P03_SD_CS-10_Salvaging_and_Spreading_Topsoil_2022.docx

DOCX document 47 KB Posted

Attached to
NRCS South Dakota Easement Restoration IDIQ
Solicitation number
12FPC124Q0011
Issued by

About this file

This document is a Construction Specification from the Natural Resources Conservation Service (NRCS) for salvaging and spreading topsoil as part of a construction project.

The specification outlines the scope of work, which is to salvage topsoil from designated areas and spread it on specified earth surfaces to a depth of 6 to 18 inches. The topsoil must be free of objectionable materials, and the spreading must be done when the ground is not frozen or excessively wet. After spreading, the topsoil surface must be left reasonably smooth.

The related federal contract opportunity is an Indefinite Delivery Indefinite Quantity (IDIQ) solicitation from the USDA NRCS in South Dakota for Easement Restoration and Emergency Watershed Protection services. Quotes are due by 5/20/2024 at 1700, with questions due by 5/10/2024 at 1400.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Natural Resources Conservation Service

Construction Specification SD-10 Salvaging and Spreading Topsoil

Scope The work shall consist of salvaging topsoil from borrow pits or other excavations and spreading it in the designated areas as shown on the drawings to the specified depths.

Quality of Topsoil Topsoil shall consist of friable soil reasonably free of grass, roots, weeds, sticks, stones, or other foreign materials.

Excavation Topsoil shall be salvaged from designated earth surfaces that will be disturbed by construction activities. After designated sites have been cleared and grubbed, the topsoil shall be removed from the designated areas and stockpiled at locations shown on the drawings or acceptable to the Natural Resources Conservation Service (NRCS) inspector. Objectionable materials shall be removed and buried, or disposed of, at locations approved by the NRCS inspector.

Spreading Spreading shall not be done when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work. Surfaces to be covered shall be lightly scarified just prior to the spreading operation.

All earth fills not to be submerged shall be covered with topsoil to a depth of 6 to 18 inches measured perpendicular to the surface of the fill and placed to the neat lines shown on the drawings.

Following the spreading operation, the topsoil surface shall be left reasonably smooth and without ruts or surface irregularities that could contribute to concentrated waterflow downslope and shall be left in a condition that will permit seeding equipment to be operated without excessive smoothing.

NRCS, SDCONSTRUCTION SPECIFICATION SD-10 – Page 2 of 2October 2022
NRCS, SDCONSTRUCTION SPECIFICATION SD-10 – Page 1 of 4October 2022