P03_SD_CS-04_Stripping_2022.docx

DOCX document 46 KB Posted

Attached to
NRCS South Dakota Easement Restoration IDIQ
Solicitation number
12FPC124Q0011
Issued by

About this file

This document is a construction specification from the Natural Resources Conservation Service (NRCS) in South Dakota, titled "SD-04 Stripping." It outlines the requirements for removing topsoil and other undesirable materials from borrow areas and foundations of structures and earth fill areas. The specification covers the required depth of stripping to expose subsoil, the placement and stockpiling of suitable topsoil, and the disposal of waste material. It also specifies that foundation stripping must create a reasonably smooth surface, and borrow area stripping must expose material suitable for earth fill.

The related federal contract opportunity is an Indefinite Delivery, Indefinite Quantity (IDIQ) solicitation from the USDA NRCS in South Dakota for Easement Restoration and Emergency Watershed Protection services. Quotes are due by 5/20/2024 at 1700, and questions are due by 5/10/2024 at 1400.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Natural Resources Conservation Service

Construction Specification SD-04 Stripping

1. Scope The work shall consist of removing topsoil and other undesirable materials from borrow areas and foundations of structures and earth fill areas.

2. General Required stripping excavation depth will be the depth needed to expose subsoil reasonably free of roots and other perishable organic materials. Excavated earth material suitable for fill shall be placed in earth fill areas as appropriate. Stripped material suitable for topsoil shall be stockpiled and placed over disturbed areas as shown on the drawings or as approved by the Natural Resources Conservation Service (NRCS) inspector. All waste material shall be disposed of as shown on the drawings or as approved by the NRCS inspector.

3. Foundation Stripping Remove loose soil and extend stripping to a reasonably smooth surface in consolidated subsoil. Except as shown on the drawings, foundation slopes shall be excavated to one horizontal to one vertical, or flatter.

4. Borrow Area Stripping Borrow areas shall be stripped to expose material suitable for earth fill.

NRCS, SDCONSTRUCTION SPECIFICATION SD-04 – Page 2 of 2October 2022
NRCS, SDCONSTRUCTION SPECIFICATION SD-04 – Page 1 of 4October 2022