P09 - Att 09 _Training and Admin Support Space_Planning Guide.pdf
PDF 2 MB Posted
- Attached to
- C1DA--EHRM Training and Admin Support Space Modular Trailer Site Prep Design - West Roxbury (VA-23-00000569)
- Solicitation number
- 36C77623R0097
About this file
This document is a presolicitation notice for architectural and engineering services to support the design of a modular trailer site preparation for an Electronic Health Record modernization training facility located at the VA Medical Center in West Roxbury, Massachusetts. Key details include that the solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and involves investigative and feasibility design services, schematic design drawings, design development drawings, construction documents, and construction period services. The anticipated period of performance is 165 calendar days from notice to award. Submissions are due by May 8, 2023 and the award is projected to be made in August 2023. Evaluation criteria include professional qualifications, specialized experience, capacity, past performance, knowledge of the locality, and experience in construction period services.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA HEFP SEP – For planning purposes only rev 4: 11/15/2021
Electronic Health Record Modernization Training and Support Space
HEFP SEP Space Planning Job Aid
This document was drafted based on lessons learned from the Initial Operating Capability events at Spokane VAMC, requirements outlined in the VA OEHRM (Office of Electronic Health Record Modernization) Universal Training Requirements document, and several other OEHRM/Cerner developed site specification documents. This document is for planning use only.
Additional requirements may be presented by the VAMC Change Leadership Team, VA OEHRM and/or Cerner at the time of deployment.
Three options or combinations of options:
1. VHA-owned real property. VHA renovates to meet need or partial need. VHA contracts and funds using EHRM NRM.
2. Modular trailers on VHA-owned land or parking area. VHA contracts and EHRM NRM pays for site prep of land, including dirt work and/or paving, power, water, sewer, fiber, cable, and other necessary utilities. VA OEHRM (usually through Cerner) contracts and funds lease and build-out of modular trailers. At a minimum, utilities shall be brought to junction box at one trailer or can be distributed to exterior of each unit. Water and sewer may be provided using VA OEHRM leased and serviced tanks (usually through Cerner) to avoid the construction of new water main and sanitary sewer lines for temporary classrooms.
3. GSA or commercially owned real property. OEHRM leases and renovates to meet need or partial need. If the space is GSA owned, OEHRM will negotiate and contract with GSA directly. Otherwise, OEHRM contracts and funds lease and tenant improvements through Cerner. Cerner identifies appropriate space and contracts with the Lessor. OIT provides VHA connectivity to leased space through existing internet service or “flyaway” kits.
Staff from sites, such as CBOCs, that are located within 50 miles of the parent VAMC, will travel to the parent VAMC for training. CBOCs that are greater than 50 miles from the parent VAMC will have training on-site and will either use space available in clinic or space leased by OEHRM (usually through Cerner).
Summary of Space Requirements (refer to below paragraphs for detailed information)
Space Description Amount Timeline Duration
1. Cerner On-Site Administrative Space
Cerner Admin Support 1,800 sq ft 16 months prior to go-live
16 months
Conference Room 240 sq ft 16 months prior to go-live
16 months
2. Local Workshop Events
Workshop Event Classrooms 12,000 - 18,000 sq ft
14 months prior to go-live
4 workshops, 1 week each
Note: Typically, virtual or leased space, off-campus
3. Integration Validation Testing Events
IV Testing 1,800 sq ft 7 months prior to go-live 2 events, 2 weeks each
Cerner Support for IV
Testing1
1,200 sq ft 7 months prior to go-live 4 – 6 months
Waiting Room for Testers 1,200 sq ft 7 months prior to go-live 2 events, 2 weeks each
Change Management 300 sq ft 6 months prior to go-live 2 events, 2 weeks each
Large Auditorium (post-Covid)
50 seats 7 months prior to go-live Intermittently
4. Super User and End User Training Space
Classrooms (based on # end users)
600 sq ft2 6 months prior to go-live 3-4 months
Planning/Preparation Room 600 sq ft 6 months prior to go-live 3-4 months
Process Education Room (post-Covid)
1,800 sq ft 6 months prior to go-live 3-4 months
5. Command Center
Command Center 6000 - 9000 sq ft3 1 month prior to go-live 4-6 weeks
Briefing Center (Leadership) 600 sq ft 1 month prior to go-live 4-6 weeks
Cerner Solutions Architects 1,200 sq ft 1 month prior to go-live 4-6 weeks
Visitor Lounge 600 sq ft 1 month prior to go-live 4-6 weeks
1. On-Site Cerner Administrative Support General Description: To support EHRM’s day to day operations prior to go-live. It is preferable to locate this space on VAMC campus due to frequent VA staff interactions. If adequate space is not available on campus, off-campus solutions may suffice but are recommended to be within a short distance of the VAMC.
Timeline: 15 months before go-live.
Duration: Cerner on-site administrative support is needed from 15 months prior to go-live through up to a month following go-live. If it is determined that Cerner or other support will be needed into the sustainment period, space area may be used beyond go-live.
1 Although multiple, smaller rooms are ideal, larger rooms and areas are also acceptable.
2 This represents the ideal classroom size. Smaller sized rooms can be utilized for training but will likely result in a lesser seat count.
3 The Command Center consists of 10-15 rooms, approximately 600 sq ft each. These can be classrooms that are no longer needed for end user training. Number of Command Center rooms is typically based on size and complexity of VAMC.
1.1. Space
1.1.1 Cerner Administrative Support = 1,800 total square feet (approximately 30 workstations, 36 square feet per workstation, plus social distancing). This can be multiple rooms/locations.
1.1.2 Conference Room = 240 square feet (6 team members, 4 large whiteboards)
1.1.3 Access to restroom, breakroom with refrigerator and microwave, and drinking water.
This space may be existing and shared with VA staff.
1.2 Power and Network
1.2.1 Electrical outlets (duplex) and data drops (1 drop) at each workstation for Government furnished computers. Site may also elect to include additional power and data for other ancillary needs.
1.2.2 Access to printer.
1.2.3 Desirable to have guest WiFi, but not required. At this time, VHA NRM EHRM funds shall not be used to support the upgrade or installation of guest WiFi.
1.2.4 Minimum bandwidth requirement: 1 mb/s per person.
1.3 Security
1.3.1 Access needed 24/7.
1.3.2 Space needs to be secured for authorized personnel only. Typically, sites have installed proximity card readers.
1.4 Audiovisual
1.4.1 Requires projector and screen.
1.4.2 Requires conference room phone.
1.5 Furniture
1.5.1 Typical workstation: desktop and chair.
1.5.2 Consider partitions due to Covid-19.
1.5.3 Conference room table and chairs.
1.5.4 Whiteboards.
1.5.5 In accordance with the table at the end of this document, Cerner typically rents and provides the furniture.
2. Local Workshop Events (Currently, workshops are held virtually due to Covid-19. Typically, if workshop events are face-to-face, they are held in leased/rented hotel or conference facilities.)
General Description: To complete the local design of the new electronic health record (EHR).
During the workshops, facility medical staff learn the national design and workflows and recommend adjustments to make sure the EHR is configured for local needs. Unless space is readily available on campus, sites should consider asking VA OEHRM to lease this space in the community due to timing and amount needed.
Timeline: 14 months before go-live.
Duration: Each workshop is approximately 1 week. There are a series of 4 workshops, typically 1 month apart. After the workshops are complete, if this space is on the VAMC campus, it may be used for IV Testing, Super User and End User training. If the space is leased in the community, it may be used for IV Testing, Super User and End User training, but VA OEHRM and Cerner prefer to conduct these events on-site, if possible.
2.1 Space
2.1.1 Workshop Events = 12,000 to 18,000 square feet. 20-30 rooms, depending on size and complexity of VAMC. Rooms shall be approximately 600 square feet each.
2.1.2 Desirable to have all classrooms in one location. Due to number of rooms required, VA
OEHRM may need to host these off-site or at more than one location.
2.1.3 Post-Covid: Groups may need access to large auditorium space for kick-off and debriefs.
2.1.4 Access to rest rooms and drinking water.
This space may be existing and shared with VA staff.
2.2 Power and Network
2.2.1 Access to electrical outlets (duplex) and data drops for charging devices and computers.
2.2.22.2.3 Minimum bandwidth requirement is 100 mb/s.
2.2.4 Desirable to have guest WiFi, but not required. At this time, VHA NRM EHRM funds shall not be used to support the upgrade or installation of guest WiFi.
2.3 Security: No unique requirements.
2.4 Audiovisual
2.4.1 Each room requires a projector and screen.
2.4.2 Optional: Each room could benefit from teleconferencing ability or a conference room phone.
2.5 Furniture
2.5.1 Tables (square or round) and chairs for participants.
2.5.2 In accordance with the table at the end of this document, Cerner typically rents and provides the furniture through the venue.
3. Integration Validation (IV) Testing Events General Description: Prior to training, IV testing is required to review and confirm work completed to date. VA OEHRM and Cerner prefer that this space is on the VAMC campus.
Timeline: 6 months before go-live.
Duration: Each IV testing event is approximately 2 weeks. There are usually (2) IV testing events, typically 1 month apart. After IV testing is complete, this space may be used for super user and end user training.
3.1 Space
3.1.1 IV Testing = 1,800 square feet.
3.1.1.1 One computer and/or end user device is required per scenario. Typically, a maximum of 30 scenarios per VAMC.
3.1.1.2 Each workstation requires dual monitors.
3.1.1.3 Cerner will accept a variety of IV Testing space solutions. The planning factor of
1,800 square feet is representative of total space requirement, however, Cerner is generally flexible with using a combination of rooms, provided that there is adequate space and infrastructure.
3.1.2 (2) Cerner Support for IV Testing = 1,200 square feet each.
3.1.2.1 If IV Testing will happen on-site at VAMC, the on-site Cerner Administrative Support can also be used for this function.
3.1.2.2 Additionally, if Super User and End User training will happen on-site at VAMC, the Cerner Support for IV Testing rooms can be converted to classrooms.
3.1.3 (1) Waiting Room for Testers = 1,200 square feet.
3.1.3.1 May be (2) rooms, 600 square feet each.
3.1.3.2 If Super User and End User training will happen on-site at VAMC, the Waiting Room for Testers can be converted to classrooms.
3.1.4 (1) Change Management user room for posting test surveys (5 people) = 300 square feet.
3.1.4 Post-Covid: Groups may need access to large auditorium (50 people) for kick-off.
3.1.5 Access to restrooms, breakroom with refrigerator and microwave, and drinking water.
This space may be existing and shared with VA staff.
3.2 Power and Network
3.2.1 Electrical outlets (3 outlets per workstation) and data drops (duplex) at each workstation.
3.2.2 VA network necessary for testing to occur.
3.2.3 Minimum bandwidth requirement is 50 mb/s.
3.2.3 Desirable to have guest WiFi, but not required. At this time, VHA NRM EHRM funds shall not be used to support the upgrade or installation of guest WiFi.
3.3 Security
3.3.1 Access needed 24/7.
3.3.2 Space needs to be secured for authorized personnel only. Typically, sites have installed proximity card readers.
3.4 Audiovisual
3.4.1 Requires projector and screen.
3.4.2 Requires teleconferencing ability or conference room phone.
3.5 Furniture
3.5.1 Typical workstation: desktop and chair.
3.5.2 Consider partitions due to Covid-19.
3.5.3 In accordance with the table at the end of this document, Cerner typically rents and provides the furniture.
4. Super User and End User Training Space General Description: Cerner will conduct super user training and end user training of VA personnel. Approximately 90-95% of all VAMC staff will require some type of end user training.
Super user training and end user training can occur at the same facility.
Training locations are preferred to be located at the VAMC due to proximity of users being trained, however off-site solutions may be required due to limited VAMC space.
- Classrooms that do not accommodate social distancing (post-Covid): 15 end users + 2 trainers = 500-600 square feet. (alternate room sizes can be reviewed)
- Classrooms accommodating social distancing: 8 end users + 2 trainers = 500 square feet.
(alternate room sizes can be reviewed)
In addition to training at VAMC locations, training at CBOC locations will also be required, and is generally defined by any location greater than 50 miles from their parent VAMC. If adequate space for training is not present within the CBOC location, an alternate space solution may need to be considered.
Timeline: Space shall be ready 6 months before go-live.
Duration: Training space may be needed for 6-7 months.
Number of end users: Provided by OEHRM CMO. Estimate can be provided by HEFP SEP for planning and to initiate design.
Number of classrooms: Provided by OEHRM CMO. Calculation below may be used as a baseline to plan and design space.
4.1. Space
4.1.1 Classrooms = 500-600 square feet each (alternate room sizes can be reviewed). Number of rooms determined by total number of end users. An estimated total number of end users and total number of training rooms can be provided by HEFP SEP team.
4.1.2 Planning/Preparation Room = 600 square feet.
4.1.3 Process Education Room (post-Covid) = 1,800 square feet.
Main VAMCs formula (updated 4/20/2021)
Not Socially Distanced: Room Total = End User Population x 5 classes per end user / 12 seats per class /
8 weeks of EUT / 5 days of training per week
Socially Distanced: Room Total = End User Population x 5 classes per end user / 8 seats per class / 8 weeks of EUT / 5 days of training per week
CBOCs/Remote Sites formula (updated 4/20/2021)
Not Socially Distanced: Room Total = End User Population x 5 classes per end user / 12 seats per class /
5 weeks of EUT / 5 days of training per week
Socially Distanced: Room Total = End User Population x 5 classes per end user / 8 seats per class / 5 weeks of EUT / 5 days of training per week
Independent of social distancing requirements, large rooms that can support up to 15 users are acceptable and preferred to help reduce the total classroom count needed.
To accommodate changes in social distancing requirements as well as varying class sized, the number of classrooms will be calculated based on 12 seats per class, but built out to support 15 end users per room.
4.1.2 Planning/Preparation room = 600 square feet.
4.1.2.1 (6) workstations + storage cabinets for training materials.
4.1.2.2 If Super User and End User Training will happen on-site at VAMC, the on-site Cerner Administrative Support may also be used for this function.
4.1.3 Post-Covid: Process Education Room = 1,800 square feet. Total of 50 people for briefings. May occur in smaller classrooms. Typically consists of 3 events in 3 months prior to go-live.
4.1.4 Access to restroom, breakroom with refrigerator and microwave, and drinking water.
This space may be existing and shared with VA staff.
4.2 Power and Network
4.2.1 Electrical outlets (3 outlets per end user) and data drops (duplex) at each workstation for Government furnished computers. Training devices can connect wirelessly if available.
4.2.2 VA network is required.
4.2.3 Minimum bandwidth requirement is 50 mb/s.
4.3 Security
4.3.1 Access needed 24/7.
4.3.2 Space needs to be secured for authorized personnel only. Typically, sites have installed proximity card readers.
4.4 Audiovisual
4.4.1 Requires projector and screen in each classroom.
4.4.2 Requires conference phone or teleconferencing capability in each classroom, planning/prep room and process education room.
4.5 Furniture
4.5.1 Typical workstation: desktop and chair.
4.5.2 Consider partitions due to Covid-19.
4.5.3 Podium with task stool.
4.5.4 Bookcases or tables at entrance and front of room for materials and peripheral storage.
4.5.5 (2) 4x6 whiteboards.
4.5.6 In accordance with the table at the end of this document, Cerner typically rents and provides the furniture.
5. Command Center General Description: As part of the EHRM deployment, space will be needed at each VAMC to support a Command Center function for go-live activities.
The command center is preferred to be located at one location, however, can be separated if a large enough single space is not available. The space used for IV Testing could function well for this purpose if it meets the needs defined in this document. Additionally, if Super User and End
User training occurs on-site at the VAMC, classroom space may be converted to support any
Command Center functions. There is a strong program preference to keep the command center at the VAMC when possible.
Ten to fifteen rooms (minimum) are required for the Command Center. Number of rooms is based on size and complexity of the VAMC.
Timeline: Space should be ready 1 month prior to event. Used during go-live event.
Duration: 4-6 weeks.
Note: Help Desk will now be supported remotely in Kansas City.
5.1 Space
5.1.1 Command Center = 10-15 rooms, 600 square feet. Training rooms may be used to support Command Center function.
5.1.2 Briefing Center (Leadership) – 600 square feet.
5.1.3 Cerner Solution Architects = 1,200 square feet.
5.1.4 Visitor Lounge = 600 square feet.
5.1.5 Access to restrooms, breakroom with refrigerator and microwave, and drinking water.
This space may be existing and shared with VA staff.
5.1.6 The command center can consist of multiple rooms or a large space and should be reviewed further with the deployment team at the time of Current State Review.
5.2 Power and Network
5.2.1 Electrical outlets (duplex) and data drops (duplex) at each workstation.
5.2.2 VA network.
5.2.3 Minimum bandwidth requirement is 50 mb/s.
5.2.4 Desirable to have guest WiFi, but not required. At this time, VHA NRM EHRM funds shall not be used to support the upgrade or installation of guest WiFi.
5.3 Security
5.3.1 Access needed 24/7.
5.3.2 Space needs to be secured for authorized personnel only. Typically, sites have installed proximity card readers.
5.4 Audiovisual
5.4.1 Large display monitors or projectors in each room to display information.
5.4.2 Requires teleconferencing ability or conference room phone in each room.
5.4.3 (1-5) printers
5.5 Furniture
5.5.1 Typical workstation: desktop and chair.
5.5.2 Consider partitions due to Covid-19.
5.5.3 In accordance with the table at the end of this document, Cerner typically provides the furniture.
Delineation of responsibility for space inside an existing VA facility
Facility Improvement Tasks Cerner VA-OIT VA-VHA
Floor Plans
Walls – framing, demising, relocation X
Ceilings – framing, height adjustment X
Flooring – removal, replacement X
Space Management – clear all existing furniture, chalkboard, devices and equipment from the space to allow for preparation activities in the space
X
Mechanical/Electrical/Plumbing
Provide electrical outlets suitable for administrative use. X
Contract and manage engineering design, as needed X
Mechanical equipment improvements X
Electrical – installation of additional circuits and outlets, maintenance and repairs. This includes adding electrical circuits and outlets as needed to support referenced facility needs, including any additional breaker panel space. This may consist of needs for training devices, a/v, network equipment and other support items.
X
Plumbing X
Life Safety
Fire Alarm – monitoring, maintenance, and testing X
Fire Sprinkler – maintenance and testing X
Fire Extinguishers – maintenance and testing X
Security
Door Hardware – replacement as needed to support access control, maintenance and repairs to new hardware
X
Door Hardware – maintenance and repairs to existing hardware
X
Access Control – installation of equipment X
Monitoring – monthly monitoring X
Physical Security – after hours physical security provided on an as needed basis
X
Network
Provide use of existing guest wireless, where available X
Provide and install Cerner supplemental wireless internet if needed (i.e. LTE based solutions)
X
Audio Visual
Install portable projectors and other audio-visual equipment in each room. Equipment to be removed at deployment completion.
X
Conference phones X
Furniture
Space planning and room configuration X
Provide, install and manage furniture and whiteboards (if needed)
X
Appliances
Purchase, installation & management as appropriate. X
Property Management Tasks
Janitorial Service – provide janitorial services for referenced facility needs
X
Dumpster Service – provide dumpster services for referenced facility needs (if needed)
X
Fire Alarm Monitoring – provide monitoring for life safety systems X
Security Monitoring – contract and provide monitoring service for
Cerner security system
X
Utilities – provide utility services for all utilities X
Pest Control – provide pest control services for referenced facility needs
X
Space Reconfiguration – relocation and configuration of furniture as needed to support all workshop, training, and Go Live activities
Facility Parking Plan – provide parking for referenced facility needs X
Delineation of responsibility for leased space – modular/commercial
Facility Improvement Tasks Cerner VA-OIT VA-VHA
Obtain Space
Lease commercial property X
Deliver and install modular buildings including stairs, ramps and platforms for access. Remove buildings at completion.
X
Floor Plans
Walls – framing, demising, relocation X
Ceilings – framing, height adjustment X
Flooring – removal, replacement X
Provide Restrooms X
Provide IT Closets w/ cooling as appropriate X
Utilities & Site Improvements (for modular buildings on VA property)
Extend infrastructure for water and connect to modular buildings. Water line must have sufficient capacity to support sprinklers, if determined necessary. If necessary, water may be provided using tanks. Tank servicing would be provided by Cerner.
X
Extend infrastructure for sewer and connect to modular buildings. If necessary, sewer may be provided using tanks. Tank servicing would be provided by Cerner.
X
Extend fiber to modular buildings and terminate in network equipment
X
Extend infrastructure for electric and connect to modular buildings
Complete other necessary site improvements on VA land determined necessary to support modular buildings after further review.
X
Mechanical/Electrical/Plumbing (Commercial and Modular)
Provide electrical outlet location requirements X
Contract and manage interior engineering design, as needed
X
Mechanical equipment improvements X
Electrical – installation of additional circuits and outlets, maintenance and repairs. This includes adding electrical circuits and outlets as needed to support referenced facility needs, including any additional breaker panel space. This may consist of needs for training devices, a/v, network equipment and other support items.
X
Interior Plumbing X
Life Safety (Commercial and Modular)
Fire Alarm – monitoring, maintenance, and testing if needed
Fire Sprinkler – installation and maintenance if needed
Fire Extinguishers – installation and maintenance X
Security
Complete site assessment and provide security recommendations
X
Provide Cerner security design indication placement of security elements.
X
Door Hardware – replacement as needed to support access control, maintenance and repairs to new hardware
X
Door Hardware – maintenance and repairs to existing hardware
X
Access Control – installation of equipment for Cerner security system
X
Monitoring – monthly monitoring of Cerner security system
Physical Security – after hours physical security provided on an as needed basis (Cerner if commercial, VA if modular at VAMC)
X X
Network
ISP Circuit Build Fee for VA circuit, if needed (fee required by the Internet Service Provider)
X
ISP Circuit Build Fee for Cerner circuit, if needed (fee required by the Internet Service Provider)
X
Provide network cabling location requirements X
Provide and install Cerner and VA network rack and equipment to the network room to support wireless network extension. This includes patch panels, PDU’s and
UPS units as design requires.
X
Extend necessary cabling/conduit to Cerner network equipment, including wireless access points and fiber.
X
Provide and install any additional equipment (technology, i.e. switches) necessary to maintain a VA network to support all training devices.
X
Install network cabling infrastructure to each training device, including work associated with a demarcation point extension.
X
Audio Visual
Install electrical circuits and outlets necessary to support
AV equipment in each workshop room and classroom
X
Install portable projectors and other audio-visual equipment in each room. Equipment to be removed at deployment completion.
X
Install cabling for projector use X
Classroom Technology
Provide, install and manage VA end user training devices for training.
X
Provide, install and manage VA network equipment. X
Provide, install and manage backup computers for trainers.
Provide, install and manage phones for Go-Live. X
Provide, install and manage Barcode Scanners. X
Provide, install and manage Label Printers (pharmacy, wireless specimen and desktop specimen)
X
Provide, install and manage Armband Printers. X
Provide, install and manage Printers.
Provide, install and manage Name Badge Printers. X
Provide, install and manage Document Scanners. X
Provide Cisco conference phones. OIT will support installation and management.
Provide, install and manage Audio Visual equipment. X
Provide, install and manage Large Screen Monitors X
Provide, install and manage E-signature pads X
Provide, install and manage Mobile Devices (iPhone/Zebra
TC52)
X
Provide, install and manage IV Infusion Pumps X
Provide, install and manage Wireless Vital Sign Monitors X
Furniture
Space planning and room configuration X
Purchase, install and manage furniture and whiteboards X
Appliances
Purchase, installation & management as appropriate. X
Property Management Tasks
Janitorial Service – provide janitorial services for referenced facility needs
X
Dumpster Service – provide dumpster services for referenced facility needs (if needed)
X
Fire Alarm Monitoring – provide monitoring for life safety systems X
Security Monitoring – contract and provide monitoring service for
Cerner security system
Internet service provider – contract service provider for Cerner network
X
Utilities – provide utility services for all utilities X
Pest Control – provide pest control services for referenced facility needs
X
Space Reconfiguration – relocation and configuration of furniture as needed to support all workshop, training, and Go Live activities
X
Facility Parking Plan – provide parking for referenced facility needs
X
CBOC facilities to be reviewed by VHA for training space solutions. VHA to manage any CBOC facility improvements inside existing VA owned/leased buildings.
Types of End User Devices/Technologies for EHRM Deployments
(VA OEHRM and Change Leadership Teams will fill out at each VAMC)
Technology Owner Qty Use VA Workstation PC, monitor, mouse, keyboard, software
VA
TBD Testing/Training/Command Center
Cerner Workstation PC, monitor, mouse, keyboard, software
Cerner TBD Training/Command Center
Barcode Scanner: Zebra DS8108-HC or Zebra DS8178-HC (wireless)
VA
TBD Testing/Training/Command Center
Label Printer – Lab: Zebra ZT410 VA TBD Testing
Label Printer – Pharmacy: Zebra ZT410 VA TBD Testing
Label Printer - Wireless Specimen: Zebra ZQ610 VA TBD Testing
Label Printer - Desktop Specimen: Zebra ZD420 VA TBD Testing
Armband Printer (adult): Zebra ZD510 VA TBD Testing
Laser Printer VA
TBD
Administrative/Testing/Training/Command Center
Name Badge Printer Cerner TBD Testing/Training/Command Center
Document Scanner VA TBD
Conference Phones Cerner TBD OIT will support install and management.
VOIP Phones VA TBD
Audio Visual (projectors) without Teleconferencing
Cerner TBD Testing/Training/Command Center
Audio Visual (projectors) with Teleconferencing Cerner TBD Testing/Training/Command Center
Large Screen Monitors Cerner TBD
IV Infusion Pumps VA TBD
Wireless vital sign monitors VA TBD
Docking stations (if needed) VA TBD
E-signature pad VA TBD
Mobile Devices (iPhone / Zebra TC52) VA TBD
VHA HEFP SEP – For planning purposes only rev 4: 11/15/2021
Example 1: White City – small, socially distanced classrooms – ideally, 8 students and 1-2 instructors
Example 2: Seattle – larger classrooms, prior to social distancing – up to 15 students and 1-2 instructors
Example 3: Walla Walla – Modular Training Building – prior to social distancing – up to 15 students per classroom
Example 4: Spokane – Cerner Admin and End User Device Classrooms, used for Command Center/Help Desk during go-live Classroom layout is 16 per room – prior to social distancing.
Example 5: Anchorage – with social distancing – up to 8 students per classroom, 1-2 instructors
Example 6: Typical classroom layout templates for social distancing
Spokane VAMC - Cerner Admin Work Area and Help Desk (now remote) front entry
Spokane VAMC - Cerner Admin Work Area (front door) Projection Screens – VA General info on center, Help Desk (now remote) ticket status to right
Spokane VAMC - Cerner Admin Work Area and Go-Live Help Desk (now remotely)) screen with projected status on right side
VHA HEFP SEP Points of Contact:
Cynthia Doolittle, Director, Special Engineering Projects – cynthia.doolittle2@va.gov, 612-720- Michael Vulpis, Engineer, michael.vulpis@va.gov, 857-203-6694
James Cullum, Engineer – James.Cullum@va.gov, 765-661-7326
Kristen Colwell, Program Analyst – Kristen.Colwell@va.gov, 865-229-2440
References and Resources:
1. VHA HEFP EHRM Sharepoint:
https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM?FollowSite=1&SiteName=VHA%20OCA
MES%20EHRM
2. OEHRM Universal Training & Command Center Space Requirements, v0.02, March 30, 2020.
(Please request from VHA HEFP SEP for planning purposes until final version is signed by VA
OEHRM.)
3. Field and CAM EHRM Tools/HEFP SEP ERHM Training&Admin Space-Planning Job Aid & Planning Workbook
VHA HEFP EHRM - Training and Support Space Updates - All Documents (sharepoint.com) Training and Admin Space Support Workbook to be uploaded to each VISN’s Subsite > Documents > Training Space folder
4. FORCE Package Template
VHA HEFP EHRM - A-E FORCE Package-EHRM Trng & Admin Space-Renovation - All Documents (sharepoint.com) VHA HEFP EHRM - A-E FORCE Package-EHRM Trng & Admin Space-Trailer Site Prep - All Documents (sharepoint.com)
5. Available in the VA’s Technical Information Library (TIL)
Site Infrastructure and End User Device Requirements (SIEUDR) Infrastructure Standard for Telecommunications Spaces (ISTS) mailto:cynthia.doolittle2@va.gov mailto:michael.vulpis@va.gov mailto:James.Cullum@va.gov mailto:Kristen.Colwell@va.gov https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM?FollowSite=1&SiteName=VHA%20OCAMES%20EHRM https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM?FollowSite=1&SiteName=VHA%20OCAMES%20EHRM https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FTraining%20and%20Support%20Space%20Updates&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FTraining%20and%20Support%20Space%20Updates&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FEHRM%20Contracting%20Package%20Templates%2FA%2DE%20FORCE%20Package%2DEHRM%20Trng%20%26%20Admin%20Space%2DRenovation&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FEHRM%20Contracting%20Package%20Templates%2FA%2DE%20FORCE%20Package%2DEHRM%20Trng%20%26%20Admin%20Space%2DRenovation&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FEHRM%20Contracting%20Package%20Templates%2FA%2DE%20FORCE%20Package%2DEHRM%20Trng%20%26%20Admin%20Space%2DRenovation&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FEHRM%20Contracting%20Package%20Templates%2FA%2DE%20FORCE%20Package%2DEHRM%20Trng%20%26%20Admin%20Space%2DRenovation&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FEHRM%20Contracting%20Package%20Templates%2FA%2DE%20FORCE%20Package%2DEHRM%20Trng%20%26%20Admin%20Space%2DTrailer%20Site%20Prep&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FEHRM%20Contracting%20Package%20Templates%2FA%2DE%20FORCE%20Package%2DEHRM%20Trng%20%26%20Admin%20Space%2DTrailer%20Site%20Prep&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FEHRM%20Contracting%20Package%20Templates%2FA%2DE%20FORCE%20Package%2DEHRM%20Trng%20%26%20Admin%20Space%2DTrailer%20Site%20Prep&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VHAOCAMESEHRM/VHA%20Site%20Assessment%20Resources/Forms/AllItems.aspx?id=%2Fsites%2FVHAOCAMESEHRM%2FVHA%20Site%20Assessment%20Resources%2FEHRM%20Contracting%20Package%20Templates%2FA%2DE%20FORCE%20Package%2DEHRM%20Trng%20%26%20Admin%20Space%2DTrailer%20Site%20Prep&viewid=d14511ba%2D8bd6%2D461a%2D9a61%2D472a9277303c https://dvagov.sharepoint.com/sites/VACO.OEHRMoffice/Misc/Construction_ANCMTS/Forms/AllItems.aspx?id=%2Fsites%2FVACO%2EOEHRMoffice%2FMisc%2FConstruction%5FANCMTS%2F00%20VA%20OEHRM%20Site%20Infrastructure%20Requirements%20%2D%202%2E0%5FSigned%2Epdf&parent=%2Fsites%2FVACO%2EOEHRMoffice%2FMisc%2FConstruction%5FANCMTS https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf
File details come from the government source that posted it. Updated .