P01-AL14-07PSAChecklistforCMandPM.pdf
PDF 70 KB Posted
- Solicitation number
- 36C24426Q0195
About this file
This document is a Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts, revision 2.1, used by the Department of Veterans Affairs (VA) medical centers (VAMCs). The checklist serves as a commissioning and inspection template to verify proper installation, functionality, and safety of ceiling-mounted patient lift systems before they are released into service.
The checklist is organized into four primary inspection categories: Structure, Rails/Tracks and End Stops, Lift Unit and Straps, and Load Testing. The Structure section requires visual verification of proper connections to building infrastructure, including seismic bracing where applicable, and proper ceiling interface installation. The Rails/Tracks and End Stops section mandates verification of fastener tightness, debris-free tracks, proper end stop installation, and functionality of turntables and gates where applicable. The Lift Unit and Straps section requires inspection of casing integrity, charging functionality, hand control operation in all directions, indicator light function, emergency functions, strap condition, and spreader bar components. The Load Testing section verifies soft start/stop features, lifting speed compliance (not exceeding 2.5 inches per second with zero load and 1.5 inches per second at maximum capacity), load and deflection testing at rated capacity, emergency stop function, and emergency lowering capability. The document includes a critical safety note prohibiting installation of ceiling-mounted patient lifts in treatment units with actively suicidal patients. Completion requires sign-off from the inspector, VA representative, and the manager of the service using the lifts, with the service manager responsible for confirming staff training and establishing ongoing training protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P02-Contract Guldmann Inventory.xlsx | XLSX spreadsheet | |
| P01-AL14-07PSAChecklistforInstallationandRelocation.pdf | ||
| Brand Name Guldmann Ceiling Lifts RFQ 36C24426Q0195.pdf | ||
| Wage Determination 2015-4215 Rev 30.pdf | ||
| Guldmann Name Brand Justification_Redacted.pdf | ||
| 36C24426Q0195_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision 2.1 1 of 2 Serial #: ____________________
PASS FAIL
PASS FAIL
The commissioning for a patient ceiling lift system(s) shall include, but not be limited to, the following points as components of the commissioning procedures.
NOTE: Ceiling mounted patient lifts are not to be installed in treatment units with actively suicidal patients.
Lift Location:
VAMC Contact's Phone Number:
Installer:
VAMC Contact:
Manufacturer:
Model:
Facility: Work Order:
Serial Number: EE Number:
Installer's Phone Number:
Structure
Rails/Tracks and End Stops
NOTES:
Lift Unit and Straps
NOTES:
Perform a visual inspection to verify structural component sizing and physical installation to ensure that the correct structural system is in place and properly installed to support the lift.
Verification that all fasteners and set screws are properly tightened on the trollies and rails/tracks.
Ensure that the rail/track is free of gaps (unless required by design). If included in installation, verify rail turntable function, exchanger function, gate alignment, and safety block installation.
Confirm track is clean and clear of all debris. (Use manufacturer’s recommended cleaning materials to avoid damage to the motor case and other components.)
Verification that all manufacturer specified end stops or docking gates are properly installed.
Inspection of lift unit casing for cracks and alignment.
Inspection and activation of hand control for full operation (e.g., up, down, left, right) and “return to charge” function if applicable.
Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts
Mfgr Contact's Phone Number:
Date:
Mfgr Contact:
Confirm any and all lift unit indicator lights are functioning. (e.g., red service warning light, charging state light) Inspection and verification of all emergency functions of the lift unit.
Inspection of spreader bar and clips for cracks and for loose or missing rings or cotter pins.
Full extension and inspection of lift strap for loose threads or frays.
Complete
Verification that the lift unit charges properly.
Perform a visual inspection to verify proper connections of the lift's structural system to the building’s structure (including seismic bracing if applicable).
Perform a visual inspection to verify proper interface at the ceiling (hard deck or soft tile) and proper installation of all protective features around the support rods and rails/tracks.
Revision 2.1 2 of 2 Serial #: ____________________
PASS FAIL
NOTES:
After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the inspector shall release the ceiling mounted lift installation to VA representative.
SIGNATURE:
After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the manager of the service using the ceiling mounted lifts confirms that the current staff have received initial training on ceiling mounted lifts and that there is a process in place to provide ongoing training on the proper use of ceiling mounted lifts.
SIGNATURE:
TITLE:
Manager of the Service Using the Ceiling Mounted Lifts COMPLETE
TITLE:
VA Representative After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the VA representative shall review those items with the inspector prior to releasing the ceiling mounted lift back into service to ensure completion of all requirements.
SIGNATURE:
COMPLETE
Inspector COMPLETE
DATE:
DATE:
DATE:
Verification of any “soft start” or “soft stop” features and that lifting speed does not exceed 2.5 inches per second with “zero” load.
Verification of load testing and deflection testing at the manufacturer's specified maximum rated lift capacity.
Verification of any “soft start” and “soft stop” features and that lifting speed does not exceed 1.5 inches per second under maximum rated lift capacity.
Verification of emergency lowering feature at maximum rated lift capacity.
TITLE:
Verification of function of emergency stop at maximum rated lift capacity.
NOTES:
Load Testing
Inspection
File details come from the government source that posted it. Updated .