This document is a comprehensive set of construction drawings for the renovation of the 6th floor of Building 76 at Bath VA Medical Center to create an outpatient mental health clinic. The project encompasses approximately 8,500 square feet of renovation work on the 6th floor plus associated attic space and involves complete demolition and replacement of architectural, mechanical, electrical, and plumbing systems. The scope includes removal of all existing steam radiators, window AC units, ductwork, registers, grilles, diffusers, and interior non-load bearing walls, with steam piping demolished back to mains on the 5th floor and capped. New work includes installation of a complete air handling unit (AHU-1 with 7,180 CFM supply and 5,780 CFM return capacity), new ductwork and HVAC terminal units (22 VAV and 6 CAV units), new plumbing fixtures including water closets with sensor flush valves and lavatories, domestic water and sanitary piping systems, and new fire protection sprinkler piping. The renovation is classified as a "modification" per NFPA 101, with the 6th floor designated as Business Occupancy. The building is fully sprinklered with existing control systems to remain, and all new construction must comply with NFPA Chapter 38 requirements.
The mechanical systems design includes a new AHU located in the attic with dual hot water circulation pumps (HWP-1 and HWP-2 at 99 GPM each), dual chilled water pumps (CHWP-1 and CHWP-2 at 96 GPM each), two shell-and-tube heat exchangers for steam-to-hot-water conversion, and comprehensive HVAC controls with pressure-independent VAV boxes featuring CO₂-based demand-controlled ventilation. Electrical work includes lighting, power distribution, fire alarm integration, and building management system controls. Plumbing includes new domestic water supply and distribution, sanitary waste lines with cleanouts, and vent piping serving 24 new plumbing fixtures including toilets, lavatories, floor drains with trap primers, and an electric bottle filling station. All systems must achieve testing, adjusting, and balancing certification per AABC or NEBB standards. The project is located at 76 Veterans Avenue, Bath, NY 14810, and the design is 100% complete as of September 10, 2025, prepared by AE Works Ltd. in collaboration with Barber & Hoffman, Inc. (structural), Siris CX (commissioning), and RWDI USA LLC (building performance consulting).
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
418 Beaver Street
Sewickley, PA 15143
Phone: 412.287.7333 www.aeworks.com
AE Works Project Number:
A u to d e s k D o c s /V
B A
T -0
B a th V
A th F l O u tp a ti e n t M e n ta l H e a lt h
/V B
A T
-0
A R
C H
.r v t
/8
/2
:1
:1
A
M
G001
COVER SHEET OUTPATIENT MENTAL HEALTH
CLINIC, BUILDING 76, 6TH FLOOR
76 VETERANS AVENUE, BATH, NY 14810
528A6-19-604
09/10/2025 BAS AC
100% CONSTRUCTION
DOCUMENTS
VBAT-005
BATH VA MEDICAL CENTER
OUTPATIENT MENTAL HEALTH CLINIC
BUILDING 76, SIXTH FLOOR
76 VETERANS AVENUE
BATH, NY 14810
PROJECT DIRECTORY
OWNER:
BATH VA MEDICAL CENTER
76 VETERANS AVENUE
BATH, NEW YORK 14810
ARCHITECT/ENGINEER:
AE WORKS, LTD
418 BEAVER STREET
SEWICKLEY, PA 15143
PHONE: (412) 287-7333
VICINITY MAP
SITE
LOCATION MAP
GENERAL
G001 COVER SHEET
G101 LIFE SAFETY INFORMATION
G102 LIFE SAFETY PLANS
G103 ICRA NOTES
G104 6TH FLOOR - DUST CONTROL & ICRA PLAN
ABATEMENT
ASB-01 6TH FLOOR - ASBESTOS ABATEMENT
STRUCTURAL
S100 NOTES AND DETAILS
ARCHITECTURAL
A001 ABBREVIATIONS, NOTES & SYMBOLS
AD101 6TH FLOOR - DEMOLITION PLAN
AD102 ATTIC - DEMOLITION PLAN
A101 6TH FLOOR - CONSTRUCTION PLAN
A102 ATTIC - CONSTRUCTION PLAN
A111 5TH FLOOR - REFLECTED CEILING PLAN
A112 6TH FLOOR - REFLECTED CEILING PLAN
A401 ENLARGED PLANS & ELEVATIONS
A501 CASEWORK SECTIONS AND INTERIOR DETAILS
A502 INTERIOR DETAILS
A601 DOOR / WINDOW SCHEDULE & DETAILS
A701 PARTITION TYPES
AE101 6TH FLOOR - FURNITURE, FIXTURE AND EQUIPMENT PLAN
AI101 6TH FLOOR - FINISH PLAN, SCHEDULE & DETAILS
AS101 6TH FLOOR - SIGNAGE PLAN
FIRE PROTECTION
F001 FIRE PROTECTION SYMBOLS, ABBREVIATIONS AND DETAILS
FD101 6TH FLOOR - SPRINKLER DEMOLITION PLAN
F101 6TH FLOOR - FIRE PROTECTION -NEW WORK PLAN
F102 ATTIC - FIRE PROTECTION - NEW WORK PLAN
PLUMBING
P001 PLUMBING SYMBOLS, SCHEDULES, DETAILS & NOTES
PD101 OVERALL PLUMBING DEMOLITION PLANS
P101 PLUMBING PLANS - DOMESTIC WATER
P102 PLUMBING PLANS - SANITARY AND VENT
P103 ATTIC LEVEL - PLUMBING PLAN
P901 DOMESTIC WATER RISER DIAGRAMS
P902 SANITARY AND VENT RISER DIAGRAMS
SITE
CONTACT:
DAN KRAJCIR-WATTS
PROJECT SECTION (HEALTHCARE ENGINEER)
DANIEL.KRAJCIRWATTS@VA.GOV
CAMPUS MAP
NORTH
SHEET INDEX
MECHANICAL
M001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
MD100 5TH FLOOR - DUCTWORK - DEMOLITION PLAN
MD101 6TH FLOOR - DUCTWORK - DEMOLITION PLAN
MD102 ATTIC - DUCTWORK - DEMOLITION PLAN
MD103 ATTIC - HYDRONICS - DEMOLITION PLAN
M100 5TH FLOOR - DUCTWORK - NEW PLAN
M101 6TH FLOOR - DUCTWORK - NEW PLAN
M102 ATTIC - DUCTWORK - NEW PLAN
M113 DUCTWORK - NEW PLAN - SECTION VIEWS
M201 6TH FLOOR - HYDRONICS - NEW PLAN
M202 ATTIC - HYDRONICS - NEW PLAN
M301 HVAC DETAILS
M302 HVAC DETAILS
M303 HVAC DETAILS
M304 HVAC DETAILS
M401 MECHANICAL SCHEDULES
M402 MECHANICAL SCHEDULES
M500 HVAC CONTROLS - LEGEND
M501 HVAC CONTROLS 1
M502 HVAC CONTROLS 2
M503 HVAC CONTROLS 3
ELECTRICAL
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED101 ELECTRICAL 6TH FLOOR DEMOLITION PLANS
ED102 ELECTRICAL ATTIC POWER & COMMUNICATIONS DEMOLITION PLAN
E101 6TH FLOOR LIGHTING PLAN
E201 6TH FLOOR POWER PLANS
E202 ATTIC POWER & COMMUNICATIONS PLAN
E301 6TH FLOOR COMMUNICATIONS PLAN
E401 6TH FLOOR FIRE ALARM PLANS
E501 ELECTRICAL DETAILS
E502 ELECTRICAL DETAILS
E601 ELECTRICAL SCHEDULES & ONE-LINE DIAGRAM
E602 ELECTRICAL SCHEDULES
# Revisions Date
STRUCTURAL ENGINEER:
BARBER & HOFFMAN, INC.
1659 PA-228
CRANBERRY TWP, PA 16066
COMMISSIONING ENGINEER:
SIRIS CX
11 E WALL ST., SUITE 228
MOUNT PLEASANT, SC 29464
BUILDING PERFORMANCE CONSULTANTS
RWDI USA LLC
1608 WALNUT ST., SUITE 1603,
PHILADELPHIA, PA 19103
CONTACT:
BEVERLY SHELBY
PROJECT MANAGER
BEVERLY@AEWORKS.COM
SITE
RESULT NFPA SECTION / TITLE
(NFPA 101. NFPA 220 NOTED
WHERE APPLICABLE)
MIXED USE OCCUPANCY - (Overall building)
B Business
CONSTRUCTION TYPE
FIRE RESISTIVE REQUIREMENTS
PRIMARY STRUCTURAL FRAME - INCLUDING:
COLUMNS, AND STRUCT. MEMBERS CONNECTED TO COLUMNS
BEARING WALLS
EXTERIOR
INTERIOR (SUPPORTING MORE THAN 1 STORY)
NONBEARING WALLS & PARTITIONS
EXTERIOR
FLOOR CONSTRUCTION AND ASSOCIATED SECONDARY
MEMBERS
ROOF CONSTRUCTION AND ASSOCIATED SECONDARY
B Business
- 6.1.14 Multi Use. Must comply with
6.1.14.3 Mixed occupancies or 6.1.14.4
Separated occupancies.
EXISTING BUSINESS OCCUPANCY w/ Ancillary 6.1.11.1 & 43.2.1 & Chapter 39
NFPA TYPE I (332) I (332) Per NFPA 220 Table A.4.1.1
N/A 18.3.7..1 & 18.3.7.1 (2): Two smoke compartments in buildings containing healthcare. Every story regardless of use.
18.3.7.6 20 MIN Min. Rating for Doors
EXISTING
N/A (Columns at exterior walls)
N/A
2 HOUR (Supporting 1 floor)
2 HOUR
CORRIDORS (W/ SPRINKLER SYSTEM)
MIXED-USE OCCUPANCY (NFPA) overall existing building
6TH FLOOR = EXISTING BUSINESS OCCUPANCY w/ Ancillary Assembly & Storage Areas
SMOKE BARRIER SUBDIVISION
AN APPROVED AUTOMATIC SPRINKLER
SYSTEM IS AN ACCEPTABLE SUBSTITUTE FOR A 1-
HOUR FIRE RESISTANCE RATED CONSTRUCTION,
PROVIDED SUCH A SYSTEM IS NOT OTHERWISE
REQUIRED BY OTHER PROVISIONS OF THE CODE, OR
USED FOR AN ALLOWABLE AREA INCREASE.
0 HOUR RATED 38.3.6.1: 0 HR Fully Sprinklered
FIRE DETECTION AND PREVENTION
AUTOMATIC SPRINKLERS
ALL FLOORS
FIRE ALARM SYSTEM
FIRE EXTINGUISHERS
EXITING REQUIREMENTS
OCCUPANT LOAD - STORAGE
EGRESS WIDTH
CORRIDORS - any facility not listed in table (includes B)
EXITING STAIRWAYS
OTHER EGRESS COMPONENTS
EGRESS DOORS
FULLY SPRINKLERED -
YES -
YES. ALSO REFER TO MEP/FP DWGS. -
NFPA 10 Section 5.4.1.2 Ordinary Hazard
170 SF/ 500 preliminary sf = 1 500 GSF/ Occ.
8,330 SF/ 150 = 56 OCCUPANTS - 150 SF/ Occ
44" MIN. - See below for bed movement & treatment area requirements
T7.3.3.1: 0.2"/occ & 38.2.3 & 39.2.3.1, not less than 44"
T7.3.3.1: 0.3"/occ &Table 7.2.2.2.1.1(b) Exisitng
EXISTING EXCEED REQ'D WIDTH. SEE PLAN
DESCRIPTION
VERTICAL SHAFTS OPENINGS 2 HR 2 HR per 8.6.5(1) and Table: 8.3.2.2.2
STORAGE AREAS 8.7.1.2: Provide Smoke Partition at storage area according with Section 8.4
SMOKE PARTITION
MEMBERS
NFPA 18.2.5.7.3.3: Travel distance within a non-sleeping suite to an exit access door from the suite shall not exceed 100 ft
ASSEMBLY AREAS 0 HR within B OccupancyN/A Assembly Classified B per above
DEAD END CORRIDOR - BUSINESS 38.2.5.2.1: 50 FEET MAX If sprinklered
COMMON PATH OF TRAVEL - BUSINESS 38.2.5.3.1: 100 FEET If sprinklered
EXITING ACCESS TRAVEL DISTANCE - BUSINESS
38.2.6: 200 FEET
38.2.6.3: 300 FEET fully sprinklered
100 FEET
EXISTING LEVEL-5 COMPOSED OF OUTPATIENT CLINICS. (BUSINESS OCCUPANCIES)
NFPA 220 TABLE 4.1.1
3 HOUR
3 HOUR
3 HOUR
0 HOUR
Project to comply with option of: 6.1.14.4 Separated occupancies.
2 HOUR EXISTING
EXISTING
50 FEET
300 FEET
A Assembly - Classified as Business per NFPA Group Rooms Classified as B Business N/A per 3.3.205.2: Less than 50 Occupants
S Storage Areas Ancillary. See separation requirements below
OCCUPANT LOAD - BUSINESS
CORRIDORS - in ambulatory care areas with stretcher traffic
CORRIDORS - Group I-2 / bed movement corridors
(44" MIN at non-treatment areas/ exit access)
8 feet (48" from sleeping rooms; 44" min at non-treatment areas/ exit access)
CLASSIFICATION OF HAZARD OF CONTENTS ORDINARY HAZARD FOR BUSINESS 38.1.5 - ORDINARY
T7.3.3.1: 0.2"/ occ & 18.2.3.4 - 8 feet
T7.3.3.1: 0.2"/ occ & 20.2.3.2
LIFE SAFETY SUMMARY
EXISTING EXCEED REQ'D WIDTH. SEE PLAN
T7.3.3.1: 0.2"/occ
T7.3.3.1: 0.2"/occ
STAIR ENCLOSURES 7.1.3.2.1 (2hr more than 4 stories)2 HR
N/A
Ordinary Hazard includes Class A and Class B.
Per 18.3.7.2 Smoke barrier requirements do not apply
TELECOMMUNICATIONS VA Fire Protection Design Manual0 HR
EXISTING BUILDING IS FULLY-SPRINKLERED
B Business
Project work classified as a "Modification" as defined by Section 43.2.2.1.3
43.5.1.3 Newly constructed elements, components, and
systems shall comply with the requirements of other sections of code applicable to new construction [i.e. Chapter 38]
SUMMARY OF WORK
THE AREA OF WORK BEING RENOVATED IN THIS PROJECT IS LIMITED TO THE
CENTRAL PORTION OF THE SIXTH FLOOR WITH THE EXCEPTION OF
INCIDENTAL WORK REQUIRED FOR COMPLETION, SUCH AS MEP TIE-INS/
MINOR REMOTE WORK. NEW WORK AT THE SIXTH FLOOR IS COMPOSED OF
ONE OCCUPANCY TYPE WITH SUPPORTING ANCILLARY SPACES. THERE WILL
BE NO CHANGE TO BUILDING OCCUPANCY TYPES.
THE PROJECT IS CONSIDERED A "MODIFICATION" PER NFPA AS DEFINED BY
NFPA 101 SECTION 43.2.2.1.3. AS SUCH, NFPA CHAPTER 39 (EXISTING
BUSINESS OCCUPANCY) APPLIES AND NEWLY CONSTRUCTED ELEMENTS,
COMPONENTS AND SYSTEMS ARE TO COMPLY WITH REQUIREMENTS OF
CHAPTER 38 (NEW BUSINESS OCCUPANCY).
2024 NFPA TABLE 7.3.1.2 OCCUPANT LOAD FACTOR
FLOOR AREA PER OCCUPANTFUNCTION OF SPACE
STORAGE 500 GROSS
ASSEMBLY AREAS UNCONCENTRATED 15 NET
BUSINESS AREAS 150 GROSS
HEALTH CARE USE
240 GROSSINPATIENT TREATMENT
DEPARTMENTS
SLEEPING DEPARTMENTS
AMBULATORY HEALTH CARE
120 GROSS
150 GROSS
REFER TO BUSINESSOUTPATIENT
OCCUPANCY TYPE
SIXTH FLOOR WORK AREA
NFPA 3.3.205.7: HEALTH CARE OCCUPANCY. AN OCCUPANCY USED TO
PROVIDE MEDICAL OR OTHER TREATMENT OR CARE SIMULTANEOUSLY
TO FOUR OR MORE PATIENTS ON AN INPATIENT BASIS, WHERE SUCH
PATIENTS ARE MOSTLY INCAPABLE OF SELF-PRESERVATION DUE TO
AGE, PHYSICAL OR MENTAL DISABILITY, OR BECAUSE OF SECURITY
MEASURES NOT UNDER THE OCCUPANTS’ CONTROL.
INPATIENT TREATMENT APPLIES TO HEALTH CARE, OUTPATIENT
FACILITY, PATIENTS ARE CAPABLE OF SELF PRESERVATION.
RENOVATION TO COMPLY WITH NFPA BUSINESS OCCUPANCY.
NFPA USE GROUP: BUSINESS
NFPA 3.3.295 SUITE: (FOR REFERENCE ONLY, NOT APPLICABLE FOR THIS
PROJECT).
3.3.295.2 HEALTH CARE SUITE (HEALTH CARE OCCUPANCIES). A ROOM
OR ROOMS SHARING A MEANS OF EGRESS SEPARATED FROM THE
REMAINDER OF THE BUILDING BY WALLS, DOORS, FLOORS, AND
CEILINGS.
3.3.295.3 NON-PATIENT-CARE SUITE (HEATH CARE OCCUPANCIES).
A HEALTH CARE SUITE THAT IS NOT INTENDED FOR PATIENT SLEEPING
OR CARE.
3.3.295.4 PATIENT CARE NON-SLEEPING SUITE (HEALTH CARE
OCCUPANCIES). A HEALTH CARE SUITE PROVIDING CARE FOR ONE OR
MORE PATIENTS NOT INTENDED FOR OVERNIGHT PATIENT SLEEPING.
3.3.295.5 PATIENT CARE SLEEPING SUITE (HEALTH CARE OCCUPANCIES).
A HEALTH CARE SUITE CONTAINING ONE OR MORE BEDS INTENDED FOR
OVERNIGHT PATIENT SLEEPING.
NFPA 3.3.205.2: ASSEMBLY OCCUPANCY. AN OCCUPANCY (1) USED FOR A
GATHERING OF 50 OR MORE PERSONS FOR DELIBERATION, WORSHIP,
ENTERTAINMENT, EATING, DRINKING, AMUSEMENT, AWAITING
TRANSPORTATION, OR SIMILAR USES; OR (2) USED AS A SPECIAL
AMUSEMENT BUILDING, REGARDLESS OF OCCUPANT LOAD.
LIFE SAFETY REVIEW
APPLICABLE CODES:
NFPA 101 (2024) IS THE PRIMARY CODE REQUIREMENT FOR VA COMPLIANCE.
NFPA 101 LIFE SAFETY CODE- LATEST VERSION (2024)
NFPA 220 STANDARD ON TYPES OF BUILDING CONSTRUCTION- LATEST VERSION (2024)
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) - INCLUDING VA
SUPPLIMENT (PG-18-13) GOVERNS OVER ADA. (2010 ADA STANDARDS FOR ACCESSIBLE
DESIGN - REFERENCE ONLY)
ICC/ANSI A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
NFPA CODES 13, 70, 72, 75, 90A AND 2001
INTERNATIONAL BUILDING CODE (IBC) 2004
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2004
INTERNATIONAL MECHANICAL CODE (IMC) 2004
INTERNATIONAL PLUMBING CODE (IPC) 2004
INTERNATIONAL FUEL GAS CODE (IFGC) 2004
INTERNATIONAL FIRE CODE (IFC) 2004
MANUALS AND GUIDELINES:
PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
PG-18-4 STANDARD DETAILS AND CAD STANDARDS
PG-18-5 EQUIPMENT GUIDE LIST
PG-18-9 SPACE PLANNING CRITERIA
PG-18-10 DESIGN MANUALS (BY DISCIPLINE)
VA ARCHITECTURAL DESIGN MANUAL
VA ASBESTOS ABATEMENT MANUAL
VA MANUAL FOR PREPARATION OF COST ESTIMATES & RELATED DOCUMENTS
FOR VA FACILITIES
VA ELECTRICAL DESIGN MANUAL
VA FIRE PROTECTION DESIGN MANUAL – 9TH EDITION (NOVEMBER 2023)
VA HVAC DESIGN MANUAL – MARCH 1, 2024
VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL
PG-18-12 DESIGN GUIDES (GRAPHICAL, BY FUNCTION)
PG-18-13 BARRIER FREE DESIGN GUIDES
PG-18-14 ROOM FINISHES, DOOR, AND HARDWARE SCHEDULE
PG-18-15 MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS
H-18-8 SEISMIC DESIGN HANDBOOK
BUILDING DATA
EXISTING BUILDING HEIGHT: SIX STORIES
EXISTING SIXTH FLOOR AREA
AREA OF RENOVATION (WORK AREA) = APPROX. 8,500 SF
FINISH REQUIREMENTS
FINISH REQUIREMENTS:
SECTION 38.3.3 INTERIOR FINISH. INTERIOR FINISH SHALL BE IN ACCORDANCE WITH SECTION 10.2.
38.3.3.2.1. INTERIOR WALL AND CEILING FINISH MATERIAL COMPLYING WITH SECTION 10.2 SHALL BE CLASS A OR CLASS B IN EXITS
AND IN EXIT ACCESS CORRIDORS.
38.3.3.2.2. INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A, CLASS B, OR CLASS C IN AREAS OTHER THAN THOSE SPECIFIED
IN 38.3.3.2.1
SECTION 10.2.8.1 OTHER THAN AS REQUIRED IN 10.2.4, WHERE AN APPROVED AUTOMATIC SPRINKLER SYSTEM IS INSTALLED IN ACCORDANCE WITH SECTION 9.7, CLASS C INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE PERMITTED IN ANY LOCATION WHERE CLASS B IS REQUIRED, AND CLASS B INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE PERMITTED IN ANY LOCATION
WHERE CLASS A IS REQUIRED.
SECTION 38.3.3.3.2 INTERIOR FLOOR FINISH IN EXIT ENCLOSURES SHALL BE CLASS I OR CLASS II.
FIRE EXTINGUISHERS:
NFPA 10 SECTION 5.4.1.2 ORDINARY HAZARD INCLUDES CLASS A AND CLASS B.
CLASS A – COMBUSTIBLE MATERIALS
CLASS B – FLAMMABLES WITH MODERATE RATES OF HEAT RELEASED
NFPA 10 TABLE 6.2.1.1 CLASS A HAZARDS:
MINIMUM RATED FE: 2-A
MAXIMUM FLOOR AREA PER FE: 11,250 SF
MAXIMUM TRAVEL DISTANCE: 75’
NFPA 10 TABLE 6.3.1.1 CLASS B HAZARDS
ORDINARY HAZARD: 20B
MAXIMUM TRAVEL DISTANCE 50’
FIRE EXTINGUISHERS TO REMAIN ON FLOOR DURING DEMOLITION AND DURING DOWN TIME OF FIRE SUPPRESSION SYSTEM.
FIRE AND SMOKE PROTECTION:
CORRIDOR CONSTRUCTION:
NFPA SECTION 38.3.6.1 CONSTRUCTION –THE CORRIDOR WALLS IN BUSINESS OCCUPANCY ARE REQUIRED TO HAVE A MINIMUM ONE-HOUR FIRE-RESISTANCE RATING SHALL COMPLY WITH SECTION 8.3 FOR FIRE BARRIERS.
• EXCEPTIONS
• RATING NOT REQUIRED WITHIN BUILDINGS PROTECTED THROUGHOUT BY AN APPROVED
AUTOMATIC SPRINKLER SYSTEM.
SUMMARY: THE CORRIDOR IS NOT REQUIRED TO BE RATED DUE TO EXCEPTION IN NFPA SECTION 38.3.6.1..
EXIT ENCLOSURES:
NFPA SECTION 7.1.3.2.1 EXITS. INTERIOR EXIT STAIRWAYS SHALL BE ENCLOSED WITH FIRE BARRIERS CONSTRUCTED IN ACCORDANCE WITH SECTION 8.2 EXIT ENCLOSURES SHALL HAVE A FIRE-RESISTANCE RATING OF NOT LESS THAN 2 HOURS WHERE CONNECTING FOUR STORIES OR MORE AND NOT LESS THAN 1
HOUR WHERE CONNECTING LESS THAN FOUR STORIES.
SUMMARY: THE EXISTING STAIR EXITS ARE EQUIPPED WITH 90 MINUTE LABELED DOORS FOR 2HR SHAFT
ENCLOSURE.
SHAFT ENCLOSURES:
NFPA 8.6.5(1): 2 HOURS CONNECTING 4 STORIES OR MORE.
SMOKE PARTITIONS:
NFPA SECTION 8.4.1 GENERAL. WHERE REQUIRED ELSEWHERE IN THIS CODE, SMOKE PARTITIONS SHALL BE
PROVIDED TO LIMIT THE TRANSFER OF SMOKE.
SMOKE BARRIERS:
NFPA SECTION 8.5.1* GENERAL. WHERE REQUIRED BY CHAPTERS 11 THROUGH 43, SMOKE BARRIERS SHALL BE PROVIDED TO SUBDIVIDE BUILDING SPACES FOR THE PURPOSE OF RESTRICTING THE MOVEMENT OF SMOKE.
NFPA SECTION 18.3.7.1. BUILDINGS CONTAINING HEALTH CARE FACILITIES SHALL BE SUBDIVIDED BY SMOKE
BARRIERS (SEE 18.2.4.4), UNLESS OTHERWISE PERMITTED BY 18.3.7.2.
18.3.7.2 THE SMOKE BARRIER SUBDIVISION REQUIREMENT OF 18.3.7.1 SHALL NOT APPLY TO ANY OF THE
FOLLOWING OCCUPANCIES:
(1) STORIES THAT DO NOT CONTAIN A HEALTH CARE OCCUPANCY LOCATED DIRECTLY ABOVE THE HEALTH
CARE OCCUPANCY.
(2) AREAS ON HEALTH CARE FLOORS THAT DO NOT CONTAIN A HEALTH CARE OCCUPANCY AND THAT ARE SEPARATED FROM THE HEALTH CARE OCCUPANCY BY A 2-HOUR FIRE BARRIER COMPLYING WITH 8.3
(3) STORIES THAT DO NOT CONTAIN A HEALTH CARE OCCUPANCY AND THAT ARE BELOW THE HEALTH CARE
OCCUPANCY.
(4) OPEN AIR PARKING STRUCTURES PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC
SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7
SUMMARY: SMOKE BARRIER SUBDIVISION IS NOT REQUIRED AT WORK AREA OF LEVEL SIX.
SIXTH FLOOR OCCUPANT LOAD
AREA (SF)ROOM USE GROUP LOAD FACTOR OCCUPANTS
RECEPTION 155 150 2B
COPY 176 150 2B
STORAGE 24 500 1S
PRESCRIBER 122 1B
115 1B
123 1B
122 1B
177 2B
TREATMENT 178 2B
STORAGE 22 1S
STAFF TLT 52 1S
STORAGE 24 1S
STAFF LOUNGE 172 2B
HAC 500 1S
PRESCRIBER
PRESCRIBER
PRESCRIBER
PRESCRIBER
127 1BTELEHEALTH 150
128 1BNURSE 150
130 1BNURSE 150
133 1BNURSE 150
339 12BGROUP THERAPY 150
364 22BGROUP THERAPY 150
STORAGE 74 1S 500
110 1BPSYCH INTERN 150
110 1BPSYCH INTERN 150
151 2BPSYCH TESTING 150
151 2BPSYCH TESTING 150
42 1BTEST 150
44 1BTEST 150
116 1BSOCIAL WORK 150
123 1BSOCIAL WORK 150
125 1BSOCIAL WORK 150
123 1BSOCIAL WORK 150
200 2BSOCIAL WORK 150
STORAGE 34 1S 500
TOILET 53 1B 150
TOILET 56 1B 150
TOILET 56 1B 150
IT/DATA 189 1S 500
WAITING 441 3B 150
NORTH WING 4390 9S 500
SOUTH WING 6720 14S 500
TOTAL OCCUPANCY THIS FLOOR 103
THREE (3) EXISTING EXIT STAIRS =
35 OCCUPANTS SERVED PER STAIR
AREA OF WORK KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
418 Beaver Street
Sewickley, PA 15143
Phone: 412.287.7333 www.aeworks.com
AE Works Project Number:
A u to d e s k D o c s /V
B A
T -0
B a th V
A th F l O u tp a ti e n t M e n ta l H e a lt h
/V B
A T
-0
A R
C H
.r v t
/8
/2
:1
:1
A
M
G101
LIFE SAFETY INFORMATION OUTPATIENT MENTAL HEALTH
CLINIC, BUILDING 76, 6TH FLOOR
76 VETERANS AVENUE, BATH, NY 14810
528A6-19-604
09/10/2025 JW AC
100% CONSTRUCTION
DOCUMENTS
VBAT-005
NORTH
# Revisions Date
R-Values:
Roofs, Walls, and Floor Slabs shall comply with the minimum values noted
IECC, Table C402.1.3
Roof = R-30 Ci Mass = R-11.4 Ci Wall, Below Grade = R-7.5 Mass Floors = R-14.6 Ci
Climate Zone:
Zone 5A
IECC, Figure C301.1
Bath, NY is located in Climate Zone 5A.
Frost Line is 4 Feet below grade.
Building Design: Code Reference: Summary:
ENERGY REQUIREMENTS:
DN UP DN
UP
DN UP
AREA OF RENOVATION
EXISTING FIRE BARRIER
EXISTING
LAUNDRY
CHUTE
(2HR)
EXISTING ELEC.
CLOSET
EXISTING 44" FIRE RATED
DOOR (90 MIN).
(CLEAR 43" / 0.2) = 215
OCCUPANT CAPACITY
EXISTING
FIRE
BARRIER
EXISTING STAIR C6 DOOR
(90 MIN).= 42" (CLEAR 41"
/ 0.2) = 205 OCCUPANT
CAPACITY
EXISTING 44" FIRE RATED
DOOR (90 MIN).
(CLEAR 43" / 0.2) = 215
OCCUPANT CAPACITY
N.I.C.N.I.C.
N.I.C.
EXISTING MECH/
ELEC/ STOR
3290 SF
EXISTING
STOR
1100 SF
4,390 SF TOTAL NORTH WING
4,390/ 500 (NFPA) = 9 OCCUPANTS
6,720 SF TOTAL SOUTH WING
6,720/ 500 (NFPA) = 14 OCCUPANTS
N.I.C.
SOUTH WING
NORTH WING
640 SF
EXISTING STOR
6080 SF
STAIR C6 SERVES EXISTING MECH/ ELEC/
STORAGE IN ATTIC ABOVE =+- 8,000 SF
8,000/ 500 (NFPA) = 16 OCCUPANTS
STAIR C6
SMOKE PARTITION
(Not required but provided to maintain existing Life Safety).
189 SF
IT / DATA
74 SF
STORAGE
STORAGE
E X
IT
D o o r
206 ' EXIT ACCESS TRAVEL
47' C.P.T.
110 SF
PSYCH INTERN
BUSINESS
110 SF
PSYCH INTERN
BUSINESS
151 SF
PSYCH
TESTING
BUSINESS
151 SF
PSYCH
TESTING
BUSINESS
44 SF
TEST
BUSINESS
42 SF
TEST
BUSINESS
116 SF
SOCIAL WORK
BUSINESS
123 SF
SOCIAL WORK
BUSINESS
125 SF
SOCIAL WORK
BUSINESS
123 SF
SOCIAL WORK
BUSINESS
200 SF
SOCIAL WORK
BUSINESS
155 SF
RECEPTION
BUSINESS
176 SF
COPY
BUSINESS
34 SF
STORAGE
STORAGE
53 SF
TOILET
BUSINESS
56 SF
TOILET
BUSINESS
56 SF
TOILET
BUSINESS
441 SF
WAITING
BUSINESS
24 SF
STOR
STORAGE
122 SF
PRESCRIBER
BUSINESS
115 SF
PRESCRIBER
BUSINESS
122 SF
PRESCRIBER
BUSINESS
123 SF
PRESCRIBER
BUSINESS
177 SF
PRESCRIBER
BUSINESS
178 SF
TREATMENT
BUSINESS
130 SF
NURSE
BUSINESS
133 SF
NURSE
BUSINESS
128 SF
NURSE
BUSINESS
127 SF
TELEHEALTH
BUSINESS
31 SF
HAC
172 SF
STAFF LOUNGE
BUSINESS
22 SF
STORAGE
STORAGE
52 SF
STAFF TLT
BUSINESS
339 SF
GROUP
THERAPY
BUSINESS
364 SF
GROUP
THERAPY
BUSINESS
ELEVATOR
NO.2
ELEVATOR
NO.3
E X
IT
D o o r
E X
IT
D o o r
6ATS3-76
ELEV
NO.1
PENTHOUSE
24 SF
STORAGE
STORAGE
33 ' C.P.T.
FEC
FEC FEC174' EXIT ACCESS TRAVEL
DN
DN
SMOKE PARTITIONS
AT STORAGE ROOMS, TYP
SMOKE PARTITIONS
AT STORAGE ROOMS, TYP
SMOKE PARTITIONS
AT STORAGE ROOMS, TYP
103 TOTAL OCCUPANTS THIS FLOOR
EXISTING STAIR DOOR
(90 MIN).= 42" (CLEAR 41" / 0.2) =
205 OCCUPANT CAPACITY
EXISTING STAIR DOOR
(90 MIN).= 42" (CLEAR 41" / 0.2) =
205 OCCUPANT CAPACITY
AREA (SF)
EXIT GENERATOR (OCCS / SF)
OCCUPANTS
EGRESS SYMBOL LEGEND
(135)
34"
DOOR(S)
EXIT
(REQUIRED OCCUPANTS)
EXIT WIDTH
EXIT COMPONENT
EXIT PATH
EXIT CAPACITY
FEC FIRE EXTINGUISHER CABINET
COMMON PATH OF TRAVEL
EXIT ACCESS TRAVEL DISTANCE
1 HOUR RATED
FIRE PARTITION
2 HOUR RATED
FIRE PARTITION
SMOKE PARTITION
RATED PARTITION KEY
EXISTING
NEW
EXISTING
NEW
EXISTING
NEW
ELEVATOR
MACHINE ROOM
7ATC2
STAIR C
30' EXIT ACCESS TRAVEL
DN
UP
DN UP
SCOPE LIMITED TO ABOVE CEILING WORK
N.I.C.
N.I.C.
N.I.C.
N.I.C.
DN
WOMEN'S TOILET
527A
SWS & BH
EXAM 12
528A
EXAM
EXAM
528B
DISPOSITION
528C
EXAM 15
EXAM 16
505A
EXAM 17
EXAM 18
504A
EXAM 9
503A
EXAM 10
WAITING
REGISTRATION
500A
STORAGE
500B
OFFICE
OFFICE
STAFF TOILET
559A
EXAM 19
SHARED STAFF
558A
CONF
MENS
535A
EXAM
EXAM 16
534A
EXAM 17
EXAM 14
EXAM 15
533A
RN WORK ROOM
530PHYS. WORK
ROOM
MED
528D
CORRIDOR
5HA7-76
TOILET
TOILET
STAIR C5
C5
ELEVATOR
NO. 2
ELEVATOR
NO. 3
NO CHANGE TO LAYOUT, FUNCTION, OR OCCUPANCY AT THIS LEVEL.
EXISTING EGRESS PATHS INDICATED FOR REFERENCE.
212' EXIT ACCESS TRAVEL 138' EXIT ACCESS TRAVEL
33 ' C.P.T. 64 ' C.P.T.
E X
IT
D o o r
1/16" = 1'-0"
SIXTH FLOOR LIFE SAFETY PLAN
AREA OF WORK KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
418 Beaver Street
Sewickley, PA 15143
Phone: 412.287.7333 www.aeworks.com
AE Works Project Number:
A u to d e s k D o c s /V
B A
T -0
B a th V
A th F l O u tp a ti e n t M e n ta l H e a lt h
/V B
A T
-0
A R
C H
.r v t
/8
/2
:1
:2
A
M
G102
LIFE SAFETY PLANS OUTPATIENT MENTAL HEALTH
CLINIC, BUILDING 76, 6TH FLOOR
76 VETERANS AVENUE, BATH, NY 14810
528A6-19-604
09/10/2025 JW AC
100% CONSTRUCTION
DOCUMENTS
VBAT-005
NORTH
# Revisions Date
1/16" = 1'-0"
ATTIC - SAFETY PLAN
1/16" = 1'-0"
FIFTH FLOOR LIFE SAFETY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
418 Beaver Street
Sewickley, PA 15143
Phone: 412.287.7333 www.aeworks.com
AE Works Project Number:
A u to d e s k D o c s /V
B A
T -0
B a th V
A th F l O u tp a ti e n t M e n ta l H e a lt h
/V B
A T
-0
A R
C H
.r v t
/8
/2
:1
:2
A
M
G103
ICRA NOTES OUTPATIENT MENTAL HEALTH
CLINIC, BUILDING 76, 6TH FLOOR
76 VETERANS AVENUE, BATH, NY 14810
528A6-19-604
09/10/2025 JW AC
100% CONSTRUCTION
DOCUMENTS
VBAT-005
# Revisions Date
A C D E F G H I J
K
ELEVATOR
NO.2
ELEVATOR
NO.3
SOFT ICRA
BARRIER
B
SOFT ICRA
BARRIER
SOFT ICRA
BARRIER
GRAVEL AND PAD BELOW FOR WASTE
COLLECTION. TO BE CONFIRMED WITH VA COR.
CONSTRUCTION WASTE CHUTE LOCATION.
TO BE CONFIRMED WITH VA COR.
DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT
PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND DETERMINE THE POTENTIAL RISK
GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED
"OFFICE WORKERS", MEDIUM RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK
GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH LABS, MYELO
SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC
INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE
AREA AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION PROVIDED IN THIS SUBMITTED
DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC
POLICY, SUCH AS THE RELOCATION OF HIGH RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR
ESTABLISH ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO SPECIFIC VAMC
POLICIES OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.
BATH RENOVATION
FOR THE PURPOSE OF THIS RENOVATION, THE CONSTRUCTION WORK IS CONSIDERED MEDIUM RISK AND COMPRISES WORK WHICH COULD
GENERATE MODERATE TO HIGH LEVELS OF DUST NOT WITHIN THE CONFINES OF A SUITE OR OFFICE AND INCLUDES EXTENSIVE CONSTRUCTION
WORK (DEMOLITION) THROUGHOUT THE SIXTH FLOOR. THE DUST CONTROL PLAN MUST BE DISTRIBUTED AND REVIEWED BY ALL CONTRACTORS
PERFORMING WORK ON THIS CONSTRUCTION PROJECT.
A. EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF FEASIBLE SEAL OFF ADJACENT
AIR INTAKES.
• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND REPLACE AS NEEDED TO AVOID
BUILDUP OF PARTICULATE.
• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN STAIRWELLS AND
CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.
B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT DURATION PROJECTS GENERATING MINIMAL
DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING
FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-
RATED BARRIER WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING. SEAL OFF AND BLOCK
RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR CONTAINMENT. LARGE DUST PROJECTS NEED AN ENTRY VESTIBULE FOR CLOTHING
CHANGES AND TOOL STORAGE AND TIGHT SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN
INTERIM PLASTIC DUST BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID IMPERVIOUS BARRIER IS BEING
CONSTRUCTED. ANY DUST MUST BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF
THE CONSTRUCTION PROJECT DUST BARRIERS MUST BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR
MUST HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. CONTRACTOR PERSONNEL MUST
MONITOR AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST
EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE OF INSECTS AND FLIES, WET CEILING TILE, ETC.
• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES MUST BE DEFINED. EGRESS PATHS SHOULD BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHOULD BE USED ONLY DURING AFTER HOURS AND COORDINATED WITH COR; AND ONLY AUTHORIZED PERSONNEL
SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHOULD DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION
AREA AND MATERIALS.
• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS
SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS
SHOULD BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING SHOULD BE SEALED WHEN NOT IN
USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR MUST
NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITH PRIOR APPROVAL OF THE VAMC.
• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
• CEILINGS THAT ARE REMOVED/MOIFIED TO ALLOW CONSTRUCITON OF ICRA BARRIERS SHOULD BE REINSTALLED TO PRE-CONSTRUCTION
CONDITIONS.
VENTILATION AND ENVIRONMENTAL CONTROLS
• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR; FILTERS
SHOULD BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO
DIRTY AREAS.
• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS
AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF
FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST MUST BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHOULD BE USED BEFORE
EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED DAILY.
• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY
OF TESTING AIR PRESSURE THROUGHOUT THE PROJECT.
• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE OF THE PARTITION.
CONTAMINATION OF PATIENT ROOMS
• WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORK (E.G. COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED
VACUUM SHOULD BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS
UTILIZED THE CONTRACTOR MUST CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA). ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH OCCUPIED AREAS MUST BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE
OR WORK AREA.
• CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS AND SWEPT OR
HEPA-VACUUMED DAILY FOR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE
CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE
SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING OF HEAVY DIRT AND DUST FROM CONSTRUCTION AREAS.
AREA OF WORK
ICRA BARRIER LOCATION
- SOFT BARRIER UNLESS
NOTED OTHERWISE
ICRA LEGEND
BLDG 76
STAGING AREA
COR TO COORDINATE WITH
THE FACILITIES MANAGEMENT
SERVICE TO SELECT THE
STAGING/STORAGE SPACE.
AREA OF WORK KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
418 Beaver Street
Sewickley, PA 15143
Phone: 412.287.7333 www.aeworks.com
AE Works Project Number:
A u to d e s k D o c s /V
B A
T -0
B a th V
A th F l O u tp a ti e n t M e n ta l H e a lt h
/V B
A T
-0
A R
C H
.r v t
/8
/2
:1
:3
A
M
G104
6TH FLOOR - DUST CONTROL & ICRA PLAN OUTPATIENT MENTAL HEALTH
CLINIC, BUILDING 76, 6TH FLOOR
76 VETERANS AVENUE, BATH, NY 14810
528A6-19-604
09/10/2025 JW AC
100% CONSTRUCTION
DOCUMENTS
VBAT-005
NORTH
NOTES:
1. ENSURE RENOVATED AREA IS COMPLETELY SEALED OFF FROM SURROUNDING AREAS.
2. MAINTAIN MEANS OF EGRESS AT STAIR TOWERS DURING CONSTRUCTION. RESTRICT ACCESS TO FLOOR FROM WITHIN STAIRWELL DURING CONSTRUCTION.
3. COORDINATE PHASING SCHEDULE WITH COR PRIOR TO STARTING CONSTRUCTION.
4. CEILINGS THAT ARE REMOVED/MOIFIED TO ALLOW CONSTRUCITON OF ICRA BARRIERS ARE THE CONTRACTOR'S RESPONSIBILITY TO BE REINSTALLED TO PRE-CONSTRUCTION CONDITIONS.
5. REPLACE TILE AT END OF DAY UNLESS ICRA BARRIER TO REMAIN.
6. PROVIDE HAND WASH STATIONS AS REQUIRED BY ICRA REQUIREMENTS.
7. CART CONTAINMENT TO BE UTILIZED AT FIFTH FLOOR. ALL COORDINATION TO BE DONE WITH COR FOR TIMING AND LOCATION ON A DAILY BASIS.
1/8" = 1'-0"
SIXTH FLOOR DUST CONTROL AND ICRA PLAN
# Revisions Date
1" = 300'-0"
STAGING AREA PLAN
AE WORKS®
Issue Date
Phase
100% CONSTRUCTION
DOCUMENTS
09/10/2025
ABBREVIATIONS
@ At A.B. Anchor Bolt ARCH. Architect or Architectural BLDG. Building BLKG. Blocking BOTT. Bottom BRG. Bearing CANT. Cantilever CJP Complete Joint Penetration CLR. Clear CMU Concrete Masonry Unit COL. Column CONC. Concrete CONN. Connection CONST. Construction CONT. Continuous CONTR. Contractor COORD. Coordinate DET. Detail DIA. or ø Diameter DIAG. Diagonal or Diagram DWG. Drawing DWL. Dowel E.F. Each Face EL. Elevation ELEV. Elevator EMBED. Embedment E.O.S. Edge of Slab E.W. Each Way EX. Existing EXT. Exterior F.S. Far Side F.V. Field Verify GA. Gauge or Gage GALV. Galvanized H.P. High Point HORIZ. Horizontal I.F. Inside Face INT. Interior LLH Long Leg Horizontal LLV Long Leg Vertical L.P. Low Point LT. WT. Lightweight MASY. Masonry MAX. Maximum MECH. Mechanical MIN. Minimum N.F. Near Face N.T.S. Not To Scale O.C. On Center O.F. Outside Face OPNG. Opening REINF. Reinforcing or Reinforcement REQD. Required SECT. Section SIM. Similar STIFF. Stiffener or Stiffened T&B Top And Bottom T.B.D. To Be Determined TYP. Typical U.O.N. Unless Otherwise Noted VERT. Vertical W/ With WWR Welded Wire Reinforcement W.P. Work Point
1.
A.
B.
C.
2.
A.
B.
C.
D.
E.
F.
CODES AND STANDARDS
New construction has been designed to, and shall be constructed in accordance with the following building codes and standards:
New York State Building Code 2024 International Building Code (IBC 2024) ASCE 7-22, Minimum Design Loads for Buildings and Other Structures
Unless explicitly modified in the Contract Drawings and Specifications, the Contractor shall comply with provisions of:
ACI 301-20, Specifications for Structural Concrete ACI 318-19, Building Code Requirements for Structural Concrete ACI 530-19, Building Code Requirements for Masonry Structures ACI 530.1-19, Specification for Masonry Structures AISC 360-22, Specification for Structural Steel Buildings AWS D1.1-20, Structural Welding Code - Steel
DESIGN LOADS (IBC 2018)
Floor live load (unless otherwise noted)
Hospitals: operating rooms / labs ---------------------------------------------- 60 psf (2) Hospitals: corridors above first floor ------------------------------------------- 80 psf Mechanical penthouse / attic ---------------------------------------------------- 50 psf
(2) Includes 15 psf partition allowance, unreduced (IBC 1607.5)
Earthquake design data
Risk category (ASCE 7, Table 1.5-1) ----------------------------------------- IV Seismic importance factor (ASCE 7, Table 1.5-2) ------------------------- Ie = 1.5 Mapped spectral response acceleration parameters
Short period ----------------------------------------------------------------- Ss = 0.128 g 1-second period ------------------------------------------------------------ S1 = 0.044 g
Site class (assumed) -------------------------------------------------------------- D Design spectral response acceleration parameters
Short period ----------------------------------------------------------------- Sds = 0.136 g 1-second period ------------------------------------------------------------ Sd1 = 0.07 g
Seismic design category --------------------------------------------------------- C
Seismic bracing of architectural, mechanical, and electrical components For seismic design category C component bracing requirements are as follows:
Architectural components:
Ip = 1.5 Mechanical / electrical components:
Ip = 1.5
DESIGN STRESSES
Concrete minimum compressive strength in 28 days:
Misc. repairs and housekeeping pad ----------------------------------------- f'c = 3,000 psi
Reinforcing bars (ASTM A615, Grade 60) ------------------------------------------- Fy = 60,000 psi Welded wire reinforcement (ASTM A1064) ----------------------------------------- Fy = 70,000 psi Structural steel W, WT and S shapes (ASTM A992 or ASTM A572/50) ----- Fy = 50,000 psi Structural steel other shapes (ASTM A36) ------------------------------------------ Fy = 36,000 psi Anchor rods (ASTM F1554, Grade 55 weldable) ---------------------------------- Fy = 55,000 psi Metal decks (ASTM A653)
Non-composite form deck ------------------------------------------------------- Fy = 60,000 psi Hollow structural sections (ASTM A500, Grade C)
Rectangular ------------------------------------------------------------------------- Fy = 50,000 psi Round -------------------------------------------------------------------------------- Fy = 46,000 psi
Steel pipe (ASTM A53, Grade B )------------------------------------------------------ Fy = 35,000 psi Masonry -------------------------------------------------------------------------------------- f'm = 2,000 psi
Load-bearing CMU (ASTM C55 or C90) Brick (ASTM C216 Grade SW) Mortar (ASTM C270) ------------------------------------------------------------- Type M or S Grout (ASTM C476) -------------------------------------------------------------- 3,000 psi
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
GENERAL
All new construction shall comply with the Contract Documents and the Building Code.
Typical details and general notes apply to all parts of the work except where specifically detailed or unless otherwise noted.
The structural drawings illustrate structural members. Refer to architectural, mechanical, and electrical drawings for non-structural items which require special provisions during the construction of the structural members.
Drawings are not to be scaled.
Refer to architectural plans for floor depressions, openings, slopes, drains, curbs, pads, embedded items, non-bearing partitions, etc. Refer to mechanical and electrical plans for sleeves, openings, and hangers for pipes, ducts, and equipment.
No pipes or ducts shall be embedded into structural members unless so shown on the plans or approved by the Engineer.
The Contractor shall verify and be responsible for all dimensions and conditions which impact the work. Field verify sizes, elevations, hole locations, etc., prior to fabrication.
Existing conditions as shown on these plans are for reference only. The Contractor is required to field verify all existing conditions prior to construction.
The Contractor shall resolve any conflicts on the drawings or in the specifications with the Architect/Engineer before proceeding with the work.
Any deviation, modification, or substitution from the approved set of structural drawings shall be submitted to the Owner, Architect, and Engineer for review/approval prior to its use or inclusion on the shop drawings.
The Contractor shall provide means, method, techniques, sequence, and procedure of construction as required.
The Contractor shall protect all work, materials, and equipment from damage and shall provide proper storage facilities for materials and equipment during construction.
Site visits performed by the Architect/Engineer do not constitute inspections of means and methods of construction performed by the Contractor.
The Contractor shall review shop drawings for completeness and compliance with contract documents. The Contractor shall stamp shop drawings prior to submission to the Architect and Engineer.
Shop drawings will not be processed if they are incomplete, lack coordination with relevant portion of contract documents, lack calculations if required, or if deviations, modifications, and substitutions are indicated without prior written approval from the Architect/Engineer.
Do not cut or alter any structural members without written authorization of the Engineer unless indicated on the structural drawings.
1.
2.
3.
ROOF, FLOOR, OR WALL OPENINGS
The Contractor shall verify and coordinate the number, size, and location of all sleeves and openings required for mechanical or electrical items.
Sleeves and openings shall be located in a manner that will maintain the structural integrity of the roof, floor, or wall system.
No structural elements are to be cut unless specifically approved by the Engineer.
1.
2.
A.
B.
C.
3.
4.
5.
6.
CONCRETE CONSTRUCTION
All concrete construction shall be in accordance with the latest Building Code Requirements for Structural Concrete ACI 318 and ACI Detailing Manual, except that construction and removal of forms and reshoring shall be inspected by the Contractor's engineer.
Reinforcing steel shall have the following minimum coverage. Place bars as near to the concrete surface as these minima permit wherever possible, unless noted otherwise:
Exterior face of walls: 2" All other wall faces and slabs: 3/4" (#11 and smaller), 1 1/2" (#14 and #18) Beams, columns: 1 1/2" (2" for exterior)
Welded wire reinforcement for slabs on ground shall have a minimum top coverage of 1" and a maximum top coverage of 1 1/2", unless otherwise noted.
Reinforcement shall be positively supported and maintained in this position during placement of concrete.
Furnish bar supports where necessary during construction.
Slab thickness indicated over steel form deck includes form depth. Use decking that will safely support all construction loads, including wet weight of concrete.
Limit deflection of decking to 1/240 of span when loaded with the wet weight of concrete and construction loads.
Bar bends shall be made cold. Bars shall not be bent after any portion of the bar is encased in concrete.
1.
2.
3.
4.
5.
6.
7.
8.
A.
B.
LOOSE LINTEL SCHEDULE
Interior lintels shall be shop painted. Lintels exposed to weather shall be 3/8" minimum thickness and hot-dip galvanized.
Bottom plates in beam/plate assemblies shall be 1/2" less in width than the supported masonry wall. Stop end of bottom plates 1/2" from edge of opening.
Weld bottom plates to lintels with continuous fillet welds (exterior side).
Steel lintels and lintel plates in exterior walls shall be fabricated, followed by hot-dip galvanizing of the complete assembly.
Lintels shall have minimum bearing at each end of 1" per foot of opening (6" minimum) except as detailed.
Lintels shall have 8" minimum solid masonry below bearing points and shall extend beyond the full bearing area.
Lintel bearing plates shall be held back 1/2" minimum from face of masonry at opening. Provide flexible caulk between lintel and masonry at this location. Match mortar color.
The following schedules apply to all non-bearing masonry walls and to bearing walls where lintels are not indicated on the structural drawings. See drawings for other lintels in bearing walls.
For 4", 8", 12", and 16" walls, provide one angle for each 4" of masonry wall thickness with 3 1/2" leg horizontal as follows:
Span Limits Angle Size 0'-0" to 4'-0" L3 x 3 1/2 x 1/4 4'-1" to 5'-6" L4 x 3 1/2 x 5/16 5'-7" to 7'-6" L5 x 3 1/2 x 5/16 For 6" walls provide:
Span Limits Lintel Size 0'-0" to 4'-0" WT5x6 4'-1" to 5'-6" WT5x8.5 5'-7" to 7'-6" WT7x11 (interior)
WT7x13 (exterior)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
STEEL CONSTRUCTION
Steel detailing, fabrication, and erection shall conform to the AISC Specification for Structural Steel Buildings and Code of Standard Practice, and the AWS Structural Welding Code.
Stresses occurring during fabrication, shipment, and erection shall be temporary and not excessive. Stresses at all times shall be less than design and allowable stresses.
The full design and load-carrying capacity of the steel work shall not be impaired due to fabrication, shipment, or erection procedures. Throughout the complete process, the stability of all individual members and assembles shall be maintained.
The Contractor shall be responsible for the control of all erection procedures and sequences with relation to temperature differentials and weld shrinkage.
Welding electrodes shall be E70XX except where other electrodes are required for compatibility with material being welded.
Shop drawings are required and shall note type of electrodes, size of all welds, and type and size of all bolts. Shop drawings shall be prepared under the supervision of a professional engineer licensed in the jurisdiction where the project is located.
See all contract drawings for miscellaneous steel requirements.
All shop and field welding shall be performed by a recently certified welder.
Do not weld to existing steel without written approval from the Engineer.
Provide 1/4" closure plates at all open ends of HSS members.
Miscellaneous hanging loads such as stair stringers, pipes, mechanical units, etc., supported by steel members shall be applied in such a manner that no torsional forces are induced in the steel members, i.e., loads shall pass through the centerline of wide flange sections and through the shear center of channels.
1.
2.
3.
4.
5.
6.
7.
8.
STEEL DECK
The metal decking shall be of the type and gauge as indicated on the drawings.
Decking and all accessories shall be formed from steel sheets conforming to ASTM A653. The steel shall be zinc coated conforming to ASTM A924, Class G60 as required in the specifications. Deck units shall be continuous over three or more spans where possible.
Diaphragm action shall be provided for in all areas with welding pattern in accordance with manufacturer's recommendations.
All welding of metal deck shall be in accordance with AWS D1.3.
Hanging directly from roof deck shall not be permitted.
Steel deck and framing will deflect during placement of concrete. These deflections will require placement of concrete in excess of the amount based on nominal dimensions in order to bring the slab within tolerances of a horizontal plane. The Contractor shall provide the excess concrete at no cost to the Owner.
Section properties shall be determined according to the Light Gauge Steel Institute.
Comply with Steel Deck Institute Specifications for deck attachment and connectors.
Steel deck shall be erected and fastened in accordance with the manufacturer's specifications and erection layouts.
EX. BRICK VENEER
(SEE ARCH. DWGS.)
ANGLES TO EXTEND
8" BEYOND OPENING
E.E. AND BEAR ON 8" OF
SOLID MASY.
G R
O U
TE
D
S O
LI
D
N
EW
(2 ) C
O U
R
SE
S
(S
EE
M
EC
H . A
N D
AR
C H
. D W
G S.
EX. MASY. WALL
O
PE
N
IN
G
(S
EE
M
EC
H . A
N D
AR
C
H . D
W G
S.
(2)L5x3 1/2x3/8 GALV.
W/ 8" BRG. EACH END
L5x5x3/8 GALV. W/ 8"
BRG. EACH END
2- 1/
2" M
IN
CONC. INFILL W/
6x6-W1.4xW1.4
WWR
WOOD OR STEEL FORM, AT
BOTTOM AND ENDS. SCREW ONTO
BENT PLATE. REMOVE AFTER
CONCRETE ACHIEVES FULL STRENGTH.
3/8x3x0'-3" x 2'-0" LONG BENT PL.
W/ (2)1/2"ø CARBON STEEL
KWIK BOLT TZ, 3-1/4" EMBED.
TYP. BOTH SIDES.
OPENING LOCATION AND
DIMENSION SEE PLAN
EX. CONC. SLAB
LOCATE SLAB PENETRATION
BETWEEN CONCRETE JOIST RIBS.
CONCRETE JOISTS SHALL NOT BE
DAMAGED. SEE MECHANICAL DUCT
LAYOUT FOR LOCATIONS AND
DIMENSION.
DRILL 1"ø HOLE IN FOUR CORNERS
AND SAW CUT EDGES OF
OPENING.
EX. CONC. JOIST RIB
(6" WIDE TYP. AT
TOP)
2'-1"±
BARBER & HOFFMAN, INC.
ST
ATE OF NEW YORK
M
IC
HA
EL R . MI LLER
LICENSED PROFESS IONA L ENG IN
EE
R
EXCELSIOR
092005
AREA OF WORK KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works Ltd.
418 Beaver Street Sewickley, PA 15143 Phone: 412.287.7333 www.ae-works.com AE Works Project Number:
BARBER & HOFFMAN
1659 ROUTE 228, SUITE 200
CRANBERRY TWP., PA 16066-5319
724-741-0848 bh@barberhoffman.com
Au to de sk
D oc s:
//V
BA
T-
Ba th
V A
6t h
Fl O ut pa tie nt
M en ta l H ea lth
/2 0P
VA
M
C B at h
BI
M
R -2
0.
rv t 9/
9/
:1 3:
P
M
S100
NOTES AND DETAILS OUTPATIENT MENTAL HEALTH
CLINIC, BUILDING 76, 6TH FLOOR
76 VETERANS AVENUE, BATH, NY 14810
528A6-19-604
09/10/25 MRM/KJB LDW
100% CONSTRUCTION
DOCUMENTS
VBAT-005
NORTH
MASONRY EXTERIOR WALL LINTEL DETAIL3
EX. MECH. PENETRATION INFILL DETAIL2
TYP. SLAB PENETRATION PLAN DETAIL1
SYMBOLS LEGEND
SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC SYMBOLS
SHEET NUMBER SEQUENCE
SHEET TYPE
DISCIPLINE
A 101
1t
A02
Room Name
0-0000
NET SF
0 GRID LINE
ROOM NUMBER
DOOR NUMBER
WINDOW TYPE
WALL TYPE
NORTH ARROW
N
SPECIALTY
EQUIPMENT /
FURNITURE TAG
KEYNOTE
CENTER LINE
INTERIOR
ELEVATION
DETAIL
SPOT
ELEVATION
MARKERS
REVISION NUMBER
REVISION
CLOUD
EXTERIOR
ELEVATION
BUILDING SECTION
SHEET NUMBER
A301
A201
A211
A501
4 2
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
+ 10' - 0" CEILING TAG
SD CD
CL
WALL SECTION
A301
DETAIL
SHEET
LEVEL
10'-0"
WALL FINISHPT#
DATUM POINT
M
IN
6" M
A X
. 1' - 0"
M
IN
6" M
A X
1' - 6"
1' -3
M
IN
' M
A X
TOILET PAPER
DISPENSER
3'
T O
T O
P O
F B
U B
B
LE
R
ELECTRIC
WATER COOLER
ELECTRIC
WATER COOLER
(ACCESSIBLE)
3'
A D
A T
O T
O P
O F
B U
B B
LE
R
4'
PAPER TOWEL
DISPENSER W/
WASTE RECEPTACLE
GRAB BAR
TOILET PAPER
DISPENSER
8"
3'
A F
F A
D A
URINAL FLUSH
VALVE
3'
MOP SINK
BASIN
6'
T O
P O
F S
H E
LF
MOP AND BROOM
HOLDER
4'
T O
P O
F S
H E
LF
UTILITY
SHELF
1'
0"
SANITARY NAPKIN
RECEPTACLE
3'
COMBINATION PAPER
TOWEL DISPENSER W/
WASTE RECEPTACLE
4'
TOILET SEAT
COVER DISPENSER
4'
PAPER TOWEL
DISPENSER
(RECESSED)
3' - 6" MIN.
1'
M
IN
VERTICAL GRAB BAR
3'
1'
M
IN
3' - 0" MIN.
1' - 0" MIN.
TYPICAL MOUNTING HEIGHTS (ANSI), U.N.O.
1/
2"
1'
M
IN
. T O
S E
A T
4'
SANITARY NAPKIN
DISPENSER
4'
BABY CHANGING
STATION-
RECESSED
FIRE EXTINGUISHER
CABINET
CLOSET ROD
AND SHELF
ADA CLOSET
ROD AND SHELF
LO
W
E S
T O
F
M
IN
. O
R
B
E
LO
W C
LG
4'
ELEVATOR
CALL BUTTON
OUTLET
4'
WALL SWITCH THERMOSTAT
4'
M A
X
LO
W
E S
T O
F
M
IN
. O
R
B
E
LO
W C
LG
VISUAL SIGNAL STROBE
F E
H A
N D
LE
N
O T
T O
E X
C E
E D
A F
F
A .F
.F . T
O P
O F
S H
E
LF
5'
LINEN CLOSET
SHELVING
4'
FIRE ALARM
PULL BOX
4'
A C
C E
S S
IB
LE
5'
0"
ROBE HOOK
4'
4'
A T
T U
B / T
O
IL
E T
TOWEL BAR (TYP.) PERSONAL
EMERGENCY
PULL SWITCH
3'
4'
A F
F C
E N
T E
R O
F V
A
LV
E
SOAP DISPENSER
A .F
.F . A
D A
T O
P O
F S
H E
LF
4'
A .F
.F . T
O P
O F
S H
E
LF
5'
1'
M A
X
1'
TYPICAL DEVICE ALIGNMENTS, U.N.O.
TYPICAL LOCATION FOR POWER AND TELEPHONE OUTLETS AT WALL PANEL OR COLUMN,
UNLESS OTHERWISE NOTED
TYPICAL LOCATION FOR OUTLETS, SWITCHES AND THERMOSTATS, ETC. AT CREDENZA OR
COUNTERTOP
TYPICAL LOCATION FOR TWO ROWS OF LIGHT SWITCHES, DIMMERS, EGRESS BUTTONS,
THERMOSTATS, ETC.
THERMOSTAT, INTERCOM OR 2ND ROW OF
RECEPTACLES CENTER TO CLUSTER
LIGHT SWITCH, DIMMERS, EGRESS
BUTTON, INTERCOM
BUTTON, CARD READER, ETC.
FIRE ALARM DEVICE
LIGHT SWITCH, DIMMERS, EGRESS BUTTON,
INTERCOM BUTTON, CARD READER, ETC.
THERMOSTAT, INTERCOM OR 2ND ROW OF
RECEPTACLES CENTER TO CLUSTER
FIRE EXT. CABINET
WALL OUTLET, LIGHT SWITCHES, REQUEST TO EXIT BUTTONS, THERMOSTAT,
FIRE ALARM DEVICE
WALL OUTLET, FIRE EXTINGUISHER CABINET, & FIRE ALARM DEVICE
DOOR FRAME OR CORNER
FIRE ALARM DEVICE
POWER AND TELEPHONE RECEPTACLE
POWER AND TELEPHONE
RECEPTACLE CENTERED BETWEEN
PANEL JOINT
FINISH FLOOR
TYPICAL WALL PANEL JOINT
CREDENZA OR COUNTER
LIGHT SWITCHES, DIMMERS,
POWER AND TELEPHONE
RECEPTACLE, ETC. CLUSTER
FINISH FLOOR
FIRE ALARM DEVICE
POWER AND TELEPHONE RECEPTACLE
THERMOSTAT, INTERCOM
LIGHT SWITCH, DIMMERS, EGRESS BUTTON,
INTERCOM BUTTON, CARD READER, ETC.
CLUSTER, (SEE PLAN FOR QUANTITY OF EACH
CLUSTER)
b) QUAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .