% of all field welds, or the amount of work to be inspected (e.g. 10% of all wall surfaces).
5. Attach completed STSI to the end of the Specification Section 01 40 00, Quality
Requirements.
PARK/PMIS Statement of Structural Tests and Special Inspections Page 4 of 11
Qualification Requirements for Inspectors and Testing Technicians
PE/SE Structural Engineer – licensed PE or SE specializing in the design of buildings and structures
PE/GE Geotechnical Engineer – licensed PE specializing in soil mechanics and foundations
EIT Engineer-In-Training – graduate engineer who has passed the Fundamentals of engineering examination
American Concrete Institute (ACI) Certification
ACI-CCSI Concrete Construction Special Inspector
ACI-LTT Concrete Laboratory Testing Technician Level 1 or 2
ACI-STT Concrete Strength Testing Technician
ACI-FTT Concrete Field Testing Technician – Grade I
American Society of Non-Destructive Testing (ASNT) Certification
Non-Destructive Testing Technician – Level II or III
American Welding Society (AWS) Certification
AWS-CWI Certified Welding Inspector
Exterior Design Institute (EDI) Certification
EDI-EIFS Certified EIFS inspector
International Code Council (ICC) Certification
ICC-PCSI Prestressed Concrete Special Inspector
ICC-RCSI Reinforced Concrete Special Inspector
ICC-SSI Soils Special Inspector
ICC-SFSI Spray-applied Fireproofing Special Inspector
ICC-SMSI Structural Masonry Special Inspector
ICC-SSBSI Structural Steel and Bolting Special Inspector
ICC-SWSI Structural Welding Special Inspector
National Institute for Certification in Engineering Technologies (NICET) Certification
NICET-CT Concrete Technician – Levels I, II, III and IV
NICET-GET Geotechnical Engineering Technician - Levels I, II, III and IV
NICET-ST Soils Technician - Levels I, II, III and IV
PARK/PMIS Statement of Structural Tests and Special Inspections Page 5 of 11
Other
PARK/PMIS Statement of Structural Tests and Special Inspections Page 6 of 11
Listing of Required Structural Tests and Special Inspections
R eq u ir ed
Structural Test or Special Inspection Required
Qualifications
C o n ti n u o u s
P er io d ic
F re q u en cy o f
P er io
T es t o r
In sp ec ti n
Steel Construction (ref: IBC-12 Section 1705.2, AISC 360-10 Chapter N, AISC 341-
10 Chapter J)
Prior to Welding (AISC 360-10 Table N5.4-1)
X 1. Welding procedure specifications (WPSs) available PE/SE X
X 2. Manufacturer certifications for welding consumables available
PE/SE X
X 3. Material identification (type/grade) PE/SE X
X 4. Welder identification system AWS-CWI X
5. Fit-up of groove welds (including joint geometry)
a. Joint preparation X
b. Dimensions (alignment, root opening, root face, bevel) X
c. Cleanliness (condition of steel surfaces) X
d. Tacking (tack weld quality and location) X
e. Backing type and fit (if applicable) X
6. Configuration and finish of access holes X
X 7. Fit-up of fillet welds AWS-CWI ALL WELDS
a. Dimensions (alignment, gaps at root) X
b. Cleanliness (condition of steel surfaces) X
c. Tacking (tack weld quality and location) X
X 8. Check welding equipment AWS-CWI X
During Welding (AISC 360-10 Table N5.4-2)
X 1. Use of qualified welders AWS-CWI X
X 2. Control and handling of welding consumables AWS-CWI
a. Packaging X
b. Exposure control X
X 3. No welding over cracked tack welds AWS-CWI X
X 4. Environmental conditions AWS-CWI
a. Wind speed within limits X
b. Precipitation and temperature X
X 5. WPS followed AWS-CWI
a. Settings on welding equipment X
b. Travel speed X
c. Selected welding materials X
d. Shielding gas type/flow rate X
PARK/PMIS Statement of Structural Tests and Special Inspections Page 7 of 11 u ir
Qualifications
C o n ti n u o u s
P er io q u
P er io t o r
In sp ec ti
e. Preheat applied X
f. Interpass temperature maintained (min. /max.) X
g. Proper position (F, V, H, OH) X
h. Intermix of filler metals avoided unless approved (ref:
AISC 341-10)
X
X 6. Welding techniques AWS-CWI ALL WELDS
a. Interpass and final cleaning X
b. Each pass within profile limitations X
c. Each pass meets quality requirements X
After Welding (AISC 360-10 Table N5.4-3)
X 1. Welds cleaned AWS-CWI X ALL WELDS
X 2. Size, length and location of welds AWS-CWI X ALL WELDS
X 3. Welds meet visual acceptance criteria AWS-CWI ALL WELDS
a. Crack prohibition X
b. Weld/base-metal fusion X
c. Crater cross section X
d. Weld profiles X
e. Weld size X
f. Undercut X
g. Porosity X
4. Arc strikes X
5. k-area X
6. Backing removed and weld tabs removed (if required) X
7. Repair activities X
8. Document acceptance or rejection of welded joint or member
X
9. Placement of reinforcing or contouring fillet welds (if required) (ref: AISC 341-10)
X
10. Backing removed, weld tabs removed and finished, and fillet welds added (if required) (ref: AISC 341-10)
X
Nondestructive Testing (AISC 360-10 Section N5.5)
1. Risk Category II Structures - Perform Ultrasonic Testing on 10% of CJP groove welds in butt, T- and corner joints subject to transversely applied tension loading, in materials 5/16 in. thick or greater.
X
2. Risk Category III or IV Structures - Perform Ultrasonic
Testing on all CJP groove welds subject to transversely applied tension loading in butt, T- and corner joints, in materials 5/16 in. thick or greater.
X
3. Access Holes – Perform Magnetic Particle Testing or
Liquid Penetrant Testing when the flange thickness exceeds 2 in. for rolled shapes, or when the web thickness
PARK/PMIS Statement of Structural Tests and Special Inspections Page 8 of 11 u ir
Qualifications
C o n ti n u o u s
P er io q u
P er io t o r
In sp ec ti exceeds 2 in. for built-up shapes.
4. Welded Joints Subject to Fatigue X
Nondestructive Testing (AISC 341-10 Section J6.2)
1. k-area X
2. CJP Groove weld X
3. Lamellar tearing X
4. Beam cope and access hole X
5. Reduced beam section repair X
6. Weld tab removal X
Prior to Bolting (AISC 360-10 Table N5.6-1)
These inspections are not required for snug-tight joints
1. Manufacturer’s certifications available for fastener materials
X
2. Fasteners marked in accordance with ASTM requirements X
3. Proper fasteners selected for the joint detail (grade, type, bolt length if threads are to be excluded from shear plane)
X
4. Proper fasteners selected for the joint detail (grade, type, bolt length if threads are to be excluded from shear plane)
X
5. Connecting elements, including the appropriate faying surface condition and hole preparation, if specified, meet applicable requirements
X
6. Pre-installation verification testing by installation personnel observed and documented for fastener assemblies and methods used
X
7. Proper storage provided for bolts, nuts, washers and other fastener components
During Bolting (AISC 360-10 Table N5.6-2)
These inspections are not required for snug-tight joints.
These inspections are not required for pretensioned joints and slip-critical joints, when the installer is using the turn-of-nut method with matchmarking techniques, the direct-tension-indicator method, or the twist-off-type tension control bolt method.
1. Fastener assemblies, of suitable condition, placed in all holes and washers (if required) are positioned as required
X
2. Joint brought to the snug-tight condition prior to the pretensioning operation
X
3. Fastener component not turned by the wrench prevented from rotating
X
4. Fasteners are pretensioned in accordance with the RCSC
Specification, progressing systematically from the most
PARK/PMIS Statement of Structural Tests and Special Inspections Page 9 of 11 u ir
Qualifications
C o n ti n u o u s
P er io q u
P er io t o r
In sp ec ti rigid point toward the free edges
After Bolting (AISC 360-10 Table N5.6-3)
X Document acceptance or rejection of bolted connections PE/SE X ALL BOLTS
Other Inspection Tasks (AISC 360-10 Section N5.7)
1. Verify compliance of fabricated steel with the details shown on the approved shop drawings.
X
2. Verify compliance of the erected steel frame with the details shown on the approved erection drawings, including braces, stiffeners, member locations and joint details.
X
3. Anchor rods and other embedments support structural steel
a. Verify the diameter, grade, type and length of the anchor rod or embedded item.
X
b. Verify the extent or depth of embedment into the concrete.
X
4. RBS requirements, if applicable (ref: AISC 341-10)
a. Contour and finish X
b. Dimensional tolerances X
5. Protected zone—no holes and unapproved attachments made by fabricator or erector, as applicable (ref: AISC
341-10)
X
6. H-piles - Protected zone—no holes and unapproved attachments made by the responsible contractor, as applicable (ref: AISC 341-10)
Steel Construction Other Than Structural Steel (IBC-12 Table 1705.2)
1. Material verification and cold-formed steel deck:
a. Identification markings to conform to ASTM standards specified in the approved construction documents
X
b. Manufacturer’s certified test reports. X
2. Inspection of welding:
a. Cold-formed steel deck:
1) Floor and roof deck welds. X
b. Reinforcing steel:
1) Verification of weldability of reinforcing steel other than ASTM A706.
X
2) Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames, and boundary elements of special structural walls of concrete and shear
PARK/PMIS Statement of Structural Tests and Special Inspections Page 10 of 11 u ir
Qualifications
C o n ti n u o u s
P er io q u
P er io t o r
In sp ec ti reinforcement.
3) Shear reinforcement. X
4) Other reinforcing steel. X
Inspection of Composite Structures Prior to Concrete Placement (AISC 341-10 Table J9-1)
1. Material identification of reinforcing steel (Type/Grade) X
2. Determination of carbon equivalent for reinforcing steel other than ASTM A706
X
3. Proper reinforcing steel size, spacing and orientation X
4. Reinforcing steel has not been rebent in the field X
5. Reinforcing steel has been tied and supported as required X
6. Required reinforcing steel clearances have been provided X
7. Composite member has required size X
Inspection of Composite Structures During Concrete Placement (AISC 341-10 Table J9-2)
1. Concrete: Material identification (mix design, compressive strength, maximum large aggregate size, maximum slump)
X
2. Limits on water added at the truck or pump X
3. Proper placement techniques to limit segregation X
Inspection of Composite Structures After Concrete Placement (AISC 341-10 Table J9-3)
1. Achievement of minimum specified concrete compressive strength at specified age
Cold-formed Steel Trusses Spanning 60-feet or Greater (ref: IBC-12 Section 1705.2.2.2)
1. Verify temporary installation restraint/bracing installed in accordance with the approved shop drawings.
2. Verify permanent individual truss member restraint/bracing installed in accordance with the approved shop drawings.
Concrete Construction (ref: IBC-12 Table 1705.3) X 1. Inspection of reinforcing steel, including prestressing tendons, and placement.
ACI-CCSI
ICC-RCSI
X
EACH POUR
2. Inspection of reinforcing steel welding in accordance with
Steel Construction section above.
3. Inspection of anchors cast in concrete where allowable loads have been increased or where strength design is used.
4. Inspection of anchors post-installed in hardened concrete members.
X 5. Verify use of approved design mix. ACI-CCSI X EACH POUR
X 6. At the time fresh concrete is sampled to fabricate ACI-CCSI X
PARK/PMIS Statement of Structural Tests and Special Inspections Page 11 of 11 u ir
Qualifications
C o n ti n u o u s
P er io q u
P er io t o r
In sp ec ti specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete.
X 7. Inspection of concrete and shotcrete placement for proper application techniques.
ACI-CCSI
ICC-RCSI
X 8. Inspection for maintenance of specified curing temperature and techniques.
ACI-CCSI
ICC-RCSI
X
EACH POUR
9. Inspection of prestressed concrete:
a. Application of prestressing forces X
b. Grouting of bonded prestressing tendons in the seismic-force-resisting system.
10. Erection of precast structural members X
11. Verification of in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs.
X 12. Inspection formwork for shape, location and dimensions of the concrete member being formed.
ACI-CCSI X
EACH POUR
CONTRACT LINE
ITEM NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI) TITLE QUANTITY
UNIT OF
MEASURE
UNIT PRICE
1 Exterior Rehabilitation 1 Lump Sum $0.00
2 OPTION A- Not Used - - -
OPTION B- Provide Complete Perimeter Drain.
1 Lump Sum $0.00
OPTION C- Restore Existing Window Frames and Storm Window Restoration.
1 Lump Sum $0.00
OPTION D- Provide New Wheelchair Lift, Stone Steps, and Ornamental Railings.
1 Lump Sum $0.00
OPTION E- Provide Complete Portico Stone Paving Replacement
1 Lump Sum $0.00
7 Stone Repointing 1 Linear Foot - 8 Brick Repointing 1 Square Foot - 9 Brick Masonry Replacement 1 Brick -
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 2 through 6) ------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 6) -----------
All measurement and payment information is included in the project specifications, Section 012700.
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimu conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation o the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended pri dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Gover for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated b determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed the Contracting Officer to offer the best value to the Government.
TOTAL BASE PRICE (Contract Line Item Number 1) ------------------------------------
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advant Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instruc Submission of Offers and Other Information) in Section L of the Solicitation.
PROJECT TITLE: Complete the Exterior Rehabilitation of the Vanderbilt Mansion National Historic Site
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER:
PARK - PMIS: VAMA- 152373
DEVELOPED AREA: Mansion Exterior
PARK - PMIS
CPS - 1
TOTAL PRICE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 um, an offer that e proposal extended total f extended prices, ices to whole rnment, the period based on what is in the judgment of t will result in cost ageous to the ctions for
CPS - 2
CONTRACT LINE
ITEM NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI) TITLE QUANTITY
UNIT OF
MEASURE
UNIT PRICE
1 Exterior Rehabilitation 1 Lump Sum $2,418,137.00
2 OPTION A- Not Used - - -
OPTION B- Provide Complete Perimeter Drain.
1 Lump Sum $149,021.00
OPTION C- Restore Existing Window Frames and Storm Window Restoration
1 Lump Sum $689,011.00
OPTION D- Provide New Wheelchair Lift, Stone Steps, and Ornamental Railings.
1 Lump Sum $125,017.00
OPTION E- Provide Complete Portico Stone Paving Replacement
1 Lump Sum $292,711.00
7 Stone Repointing 1 Linear Foot - 8 Brick Repointing 1 Square Foot - 9 Brick Masonry Replacement 1 Brick -
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 2 through 8) ------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 8) -----------
All measurement and payment information is included in the project specifications, Section 012700.
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minim conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render th unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation o the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended pr dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Gove for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed the Contracting Officer to offer the best value to the Government.
TOTAL BASE PRICE (Contract Line Item Number 1) ------------------------------------
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals tha savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advant Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instru Submission of Offers and Other Information) in Section L of the Solicitation.
PROJECT TITLE: Complete the Exterior Rehabilitation of the Vanderbilt Mansion National Historic Site
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER:
PARK - PMIS: VAMA- 152373
DEVELOPED AREA: Mansion Exterior
CPS - 1
TOTAL PRICE
$2,418,137.00
$2,418,137.00
$149,021.00
$689,011.00
$125,017.00
$292,711.00
$1,255,760.00
$3,673,897.00 um, an offer that he proposal e extended total of extended prices, rices to whole rnment, the period based on what is d in the judgment of at will result in cost tageous to the uctions for
CPS - 2
C E
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
O
P
L A
N
013100 1.3 Letter Designating Project Superintendent X
013100 1.3 Construction Schedule X
013100 1.3 Comprehensive Breakdown of Schedule of Values X
013100 1.3 Accident Prevention Plan X
013100 1.3 List of Subcontractors for Project X
013100 1.3 Statements Certifying Subcontractor Compliance with Labor Standard Clauses.
X
013100 1.3 Evidence of Liability Insurance Coverage and Workman's Comp for Contractor and Subcontractors
X
013100 1.3 Waste Management Plan X
013100 1.3 Quality Control Plan X
013100 1.3 Temporary Storm Water Pollution Prevention Plan X
013100 1.3 Indoor Air Quality Management Plan X
013100 1.3 Contractors Commissioning Plan X
013100 1.3 Historic Preservation Treatment Plan X
013100 1.3 Accessibility Inspection Report X
013233 1.2 Construction Images X
013513.22 1.3 Daily Archeological Construction Work Schedule X
015000 1.4 Temporary Facilities and Controls
Product Data X
Shop Drawings X
Delegated-Design Submittal X
017329 1.2 Cutting and Patching Plan X
017340 1.2 Land Surveyor or Professional Engineer Certificate X
017340 1.2 Landfill Receipt X
017340 1.2 Quanitity Survey X
024119 1.6 Selective Removals
Proposed Protection Measures X
Schedule of Selective Removal Activities X
Inventory X
PreRemoval Photographs or Video X
Qualification Data X
Warranties X
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
A
N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
033000 1.4 Cast-In-Place Concrete
Product Data X
Reinforcement Shop Drawings X
Formwork Shop Drawings X
Construction Joint Layout X
Contraction Joint Layout X
Samples X
Laboratory Test Reports X
Material Certificates X
Cold and Hot Weather Concreting Procedures X
Pozzolanic Material Certification X
Certified Recycled Steel Content X
Recycled Aggregate Laboratory Reports X
VOC Content MSDS and Cut Sheet X
040120 1.5 Brick Masonry Restoration
Product Data X
Shop Drawings X
Mortar Samples X
Mortar Mixes X
Masonry Unit Samples X
Sand Samples X
Accessory Samples X
Qualification Data X
Preconstruction Test Reports X
Quality-Control Program X
Restoration Program X
Cleaning Program X
Mortar Analysis X
040140 1.5 Stone Masonry Restoration
Product Data X
Shop Drawings X
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
A
N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
Mortar Samples X
Mortar Mixes X
Stone Samples X
Sand Samples X
Accessory Samples X
Qualification Data X
Preconstruction Test Reports X
Quality-Control Program X
Restoration Program X
Cleaning Program X
Mortar Analysis X
040519 1.2 Post-Installed Adhesive, Grout and Mechanical Anchors
Shop Drawings X
Installer Qualifications and Procedures X
Change Calculations and Drawings X
Record Documents X
050175 1.3 Historic Treatment of Cast and Wrought Iron
Product Data X
Shop Drawings X
Iron Samples X
Fitting and Bracket Samples X
Connection Samples X
Finish Samples X
Sealant Materials X
Accessory Samples X
Qualification Data X
Restoration Program X
Cleaning Program X
051200 1.6 Structural Steel
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
A
N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
Survey Certificates X
Reports X
055113 1.4 Metal Ramp and Railings
Product Data X
Shop Drawings X
Samples for Verification X
Cleaning Solution Cut Sheets X
055113 1.5 Welding Certificates X
Paint Compatibility Certificates X
055313 1.4 Bar Gratings
Product Data X
Shop Drawings X
055313 1.5 Mill Certificates X
Welding Certificates X
Paint Compatibility Certificates X
057300 1.6 Decorative Metal Railings
Product Data X
Shop Drawings X
Samples involving color, texture and design X
057300 1.7 Qualification Data X
Mill Certificates X
Welding Certificates X
Product Test Reports X
Preconstruction Test Reports X
Evaluation Reports X
061053 1.4 Miscellaneous Rough Carpentry
Product Data X
061053 1.5 Evaluation Reports X
062013 1.3 Exterior Finish Carpentry
Samples involving color, profiles and texture X
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
A
N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
Qualification Data X
Restoration Program X
062013 1.4 Compliance Certificates X
Warranties X
071326 1.4 Waterproofing
Product Data X
Shop Drawings X
Samples X
071326 1.5 Qualification Data X
Field Quality-Control Reports X
Warranties X
076200 1.5 Sheet Metal Flashing and Trim
Product Data X
Shop Drawings X
Sheet Metal Flashing Samples X
Trim and Joint Samples X
Accessory Samples X
076200 1.6 Qualification Data X
Product Test Reports X
Warranties X
079200 1.4 Joint Sealants
Product Data X
Samples showing exposed colors X
Joint Sealant Schedule X
079200 1.5 Qualification Data X
Product Test Reports X
Field-Adhesion-Test Reports X
Warranties X
080150 1.4 Wood Window and Door Restoration
Restoration Proposal X
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
A
N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
Replacement Member Samples X
Hardware Samples X
Weather Stripping Samples X
Replacement Glass Samples X
Sealant Samples X
Photographic Documentation X
080150 1.5 Qualification Data X
Maintenance Data X
Field Quality-Control Reports X
083113 1.3 Access Doors and Frames
Product Data X
Shop Drawings X
Samples X
085169 1.4 Metal Storm Windows
Product Data X
Shop Drawings X
Finish Samples X
Glazing Samples X
085169 1.5 Qualification Data X
Product Test Reports X
Field Quality-Control Reports X
Warranties X
087000 1.3 Hardware
Product Data X
Samples for New Hardware X
Hardware Schedule X
Conditions Survey for Restored Hardware X
087000 1.4 Qualification Data X
Maintenance Data X
Warranties X
089119 1.4 Fixed Louvers
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
A
N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
Product Data X
Shop Drawings X
Samples X
089119 1.5 Product Test Reports X
Windborne-debris-impact-resistance test reports X
092100 1.5 Exterior Stucco
Product Data X
Shop Drawings X
Sand Samples X
Accessory Samples X
Sample Panel X
Mix Samples X
Qualification Data X
Quality-Control Program X
099113 1.4 Exterior Painting
Product Data X
Topcoat Product Samples X
Product List X
144216 1.4 Vertical Wheelchair Lift
Product Data X
Shop Drawings X
Templates X
Samples X
Manufacturer's Certificates X
Qualification Data X
Product Certificates X
Warranties X
221113 1.4 Facility Water Distribution Piping
Product Data X
221113 1.5 Coordination Drawings X
Field Quality-Control Reports X
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
A
N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
221113 1.6 Operation and Maintenance Data X
221413 1.4 Facility Storm Drainage Piping
Product Data X
Cleaning Program X
221413 1.5 Field Quality-Control Reports X
233313 1.3 Fire Dampers
Product Data X
260519 1.4 Low-Voltage Electrical Power Conductors, Cables and Conduits
Product Data X
260519 1.5 Qualification Data X
Field Quality-Control Reports X
262726 1.4 Wiring Devices
Product Data X
Shop Drawings X
Samples X
Field Quality-Control Reports X
Operation and Maintenance Data X
265000 1.3 Custom Fabricated Light Fixtures
Product Data X
Shop Drawings X
Restoration Program X
Patterns, Models, or Plaster Castings X
Samples involving color, texture and design X
Qualification Data X
Operation and Maintenance Data X
Warranties X
310000 1.4 Earthwork
Soil Material Testing Results X
Third-Party Soil Testing Service Qualifications X
List of Soil Sources X
311319 1.4 Temporary Tree and Plant Protection
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
N O
T
IF
IC
A
T
IO
N
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S P
R O
G R
A M
A
N
SUBMITTAL LIST
Spec.
Sec.
Par. No. Description
INFORMATIONAL ACTION
Vanderbilt Mansion National Historic Site, PMIS 152373, Complete the Exterior Rehabilitation
SUBMITTAL REQUIREMENTS
Existing Condition Documentation X
312513 1.3 Erosion and Sedementation Control
Permit Documentation X
Erosion and Sediment Control Plan X
Material Samples X
321214 1.4 Asphalt Paving
Test Reports X
CQC Accessibility Inspection Report X
Granular Subbase X
Certificates X
321400 1.4 Unit Paving
Product Data X
Sieve Analysis X
Unit Paver Samples X
Joint Material Samples X
321400 1.5 Adhesion and Compatibility Test Reports X
Material Certificates X
Product Test Reports X
329200 1.3 Turf and Grasses
Product Data X
Manufacturer's Certificates X
334100 1.3 Storm Drainage Piping
Product Data X
Project Record Documents X
334600 1.4 Foundation Drainage System
Product Data X
Project Record Documents X
334900 1.5 Storm Drainage Structures
Samples X
Topic Specification
Section Requirement
Submittal Date
Completed Received by Park
017700 Final Project Record Drawings
144216 Vertical Wheelchair Lift
099113 5%, Not Less Than 1 Gal of Each Material & Color
265000 Extra Materials for Restored Fixtures as Indicated
014000 DSC-CQC Accesibility Inspection Report
017700 Pest Control Report
017700 Waste Disposal Report
071326 Waterproofing Leak-Detection Inspection Report
079200 Field Adhesion Test Report of Joint Sealants
085169 Metal Storm Window Inspection Report
144216 Insp. and Acceptance Cert. and Operation Permits
015719.11 Moisture Control Inspections and Reports
017419 Final Summary of Solid Waste Disposal and Diversion
040519 Record Documents for Installed Materials
071326 Waterproofing Warranty: 5 yr Mfr. & 5 yr Inst.
076200 Maint. Data for sheet metal flashing and trim
076200 Finish Warranty: 10 yr Mfr.
079200 Joint Sealant Warranty: 5 yr Mfr. & 2 yr Inst.
085169 Mtl. Strm. Wind. Wty: 10 yr Mfr. & 10 yr glazing
087000 Hardware Warranty: 3 yr Mfr.
144216 O&M Data for Vertical Wheelchair Lift
221113 O&M Data for Water Valves and Specialties
265000 Custom Fab. Light Fixture Warranty: 1 yr Fabricator
Reports
O&M Data Warranties Guarantees
Environmental Record
Documents
Extra Stock
CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS
Project Record Drawings
System Demonstration and Training
Tools Spare Parts Equipment
Keys and Keying Sch.
Fund Source: Gross Project Construction Cost:
Predesign Begin Date:
FY of Const. Funding Park:
State: Region:
Type of Building
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
SS Prereq 1 Construction Activity Pollution Prevention
NA NA N/A
SS Credit 1 Site Selection NA NA 0
SS Credit 2 Development Density & Community Connectivity
N N 0
SS Credit 3 Brownfield Redevelopment N N 0
SS Credit 4.1 Alternative Transportation, Public Transportation Access
N N 0
SS Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms
N N 0
SS Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
N N 0
SS Credit 4.4 Alternative Transportation, Parking Capacity
N N 0
SS Credit 5.1 Site Development, Protect or Restore Habitat
N N 0
SS Credit 5.2 Site Development, Maximize Open Space
N N 0
SS Credit 6.1 Stormwater Design, Quantity Control (See EISA Section 438)
Y
A SMALL AMOUNT OF
RAINWATER WILL BE
DIVERTED TO NEW
DRYWELLS AROUND SITE.
Y 1
A SMALL AMOUNT OF
RAINWATER WILL BE
DIVERTED TO NEW
DRYWELLS AROUND SITE.
SS Credit 6.2 Stormwater Design, Quality Control (See EISA Section 438)
Y
A SMALL AMOUNT OF
RAINWATER WILL BE
DIVERTED TO NEW
DRYWELLS AROUND SITE.
Y 1
A SMALL AMOUNT OF
RAINWATER WILL BE
DIVERTED TO NEW
DRYWELLS AROUND SITE.
EISA 2007,
Section 438 Protect Hydrology Y
A SMALL AMOUNT OF
RAINWATER WILL BE
DIVERTED TO NEW
DRYWELLS AROUND SITE.
Y N/A
A SMALL AMOUNT OF
RAINWATER WILL BE
DIVERTED TO NEW
DRYWELLS AROUND SITE.
Project Type Building Renovation
Description:
Park/PMIS: VAMA/152373 2014
Not Certified/Missing Prereq.
EXTERIOR RESTORATION 2010
Please Input CRV in block to the right for the building(s) in this project
Indicate CRV Above
Missed Prereq. Missed Prereq.
Gross Non Building (i.e. Site) Cost:
Indicate CRV Above Indicate CRV Above
If Renovation, Exist. Bldg. CRV
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development
JOHN G. WAITE ASSOCIATES, ARCHITECTS VAMA
$0
Missed Prereq.
Not Certified/Missing Prereq.
Gross Building Construction Cost:
Missed Prereq. Missed Prereq. Missed Prereq.
LEED Certification Level Not Certified/Missing Prereq. Not Certified/Missing Prereq. Not Certified/Missing Prereq.
Construction
Indicate CRV Above% Federal Regulations Achieved
Sustainable Sites (SS) Maximum LEED NC 2009 Credits: 26
Construction Documents
Indicate CRV Above
Architect/Engineer Firm:
NortheastDate: July 14, 2014 NY Historic
NPS Project Sustainability Checklist Building and Non-Building Projects
(For New Construction or Renovation) LEED 2009 Edition
Project Title: REHABILITATE THE EXTERIOR OF HISTORIC VANDERBILT MANSION Line Item
Not Certified/Missing Prereq.
Total LEED-NC Credits
45,000Building Size (Square Feet)
Indicate CRV Above
Form E 62 (8/2/13) 1
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
SS Credit 7.1 Heat Island Effect, Non-Roof N N 0
SS Credit 7.2 Heat Island Effect, Roof N N 0
SS Credit 8 Light Pollution Reduction N N 0
2006 NPS Mgmt Policies (Para.
4.9) Soundscape Preservation NA
NO NOISE PRODUCING
EQUIPEMENT IS
PROPOSED IN THIS SCOPE
OF WORK.
NA N/A
THE NEW WHEELCHAIR
LIFT IN OPTION D WILL
PRODUCE OCcAISIONAL
NOISE WHEN IN
OPERATION, BUT WILL BE
OF SHORT DURATION.
2006 NPS Mgmt Policies (Para.
4.10) Dark Sky Preservation NA
EXISTING HISTORIC LIGHT
FIXTURES WILL BE
RESTORED AND HISTORIC
REPRODUCTIONS WILL BE
USED WHERE NEW
FIXTURES ARE NEEDED TO
MAINTAIN THE HISTORIC
APPEARANCE OF THE
MANSION. NO NEW
LIGHTING WILL BE
PROVIDED.
Y N/A
THE HISTORIC
REPRODUCTION FIXTURE
AT NORTH PORTICO
BASEMENT IS IN AN
ENCLOSED AREA. NEW
LED LIGHT AT H.C. LIFT IS
CUT- OFF ABOVE, SO ALL
LIGHT IS DIRECTED
DOWNWARD.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
WE Prereq 1 Water Use Reduction, 20% Reduction (see Guiding Principle III - Protect and Conserve Water)
NA
NO NEW PLUMBING
FIXTURES ARE PROPOSED
IN THIS SCOPE OF WORK.
NA N/A
NO NEW PLUMBING
FIXTURES ARE PROPOSED
IN THIS SCOPE OF WORK.
WE Credit 1
Water Efficient Landscaping, Reduce by 50% (see Guiding Principle III - Protect and Conserve Water)
NA NA 0 G IS NOT MAINTAINED WITH POTABLE RESOURCES.
WE Credit 1 (cont'd)
Water Efficient Landscaping, No Potable Use or No Irrigation
Y 2 Y 2 DSCAPING DOES NOT REQUIRE IRRIGATION
WE Credit 2 Innovative Wastewater Technologies
N N 0
NPS Policy Water Metering NA
CHANGES TO EXISTING
WATER SERVICE ARE NOT
IN THE SCOPE OF THIS
PROJECT.
NA N/A
CHANGES TO EXISTING
WATER SERVICE ARE NOT
IN THE SCOPE OF THIS
PROJECT.
EPACT 2005,
Section 109
Water Used for Energy Conservation
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
WE Credit 3 Water Use Reduction (30%, 35%, 40%)
N
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
LEED-NC Subtotal
Energy & Atmosphere (EA) Maximum LEED NC 2009 Credits: 35
LEED-NC Subtotal
Water Efficiency (WE) Maximum LEED NC 2009 Credits: 10
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Documents Construction
Form E 62 (8/2/13) 2 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
EA Prereq 1
Fundamental Commissioning of the Building Energy Systems * (see Guiding Principle I - Employ Integrated Design Principles)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Prereq 2 Minimum Energy Performance (see Guiding Principle II Optimize Energy Performance)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Prereq 3
Fundamental Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Credit 1
Optimize Energy Performance:** (Federal Regulations require 30% for New Construction and 20% for Existing Building Renovation. Note that this automatically equates to 10 Points for New Construction and 7 Points for Existing Building Renovation.) (see Guiding Principle II - Optimize Energy Performance)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA 0
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EISA 2007,
Section 433
Reduce Fossil Fuel Derived Energy
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EO 13423, Sec.
2.(h)
Energy Efficient Electronic Products (Select EPEAT) (Predominantly relates to purchases of desktop/laptop computers and peripherals)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING SYSTEMS ARE
NOT IN THE SCOPE OF
THIS PROJECT.
CFR Title 10, Part 436.4
Procure Energy Star or FEMP designated products
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING SYSTEMS ARE
NOT IN THE SCOPE OF
THIS PROJECT.
EPACT 2005,
Section 104
Premium Efficiency Electric Motors
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EISA 2007,
Section 523
On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA N/A
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Credit 2 On-Site Renewable Energy*** 1%-13% Renewable Energy
N N 0
EA Credit 3
Enhanced Commissioning (required for projects with building size > 5,000 sf) (see Guiding Principle I - Employ Integrated Design Principles)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA 0
CHANGES TO EXISTING
BUILDING SYSTEMS ARE
NOT IN THE SCOPE OF
THIS PROJECT.
Schematic Design Design Development
Sustainability Features
PMIS Submission Predesign Construction Documents Construction
Form E 62 (8/2/13) 3 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
EA Credit 4 Enhanced Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA 0
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
EA Credit 5
Measurement & Verification (see Guiding Principle II - Optimize Energy Performance)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA 0
CHANGES TO EXISTING
BUILDING UTILITIES ARE
NOT IN THE SCOPE OF
THIS PROJECT.
MOU Guiding Principles & EO
13423
Measurement & Verification (see Guiding Principle II - Optimize Energy Performance)
NA
CHANGES TO EXISTING
BUILDING HVAC SYSTEMS
ARE NOT IN THE SCOPE OF
THIS PROJECT.
NA 0
CHANGES TO EXISTING
BUILDING UTILITIES ARE
NOT IN THE SCOPE OF
THIS PROJECT.
EA Credit 6 Green Power N
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
MR Prereq 1 Storage & Collection of Recyclables
Y N/A
RECYCLABLE STORAGE IS
AVAILABLE IN THE WOOD
STORAGE BINS UNDER
THE NORTH PORTICO.
Y N/A
RECYCLABLE STORAGE IS
AVAILABLE IN THE WOOD
STORAGE BINS UNDER
THE NORTH PORTICO.
MR Credit 1.1 Building Reuse, Maintain Existing Walls, Floors & Roof
Y 3
EXISTING BUILDING TO
REMAIN.
Y 3
EXISTING BUILDING TO
REMAIN.
MR Credit 1.2 Building Reuse, Maintain Interior Nonstructural Elements
Y 1
EXISTING BUILDING TO
REMAIN.
Y 1
EXISTING BUILDING TO
REMAIN.
MR Credit 2
Construction Waste Management, Divert 50% from Disposal (see Guiding Principle V - Reduce Environmental Impact of Materials)
Y 1
SALVAGED STONE AND
CONCRETE CAN BE USED
OFF SITE AS FILL.
REMOVED STEEL TO BE
RECYCLED.
Y 1
SALVAGED STONE AND
CONCRETE CAN BE USED
OFF SITE AS FILL.
REMOVED STEEL TO BE
RECYCLED.
MR Credit 2 (cont'd)
Construction Waste Management, Divert 75% from Disposal
Y 1
SALVAGED STONE AND
CONCRETE CAN BE USED
OFF SITE AS FILL.
REMOVED STEEL TO BE
RECYCLED.
Y 1
SALVAGED STONE AND
CONCRETE CAN BE USED
OFF SITE AS FILL.
REMOVED STEEL TO BE
RECYCLED.
MR Credit 3 Materials Reuse Y 1
LARGE PIECES OF
SALVAGED STONE CAN BE
REUSED TO FABRICATE
SMALLER DUTCHMEN.
Y 1
LARGE PIECES OF
SALVAGED STONE CAN BE
REUSED TO FABRICATE
SMALLER DUTCHMEN.
MR Credit 4
Recycled Content, 10% (post-consumer + ½ pre-consumer). Use EPA's CPG for designated products to use)
Y 1
STEEL USING MINIMUM
RECYCLED CONTENT WILL
BE SPECIFIED.
Y 1
STEEL USING MINIMUM
RECYCLED CONTENT WILL
BE SPECIFIED.
MR Credit 4 Recycled Content, 20% (post-consumer + ½ pre-consumer)
N N 0
Predesign Schematic Design Design Development Construction Documents
LEED-NC Subtotal
Materials & Resources (MR) Maximum LEED NC 2009 Credits: 14
Sustainability Features
PMIS Submission Construction
Form E 62 (8/2/13) 4 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
MR Credit 5 Regional Materials, Extracted, Processed & Manufactured Regionally
N Y 1
BLUESTONE AND SAND
FOR MORTAR REPOINTING
ARE LOCALLY AVAILABLE.
EO 13423, Sec.
2.(d)
Biopreferred Products NA
NO PRODUCTS WITH
BIOPREFERRED OPTIONS
ARE ANTICIPATED TO BE
SPECIFIED.
NA N/A
NO PRODUCTS WITH
BIOPREFERRED OPTIONS
ARE ANTICIPATED TO BE
SPECIFIED.
MR Credit 6 Rapidly Renewable Materials N N 0
MR Credit 7
Certified Wood (see Guiding Principle V - Reduce Environmental Impact of Materials) - Note: LEED requires FSC certification, but for compliance with federal requirements any of the following certifications are sufficient: Forest Stewardship…