This scope of work document outlines requirements for demolishing an existing concrete handicap ramp and constructing new concrete ramps at the VA Medical Center in Bath, New York. The contractor shall demolish the existing concrete ramp, curb, and asphalt drive between buildings 35 and 78, fill the exterior and interior door opening with matching masonry, construct a new concrete sidewalk, restore the asphalt drive to lawn, cut and cap an existing storm pipe, and construct a new concrete ramp between buildings 76 and 44. The general contractor is responsible for site restoration from construction activities. The contract includes items shown on drawings and specifications. Construction must be completed within 90 days of notice to proceed. The related federal contract opportunity is solicitation number 36C24223B0033 for the demolition and construction work at the VA Medical Center in Bath, New York, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. 528A6-18-622
DEMO H-CAP RAMP, B-35 & B-78
VA MEDICAL CENTER, BATH, NY 7/23/2018
Scope of Work
DEMO H‐CAP RAMP, B‐35 & B‐78/ NEW RAMP, B‐76 & B‐44
528A6‐18‐622
Contractor shall provide all labor, materials, supplies, equipment, tools, and supervision necessary to demolish existing concrete ramp located between buildings 35 & Bldg. 78, and production of new concrete ramp between buildings 76 & 44 located at the VA Medical Center in Bath, New York. Unless otherwise directed by the COR, work shall be performed in accordance with construction drawings and specifications and other standards and regulations as detailed or specified.
The General Contractor shall be responsible for: demolishing the existing concrete ramp, curb, and asphalt drive, removing existing exterior door & frame, filling the opening with matching masonry on both exterior and interior of the connecting corridor, new concrete sidewalk between buildings 35 & 78, restoring previous asphalt drive to lawn, cut & cap existing storm pipe under connecting corridor, and production of new concrete ramp between buildings 76 &
44 . The G.C. is responsible for any site restoration that may be required as a result of construction activities. This contract shall include other items as shown on the contract drawings and specifications.
Construction shall be completed 90 days from notice to proceed.