P01-Bid Doc - BOD 1-29-21 w appendix.pdf
PDF 6 MB Posted
- Solicitation number
- 36C10E21R0003
About this file
This pre-solicitation notice describes an upcoming solicitation from the Department of Veterans Affairs Veteran Benefits Administration to resurface two employee parking lots at their facility in St. Petersburg, Florida. The project scope involves repaving the north and south lots with bituminous asphalt, installing curbs, gutters, trees and new LED lighting, and reconfiguring the lots for improved traffic flow. The estimated value is between $1,000,000 to $2,000,000. The solicitation will be issued on March 30, 2021 via beta.SAM.gov, with offers due by April 30, 2021. The contract will be a single-award firm-fixed price contract for a 120-day period of performance starting at notice to proceed. The NAICS code is 237310 and it is set aside for SDVOSBs. The point of contact is provided for any questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10E21R0003 0004.docx | DOCX document | |
| Traffic Gate details.pdf | ||
| St. Petersburg Gravel Lots - FULL SPEC.pdf | ||
| Amendment 3 Questions - Answers.pdf | ||
| 36C10E21R0003 0003.docx | DOCX document | |
| 16104 ST PETERSBURG GRAVEL PARKING - FULL PLANSET.pdf | ||
| 36C10E21R0003 0002.docx | DOCX document | |
| 36C10E21R0003_1.docx | DOCX document | |
| P09-STATEMENT OF WORK - FINAL 25Mar2021 DRM revisions.pdf | ||
| P01- SPECIFICATIONS ASPHALT PAVING.pdf | ||
| P01-Aerial View of area.pdf | ||
| General Decision Number FL20200139.pdf | ||
| P01-Gravel lots Project Plans final.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Healthcare System - Bay Pines Campus Gravel Lots | Bid Documents SUBMITTAL 1000 Bay Pines Blvd Bay Pines, FL 33744
Narrative
AE COMM. #16104
VA PROJECT #VB3238
TASK ORDER # 36C10E20N0228
January 21st, 2021
13605 1st Ave. N #100 Plymouth, Minnesota 55441
P 763.412.4000 F 763.412.4090 ae-mn.com
VA BAY PINES HEALTH CARE SYSTEM | ST. PETERSBURG GRAVEL LOTS
Bid Docs – 1-29-2021
VA Bay Pines Healthcare System
St. Petersburg Gravel Lots
CLIENT / OWNER
Department of Veterans Affairs Contact: William Reber VA Project Manager 9500 Bay Pines Blvd St. Petersburg, FL 33708
(727) 657-7109
PROJECT TEAM
PROJECT MANAGEMENT / LANDSCAPE
ARCHITECTURE / PLANNING / CIVIL
ENGINEERING / LAND SURVEYING
Anderson Engineering of MN, LLC Contact: Eric Sautbine 13605 1st Avenue North, Suite 100 Plymouth, MN 55441
(763) 412-4000
ELECTRICAL ENGINEERING
IMEG Corp.
14755 Preston Road Ste. 845 Dallas TX 75254
(214) 485-6433
COST ESTIMATING
CPMI
3265 Northwood Circle, Suite 170 Eagan, MN 55121
(952) 854-3663
GEOTECHNICAL ENGINEERING
Terracon 5463 W. Waters Ave, STE 830
Tampa, FL 33634
(813) 321-0326
Contents Design Narrative
Discipline Narratives
Cost Estimating
Electrical
Site Development and Utilities
Stormwater and Drainage
Geotechnical Exploration
List of Appendices
1. Civil Calculations and SWMP
Design Narrative The Veterans Benefit Administration Regional Office St. Petersburg Florida is proposing the resurfacing of two (North and South) employee gravel parking lots with bituminous asphalt. Curbs, gutters, and trees are to be installed with the bituminous asphalt and IMEG will provide the design for supplementary lighting. The north lot will be accessed through the existing entry points with a one-way angled parking lot. Two new entry points are to be constructed on the north side of the south lot. These access points will be entry only. The exits for the south lot will be reconstructed and will have electronic gates that exist onto Hoover Ave.
The VA asked AE to consider the use of permeable pavement in lieu of asphalt pavement. AE hired
Terracon Inc to perform the geotechnical borings and report. Per Terracon they believe that a porous pavement will not function as designed due to high ground water levels. An additional concern is that porous pavement is not common in this area and construction quality might be an issue. For this design and cost estimate AE has used standard asphalt pavement.
Additionally, porous pavement it typically used when trying to meet certain stormwater requirements.
For this project, we have reduced the impervious area foot print thus reducing our stormwater runoff.
Discipline Narratives
Cost Estimating A cost estimate has been prepared for the parking lot design and will be sent to the VA about one week after document submittal to allow the cost estimator time to review the finalized set.
Electrical North Lot
Installation of new LED area lights on 25’ square steel poles. Fixtures and pole heights shall be selected to match existing lights and poles. Area lights will be located to illuminate the new North Parking to meet IES recommendations of an Average of 1 FC, and minimum of .5 FC for uncovered parking.
New light fixtures will be connected to existing parking lot lighting circuit/controls.
South Lot
Installation of new LED area lights on 25’ square steel poles. Fixtures and pole heights shall be selected to match existing lights and poles. Area lights will be located to illuminate the new North Parking to meet IES recommendations of an Average of 1 FC, and minimum of .5 FC for uncovered parking.
New light fixtures will be connected to existing parking lot lighting circuit/controls.
Provide (2) new exit gates with 12’0 arms to match existing Elka P3500 gates. Power to gates to be obtained from existing receptacle circuit on existing parking lot pole.
Site Development and Utilities North Lot
The north lot will be reconfigured to be a one way drive isle with an east entrance and a west exit as requested by the VA. The layout provided meets VA standards for drive isle and parking lot dimensions and is intended to maximize parking stalls. Additionally, new light poles with LED lights will be configured around the lot for updated lighting.
South Lot
The south lot will be reconfigured to allow for (2) new entrances from the existing employee parking lot.
The (2) south exits will remain and will get (2) electronic gates. The parking lot layout meets VA standards for drive isle and parking lot dimensions. The new layout has reduced the number of stalls that are currently existing because the existing lot does not meet VA design standards. The new layout maximizes the number of parking stalls within the project area and will also receive updated LED lighting.
Stormwater and Drainage The north and south lots proposed drainage will match the existing drainage. The project has reduced the impervious area thus reducing runoff volumes. See attached Storm Water Management Plan
(SWMP) and calculations.
Geotechnical Exploration Geotechnical report is attached as an appendix to the specification.
Post-Construction Storm Water Management Plan
Calculations & Summaries
ST. PETERSBURG GRAVEL
PARKING
100% Submittal
AE-MN Project No. 16104
January 8, 2021
Prepared By:
Anderson Engineering of MN, LLC 13605 1st Avenue North, Suite 100
Plymouth, MN 55441
Ph: 763.412.4000 Fax: 763.412.4090
Anderson Engineering of Minnesota, LLC ● 13605 1st Avenue North, Suite 100 ● Plymouth, Minnesota 55441 ● (763) 412-4000 Main ● (763) 412-4090 Fax ● www.ae-mn.com
1 | P a g e
Table of Contents
• Cover Page
• Table of Contents
• Project Overview
• General Location Map
• Existing Site Conditions
• Soils
• Proposed Site Conditions
• Methodology
• Post-Construction Performance Standards – Pinellas County Stormwater Manual
▪ 3.5 Performance Standards
▪ 3.5.4.4 Minimum Elevation
▪ 3.7 Erosion and Sediment Control
▪ Storm Drain System
▪ 4.1 Stormwater Quantity / Flood Control Requirements
▪ 5.1 Stormwater Quality Permitting Requirements
• Summary
Appendix A – Exhibits and Calculations
• A – Existing Drainage Maps
• B – Proposed Drainage Maps
• C – HydroCADD Report
• D – Geotechnical Report
Stormwater Narrative/Summary November 30th, 2020 St. Petersburg Gravel Parking 60% Submittal
St. Petersburg, FL
2 | P a g e
Project Overview
The Veterans Benefit Administration Regional Office St. Petersburg Florida is proposing the resurfacing of two
(North and South) employee gravel parking lots with bituminous asphalt. Curbs, gutters, and trees are to be installed with the bituminous asphalt and IMEG will provide the design for supplementary lighting. The north lot will be accessed through the existing entry points with a one-way angled parking lot. Two new entry points are to be constructed on the north side of the south lot. These access points will be entry only. The exits for the south lot will be reconstructed and will connect to Hoover Ave.
For the purposes of this Stormwater Management Plan, only the North and South parking lots will be considered.
General Location Map
Existing Site Conditions
The VA St. Petersburg Regional Office is located within the City limits of St Petersburg, in Pinellas County. The
North and South parking lots are located in the parking area West of the St. Petersburg Office. The South parking lot is bordered by 10th Street and Hoover Blvd to the South.
3 | P a g e
The North parking lot sheet drains into the swale located north of the parking lot which is retained by a concrete weir. It then makes its way into a detention basin west of the parking area that discharges into Lake Timucuan.
The South parking lot is divided into two drainage trends. Generally, the north half of the south parking lot drains into a 15” RCP. The South half drains into a ditch which makes its way into a detention basin East of the parking lot then into the same 15” RCP which leads into the detention basin west of the overall parking area.
The site is minimally sloped with elevation ranging from 6 to 12 above sea level.
The existing drainage pattern can be seen in Exhibit A- Existing Drainage Maps found in Appendix A of this report.
Soils
ThThe soils typically found on this project are classified as hydraulic soil Type A. The soils mainly consist of a top layer or gravel (GM) about 1’ in depth, with an underlying soil of poorly graded sand with silt (SP-SM). The soils encountered by the by the borings were found to be clean sands and will provide good drainage that are suitable for infiltration practices with an infiltration design rate of 0.80 in/hr.
A full report, complete with soil boring logs can be found in Exhibit D – Geotechnical Report within Appendix A of this report. This report was assembled by Terracon dated November 18, 2020.
Proposed Site Conditions
The north parking lot drainage divide will be kept consistent with existing conditions. Stormwater will continue to sheet flow to the north and into the existing drainage swale located on the north side of the site. Construction limits are to be help outside of the existing swale. Stormwater will be detained within the swale via concrete weir. Stormwater will discharge into the existing basin located on the west side of the site.
The south lot drainage pattern is to be divided to the north and south. The south side of the lot will be directed into the drainage swales located adjacent to Hoover Ave that discharges into the existing basin to the east.
The existing 15” RCP outlet that runs under the existing parking lot is to be replaced and re-routed. The north side of the lot will drain into a series of catch basins that are connected to the storm system. Discharge for the lot will be in the northwest corner into an existing drainage swale that leads to the basin located to the west of the site.
The proposed drainage pattern can be seen in Exhibit B – Proposed Drainage Maps found in Appendix A of this report.
Methodology
The hydrologic characteristics of the site were modeled using HydroCAD software. TR55/TR20 methods were utilized. Existing and proposed drainage areas were determined via review of current land survey data and aerial photos.
The 25, & 100-year frequency events where analyzed for peak runoff rate control in the existing and proposed conditions. The SCS Type II 24-hr storm event distribution was used. Depths for the 25, and 100-year storms were found to be 9.05”, and 12.98” respectively. Runoff from pervious and impervious surfaces were calculated separately to more accurately model the runoff volume from the site surfaces. The time of concentration for each drainage area has been calculated using the NRCS method with a minimum time of 5.0 min.
The generated report can be seen in Exhibit C –HydroCAD Report.
4 | P a g e
Post-Construction Performance Standards – Pinellas County
Stormwater Manual
3.5 Performance Standards
• Requirement: Any development or redevelopment activity, including demolition and reconstruction, of impervious surfaces that produce stormwater runoff, is subject to the performance standards.
Per rule 3.5.1.5, Resurfacing of existing paved roads, and grading of existing unpaved roads are except from stormwater criteria. The anticipated impervious area is to be decreased overall from existing conditions, and therefore stormwater treatment is not required for this project.
Rate control was analyzed for informational purposes only. The 25 and 100-year storm events were modeled per Pinellas County Stormwater Manual. Existing condition rates and proposed rates were compared for the entire property area. A full summary of the existing and proposed Hydrocad results can be found within Exhibit
C – Hydrocad Report, tabulation of the existing and proposed peak runoff rates can be found in Table 1 below.
Table 1 – Existing & Proposed Runoff Rate Summary
Storm Event Overall Pre-Development
Rate (CFS)
Overall Post-Development
Rate (CFS)
25YR – 9.05” 13.81 11.07
100YR – 12.98” 21.31 17.71
3.5.4.4 Minimum Elevation
• Requirement: The minimum edge of pavement elevation for road construction is five feet above mean see level (NAVD) or the loest edge of pavement shall be above the 25-year event as indicated in the stormwater management plan.
Pavement elevations for both the north and south lot have been risen from existing conditions to provide proper drainage throughout. The lowest proposed pavement elevation for the north lot is found to be 9.30. The lowest proposed pavement elevation for the south lot is located at the curb cut(s) adjacent to Hoover Ave and is found to be 7.3. Both lot minimum elevations are above the required elevation.
3.7 Erosion and Sediment Control
Erosion and Sediment Control measures have been designed based off of the Florida’s NPDES Generic Permit for Stormwater Discharge for Large and Small Construction Activities. A Stormwater Pollution Prevention Plan
(SWPPP) has been developed and included within the project plan set.
Storm Drain Systems
All storm sewer has been designed using a 10-year return frequency storm intensities. Intensities used for design have been pulled from the IDF tables developed by NOAA Atlas 14. The rational method was employed to determine the flowrate into the storm sewer; pipe diameter, inlet elevations, and slopes were designed to maintain an ultimate cleaning velocity of at least 3.0 fps (Feet per Second).
5 | P a g e
4.1 Stormwater Quantity / Flood Control Requirements
Per subsection 3.5.1, this project is exempt from this rule.
5.1 Stormwater Quality Permitting Requirements
Per subsection 3.5.1, this project is exempt from this rule.
Summary
The site layout and final grading is designed to take advantage of the existing terrain for drainage and will result in a gently rolling topography matching the surrounding landscape. Within the project boundary, some changes to the existing drainage patterns are expected due to the construction of the site improvements.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y:
\1
\1 v ba s t p et er sb ur g gr av el p ar ki ng s w m p\ dw gs
\1
_e xi st in g dr ai na ge s.
dw g e di t:b fie ld sa ve d:1 1/
/2
6:
A M p lo t:1
1/
/2
6:
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
972-239-6100
MARIO ARRENDONDO
Project Director
Revisions:
13605 1st Ave. N. #100 Pl ymout h, MN 55441 P 763.412.4000 | F 763.412.4090 | ae-mn.com Anderson Engineering of Minnesota, LLC | Proj # #####
ST. PETERSBURG GRAVEL
PARKING
VB3238
NOV. 30TH, 2020
ST. PETERSBURG, FLORIDA
60% CONSTRUCTION
DOCUMENTS
60 % CONSTRUCTION DOCUMENTS
NOT FOR CONSTRUCTION
Date:
SW-101
EXISTING DRAINAGE MAP -
NORTH PARKING LOT
ES BF
N 0 10' 20'
SCALE:1
EXISTING DRAINAGE MAP - NORTH PARKING LOT
1" = 10' (30" x 42" PAPER SIZE)
LEGEND
DRAINAGE ARROW DIRECTION
DRAINAGE AREA BOUNDARY
TIME OF CONCENTRATION PATH
SUB-DRAINAGE AREA
STORMWATER FEATURE
DRAINAGE AREA REACH
XX
DRAINAGE AREA SUMMARY
DRAINAGE AREA IMPERVIOUS (SF) PERVIOUS (SF) TOTAL (SF)
10S 16293 5237 21529 20S 0 15889 15889 30S 1193 253 1446
TOTAL 17486 21379 38864
60L
50P
AutoCAD SHX Text
POINT NO. 10003
AutoCAD SHX Text
POINT NO. 10002
AutoCAD SHX Text
LANDSCAPE TIMBER
AutoCAD SHX Text
LANDSCAPE TIMBER
AutoCAD SHX Text
BUMPER CURB
AutoCAD SHX Text
BUMPER CURB
0.
1%
0.1%
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y:
\1
\1 v ba s t p et er sb ur g gr av el p ar ki ng s w m p\ dw gs
\1
_e xi st in g dr ai na ge s.
di t:b fie ld sa ve d:1 1/
/2
6:
A M p lo t:1
1/
/2
6:
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
972-239-6100
MARIO ARRENDONDO
Project Director
Revisions:
13605 1st Ave. N. #100 Pl ymout h, MN 55441 P 763.412.4000 | F 763.412.4090 | ae-mn.com Anderson Engineering of Minnesota, LLC | Proj # #####
ST. PETERSBURG GRAVEL
PARKING
VB3238
NOV. 30TH, 2020
ST. PETERSBURG, FLORIDA
60% CONSTRUCTION
DOCUMENTS
60 % CONSTRUCTION DOCUMENTS
NOT FOR CONSTRUCTION
Date:
SW-102
EXISTING DRAINAGE MAP-
SOUTH PARKING LOT
ES BF
N 0 20' 40'
SCALE:1
EXISTING DRAINAGE MAP - SOUTH PARKING LOT
1" = 20' (30" x 42" PAPER SIZE)
LEGEND
DRAINAGE ARROW DIRECTION
DRAINAGE AREA BOUNDARY
TIME OF CONCENTRATION PATH
SUB-DRAINAGE AREA
STORMWATER FEATURE
DRAINAGE AREA REACH
XX
DRAINAGE AREA SUMMARY
DRAINAGE AREA IMPERVIOUS (SF) PERVIOUS (SF) TOTAL (SF)
40S 49789 19221 69010
TOTAL 49789 19221 69010
60L
CONCRETE WALK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y:
\1
\1 v ba s t p et er sb ur g gr av el p ar ki ng s w m p\ dw gs
\1
_p ro po se d dr ai na ge s.
di t:cn el so n s av ed :11
/2 3/
:4
P
M p lo t:1 1/
/2
6:
A M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
972-239-6100
MARIO ARRENDONDO
Project Director
Revisions:
13605 1st Ave. N. #100 Pl ymout h, MN 55441 P 763.412.4000 | F 763.412.4090 | ae-mn.com Anderson Engineering of Minnesota, LLC | Proj # #####
ST. PETERSBURG GRAVEL
PARKING
VB3238
NOV. 30TH, 2020
ST. PETERSBURG, FLORIDA
60% CONSTRUCTION
DOCUMENTS
60 % CONSTRUCTION DOCUMENTS
NOT FOR CONSTRUCTION
Date:
SW-201
EXISTING DRAINAGE MAP -
NORTH PARKING LOT
ES BF
N 0 10' 20'
SCALE:1
EXISTING DRAINAGE MAP - NORTH PARKING LOT
1" = 10' (30" x 42" PAPER SIZE)
LEGEND
DRAINAGE ARROW DIRECTION
DRAINAGE AREA BOUNDARY
TIME OF CONCENTRATION PATH
SUB-DRAINAGE AREA
STORMWATER FEATURE
DRAINAGE AREA REACH
XX
DRAINAGE AREA SUMMARY
DRAINAGE AREA IMPERVIOUS (SF) PERVIOUS (SF) TOTAL (SF)
100S 12419 9110 21529 200S 0 15889 15889 300S 891 555 1446
TOTAL 13310 25054 38864
600L
500P
AutoCAD SHX Text
BUMPER CURB
BAY PINES BLVD.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y:
\1
\1 v ba s t p et er sb ur g gr av el p ar ki ng s w m p\ dw gs
\1
_p ro po se d dr ai na ge s.
di t:cn el so n s av ed :11
/2 3/
:4
P
M p lo t:1 1/
/2
6:
A M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
972-239-6100
MARIO ARRENDONDO
Project Director
Revisions:
13605 1st Ave. N. #100 Pl ymout h, MN 55441 P 763.412.4000 | F 763.412.4090 | ae-mn.com Anderson Engineering of Minnesota, LLC | Proj # #####
ST. PETERSBURG GRAVEL
PARKING
VB3238
NOV. 30TH, 2020
ST. PETERSBURG, FLORIDA
60% CONSTRUCTION
DOCUMENTS
60 % CONSTRUCTION DOCUMENTS
NOT FOR CONSTRUCTION
Date:
SW-202
EXISTING DRAINAGE MAP-
SOUTH PARKING LOT
ES BF
N 0 20' 40'
SCALE:1
EXISTING DRAINAGE MAP - SOUTH PARKING LOT
1" = 20' (30" x 42" PAPER SIZE)
LEGEND
DRAINAGE ARROW DIRECTION
DRAINAGE AREA BOUNDARY
TIME OF CONCENTRATION PATH
SUB-DRAINAGE AREA
STORMWATER FEATURE
DRAINAGE AREA REACH
XX
DRAINAGE AREA SUMMARY
DRAINAGE AREA IMPERVIOUS (SF) PERVIOUS (SF) TOTAL (SF)
400S 46613 22397 69010
TOTAL 46613 22397 69010
600L
AutoCAD SHX Text
BUMPER CURB
AutoCAD SHX Text
BUMPER CURB
AutoCAD SHX Text
SPEED HUMP
AutoCAD SHX Text
BENCH MARK: TOP NUT OF HYDRANT ELEVATION = 10.46 FEET
AutoCAD SHX Text
HOOVER BLVD.
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CONCRETE SLAB
400S
EXISTING
CONDITIONS
PROPOSED
CONDITIONS
10S
EX. NORTH LOT
20S
EX. NORTH
30S
EX. NORTH
UNCAPTURED
40S
EX. SOUTH LOT
100S
PROPOSED NORTH
LOT
200S
PROPOSED NORTH
300S
PROPOSED NORTH
UNCAPTURED
400S
PROPOSED SOUTH
LOT
50P
EX. NORTH SWALE
500P
PROPOSED NORTH
SWALE
60L
EX. WEST BASIN
70L
EX. OVERALL RUNOFF
600L
PROPOSED WEST
BASIN
700L
PROPOSED OVERALL
RUNOFF
Routing Diagram for 16104_Hydrocad Prepared by Anderson Engineering of MN, LLC, Printed 11/30/2020 HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
EXISTING
10S
EX. NORTH LOT
20S
EX. NORTH
30S
EX. NORTH
UNCAPTURED
40S
EX. SOUTH LOT
50P
EX. NORTH SWALE
60L
EX. WEST BASIN
70L
EX. OVERALL RUNOFF
Routing Diagram for 16104_Hydrocad Prepared by Anderson Engineering of MN, LLC, Printed 11/30/2020
St. Petersburg Parking Lots
16104_Hydrocad Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 3HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Project Notes
Rainfall events imported from "NRCS-Rain.txt" for 999 FL Pinellas East
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 4HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Area Listing (selected nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
0.932 39 >75% Grass cover, Good, HSG A (10S, 20S, 30S, 40S)
1.544 98 Paved parking, HSG A (10S, 30S, 40S)
2.476 76 TOTAL AREA
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 5HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Soil Listing (selected nodes)
Area
(acres)
Soil
Group
Subcatchment
Numbers
2.476 HSG A 10S, 20S, 30S, 40S
0.000 HSG B
0.000 HSG C
0.000 HSG D
0.000 Other
2.476 TOTAL AREA
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 6HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Ground Covers (selected nodes)
HSG-A
(acres)
HSG-B
(acres)
HSG-C
(acres)
HSG-D
(acres)
Other
(acres)
Total
(acres)
Ground
Cover
Subcatchment
Numbers
0.932 0.000 0.000 0.000 0.000 0.932 >75% Grass cover, Good 10S, 20S, 30S, 40S
1.544 0.000 0.000 0.000 0.000 1.544 Paved parking 10S, 30S, 40S
2.476 0.000 0.000 0.000 0.000 2.476 TOTAL AREA
MSE 24-hr 6 25-Year Rainfall=9.05"16104_Hydrocad Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 7HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=21,530 sf 75.68% Impervious Runoff Depth>7.10"Subcatchment 10S: EX. NORTH LOT Flow Length=81' Tc=5.3 min CN=84 Runoff=3.82 cfs 0.293 af
Runoff Area=15,889 sf 0.00% Impervious Runoff Depth>1.62"Subcatchment 20S: EX. NORTH Flow Length=62' Slope=0.0020 '/' Tc=20.2 min CN=39 Runoff=0.34 cfs 0.049 af
Runoff Area=1,446 sf 82.50% Impervious Runoff Depth>7.59"Subcatchment 30S: EX. NORTH Flow Length=17' Tc=5.0 min CN=88 Runoff=0.27 cfs 0.021 af
Runoff Area=69,010 sf 72.15% Impervious Runoff Depth>6.85"Subcatchment 40S: EX. SOUTH LOT Flow Length=391' Slope=0.0010 '/' Tc=10.2 min CN=82 Runoff=10.26 cfs 0.905 af
Peak Elev=8.97' Storage=2,797 cf Inflow=3.92 cfs 0.342 afPond 50P: EX. NORTH SWALE Discarded=0.07 cfs 0.085 af Primary=3.35 cfs 0.216 af Outflow=3.42 cfs 0.301 af
Inflow=13.60 cfs 1.120 afLink 60L: EX. WEST BASIN Primary=13.60 cfs 1.120 af
Inflow=13.81 cfs 1.141 afLink 70L: EX. OVERALL RUNOFF Primary=13.81 cfs 1.141 af
Total Runoff Area = 2.476 ac Runoff Volume = 1.268 af Average Runoff Depth = 6.14" 37.64% Pervious = 0.932 ac 62.36% Impervious = 1.544 ac
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 8HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: EX. NORTH LOT
[49] Hint: Tc<2dt may require smaller dt
Runoff = 3.82 cfs @ 12.12 hrs, Volume= 0.293 af, Depth> 7.10"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 25-Year Rainfall=9.05"
Area (sf) CN Description
16,293 98 Paved parking, HSG A 5,237 39 >75% Grass cover, Good, HSG A
21,530 84 Weighted Average 5,237 24.32% Pervious Area
16,293 75.68% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 50 0.0260 3.27 Shallow Concentrated Flow, Paved Kv= 20.3 fps
5.0 31 0.0160 0.10 Sheet Flow, Grass: Dense n= 0.240 P2= 4.71"
5.3 81 Total
Subcatchment 10S: EX. NORTH LOT
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F lo w
(c fs
MSE 24-hr 6
25-Year Rainfall=9.05"
Runoff Area=21,530 sf
Runoff Volume=0.293 af
Runoff Depth>7.10"
Flow Length=81'
Tc=5.3 min
CN=84
3.82 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 9HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 20S: EX. NORTH
Runoff = 0.34 cfs @ 12.35 hrs, Volume= 0.049 af, Depth> 1.62"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 25-Year Rainfall=9.05"
Area (sf) CN Description
0 98 Paved parking, HSG A 15,889 39 >75% Grass cover, Good, HSG A
15,889 39 Weighted Average 15,889 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
20.2 62 0.0020 0.05 Sheet Flow, Grass: Dense n= 0.240 P2= 4.71"
Subcatchment 20S: EX. NORTH
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
MSE 24-hr 6
25-Year Rainfall=9.05"
Runoff Area=15,889 sf
Runoff Volume=0.049 af
Runoff Depth>1.62"
Flow Length=62'
Slope=0.0020 '/'
Tc=20.2 min
CN=39
0.34 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 10HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 30S: EX. NORTH UNCAPTURED
[49] Hint: Tc<2dt may require smaller dt
Runoff = 0.27 cfs @ 12.11 hrs, Volume= 0.021 af, Depth> 7.59"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 25-Year Rainfall=9.05"
Area (sf) CN Description
1,193 98 Paved parking, HSG A 253 39 >75% Grass cover, Good, HSG A
1,446 88 Weighted Average 253 17.50% Pervious Area
1,193 82.50% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 17 0.06 Direct Entry, Subcatchment 30S: EX. NORTH UNCAPTURED
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
MSE 24-hr 6
25-Year Rainfall=9.05"
Runoff Area=1,446 sf
Runoff Volume=0.021 af
Runoff Depth>7.59"
Flow Length=17'
Tc=5.0 min
CN=88
0.27 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 11HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 40S: EX. SOUTH LOT
Runoff = 10.26 cfs @ 12.17 hrs, Volume= 0.905 af, Depth> 6.85"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 25-Year Rainfall=9.05"
Area (sf) CN Description
49,789 98 Paved parking, HSG A 19,221 39 >75% Grass cover, Good, HSG A
69,010 82 Weighted Average 19,221 27.85% Pervious Area 49,789 72.15% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
10.2 391 0.0010 0.64 Shallow Concentrated Flow, Paved Kv= 20.3 fps
Subcatchment 40S: EX. SOUTH LOT
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
MSE 24-hr 6
25-Year Rainfall=9.05"
Runoff Area=69,010 sf
Runoff Volume=0.905 af
Runoff Depth>6.85"
Flow Length=391'
Slope=0.0010 '/'
Tc=10.2 min
CN=82
10.26 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 12HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Pond 50P: EX. NORTH SWALE
Inflow Area = 0.859 ac, 43.54% Impervious, Inflow Depth > 4.77" for 25-Year event Inflow = 3.92 cfs @ 12.12 hrs, Volume= 0.342 af Outflow = 3.42 cfs @ 12.16 hrs, Volume= 0.301 af, Atten= 13%, Lag= 2.6 min Discarded = 0.07 cfs @ 12.16 hrs, Volume= 0.085 af Primary = 3.35 cfs @ 12.16 hrs, Volume= 0.216 af
Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 8.97' @ 12.16 hrs Surf.Area= 3,933 sf Storage= 2,797 cf
Plug-Flow detention time= 91.2 min calculated for 0.301 af (88% of inflow) Center-of-Mass det. time= 33.5 min ( 844.1 - 810.6 )
Volume Invert Avail.Storage Storage Description
#1 8.00' 9,919 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
8.00 1,837 0 0
9.00 4,000 2,919 2,919
10.00 10,000 7,000 9,919
Device Routing Invert Outlet Devices
#1 Primary 8.70' 10.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65
2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88
#2 Discarded 8.00' 0.800 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.07 cfs @ 12.16 hrs HW=8.97' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.07 cfs)
Primary OutFlow Max=3.27 cfs @ 12.16 hrs HW=8.97' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 3.27 cfs @ 1.23 fps)
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 13HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Pond 50P: EX. NORTH SWALE
Inflow Outflow Discarded Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
Inflow Area=0.859 ac
Peak Elev=8.97'
Storage=2,797 cf
3.92 cfs
3.42 cfs
0.07 cfs
3.35 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 14HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Link 60L: EX. WEST BASIN
Inflow Area = 2.443 ac, 62.09% Impervious, Inflow Depth > 5.50" for 25-Year event Inflow = 13.60 cfs @ 12.17 hrs, Volume= 1.120 af Primary = 13.60 cfs @ 12.17 hrs, Volume= 1.120 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Link 60L: EX. WEST BASIN
Inflow Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
Inflow Area=2.443 ac
13.60 cfs13.60 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 15HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Link 70L: EX. OVERALL RUNOFF
Inflow Area = 2.476 ac, 62.36% Impervious, Inflow Depth > 5.53" for 25-Year event Inflow = 13.81 cfs @ 12.17 hrs, Volume= 1.141 af Primary = 13.81 cfs @ 12.17 hrs, Volume= 1.141 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Link 70L: EX. OVERALL RUNOFF
Inflow Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
Inflow Area=2.476 ac
13.81 cfs13.81 cfs
MSE 24-hr 6 100-Year Rainfall=12.98"16104_Hydrocad Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 16HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=21,530 sf 75.68% Impervious Runoff Depth>10.94"Subcatchment 10S: EX. NORTH LOT Flow Length=81' Tc=5.3 min CN=84 Runoff=5.73 cfs 0.451 af
Runoff Area=15,889 sf 0.00% Impervious Runoff Depth>3.79"Subcatchment 20S: EX. NORTH Flow Length=62' Slope=0.0020 '/' Tc=20.2 min CN=39 Runoff=0.97 cfs 0.115 af
Runoff Area=1,446 sf 82.50% Impervious Runoff Depth>11.47"Subcatchment 30S: EX. NORTH Flow Length=17' Tc=5.0 min CN=88 Runoff=0.40 cfs 0.032 af
Runoff Area=69,010 sf 72.15% Impervious Runoff Depth>10.66"Subcatchment 40S: EX. SOUTH LOT Flow Length=391' Slope=0.0010 '/' Tc=10.2 min CN=82 Runoff=15.56 cfs 1.407 af
Peak Elev=9.07' Storage=3,192 cf Inflow=6.18 cfs 0.566 afPond 50P: EX. NORTH SWALE Discarded=0.08 cfs 0.094 af Primary=5.46 cfs 0.430 af Outflow=5.54 cfs 0.524 af
Inflow=20.99 cfs 1.837 afLink 60L: EX. WEST BASIN Primary=20.99 cfs 1.837 af
Inflow=21.31 cfs 1.869 afLink 70L: EX. OVERALL RUNOFF Primary=21.31 cfs 1.869 af
Total Runoff Area = 2.476 ac Runoff Volume = 2.005 af Average Runoff Depth = 9.72" 37.64% Pervious = 0.932 ac 62.36% Impervious = 1.544 ac
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 17HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: EX. NORTH LOT
[49] Hint: Tc<2dt may require smaller dt
Runoff = 5.73 cfs @ 12.12 hrs, Volume= 0.451 af, Depth>10.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 100-Year Rainfall=12.98"
Area (sf) CN Description
16,293 98 Paved parking, HSG A 5,237 39 >75% Grass cover, Good, HSG A
21,530 84 Weighted Average 5,237 24.32% Pervious Area
16,293 75.68% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 50 0.0260 3.27 Shallow Concentrated Flow, Paved Kv= 20.3 fps
5.0 31 0.0160 0.10 Sheet Flow, Grass: Dense n= 0.240 P2= 4.71"
5.3 81 Total
Subcatchment 10S: EX. NORTH LOT
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
MSE 24-hr 6
100-Year Rainfall=12.98"
Runoff Area=21,530 sf
Runoff Volume=0.451 af
Runoff Depth>10.94"
Flow Length=81'
Tc=5.3 min
CN=84
5.73 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 18HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 20S: EX. NORTH
Runoff = 0.97 cfs @ 12.32 hrs, Volume= 0.115 af, Depth> 3.79"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 100-Year Rainfall=12.98"
Area (sf) CN Description
0 98 Paved parking, HSG A 15,889 39 >75% Grass cover, Good, HSG A
15,889 39 Weighted Average 15,889 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
20.2 62 0.0020 0.05 Sheet Flow, Grass: Dense n= 0.240 P2= 4.71"
Subcatchment 20S: EX. NORTH
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
MSE 24-hr 6
100-Year Rainfall=12.98"
Runoff Area=15,889 sf
Runoff Volume=0.115 af
Runoff Depth>3.79"
Flow Length=62'
Slope=0.0020 '/'
Tc=20.2 min
0.97 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 19HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 30S: EX. NORTH UNCAPTURED
[49] Hint: Tc<2dt may require smaller dt
Runoff = 0.40 cfs @ 12.11 hrs, Volume= 0.032 af, Depth>11.47"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 100-Year Rainfall=12.98"
Area (sf) CN Description
1,193 98 Paved parking, HSG A 253 39 >75% Grass cover, Good, HSG A
1,446 88 Weighted Average 253 17.50% Pervious Area
1,193 82.50% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 17 0.06 Direct Entry, Subcatchment 30S: EX. NORTH UNCAPTURED
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
0.44
0.42
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
MSE 24-hr 6
100-Year Rainfall=12.98"
Runoff Area=1,446 sf
Runoff Volume=0.032 af
Runoff Depth>11.47"
Flow Length=17'
Tc=5.0 min
CN=88
0.40 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 20HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 40S: EX. SOUTH LOT
Runoff = 15.56 cfs @ 12.17 hrs, Volume= 1.407 af, Depth>10.66"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 100-Year Rainfall=12.98"
Area (sf) CN Description
49,789 98 Paved parking, HSG A 19,221 39 >75% Grass cover, Good, HSG A
69,010 82 Weighted Average 19,221 27.85% Pervious Area 49,789 72.15% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
10.2 391 0.0010 0.64 Shallow Concentrated Flow, Paved Kv= 20.3 fps
Subcatchment 40S: EX. SOUTH LOT
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
MSE 24-hr 6
100-Year Rainfall=12.98"
Runoff Area=69,010 sf
Runoff Volume=1.407 af
Runoff Depth>10.66"
Flow Length=391'
Slope=0.0010 '/'
Tc=10.2 min
CN=82
15.56 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 21HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Pond 50P: EX. NORTH SWALE
Inflow Area = 0.859 ac, 43.54% Impervious, Inflow Depth > 7.90" for 100-Year event Inflow = 6.18 cfs @ 12.12 hrs, Volume= 0.566 af Outflow = 5.54 cfs @ 12.16 hrs, Volume= 0.524 af, Atten= 10%, Lag= 2.4 min Discarded = 0.08 cfs @ 12.16 hrs, Volume= 0.094 af Primary = 5.46 cfs @ 12.16 hrs, Volume= 0.430 af
Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 9.07' @ 12.16 hrs Surf.Area= 4,392 sf Storage= 3,192 cf
Plug-Flow detention time= 66.3 min calculated for 0.524 af (93% of inflow) Center-of-Mass det. time= 27.0 min ( 829.0 - 802.0 )
Volume Invert Avail.Storage Storage Description
#1 8.00' 9,919 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
8.00 1,837 0 0
9.00 4,000 2,919 2,919
10.00 10,000 7,000 9,919
Device Routing Invert Outlet Devices
#1 Primary 8.70' 10.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65
2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88
#2 Discarded 8.00' 0.800 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.08 cfs @ 12.16 hrs HW=9.06' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.08 cfs)
Primary OutFlow Max=5.35 cfs @ 12.16 hrs HW=9.06' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 5.35 cfs @ 1.48 fps)
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 22HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Pond 50P: EX. NORTH SWALE
Inflow Outflow Discarded Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
Inflow Area=0.859 ac
Peak Elev=9.07'
Storage=3,192 cf
6.18 cfs
5.54 cfs
0.08 cfs
5.46 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 23HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Link 60L: EX. WEST BASIN
Inflow Area = 2.443 ac, 62.09% Impervious, Inflow Depth > 9.02" for 100-Year event Inflow = 20.99 cfs @ 12.17 hrs, Volume= 1.837 af Primary = 20.99 cfs @ 12.17 hrs, Volume= 1.837 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Link 60L: EX. WEST BASIN
Inflow Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
20.99 cfs20.99 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 24HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Link 70L: EX. OVERALL RUNOFF
Inflow Area = 2.476 ac, 62.36% Impervious, Inflow Depth > 9.06" for 100-Year event Inflow = 21.31 cfs @ 12.17 hrs, Volume= 1.869 af Primary = 21.31 cfs @ 12.17 hrs, Volume= 1.869 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Link 70L: EX. OVERALL RUNOFF
Inflow Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
21.31 cfs21.31 cfs
PROPOSED
100S
PROPOSED NORTH
LOT
200S
PROPOSED NORTH
300S
PROPOSED NORTH
UNCAPTURED
400S
PROPOSED SOUTH
LOT
500P
PROPOSED NORTH
SWALE600L
PROPOSED WEST
BASIN
700L
PROPOSED OVERALL
RUNOFF
Routing Diagram for 16104_Hydrocad Prepared by Anderson Engineering of MN, LLC, Printed 11/30/2020
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 26HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Project Notes
Rainfall events imported from "NRCS-Rain.txt" for 999 FL Pinellas East
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 27HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Area Listing (selected nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
1.101 39 >75% Grass cover, Good, HSG A (100S, 200S, 300S, 400S)
1.376 98 Paved parking, HSG A (100S, 300S, 400S)
2.476 72 TOTAL AREA
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 28HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Soil Listing (selected nodes)
Area
(acres)
Soil
Group
Subcatchment
Numbers
2.476 HSG A 100S, 200S, 300S, 400S
0.000 HSG B
0.000 HSG C
0.000 HSG D
0.000 Other
2.476 TOTAL AREA
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC
Page 29HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Ground Covers (selected nodes)
HSG-A
(acres)
HSG-B
(acres)
HSG-C
(acres)
HSG-D
(acres)
Other
(acres)
Total
(acres)
Ground
Cover
Subcatchment
Numbers
1.101 0.000 0.000 0.000 0.000 1.101 >75% Grass cover, Good 100S, 200S, 300S, 400S
1.376 0.000 0.000 0.000 0.000 1.376 Paved parking 100S, 300S, 400S
2.476 0.000 0.000 0.000 0.000 2.476 TOTAL AREA
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 30HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=21,529 sf 57.68% Impervious Runoff Depth>5.75"Subcatchment 100S: PROPOSED NORTH Flow Length=71' Tc=5.0 min CN=73 Runoff=3.28 cfs 0.237 af
Runoff Area=15,889 sf 0.00% Impervious Runoff Depth>1.62"Subcatchment 200S: PROPOSED NORTH Flow Length=62' Slope=0.0020 '/' Tc=20.2 min CN=39 Runoff=0.34 cfs 0.049 af
Runoff Area=1,446 sf 61.62% Impervious Runoff Depth>6.00"Subcatchment 300S: PROPOSED NORTH Flow Length=17' Tc=5.0 min CN=75 Runoff=0.23 cfs 0.017 af
Runoff Area=69,010 sf 67.55% Impervious Runoff Depth>6.48"Subcatchment 400S: PROPOSED SOUTH Flow Length=381' Slope=0.0010 '/' Tc=15.2 min CN=79 Runoff=8.52 cfs 0.855 af
Peak Elev=8.94' Storage=2,665 cf Inflow=3.38 cfs 0.286 afPond 500P: PROPOSED NORTH SWALE Discarded=0.07 cfs 0.077 af Primary=2.70 cfs 0.169 af Outflow=2.77 cfs 0.245 af
Inflow=10.96 cfs 1.024 afLink 600L: PROPOSED WEST BASIN Primary=10.96 cfs 1.024 af
Inflow=11.07 cfs 1.041 afLink 700L: PROPOSED OVERALL RUNOFF Primary=11.07 cfs 1.041 af
Total Runoff Area = 2.476 ac Runoff Volume = 1.158 af Average Runoff Depth = 5.61" 44.45% Pervious = 1.101 ac 55.55% Impervious = 1.376 ac
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 31HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 100S: PROPOSED NORTH LOT
[49] Hint: Tc<2dt may require smaller dt
Runoff = 3.28 cfs @ 12.11 hrs, Volume= 0.237 af, Depth> 5.75"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 25-Year Rainfall=9.05"
Area (sf) CN Description
12,419 98 Paved parking, HSG A 9,110 39 >75% Grass cover, Good, HSG A
21,529 73 Weighted Average 9,110 42.32% Pervious Area
12,419 57.68% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 71 0.24 Direct Entry, Subcatchment 100S: PROPOSED NORTH LOT
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
MSE 24-hr 6
25-Year Rainfall=9.05"
Runoff Area=21,529 sf
Runoff Volume=0.237 af
Runoff Depth>5.75"
Flow Length=71'
Tc=5.0 min
CN=73
3.28 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 32HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 200S: PROPOSED NORTH
Runoff = 0.34 cfs @ 12.35 hrs, Volume= 0.049 af, Depth> 1.62"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 25-Year Rainfall=9.05"
Area (sf) CN Description
0 98 Paved parking, HSG A 15,889 39 >75% Grass cover, Good, HSG A
15,889 39 Weighted Average 15,889 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
20.2 62 0.0020 0.05 Sheet Flow, Grass: Dense n= 0.240 P2= 4.71"
Subcatchment 200S: PROPOSED NORTH
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
MSE 24-hr 6
25-Year Rainfall=9.05"
Runoff Area=15,889 sf
Runoff Volume=0.049 af
Runoff Depth>1.62"
Flow Length=62'
Slope=0.0020 '/'
Tc=20.2 min
0.34 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 33HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 300S: PROPOSED NORTH UNCAPTURED
[49] Hint: Tc<2dt may require smaller dt
Runoff = 0.23 cfs @ 12.11 hrs, Volume= 0.017 af, Depth> 6.00"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 25-Year Rainfall=9.05"
Area (sf) CN Description
891 98 Paved parking, HSG A 555 39 >75% Grass cover, Good, HSG A
1,446 75 Weighted Average 555 38.38% Pervious Area 891 61.62% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 17 0.06 Direct Entry, Subcatchment 300S: PROPOSED NORTH UNCAPTURED
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
0.25
0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
MSE 24-hr 6
25-Year Rainfall=9.05"
Runoff Area=1,446 sf
Runoff Volume=0.017 af
Runoff Depth>6.00"
Flow Length=17'
Tc=5.0 min
CN=75
0.23 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 34HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 400S: PROPOSED SOUTH LOT
Runoff = 8.52 cfs @ 12.23 hrs, Volume= 0.855 af, Depth> 6.48"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs MSE 24-hr 6 25-Year Rainfall=9.05"
Area (sf) CN Description
46,613 98 Paved parking, HSG A 22,397 39 >75% Grass cover, Good, HSG A
69,010 79 Weighted Average 22,397 32.45% Pervious Area 46,613 67.55% Impervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
5.2 200 0.0010 0.64 Shallow Concentrated Flow, Paved Kv= 20.3 fps
10.0 181 0.30 Direct Entry,
15.2 381 Total
Subcatchment 400S: PROPOSED SOUTH LOT
Runoff
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
MSE 24-hr 6
25-Year Rainfall=9.05"
Runoff Area=69,010 sf
Runoff Volume=0.855 af
Runoff Depth>6.48"
Flow Length=381'
Slope=0.0010 '/'
Tc=15.2 min
CN=79
8.52 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 35HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Pond 500P: PROPOSED NORTH SWALE
Inflow Area = 0.859 ac, 33.19% Impervious, Inflow Depth > 3.99" for 25-Year event Inflow = 3.38 cfs @ 12.12 hrs, Volume= 0.286 af Outflow = 2.77 cfs @ 12.17 hrs, Volume= 0.245 af, Atten= 18%, Lag= 3.2 min Discarded = 0.07 cfs @ 12.17 hrs, Volume= 0.077 af Primary = 2.70 cfs @ 12.17 hrs, Volume= 0.169 af
Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 8.94' @ 12.17 hrs Surf.Area= 3,861 sf Storage= 2,665 cf
Plug-Flow detention time= 101.2 min calculated for 0.245 af (86% of inflow) Center-of-Mass det. time= 36.4 min ( 873.0 - 836.5 )
Volume Invert Avail.Storage Storage Description
#1 8.00' 9,919 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
8.00 1,837 0 0
9.00 4,000 2,919 2,919
10.00 10,000 7,000 9,919
Device Routing Invert Outlet Devices
#1 Primary 8.70' 10.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65
2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88
#2 Discarded 8.00' 0.800 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.07 cfs @ 12.17 hrs HW=8.93' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.07 cfs)
Primary OutFlow Max=2.61 cfs @ 12.17 hrs HW=8.93' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 2.61 cfs @ 1.13 fps)
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 36HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Pond 500P: PROPOSED NORTH SWALE
Inflow Outflow Discarded Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
Inflow Area=0.859 ac
Peak Elev=8.94'
Storage=2,665 cf
3.38 cfs
2.77 cfs
0.07 cfs
2.70 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 37HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Link 600L: PROPOSED WEST BASIN
Inflow Area = 2.443 ac, 55.47% Impervious, Inflow Depth > 5.03" for 25-Year event Inflow = 10.96 cfs @ 12.21 hrs, Volume= 1.024 af Primary = 10.96 cfs @ 12.21 hrs, Volume= 1.024 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Link 600L: PROPOSED WEST BASIN
Inflow Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
10.96 cfs10.96 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 38HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Link 700L: PROPOSED OVERALL RUNOFF
Inflow Area = 2.476 ac, 55.55% Impervious, Inflow Depth > 5.04" for 25-Year event Inflow = 11.07 cfs @ 12.21 hrs, Volume= 1.041 af Primary = 11.07 cfs @ 12.21 hrs, Volume= 1.041 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Link 700L: PROPOSED OVERALL RUNOFF
Inflow Primary
Hydrograph
Time (hours) 2423222120191817161514131211109876543210
F
11.07 cfs11.07 cfs
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 39HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=21,529 sf 57.68% Impervious Runoff Depth>9.40"Subcatchment 100S: PROPOSED NORTH Flow Length=71' Tc=5.0 min CN=73 Runoff=5.24 cfs 0.387 af
Runoff Area=15,889 sf 0.00% Impervious Runoff Depth>3.79"Subcatchment 200S: PROPOSED NORTH Flow Length=62' Slope=0.0020 '/' Tc=20.2 min CN=39 Runoff=0.97 cfs 0.115 af
Runoff Area=1,446 sf 61.62% Impervious Runoff Depth>9.69"Subcatchment 300S: PROPOSED NORTH Flow Length=17' Tc=5.0 min CN=75 Runoff=0.36 cfs 0.027 af
Runoff Area=69,010 sf 67.55% Impervious Runoff Depth>10.24"Subcatchment 400S: PROPOSED SOUTH Flow Length=381' Slope=0.0010 '/' Tc=15.2 min CN=79 Runoff=13.16 cfs 1.352 af
Peak Elev=9.04' Storage=3,103 cf Inflow=5.69 cfs 0.502 afPond 500P: PROPOSED NORTH SWALE Discarded=0.08 cfs 0.085 af Primary=4.97 cfs 0.375 af Outflow=5.05 cfs 0.460 af
Inflow=17.52 cfs 1.727 afLink 600L: PROPOSED WEST BASIN Primary=17.52 cfs 1.727 af
Inflow=17.71 cfs 1.754 afLink 700L: PROPOSED OVERALL RUNOFF Primary=17.71 cfs 1.754 af
Total Runoff Area = 2.476 ac Runoff Volume = 1.881 af Average Runoff Depth = 9.11" 44.45% Pervious = 1.101 ac 55.55% Impervious = 1.376 ac
Printed 11/30/2020Prepared by Anderson Engineering of MN, LLC Page 40HydroCAD® 10.00-25 s/n 00837 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 100S: PROPOSED NORTH LOT
[49] Hint: Tc<2dt may require smaller dt
Runoff = 5.24 cfs @ 12.11 hrs, Volume= 0.387…