P1080 Industry Day Flyer.pdf
PDF 112 KB Posted
- Solicitation number
- N6247025R0004
About this file
This document is an Industry Day Event flyer for a Military Construction (MILCON) Project P1080 at Portsmouth Naval Shipyard. Naval Facilities Engineering Systems Command, Atlantic (NAVFAC LANT) is hosting a virtual industry engagement and in-person one-on-one meetings on 24 June and 09 July 2025, respectively, to discuss power reliability and water resiliency upgrades. The project involves on-base and off-base utility improvements, including modifications to power distribution, energy storage, onsite generation, and water distribution systems to support nuclear-powered submarine facilities.
The project has a cost range above $500,000,000, with an anticipated award in Q4 FY26. General construction contractors with shipyard/industrial construction experience are invited to participate. Registration is required by 11 June 2025, with the virtual meeting invitation sent to registered contractors. The event will cover project objectives, execution strategy, scope of work, project considerations, qualifications, and procurement schedule. One-on-one 60-minute meetings will be prioritized for prime contractors, and participants must be able to handle Controlled Unclassified Information (CUI). Interested contractors should contact the specified Navy personnel and monitor sam.gov for updates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P1080 Industry Day Questions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1080 Industry Day Event Solicitation #N62470-25-R-0004
Power Reliability and Water Resiliency Upgrades Portsmouth Naval Shipyard
When: 24 June 2025 Virtual Industry Engagement, Project Introduction and Overview – 24 June 2025 One on One Meetings with NAVFAC Atlantic (LANT) – 09 July 2025 at NAVFAC Atlantic, 6506
Hampton Blvd, Norfolk VA 23508
What: Naval Facilities Engineering Systems Command, Atlantic (NAVFAC LANT) invites contractors to receive updates, learn, ask questions, and provide feedback in a general meeting (virtual) as well as breakout sessions (in person) regarding the proposed Military Construction Project (MILCON) P1080 (Design-Bid-Build), Power reliability and water resiliency upgrades, Portsmouth Naval Shipyard (PNSY), Kittery, Maine.
Who: General Construction contractors with appropriate shipyard/industrial construction experience.
Where: Virtual Meeting
Registration is required to participate and access the meeting. Please follow the instructions provided below under Registration Information.
The invitation for the virtual industry engagement event will be provided to those whose registration is received no later than 11 June 2025. A web link to access the virtual industry event will be emailed to registered contractors as well as a time slot for the one on one meetings with NAVFAC LANT.
Project Scope: The Power reliability and water resiliency project provides increased reliability, resiliency, and capacity to the existing electric and water utility systems primarily responsible for the protection of nuclear-powered submarines and nuclear support facilities at Portsmouth Navy Shipyard (PNSY). In order to support this on-base effort, there are two off-base private utility projects which are currently in design phase and will be needed to ultimately connect with the on-base work. Off-Base Electrical: Provides modifications to the commercial power supply provided by Central Maine Power (CMP) to PNSY. Off-Base Water: Provides modifications to the commercial water utility supply provided Kittery Water District (KWD) to PNSY.
THIS PROJECT is for the On-Base work. The On-Base project on PNSY provides upgrades and modifications to shipyard power distribution, energy storage, and onsite generation to increase capacity, capability, and resiliency of the microgrid. The project also provides upgrades to base-wide water distribution and a new water storage tank.
P1080 Industry Day Event Solicitation #N62470-25-R-0004
Power Reliability and Water Resiliency Upgrades Portsmouth Naval Shipyard
Project Cost Range: Above $500,000,000
Anticipated Project Award: Q4 FY26
Agenda:
24 June 2025: General Presentation, to include but not limited to:
Project Objectives & Execution Strategy On base power and water Scope of Work Project Considerations Qualifications Expected Procurement Schedule
09 July 2025: One-on-one Breakout Sessions– Please specify with your registration if a one-on-one session is requested and if you can attend in person. Meetings are preferred to be in person at NAVFAC LANT; but if circumstances require, a TEAMs (video conference) could be arranged..
60 -minute one-on-one meetings with the NAVFAC team to provide feedback on the project.
Priority for one-on-one meetings will be given to prime contractors.
Contractors will be notified by 23 June 2025 of their designated time slot, if selected.
Registration Information:
Registration for the general meeting and the breakout sessions is required. Provide the below information to Stephanie Wray (stephanie.l.wray2.civ@us.navy.mil), Contract Specialist and Jennifer McDonald (jennifer.w.mcdonald2.civ@us.navy.mil>), Contracting Officer, no later than 11 June 2025. Please identify whether your firm is a prime contractor. Please indicate within your registration if you are requesting a one-on-one session.
Security approval is NOT required prior to participating in this event. However, the project will require the ability to handle Controlled Unclassified Information (CUI).
Comment Submission:
Please review the attached industry day questions and provide general answers via email to Stephanie Wray (stephanie.l.wray2.civ@us.navy.mil), Contract Specialist no later than 04 July 2025. These answers will provide the Government an initial agenda for the one-on-one meetings.
The government may publicly post additional information, responses from the meetings, and questions if deemed to be of value to the procurement.
NOTE: NAVFAC will post required updates, as necessary, to this announcement prior to the General Presentation Date. Please monitor https://sam.gov
File details come from the government source that posted it. Updated .