P09_564-18-105_FINAL SOW.pdf
PDF 1 MB Posted
- Attached to
- AMMENDMENT 002_36C25623R0101_PROJ 564-18-105_REPLACE WINDOWS AND DOORS B4, B5, B6, AND B7- Solicitation
- Solicitation number
- 36C25623R0101_REPLACE_WINDOWS_DOORS_B4_B5_B6_AND_B7
About this file
This scope of work document outlines specifications for replacing windows and doors at buildings B4, B5, B6, and B7. The project involves demolishing existing windows and doors according to drawings and specifications in divisions 02 through 08, including installing new aluminum-framed entrances, storefronts, windows, and aluminum-clad wood double-hung windows. Hardware specifications are provided under division 08. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration VISN 16 to replace windows and doors at the specified buildings, as detailed in the scope of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_564-18-105_36C25623R0101.xlsx | XLSX spreadsheet | |
| 564-18-105_Amendment 01_36C25623R0101_08092023.pdf | ||
| P01_UPDATED SPECS 07102023.pdf | ||
| P07_WD_AR20220035_06222023.pdf | ||
| SOLICITATION-DESCRIPTION.docx | DOCX document | |
| S02_SOLICITATION_36C25623R0101_07132023.pdf | ||
| EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx | DOCX document | |
| P01_UPDATED DRAWINGS 07102023.pdf | ||
| EXHIBIT B CONTRACTOR EVALUATION FORM.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ill. SCOPE OF WORK:
A. All work must be done in accordance with the drawings and specifications.
IV. SPECIFICATIONS INDEX:
00 01 13
00 01 15
01 00 00
01 32 16.15
01 33 23
01 35 26
01 42 19
01 45 00
01 57 19
01 74 19
02 41 00
02 83 33.13
05 40 00
06 10 00
06 20 00
07 21 00
07 40 00
DIVISION 00 - SPECIAL SECTIONS
Project Seals Page
List of Drawing Sheets
DIVISION 01 - GENERAL REQUIREMENTS
General Requirements
Project Schedules (Small Projects - Design/Bid/Build)
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Temporary Environmental Controls
Construction Waste Management
DIVISION 02 - EXISTING CONDITIONS
Demolition
Lead Based Paint Removal and Disposal
DIVISION 03 - CONCRETE - NOT USED
DIVISION 04 - MASONRY - NOT USED
DIVISION 05 - METALS
Cold-Formed Metal Framing
DIVISION 06 - WOOD,PLASTICS AND COMPOSITES
Rough Carpentry
Finish Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Spray Polyurethane Thermal Insulation
Siding Panels
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames
08 14 00 Exterior Wood Doors
08 41 13 Aluminum-Framed Entrances and Storefronts
08 51 13 Aluminum Windows
08 52 13 Aluminum-Clad Wood Double-Hung Windows
08 71 00 Door Hardware
DATE
07-15
10-17
04-13
05-17
02-17
05-16
01-18
01-11
09-13
08-17
05-16
10-17
08-16
NA
08-16
02-16
08-16
03-16
01-16
File details come from the government source that posted it. Updated .