This is a Construction Services Statement of Work for Project No. 528A6-19-604 at Bath VA Medical Center in Bath, New York. The contractor must complete a comprehensive renovation and HVAC upgrade of approximately 8,400 square feet on the 6th floor for outpatient mental health clinics within 455 calendar days from the Notice to Proceed.

The scope encompasses five primary work categories: (1) General Construction Work including demolition of non-structural elements, construction of new partitions and finishes, asbestos-containing materials (ACM) abatement coordination complying with federal, state, and VA regulations, and coordination with VA IT/telecom infrastructure; (2) Electrical, Communications, and Electronic Safety and Security work including removal and replacement of electrical systems, new power and lighting installation, telecommunications infrastructure, fire alarm modifications, access control, and nurse call integration with full commissioning; (3) Mechanical Work including demolition of existing systems, provision and installation of new AHU equipment, complete air distribution systems with ductwork, hydronic components, HVAC control systems, testing and balancing, and enhanced commissioning with staff training; (4) Plumbing and Fire Protection Work including removal and modification of existing plumbing, installation of new fixtures, sprinkler system modifications, and full commissioning with staff training; and (5) Structural renovation including new and infilled floor penetrations through concrete framing, a new concrete housekeeping slab for mechanical equipment, new wall penetrations in exterior masonry with steel angle lintels, and miscellaneous security grills with steel framing. The contractor must minimize disruption to adjacent areas and ongoing VA operations, comply with Infection Control Risk Assessment (ICRA) requirements, incorporate pre-construction risk analysis and interim life safety measures into safety planning, and utilize the Autodesk Construction Cloud Build Platform (ACC) for all submittals, RFIs, project communications, and documentation. All work must comply with federal, state, and local building codes, NFPA standards, UL standards, IBC 2003, NEC, and VA Information Security Handbook 6500.6. The VA will provide access to utilities, ACC licensing and training, and a designated staging area north of railroad tracks.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. 528A6-19-604 Upgrade and renovate 6th floor and HVAC B76

Construction Services Statement of Work

Bath VA Medical Center 76 Veterans Avenue Bath, NY 14810

The general scope of this project is to renovate roughly 8,400 square feet of the 6th floor for outpatient mental health clinics. The 6th floor also contains attic space, vertical circulation, and other back of house areas. All existing steam radiators, window AC units, ductwork, registers, grilles, and diffusers in the scope of work area will be demolished and removed from site. The steam radiator piping will be demolished back to the main and capped on the 5th floor below. Air systems solely serving the scope of work area will be demolished completely. Ductwork associated with systems serving other areas of the building in addition to the scope of work area will be demolished back to the duct riser.

The new work shall include but not limited to Architectural, Mechanical, Electrical, and plumbing as specified by the design document, new AHU and all associated work shall be provided and installed. Installation, testing, and commissioning services for new HVAC system to the sixth floor from the attic. The project is interior renovations to the 6th Floor of the existing building. The renovations mainly include the removal of interior non-load bearing walls, ceilings, floor finishes and extensive modifications to the existing mechanical, electrical, and plumbing systems.

Existing Conditions The B76, 6th floor is comprised of approximately 8,500 square feet of usable clinical space, with the east and west wings consisting of unoccupied attic space and vertical circulation. The existing 6th floor is currently unoccupied.

Construction will include, but is not limited to:

1- General Construction Work

• Demolition and removal of existing non-structural partitions, finishes, and select mechanical/electrical/plumbing elements.

• Construction of new partitions, ceilings, soffits, and architectural features in accordance with design documents.

• Installation of new doors, frames, hardware, casework, millwork, and architectural finishes (flooring, wall finishes, paint, etc.).

• Coordination with structural revisions to accommodate new mechanical and plumbing systems.

• Support installation of owner-provided equipment where indicated.

• Coordinate removal and legal disposal of all asbestos-containing materials (ACM) on the sixth floor, as identified in the hazardous materials survey. Work must comply with all federal, state, and VA regulations for asbestos abatement, including required notifications, containment, and clearance procedures.

• Contractor shall coordinate closely with VA COR and EHRM teams to ensure alignment of IT/telecom infrastructure if needed.

• All work shall be performed in a manner that minimizes disruption to adjacent areas and ongoing VA operations.

• Work shall comply with Infection Control Risk Assessment (ICRA) requirements.

2- Electrical, Communications, and Electronic Safety and Security

• Removal and replacement of electrical systems as required to support new mechanical equipment and interior layout.

• Installation of new power, lighting, controls, and emergency lighting systems.

• Installation of new telecommunications infrastructure in coordination with VA

EHRM requirements.

• Integration of electronic safety and security systems, including fire alarm modifications, access control, and nurse call as indicated.

• Provide full commissioning of the electrical systems as noted in the specifications, including completing pre-functional documentation, executing contractor testing, supporting detailed performance testing as directed by the Commissioning Agent, and training VA staff on installed system components.

3- Mechanical Work

• Demolition of existing mechanical systems as indicated.

• Providing and installation of new AHU equipment to serve the 6th floor.

• New air distribution system including all the required ductwork and its components as shown in the design documents.

• Installation of all the required hydronic work and components to support the new

AHU and the VAVs serving the 6th floor, as shown in the design documents.

• All the associated HVAC control systems shall be provided and installed by the contractor.

• Coordination of equipment placement with architectural and structural changes.

• Testing, adjusting, and balancing (TAB) of all HVAC systems.

• Enhanced commissioning of all mechanical equipment as required.

• Provide full commissioning of the mechanical systems as noted in the specifications, including participation in inspections, completing prefunctional checklists, performing contractor testing, supporting functional performance testing, and conducting training for VA staff on system operations and maintenance.

4- Plumbing and Fire Protection Work

• Removal and modification of existing plumbing systems.

• Installation of new plumbing to support handwash sinks in designated rooms and other fixtures as indicated in the design drawings.

• Coordination with mechanical and architectural systems.

• Fire protection scope to include system modifications and relocation or addition of sprinkler heads as required.

• Provide full commissioning of plumbing systems as noted in the specifications, including coordination with the Commissioning Agent for inspections, completing pre-functional checklists, facilitating functional performance testing, and providing training for VA operations staff.

• Ensure conditions around new equipment are restored similar to existing.

• Support of post project documentation.

5- Structural renovation: The structural renovations include the following.

• New floor penetrations through the existing concrete framed floor structure above

(Attic Floor). The openings shall be sized and positioned only to modify the existing concrete slabs which span between concrete joists without structural modifications. These penetrations shall not modify any existing concrete columns, beams, and joists.

• The infill of existing floor penetrations through the existing concrete framed floor structure above (Attic Floor) and below (6th Floor). These penetrations are limited in size and do not require modifications to the existing concrete columns, beams, and joists.

• A new concrete housekeeping slab shall be provided at the new mechanical equipment to be located on the existing Attic Floor.

• New wall penetrations above the Attic Floor are required within the existing exterior masonry construction. These penetrations are required for mechanical requirements and have been identified on the architectural drawings. Galvanized steel angle lintels and masonry enhancements are required at these locations.

• A few new security grills within new wall construction are required. Miscellaneous steel framing has been identified on the architectural drawings.

Safety Measures:

• Review and incorporate risk assessment and interim life safety plans and measures into safety and construction planning.

o Pre Construction Risk Analysis (PCRA) by VA o Interim Life Safety Measures (ILSM) by VA o ICRA infection control risk assessment by VA

• Generate and follow a safety plan and incorporate risk and life safety assessments.

The Contractor shall supply:

• All the materials, tools, labor, and supervision to complete this project as required on the contract drawings and in the specifications.

• Contractor will adhere strictly to the plans and specifications unless directed otherwise by the CO in writing.

Contractor shall have 455 Calendar days from the “Notice to Proceed” to complete all work. The total project duration is 455 days. This includes all processes starting with submission and approval of all submittals and ending with final punch list.”

Communications and Standards

• All contract direction, changes, financials, and contract performance are the responsibility of the VAMC Contracting Officer (CO).

• Contracting Officers Technical Representative (COR) is responsible for day-to-day operations in project and the primary point of contact (POC) for project.

• Communications to/from VAMC,

• Technical communications, submittals, RFI’s, change orders

• On site visits for construction and sub-contractors

• Construction coordination

• Site work coordination

Project is required to use the Autodesk Construction Cloud Build Platform

(ACC)

• Bath VAMC will provide licensing, permissions, and online training for this cloud-based tool at no cost to contractors.

• Contractor required to actively use Build on ACC for project documentation and coordination.

• ACC is used for submittals, requests for information, project communications and documentation.

o No contract financial information on ACC o No personal identification information on ACC.

Project must, at a minimum, be in accordance with

• All federal, state, and local building and safety codes MUST be followed.

• All work is to be completed as shown on the contract documents drawings and specifications unless otherwise directed by the facility/CO in writing.

• Industry Construction Standards

• National Fire Protection Association (NFPA),

• Underwriters Laboratory,

• International Building Code IBC 2003,

• National Electric Code (NEC),

• VA Information Security Handbook 6500.6, etc.

The C&A Information Technology requirements do not apply, and a Security Accreditation Package is not required.

VA supplies Access and coordination with Bath VAMC station utilities and site

Licensing, permissions, and online training for Autodesk Construction Cloud Build (ACC).

Location on station, north of railroad tracks, for staging area, trailers, parking, unless otherwise directed by COR.

Bath VA Medical Center 76 Veterans Avenue Bath, NY 14810
Existing Conditions
Construction will include, but is not limited to:
New floor penetrations through the existing concrete framed floor structure above (Attic Floor). The openings shall be sized and positioned only to modify the existing concrete slabs which span between concrete joists without structural modification...
The infill of existing floor penetrations through the existing concrete framed floor structure above (Attic Floor) and below (6th Floor). These penetrations are limited in size and do not require modifications to the existing concrete columns, beams...
A new concrete housekeeping slab shall be provided at the new mechanical equipment to be located on the existing Attic Floor.
New wall penetrations above the Attic Floor are required within the existing exterior masonry construction. These penetrations are required for mechanical requirements and have been identified on the architectural drawings. Galvanized steel angle li...
A few new security grills within new wall construction are required. Miscellaneous steel framing has been identified on the architectural drawings.
Safety Measures:
The Contractor shall supply:
Contractor shall have 455 Calendar days from the “Notice to Proceed” to complete all work. The total project duration is 455 days. This includes all processes starting with submission and approval of all submittals and ending with final punch list.”
Communications and Standards
The C&A Information Technology requirements do not apply, and a Security Accreditation Package is not required.

VA supplies