This is Addendum #1 from the California Department of Fish and Wildlife's Engineering Branch for Project P1599036, regarding Filtration and UV System Installation at Mt. Shasta Hatchery in Siskiyou County, California. The addendum, dated May 17, 2016, modifies the original bid documents to reflect that the UV equipment will be installed in a prefabricated metal chamber instead of the originally planned concrete chamber. The scope includes installation of state-supplied equipment, site work with underground piping and ADA improvements, construction of a new metal building with foundation, and electrical installation. The contractor must employ a California-registered civil engineer to design the footings for the new steel fabricated metal building.

The bid form requires contractors to submit lump sum pricing for five main items: mobilization/demobilization, site work including underground piping and ADA improvements, new metal building including foundation, installation and start-up of state-supplied equipment (including UV chamber purchase), and electrical installation. A contingency amount of 0-10% may be added to the project as determined by the Engineer at time of contract award. The estimated quantity of excavation for the building foundation is 130 cubic yards, with material to be spread and compacted south and west of the new building. Large diameter butterfly valves must be lug type, wafer by ABZ Valves and Control Model 397 or approved equal.

View the file

Other files

File Type Posted
P1599036_Addendum_4.pdf PDF
P1599036_Specifications.pdf PDF
P1599036_Bidding_Forms.pdf PDF
P1599036_Drawings.pdf PDF
P1599036_Addendum_3.pdf PDF
P1599036_Addendum_1_R1_Drawings.pdf PDF
P1599036_Addendum_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3 – BID FORM REV. 1 (Cost Sheet)

Having become completely familiar with all conditions affecting the cost of the work at the place where the work is to be done, and with the drawings, these special provisions, the Standard Specifications, and other contract documents prepared and issued therefore, the Contractor hereby proposes and agrees to perform everything required to be performed, and to provide and furnish all labor, tools, equipment, materials, permits and taxes necessary to install State supplied filtration and UV system at Mt. Shasta Hatchery, Siskiyou County, California.

All work is to be complete in place, in strict accordance with these specifications, and as shown on the California Department of Fish and Wildlife;

Drawing No. H04-2016-002 Rev. 1 Five (5) Sheets Dated: 5/17/16 and the undersigned proposes and agrees that he/she will take in full payment therefor, the following unit prices, to wit:

Item No.

Approx.

Quantity

Items of Work Description Unit Price Item Total

1. 1 Job Mobilization/Demobilization Lump Sum $

2. 1 Job Site work including underground piping and ADA improvements

Lump Sum $

3. 1 Job New Metal Building including foundation Lump Sum $

4. 1 Job

Installation and Start-Up of State supplied equipment. Includes purchase of UV chamber and all required accessories and attachments.

Lump Sum $

5. 1 Job Electrical installation Lump Sum $

C. 1 Job Contingencies (See Below) As Determined by the Engineer

Lump Sum $ N/A

TOTAL BID: #1 Sum of Item 1-5, and C $

Contingencies may or may not be added to the project. Actual Percentage Amount shall be determined at time of Contract Award and may be from zero to 10 percent as determined by the Engineer.

In case of a discrepancy between unit prices and item totals, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, the amount set forth in the “Item Total” column shall be divided by the quantity for the item and the price thus obtained shall be the unit price. In case of a discrepancy between item totals and bid total, the item totals shall prevail.

In the case of a tie bid, the determination of a successful bidder will be made by a coin toss in the presence of all interested bidders, at a time and date set by the “State."

The award, if there is an award, will be made on the basis of the Total Bid #1.