P01 SOW - Replace Roofs Various Locations Main Hospital.docx

DOCX document 368 KB Posted

Attached to
Z1DA--667-22-4-1447-0009 - Project 667-18-104 Replace roof
Solicitation number
36C25622R0086
Issued by

About this file

This document outlines a federal contract opportunity for roof replacement services at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The contract will be awarded as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Interested offerors must be verified in the Vendor Information Pages database and System for Award Management. The solicitation number is 36C25622R0086 and will involve replacing approximately 30,000 square feet of roofing across various locations at the main hospital building. The period of performance is 200 calendar days with a tentative proposal due date of September 2nd, 2022 and anticipated award by October 2022. The construction cost range is between $1-2 million. Offerors must attend a pre-bid site visit and follow infection control requirements during construction work.

View the file

Other files

File Type Posted
36C25622R0086 Presol.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal To Construct “Replace Roof, Various Locations, Main Hospital” Project No. 667-18-104 Overton Brooks VA Medical Center, Shreveport, LA

SCOPE:

Overton Brooks VAMC has a requirement to replace several roofs at various locations (approximately 30,000 SF) on the main hospital, building 1 Shreveport, LA. Roof sections include, but are not limited to, 10-North old Cooling tower area, 8-West, 2-South, Pharmacy and Pharmacy Cache, Operating Room, Lobby and 9th and 10th Floor penthouse roofs and other smaller roof sections (I.E. Bldg. 42 roof and front canopy connection, 3 floor roof overlooking loading dock, etc.). All asbestos containing material shall be abated. The existing roof systems shall be as built showing all roof penetrations, roof drainage piping, heating ventilation and air conditioning (HVAC) equipment, ductwork and appurtenances of any type.

Any items or systems determined to be abandoned or no longer required shall be identified to be removed and capped or terminated. Access and continued function/operation of adjacent occupied spaces (above, below and beside) shall be considered within the construction phasing plan to minimize the overall impact and disruptions generated by the construction activities.

The C&A requirements do not apply, and that a Security Accreditation Package is not required.

PERIOD OF PERFORMANCE:

The delivery date for this contract shall be 200 days from Notice to Proceed.

CONTRACTOR SITE VISIT AND FIELD VERIFICATION PRIOR TO BIDDING:

Contractor shall be responsible for attending the Pre-Bid Site Visit prior to bidding to verify all existing conditions and take any necessary measurements required to adequately bid the project. If the Contractor chooses not to attend the Pre-Bid Site Visit, the Contractor may submit their bid at their own risk.

INFECTION CONTROL DURING CONSTRUCTION:

Contractor shall follow and comply with the established Infection Control Risk Assessment (ICRA) specific for the project. Contractor is responsible for dust control during demolition and during hauling operations.

DEMOLITION:

Contractor shall protect all adjacent areas of the hospital, especially windows and doors during all operations. Repairing any damage shall be the sole responsibility of the Contractor. If any damage is noticed prior to starting work which may be misconstrued as damage caused by the contractor, immediately notify the COR, and the damage shall be documented as existing conditions.

PHASING, NOISE, SMELLS, AND AFTER-HOURS WORK:

Work resulting in extensive noise or odor, shall be performed after hours or on weekends. Any required utility outages shall be scheduled at the convenience of the hospital, and potentially require after hours work or on weekends.

DELIVERIES:

Contractor shall coordinate material and equipment deliveries, storage, and handling requirements with COR.

FINAL CLEAN, PRE-FINAL & FINAL INSPECTIONS:

Once all work has been completed, the Contractor shall adequately clean the project site and request a Pre-Final Inspection. Upon completion of the Pre-Final punch list items, the Contractor shall request a Final Inspection. Each of these inspections will be scheduled at the convenience of the hospital.

SUBMITTALS:

Provide: Email an electronic copy to the COR and each copy shall have a completed VA transmittal sheet attached.

Contractor shall provide submittal as detailed in the specifications and samples of all finishes showing the full range of available colors and options to be selected by the VA-ID and COR.

H G A F D E B C image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image1.png image2.png image3.png image4.png image5.png image6.png