This is a Request for Proposal (RFP) for design-build services to construct a Hazardous Waste Storage Facility at Joint Base Anacostia-Bolling in Washington, DC. The project, designated P001U, is a 4,800-square-foot single-story facility intended to provide central receiving, processing, and short-term storage for regulated and non-regulated waste, along with administrative support, training space, and restroom facilities. The scope includes all exterior and interior construction, mechanical, electrical, plumbing, telecommunications, and fire protection systems, as well as furniture, fixtures, and equipment (FF&E).
The facility design must comply with numerous federal standards including UFC (Unified Facilities Criteria), ASHRAE 90.1-2019 for energy efficiency, NFPA codes for fire protection, and DoD building codes. Key design requirements include a pre-engineered metal building with masonry veneer and pre-finished metal panels, secondary containment systems for hazardous materials storage (including a 4-foot-deep flammable storage area with metal bar grating), wet pipe sprinkler protection throughout, building commissioning, low-impact development stormwater management, and achievement of 30 percent energy reduction below the ASHRAE baseline. The RFP specifies detailed requirements for structural systems, fire-rated barriers between storage zones, HVAC systems with separate zones for administrative and storage areas, digital direct controls, emergency lighting and power with a generator for fire pump and ventilation, telecommunications infrastructure, security systems, and comprehensive testing and commissioning protocols. The contract is issued under a $750 million Small Business Anchor Multiple Award Construction project vehicle, with this task order solicitation dated March 26, 2026, through NAVFAC Washington, and includes nine identified SB MACC contract holders eligible to submit proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P001U Part 6 Final.pdf | ||
| P001U VOL I Part 2 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maximo NO. 23985706
WORK ORDER NO. 1817027
Contract NO. N4008020D0018 / N4008024F4952 Installation Project No. BXUR233001 APPROPRIATION: 057 3300- Military Construction, Air Force
FINAL SUBMITTAL
P001U Hazardous Waste Storage Joint Base Anacostia Bolling, Washington, DC
PREPARED BY:
Wiley|Wilson/Burns&McDonnell JV
2850 Eisenhower Avenue Suite 200
Alexandria, VA 22314
Architectural: Jessica Somgynari, AIA Mechanical: Scott Little, PE Interior: Tammy Farral CID Electrical: Charlie Richardson, PE Civil: Steve Schad, PE Fire Protection: Joe Rainey, PE Connor Leslie, EIT Cost Engineer: Kevin Waters, PE Structural: Drew Augustin, PE Geotechnical: Katie Cox, PE
Submitted By: Steve Schad, PE Date: 15 DEC 2025 AE Project Manager
Project Manager: Marcell Kennedy Date: 15 DEC 2025
Approved By: Christine Rutkowski Date: 15 DEC 2025 Design Production Director
P001U Hazardous Waste Storage Contract No.: N4008020D0018 / N4008024F4952 Joint Base Anacostia Bolling, Washington, DC Work Order Number: 1817027
PART SIX - ATTACHMENTS - Page 1
PART SIX - ATTACHMENTS
General Requirements
P001U Hazardous Waste Storage
FY25
Category Code 442-257
Joint Base Anacostia Boiling Washington DC
01 December 2025
PART THREE - PROJECT PROGRAM - Page 2
THIS PAGE IS INTENTIONALLY LEFT BLANK
PART THREE - PROJECT PROGRAM - Page 3
TABLE OF CONTENTS
COVER PAGE
TABLE OF CONTENTS
1. PROJECT DESCRIPTION
2. PROJECT OBJECTIVES
2.1. Mission Statement
2.2. Facility Function
2.3. Project Specific Priorities
2.4. Appropriate Design
2.5. Workflow Process
2.6. Special Design Challenges
2.7 Adaptability and Flexibility
3. SITE ANALYSIS
3.1 Existing Site Conditions
3.2 Site Development Requirements
4. BUILDING REQUIREMENTS
4.1 Space Tabulation
4.2 Space Relationships
4.3 Exterior Character
5. ROOM REQUIREMENTS
6. ENGINEERING SYSTEMS REQUIREMENTS
A10 Foundations A20 Basement Construction B10 Superstructure B20 Exterior Closure B30 Roofing C10 Interior Construction C20 Stairs C30 Interior Finishes D10 Conveying Systems D20 Plumbing
D30 HVAC
D40 Fire Protection Systems D50 Electrical Power and Lighting E10 Equipment E20 Furnishings F10 Special Construction F20 Selective Building Demolition
PART THREE - PROJECT PROGRAM - Page 4
G10 Site Preparations G20 Site Improvements G30 Site Mechanical Utilities G40 Site Electrical Utilities H10 Waterfront Structures H20 Graving Drydocks H30 Coastal Protection H40 Navigation Dredging And Reclamation H50 Waterfront Utilities H60 Waterfront Demolition H70 Waterfront ATFP
Part 3 contains the project description, functional and performance requirements, scope items, and expected quality levels that exceed Part 4. Part 4 identifies design criteria, verification requirements, and performance and quality requirements of products. See "Order of Precedence" paragraph in Part 2 for relationships between all parts of this RFP.
PART 3 - CHAPTER 1 - Page 1
1.0 PROJECT DESCRIPTION
The scope of this project is to construct a Hazardous Waste Storage Facility at Joint Base Anacostia Bolling. The site is in the Northeast quadrant of the base. It is bounded by Boundary Road SW to the south, Building 425 and its parking lot to the west, DIA Access Road SW to the north and east, and Building 425 to the east. The facility is intended to be a 4800sf single-story building to be utilized for hazardous waste storage. It includes administrative office space, shower and restroom facilities, mechanical, electrical, telecom, and fire pump rooms, and functional training space that also serves as the break room.
The scope of work includes the exterior construction, interior finishes, Mechanical, Electrical, Plumbing, Telecommunications, and Fire Protection systems, and furniture systems.
The pre-engineered metal building’s exterior construction will comply with the Joint Base Anacostia Bolling (JBAB) Installation Facilities Standards (IFS). It will consist of steel framing with masonry veneer and pre-finished metal panels with continuous rigid insulation serving as the air barrier layer. A canopy will be constructed over the main entrance, and the loading dock will be covered to provide protection from the elements. The loading dock will be protected from fire via dry sprinklers supported from the building-wide wet pipe sprinkler system. A low profile, surface mounted dock scissor lift will enable deliveries from trucks with a range of bed heights.
All doors and frames, except for the vestibule, will be hollow metal, shop primed, and field painted.
The Vestibule will be constructed of an insulated low-e glazing and thermally broken aluminum storefront system. Vestibule doors are to be aluminum framed with an anodized finish. Exterior doors and frames are to be heavy-duty and meet ATFP requirements as needed. Door hardware will be commercial grade complying with ANSI/BHMA standards. Exterior window glazing will be pre-finished aluminum thermal break windows with low-e insulated glass where necessary to meet ASHRAE 90.1 - 2019 requirements or laminated glass.
The roof will be a standing seam metal system with continuous rigid insulation on metal deck over the pre-engineered metal framing. It will be designed in accordance with UFC 3-110-03 and is intended to have a minimum slope of 1 ½” per foot. Pre-finished metal gutters and downspouts must match roofing and trim, adhering to base standards.
The building interior will be divided into an administrative area and a hazardous storage area.
These areas will be separated by a 2-hour fire-rated concrete masonry partition. A wet pipe sprinkler system will extend throughout the interior to provide protection from fire. Partitions inside the administrative area will be metal stud and gypsum wallboard extending from floor to the deck or structure above to meet security and sound requirements. Acoustical batt insulation will be provided to maintain the required STC levels between spaces, and all penetrations will be sealed.
Gypsum wallboard partitions must be finished and painted to a level 4 standard. Floor finishes will include resilient tile and rubber wall base in administrative areas, and porcelain tile on the walls and floors in the toilets and showers. Floor finishes are to be light colors to easily show spills, leaks or contaminants that enter from the Hazardous Storage Area. Ceiling finishes will mostly consist of a 24” x 24” acoustic ceiling tile system, but the toilet and shower areas will receive gypsum board ceilings.
ABA-compliant restroom toilet accessories and plumbing fixtures will be coordinated with base standards, and moisture resistant gypsum board will be utilized in the restroom and shower area.
The hazardous storage area will be subdivided into Flammable/Combustible Containment, PART 3 - CHAPTER 1 - Page 2
Alkaline Containment, Acid Containment, Hazardous Storage, and Lithium-ion Battery Storage.
Two of these spaces (Alkaline Containment and Acid Containment) will be divided and bordered with 18” concrete curbs in order to contain spills. A 4-hour fire barrier will separate the Flammable/Combustible waste from the rest of the Hazardous Storage. The Lithium-Ion Battery Storage will be separated from the Hazardous Storage and Fire Pump areas by a 2-hour fire barrier. The shared wall between the Fire Pump and Mechanical Room will be 1-hour fire-rated.
Partitions in this area will be concrete masonry.
The flooring will consist of the reinforced concrete slab-on-grade over a 10-mil vapor barrier, porous stone, and fill. In the Flammable containment areas, the slab will step down approximately 48 inches to create the secondary hazardous waste containment system. Metal floor grating will align with the slab-on-grade, spanning over the dropped slab. Pallet placement areas will be designated in the Flammable Storage by a concrete slab on metal deck supported by beams and columns on baseplates. This concrete slab will lay flush with the surrounding bar grating. This will allow for unimpeded deliveries of hazardous waste. In the Alkaline and Acid Secondary Containment Areas, the slab-on-grade will be sloped to a metal floor grating-covered sump 24 inches below the finished floor providing a secondary hazardous waste containment system.
Where floor finishes are not required, concrete sealer will be used. The structure above will be exposed in this area.
Interior doors must be flush hollow metal, with hollow metal frames. Some doors will have view lites with laminated glazing for situational awareness and visibility. Door hardware is to be in accordance with minimum requirements of ANSI/BHMA, with the finish to match base standards.
Furniture, fixtures, and equipment are also included in the project scope. These items must be durable, easy to maintain, and support the technical functions of the facilities, allowing for flexibility and mobility. Powder-coated metal lockers will be provided outside the Telecom Room for easy access from the Toilet and Shower/Changing Areas. Modular furniture should be considered to provide adaptability. Access to non-classified networks is required in this facility.
PART 3 - CHAPTER 2 - Page 1
2.0 PROJECT OBJECTIVES
2.1 Mission Statement
The Air Force mission for this project is to provide appropriate and code-compliant hazardous waste storage facility with a functional training space. The 4,800SF single story facility will contain central receiving, processing, and short-term storage for regulated and non-regulated waste (supported by a loading dock and flush loading dock scissor lift), administrative support, customer service, training space, and restroom/break areas. The goal is to achieve consistency throughout the Air Force and Joint Base Anacostia Bolling with facilities that promote safe storage and disposal of hazardous waste, while supporting proper training for professionals handling this category of material. Thus, the minimum standards set forth in this document maintain the focus of providing safe storage and a comfortable working environment.
2.2 Facility Function
The function of the Hazardous Waste Storage Facility is to provide a functional, safe, and code-compliant place for storage and disposal of hazardous waste. This is a critical element in maintaining the health and safety of personnel, while providing a designated, safe area to hold hazardous items that cannot be stored elsewhere.
2.3 Project Specific Priorities
2.3.1 Sustainable Design and Construction
Design and construct project to comply with sustainability requirements identified in Part 2 UFGS Section 01 33 29, Sustainability Requirements and Reporting. Additional specific sustainability requirements are found in RFP Part 2, Part 3, and Part 4 sections.
Design and construct project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.
Employing integrated design principles, optimizing energy performance, enhancing indoor environmental quality, and reducing environmental impact of materials will be critical design objectives throughout the design process.
2.3.2 Storm Water Management - Low Impact Development (LID)
Comply with UFC 3-210-10, Low Impact Development and FC 1-300-09N Navy and Marine Corps Design Procedures. Additional specific LID and stormwater management requirements are found in RFP Parts 3 and 4, Section G30. In addition to LID, comply with DC Department of Energy and Environment (DOEE) stormwater regulations.
2.3.3 Energy Efficiency
Incorporate energy efficiency in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.
PART 3 - CHAPTER 2 - Page 2
2.3.4 Building Commissioning
Provide commissioning to meet requirements identified in Section 01 91 00.15 Building Commissioning, and UFC 1-200-02 High Performance and Sustainable Building Requirements.
2.3.5 Accessibility Requirements
Provide barrier-free design in accordance with UFC 1-200-01 , DoD Building Code (General Building Requirements).
2.3.6 Antiterrorism Criteria
Design the facility to comply with UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings as required.
Facility will have an occupancy designated as low occupancy and UFC 4-010-01 does not apply.
Facility will be less than 3 stories and will not be required to meet the progressive collapse avoidance standards.
Facility is within a controlled perimeter.
Facility minimum standoff distance: See UFC 4-010-01, Table B-1.
Develop the site based on the requirements of UFC 4-010-01. Where conventional construction standoff distances are unavailable, the required level of protection can be achieved through analysis and building hardening based on the actual standoff distance. Blast analysis is required for all windows and doors and structural components and assemblies that are do not meet the conventional construction parameters in UFC 4-010-01, Table 2-3 or that are not listed in UFC 4- 010-01, Table B-2. Exterior doors and windows are included are in this project’s scope of work.
2.3.7 Cybersecurity
Design, acquire and execute all control systems (including systems separate from management utility monitoring and control system) in accordance with UFC 4-010-06 Cybersecurity of Facility- Related Control Systems and as required by individual Facilities Engineering Command (FEC) or Installation implementation policy.
Incorporate ICS Security Controls located in NIST 800-82, Appendix G, Table G-1. Design the project using UFGS 25 05 11, Cybersecurity for Facility-Related Control Systems. Incorporate elements of the NAVFAC Cybersecurity Hygiene Checklist into contract specifications by using
SECTION 25 05 11, CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS. CIO4
Point of Contact to be utilized in SECTION 25 05 11 is to be determined upon award of contract.
Submit Cybersecurity Plan and Cybersecurity Hygiene Report in accordance with SECTION 25 05 11."
Incorporate cybersecurity requirements into project facility control systems identified in:
ESR D30, HVAC
ESR D50, ELECTRICAL
http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01
PART 3 - CHAPTER 2 - Page 3
2.4 Appropriate Design
The following codes and standards apply to this project:
International Code Council (ICC):
IBC International Building Code IPC International Plumbing Code IMC International Mechanical Code
National Fire Protection Association (NFPA):
NFPA 1 Fire Code NFPA 10 Standard for Portable Fire Extinguishers NFPA 13 Standard for the Installation of Sprinkler Systems NFPA 30 Flammable and Combustible Liquids Code NFPA 30B Code for the Manufacture and Storage of Aerosol Products NFPA 54 Fuel Gas Code NFPA 70 National Electrical Code NFPA 72 National Fire Alarm and Signaling Code NFPA 80 Standard for Fire Doors and Other Opening Protectives NFPA 90A Standard for the Installation of Air-Conditioning and Ventilating Systems NFPA 101 Life Safety Code NFPA 110 Standard for Emergency and Standby Power Systems NFPA 285 Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of
Exterior Wall Assemblies Containing Combustible Components NFPA 291 Recommended Practice for Fire Flow Testing and Marking of Hydrants NFPA 400 Hazardous Materials Code NFPA 780 Standard for the Installation of Lightning Protection Code
Accessibility Guidelines:
ADAAG Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines ABA-DOD ABA Accessibility Standard for Department of Defense Facilities
American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE):
ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings, ASHRAE Handbooks Fundamentals
HVAC Systems and Equipment Applications
U.S. Department of Defense (DOD):
FC 1-300-09N Navy and Marine Corps Design Procedures UFC 1-200-01 DoD Building Code UFC 1-200-02 High Performance and Sustainable Building Requirements UFC 3-101-01 Architecture UFC 3-110-03 Roofing UFC 3-120-01 Design: Sign Standards
PART 3 - CHAPTER 2 - Page 4
UFC 3-120-10 Interior Design UFC 3-190-06 Protective Coatings and Paints UFC 1-200-01 DoD Building Code UFC 3-201-01 Civil Engineering UFC 3-201-02 Landscape Architecture UFC 3-210-10 Low Impact Development UFC 3-220-01 Geotechnical Engineering UFC 3-230-01 Water Storage and Distribution UFC 3-240-01 Wastewater Collection UFC 3-250-01 Pavement Design for Roads and Parking Areas UFC 3-250-04 Standard Practice for Concrete Pavement Construction UFC 3-250-08FA Standard Practice for Sealing Joints and Cracks in Rigid and Flexible
Pavements UFC 3-600-01 Fire Protection Engineering for Facilities UFC 3-301-01 Structural Engineering UFC 3-320-06A Concrete Floor Slabs on Grade Subjected to Heavy Loads UFC 3-400-02 Design: Engineering Weather Data UFC 3-401-01 Mechanical Engineering UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems UFC 3-420-01 Plumbing Systems UFC 3-450-01 Noise and Vibration Control UFC 3-501-01 Electrical Engineering UFC 3-520-01 Interior Electrical Systems UFC 3-530-01 Interior and Exterior Lighting Systems and Controls UFC 3-540-01 Engine-Driven Generator Systems for Prime And Standby Power Applications UFC 3-550-01 Exterior Electrical Power Distribution UFC 3-560-01 Operation and Maintenance: Electrical Safety UFC 3-570-01 Cathodic Protection UFC 3-575-01 Lightning and Static Electricity Protection Systems UFC-3-580-01 Information and Communications Technology Infrastructure Planning and Design UFC 3-600-01 Fire Protection Engineering for Facilities UFC 3-730-01 Programming Cost Estimates for Military Construction UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-03 Security Engineering: Physical Security Measures for High-Risk Personnel UFC 4-010-06 Cybersecurity of Facility-Related Control Systems (FRCS) UFC 4-021-01 Design and O&M: Mass Notification Systems UFC 4-021-02 Electronic Security Systems UFC 4-451-10N Design: Hazardous Waste Storage
AFI 32-1062 Electrical Systems, Power Plants and Generators AFMAN 32-1065 Grounding & Electrical Systems AFMAN 32-7002 Environmental Compliance and Pollution Prevention AFMAN 32-1084 Standard Facility Requirements
IAW CFR Title 49 Transportation
DoD Manual 5200.01 Protection of Classified Information Manual (volume 3) DoD Instruction 4170.11 Installation Energy Management DISA 310-70-1 Global Information Grid (GIG) Methods and Procedures
ITG FY05-2 NAVFAC Humid Area HVAC Design Criteria
AFCFS Air Force Corporate Facilities Standards
JBAB-IFS Joint Base Anacostia-Bolling Installation Facilities Standards
PART 3 - CHAPTER 2 - Page 5
American National Standards Institute:
ANSI C2 National Electrical Safety Code ANSI/AISI S100-10 American Iron and Steel Institute, North American Specification for the
Design of Cold-Formed Steel Structural Members ANSI/TIA/EIA-607 Grounding and Bonding Requirements for Telecommunications in Commercial Buildings ANSI/TIA-568-C.0 Generic Telecommunications Cabling for Customer Premises ANSI/TIA-568-C.1 Commercial Building Telecommunications Cabling Standard ANSI/TIA-568-C.2 Balanced Twisted-Pair Telecommunications Cabling and Components Standards ANSI/TIA-568-C.3 Optical Fiber Cabling Components Standard ANSI/TIA-568-A Commercial Building Telecommunication Cabling Standard ANSI/TIA-569-B Commercial Building Standard for Telecommunications Pathways and Spaces ANSI/TIA-606-A Administration Standard for Commercial Telecommunications Infrastructure ANSI/TIA/EIA-607-A Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises ANSI/TIA-758 Customer-Owned Outside Plant Telecommunications Cabling Standard ANSI/INFOCOMM 2M-2010 Standard for Audiovisual Systems Design and Coordination Processes ANSI/INFOCOMM 10:2013 Audiovisual Systems Performance Verification
American Society of Civil Engineers ASCE 7-16 Minimum Design Loads and Associated Criteria for Buildings and Other Structures
American Concrete Institute:
ACI 318-19 American Concrete Institute, Building Code Requirements for Structural Concrete
American Institute of Steel Construction:
AISC 360-16 Specifications for Structural Steel Buildings American Society of Mechanical Engineers
ASME B30.11 American Society of Mechanical Engineers, Monorails & Underhung Cranes
Architecture and Interior Design:
UL Fire Rated Assemblies Directory Gypsum Construction Handbook, USG Corporation Gypsum Construction Guide, National Gypsum Company Architectural Woodwork Institute (AWI) Standards, 2nd Edition The Carpet and Rug Institute (CRI) The Ceramic Tile Institute of America (CTC)
Electrical:
IESNA Illuminating Engineering Society of North America Lighting Handbook, 10th Edition IEEE 142 Recommended Practice for Grounding of Industrial and Commercial Power Systems
PART 3 - CHAPTER 2 - Page 6
Fire Protection:
FM Global Approval Guide UL Fire Protection Directory
Department of Energy and Environment (DOEE):
DOEE Stormwater Management Guidebook
US Energy Independence and Security Act (EISA) of 2007:
Section 438
Environmental Protection Agency (EPA):
EPA 841-B-09-001 Technical guidance on implementing the Stormwater Runoff Reduction
Requirements for Federal Projects Under Section 438 of the Energy Independence and Security Act
29 CFR 1910 Occupational Safety and Health Standards 40 CFR Part 264/265 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, Subpart I
2.5 Workflow Process
The main building entrance and staff operations must be located on one end of the facility. Design the Open Office to support efficient visitor check-in with direct visual access to the main entrance. The shared public areas of the building must be centrally located on the first floor. Locate the Open Office adjacent to public areas to provide monitoring as much as practical. Hazardous Material Storage must extend away from the central public areas equally as much as the design and site configuration will allow.
2.5.1 Hours of Operation
Hours of operation shall be 8-hours a day, 5 days a week.
2.5.2 Staffing/Occupancy
The number of occupants specified in the RFP are identified for programming purposes.
Determine occupancy used to design building features, such as structural, egress, and plumbing fixtures as required in applicable building or life safety codes.
TYPE OF OCCUPANCY NO. OF PERSONS DESCRIPTION OF ACTIVITY
LOW OCCUPANCY 4 ADMINISTRATIVE, STORAGE
MAXIMUM OCCUPANCY # #
6 (WAREHOUSE) + 8 (BUSINESS) 14 MAX
2.6 Special Design Challenges
Joint Base Anacostia-Bolling is considered a controlled perimeter. All construction personnel and vehicles
PART 3 - CHAPTER 2 - Page 7 must undergo security checks to access the site.
This project will have Secondary Containment areas for hazardous material. In the Flammable/Combustible Area, the Secondary containment area will be 4’-0” underground, with bar grate flooring and concrete slab on metal deck and steel posts with baseplates. The areas with concrete slab on metal decking will be for pallet locations. Due to the requirement of a secondary containment area, additional excavation will need to occur as compared to a slab on grade.
There will also be 2’-0” deep sumps protected by bar grating in the Alkaline and Acid Containment Areas.
The concrete slab on grade will be sloped toward the sump.
2.7 Adaptability and Flexibility
Not Used.
PART 3 - CHAPTER 3 - Page 1
3.0 SITE ANALYSIS
3.1 Existing Site Conditions
3.1.1 Natural Constraints
3.1.1.1 Topography
The site is relatively flat through the parking lot and proposed building location but slopes steeply to the east to a stormwater pond and slopes steeply to the north and south to other roads.
3.1.1.2 Vegetation / Landscaping
Most of the site is covered by grass except the stormwater pond covered in overgrown vegetation.
3.1.1.3 Natural Resources (Threatened and Endanger Species/Critical Habitat, Migratory Bird, Essential Fish Habitat, marine mammal restrictions, Bald and Golden Eagle nest location and restriction areas) No known natural resources will be impacted by this project.
3.1.1.4 Climatology (Solar orientation, etc.)
Not applicable.
3.1.1.5 Wetlands
Per JBAB Environmental, there are no jurisdictional wetlands present on JBAB, including this site. See WETLAND DETERMINATION INFO IN PART 6.
3.1.1.6 Geotechnical Report
A site-specific geotechnical report has been performed and is included in Part 6. See
ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION.
3.1.1.7 Environmental Restrictions
No special environmental restrictions have been identified
3.1.1.8 Radon Contamination
No known radon contamination at the project site.
3.1.1.9 Wave, Current and Tide Reports
Not applicable.
3.1.1.10 Hydrographic Survey
Not applicable.
3.1.1.11 Unexploded Ordnance (UXO) Survey or Evaluation Reports No UXO has been identified on the project site.
3.1.1.12 Existing Waterfront Facility (above and underwater) Inspection Reports Not applicable.
PART 3 - CHAPTER 3 - Page 2
3.1.1.13 Coral or Other Marine Life Maps/Reports
3.1.1.14 Flood Resistant Design
The building footprint is within the 500-year FEMA floodplain. The water level of the Potomac River is tidally influenced, so UFC 3-201-01 and ASCE 24-14 apply flood resistant design criteria to this project. Based on the usage of the building and the low levels of hazardous materials, the ASCE 24-14 flood class is 2, which requires the finish floor elevation (FFE) to be at least the Low 2065 from the DOD Regional Sea Level Rise (DRSL) database. The DRSL Low 2065 elevation is 5.34 meters (17.52 feet). The building finish floor elevation shown in PART 6 is 20.66, so the FFE meets the flood resistant design criteria. If adjustments are made to the FFE, it must be at least 17.52 feet. The building has a 4’ deep spill containment area that must be waterproofed to prevent leakage. The building must be analyzed and structurally adjusted as necessary to ensure the building is sufficiently loaded to hold the building down with water roughly 1’ high around the spill containment area.
3.1.2 Man made
3.1.2.1 Existing Vehicular Access and Circulation
Vehicles currently enter the parking lot off of DIA Access Road.
3.1.2.2 Site Utilities
There are existing power and telecommunications utilities on the south side of the site, an existing stormwater pond and associated infrastructure on the east side of the site, storm drains, water lines, and sanitary sewers north of the site, and a water line in the parking lot serving the two buildings to the west of the site.
3.1.2.3 Site Drainage & Storm Water Runoff (hydrology)
A stormwater pond is located on the east side of the site that picks up drainage from the site and areas north and west of it. It was built as a stormwater quantity BMP prior to the 2013 DOEE regulations, so is not in their database.
3.1.2.4 Existing Buildings
There are two existing warehouses west of the proposed building location.
3.1.2.5 Existing Waterfront Facilities
3.1.2.6 Existing Mooring Hardware and Fender System
3.1.2.7 Existing Dredging
3.1.2.8 Hazardous Materials and Substances
Per IAW CFR Title 49, if contamination of soil is suspected, a TLCP analysis must be conducted by a certified lab and results provided to the 11th CES/CEN. Contractors are responsible for compliant disposal of any hazardous waste generated or discovered during the project. All hazardous waste shipments must be properly manifested and transported per IAW CFR Title 49. Final disposal (Designated Facility to Generator) documentation must be provided to 11th CES/CEN within 30 days of shipment.
PART 3 - CHAPTER 3 - Page 3
3.1.2.9 Fencing
There is no fence on the project site.
3.1.2.10 Adjacent Land Use
North of the site is a road and parking lot, east is road and building, south is road, west is parking and warehouses.
3.1.2.11 Cultural Resources (historical, archeological)
3.1.2.12 AICUZ / Explosive Arcs / HERO
3.2 Site Development Requirements
3.2.1 Facility Footprint
3.2.1.1 Building Footprint
See PART 6 for building plans.
3.2.1.2 Wharf, Pier, Drydock Footprint
3.2.2 Vehicular Access and Circulation
3.2.2.1 Parking
Provide parking per drawing C-102 included in Part 6.
3.2.2.2 Service Access
Access to the loading area is from the parking lot west of the building.
3.2.2.3 Pedestrian Access and Circulation (flow, paths, sidewalks, etc.)
A sidewalk will be required between the parking lot and the building to provide separation from the building and parking to protect the building as well as provide pedestrian access across the face of the building.
3.2.2.4 Recreational
3.2.2.5 Outdoor Activity Areas
3.2.2.6 Landscaping
The only landscaping is turf grass, no shrubs or trees.
3.2.2.7 Utilities
The building will require domestic water, fire water, sanitary sewer, telecommunications, and electrical. See PART 6.
3.2.2.8 Signage
No new exterior signage is anticipated.
PART 3 - CHAPTER 3 - Page 4
3.2.2.9 Site Drainage & Storm Water Runoff (hydrology)
Stormwater quality measures will be required to treat the runoff from the project site per DOEE regulations. It is anticipated that adjustments will need to be made to the stormwater quantity pond on the east side of the site to account for the additional stormwater flow from this project. Engineer of record is responsible for confirming the size of required water quality measures and to verify what/if modifications to the existing quantity pond are required.
3.2.2.10 Dewatering
Dewatering operations are not anticipated for this project, but if they are, comply with all JBAB, DC, and federal requirements.
3.2.2.11 Site / Building Demolition
The demolition primarily consists of demolition of asphalt and concrete pavement and sidewalks.
3.2.2.12 Site Clearing
Clearing of the existing stormwater pond will be necessary to regrade it and ensure it complies with the latest DOEE requirements.
3.2.2.13 Fencing (perimeter security)
No new fences are required.
3.2.2.14 Construction Access / Lay down Area
Construction site access will be up the existing parking lot entrance off of DIA Access Road SW. Project laydown areas must maintain access to the parking and existing warehouses on the west side of the site.
3.2.2.15 Permits
See Permit Record of Design in Part 6.
3.2.2.16 Sustainable Development
In accordance with the requirements of UFC 1-200-02, the new facility must provide a 30% energy reduction minimum below the ASHRAE 90.1-2019 Appendix G baseline unless not life cycle cost effective. An energy analysis will be performed to demonstrate compliance with this requirement. Design and installation of mechanical systems will support the overall sustainability reporting requirements for the project. Design in accordance with the Guiding Principles, as defined by UFC 1-200-02, is the primary sustainability goal. Third party certification is not required since the building is under 10,000 SF.
3.2.2.17 Antiterrorism Force Protection (ATFP)
Facility is within a controlled perimeter, and this project’s occupancy is designated as low occupancy. However, doors will be designed to open out along the path of egress, and laminated glazing will be applied to windows, storefronts, and door lites, where appropriate.
PART 3 - CHAPTER 3 - Page 5
3.2.2.18 Architectural Barriers Act (ABA) Requirements
The project will provide compliant pedestrian access between the parking and the building.
3.2.2.19 Master Planning
3.2.2.20 Hazardous Materials and Substances
Hazardous materials will be stored within the facility; refer to the Basis of Design for more information. Hazardous materials will not be stored outside of the facility.
3.2.2.21 Environmental Assessment (Constraint in the EA not the entire EA)
Wherever practical, the building will use materials with recycled content, with a minimum
10% of total materials by cost being recycled. Materials will be selected to maximize recycled content (RCRA Section 6002), for EPA-designated products, and will meet or exceed EPA's recycled content recommendations for building modifications, maintenance, and cleaning.
Wherever practical, materials will be chosen based on USDA's biobased content recommendations (FSRIA Section 9002), for USDA-designated products. Additionally, the building will prioritize rapidly renewable sources and certified sustainable wood products where applicable.
Ozone depleting substances (ODS) or high Global Warming Potential (GWP) chemicals will not be specified for this project.
Low emitting materials complying with ASHRAE 189.1 will be specified to reduce off-gassing and improve indoor air quality.
The building design will prioritize recycling by providing a dedicated, easily accessible area for collecting and storing recyclable materials. The Contractor will develop and enforce a Construction Waste Management Plan to ensure at least 60% of debris is recycled or salvaged during the construction process, measured by weight or volume. Before starting work, all subcontractors will be informed of the intended waste separation or co-mingling method.
PART 3 - CHAPTER 4 - Page 1
4.0 BUILDING REQUIREMENTS
4.1 Space Tabulation
Space Name # of spaces
Unit
SF
(Net)
Total
SF
(Net)
Total
SQM
(Net)
Remarks
Vestibule 1 70 70 6.50
Open Office 1 454 454 42.18
Break/Training 1 280 280 26.01
Corridor 1 244 244 22.67
Shower/Changing 1 53 53 4.92
Toilet Room 1 60 60 5.57
Janitor 1 11 11 1
Telecom 1 81 81 7.53
Electrical 1 100 100 9.29
Mechanical 1 120 120 11.15
Fire Pump 1 120 120 11.15
Lithium Ion 1 74 74 6.87
Hazardous Storage 1 865 865 80.36
Acid Storage 1 252 252 23.41
Alkaline Storage 1 252 252 23.41
Flammable Storage 1 1,220 1,220 113.34
Loading Dock 1 120 120 11.15 Exterior
Subtotal Net Area 4,376 406.54
Net to Gross Factor 1.10 1.10
TOTAL GROSS AREA 4,813 447.19
The design build contractor shall provide actual area in both square feet and square meters in proposals.
4.2 Space Relationships
The spaces noted in this RFP are new work; work required in these spaces can be found in the Drawings, an attachment that can be found in Part 6. The Client’s requirements must be verified post award, which may result in a redesign that should be completed at no additional cost to the government. The drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract. All work included within the public and circulation areas in this project must conform to the ABA Accessibility Guidelines.
The new facility is organized into two distinct functional zones: the “front” administrative and public-facing area, and the “back” hazardous materials storage area. The main entrance to the P001U Hazardous Storage Building is to the South of the building; this enters into a vestibule. The vestibule is adjacent to the Open Office area, which connects directly to the Break Room. A door from the Open Office area leads to a Corridor including the Toilet Rooms, Janitor closet, Telecom Room, and Shower/Changing areas.
This corridor continues into the Hazardous Storage area. The “front” zone will be constructed with metal stud and painted gypsum board partitions extending to the underside of structure, providing necessary sound attenuation and security separation. All design and construction shall comply with current UFC criteria and the 2024 International Building Code. Accessibility throughout the facility will adhere to ABA
PART 3 - CHAPTER 4 - Page 2 and ADAAG requirements, with public and employee areas equipped accordingly.
The “back” portion of the facility will be separated by fire-rated masonry barriers and includes Acid, Alkaline, Lithium Battery, and Flammable/Combustible Storage areas. These areas are designed with concrete curbs and secondary containment systems appropriate to the material stored, including sloped slabs to sump pits and bar grating over containment volumes. The Flammable/Combustible Storage room is isolated from the rest of the Hazardous Storage by a 4-hour fire-rated wall.
Side entrances will be more frequently used by delivery drivers and maintenance staff, and lead into the Hazardous Storage area. Exterior doors also provide service access to the Mechanical, Electrical, Fire Pump, and Lithium Battery Storage Rooms. There is no access to the Open Office or Break Room from an entrance other than the Main Entrance. Exterior doors at the Flammable/Combustible Storage Area are intended to be exit only.
4.3 Exterior Character
The exterior appearance of the building shall be compatible with adjacent facilities and in accordance with the applicable Joint Base Anacostia-Bolling (JBAB) Installation Facilities Standards (IFS). The design shall be in conformance with the JBAB Master Plan and as indicated by the architectural Drawings included as attachments in Part 6 of this RFP. The façade will include installation of new pre-finished metal panels and concrete masonry veneer over the pre-engineered metal building framing. The wall assembly will achieve a maximum U-value of 0.052 per ASHRAE 90.1 - 2019, with continuous insulation serving as both the thermal and air barrier. Exterior doors will be heavy duty, shop primed, and field painted hollow metal assemblies that meet ATFP requirements as needed, with commercial-grade hardware in accordance with ANSI/BHMA standards. Windows will consist of low-e insulated/laminated glass units with pre-finished aluminum thermal break frames anchored to galvanized steel angles. Where necessary, glazing will be tinted to comply with ASHRAE 90.1 - 2019. Exterior glazing must meet Anti- Terrorism requirements. A new entrance canopy and covered loading dock will provide shelter from the elements. The roof assembly will be a standing-seam metal panel system on metal deck over pre-engineered framing, meeting the maximum U-value of 0.035 and designed in compliance with UFC 3- 110-03, with a minimum slope of 1-1/2” per foot. At the Loading Dock, the roofing assembly structure will be premanufactured by the pre-engineered metal building manufacturer. Lightning Protection, Snow Guards, and Fall Protection will be provided as required. Pre-finished metal gutters and downspouts will match the roof and trim.
5.0 ROOM REQUIREMENTS
General – Exterior
Space Characteristics
Function/adjacencies: Exterior of Hazardous Storage Building
Special Dimensions:
Ideal Plan Dimensions: 40’-0” x 120’-0” – see plans in Part 6 of this RFP Minimum Ceiling Height: N/A, Exterior
Acoustics: N/A
Access: N/A
Number of Occupants: Non-occupied space
Other/Special Requirements: N/A
Uniformat Section
Description Qty Size Specific Requirements
B1020
ROOF
CONSTRUCTION
1 5410sf +/- Provide a pre-finished, insulated metal roof as a part of the pre-engineered metal building system. Include flashing as required.
B201001
EXTERIOR
ENCLOSURE
5 walls
Masonry total: 1070sf
Insulated Metal Panel total: 3200sf
Precast Concrete sill:
300lf +/-
Provide masonry veneer and pre-finished insulated metal panels for the exterior enclosure.
- 25% of exterior veneer is masonry veneer, weeps and flashing as required
- 75% of exterior veneer is insulated metal panel
Rigid insulation and plywood sheathing as required to complete wall assembly – see B201003
Precast concrete sill to cap masonry veneer
B201002
EXTERIOR WALL
BACKUP
CONSTRUCTION
5 walls 4270sf +/-total backup system
Provide structural steel framing serving as the backup construction for the pre-finished metal panels and masonry veneer. Batt insulation and ½” gypsum wall board as required to complete backup portion of wall assembly.
B201003
INSULATION & VAPOR
RETARDER
AR AR
Provide continuous rigid insulation serving as the air barrier layer.
B201007 EXTERIOR SOFFITS
4 sides of building
600sf +/- Provide exterior metal soffits where roof overhangs
B201009
EXTERIOR PAINTING
AND COATINGS
AR 500sf +/- Paint exterior elements as necessary
B202001 WINDOWS 8 4’-0” x 6’-0” Provide pre-finished aluminum thermal break windows with low-e insulated glass
B301005
GUTTERS AND
DOWNSPOUTS
150sf Gutters, 6 Downspout s, 6 Boots
16’ Downspouts
Preformed metal gutters, downspouts, downspout boots; Match roofing finish and adhere to base aesthetic standards
General – Exterior
Space Characteristics
Function/adjacencies: Exterior of Hazardous Storage Building
Special Dimensions:
Ideal Plan Dimensions: 40’-0” x 120’-0” – see plans in Part 6 of this RFP Minimum Ceiling Height: N/A, Exterior
Acoustics: N/A
Access: N/A
Number of Occupants: Non-occupied space
Other/Special Requirements: N/A
Uniformat Section
Description Qty Size Specific Requirements
B301090 OTHER ROOFING AR AR
Lightning Protection, Snow Guards, and Fall Protection as required
D4010 FIRE ALARM SYSTEM
Provide weatherproof fire alarm/mass notification speakers in exterior egress areas per UFC 4-021-01.
Refer to Part 3 Engineering System Requirements.
D50
EMERGENCY
LIGHTING
Provide exterior mounted emergency lighting fixtures at building exits.
D509004
LIGHTING
PROTECTION
Provide a Lightning Protection system in accordance with UFC 3-575-01.
D509002
EMERGENCY
GENERATOR
Provide generator and ATS in accordance with UFC 3- 540-01 to support fire pump and ventilation equipment.
5.0 ROOM REQUIREMENTS
100 – Vestibule
Space Characteristics
Function/adjacencies: Adjacent to Open Office – serves as main entrance and exit
Special Dimensions:
Minimum Ceiling Height: 9’-4”
Acoustics: N/A
Access: Primary building entrance
Number of Occupants: Not continuously occupied – for entry and exit
Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
B202002 STOREFRONT 4 walls 78sf +/- Exterior Aluminum Framed Storefront System
B203002 GLAZED DOORS 1
6’-0” x 7’-0” x 1 ¾”
Exterior Insulated Glazed Double door in Aluminum framed Storefront System
B203008
EXTERIOR DOOR
HARDWARE
AR AR
Entry lockset hardware, Hinges, Accessible thresholds, door closers, coordinator, astragal, panic hardware, sweeps and weatherstripping.
C102002
GLAZED INTERIOR
DOORS
6’-0” x 7’-0” x 1 ¾”
Interior Glazed Double door in Aluminum framed Storefront System
C102007
INTERIOR DOOR
HARDWARE
AR AR
Passage lockset hardware, Hinges, Accessible thresholds, door closers, coordinator, astragal, and panic hardware.
C103014
ENTRANCE FLOOR
GRILLES AND MATS
Per LEED v4
IEQ
requirements
Recessed floor mats/grilles in aluminum frame – Provide metal and rubber insert tread system
Loose lay floor mats at entrances to Vestibule and Hazardous Storage.
C3010 WALL FINISHES 2 walls 20sf +/- Paint non-storefront surfaces
C3020 FLOOR FINISHES 1 70sf +/- Epoxy flooring with rubber wall base
C3030 CEILING FINISHES 1 70sf +/- Painted moisture-resistant gypsum board ceiling
D30 HVAC Provide per Part 3 Engineering System Requirements
100 – Vestibule
Space Characteristics
Function/adjacencies: Adjacent to Open Office – serves as main entrance and exit
Special Dimensions:
Minimum Ceiling Height: 9’-4”
Acoustics: N/A
Access: Primary building entrance
Number of Occupants: Not continuously occupied – for entry and exit
Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
D4010 FIRE ALARM SYSTEM
Provide a fire alarm and mass notification system per Part 3 Engineering System Requirements. Provide the combination fire alarm and mass notification system control panel at the designated primary facility entrance. Provide a Local Operating Console (LOC) at the primary facility entrance including a microphone for live voice announcements and an interface to activate prerecorded messages per Base standard. Provide fire alarm and mass notification system radio transmission and receiving equipment compatible with the AES equipment located in the Base dispatch building.
Provide a separate cabinet or other approved container to store the fire alarm system shop drawings adjacent to the fire alarm control panel.
D4040 SPRINKLER SYSTEM
Provide a wet pipe sprinkler system throughout the facility per Part 3 Engineering System Requirements
D503005 SECURITY SYSTEMS Provide per Part 3 Engineering Systems Requirements
5.0 ROOM REQUIREMENTS
101 – Open Office
Space Characteristics
Function/adjacencies: Adjacent to Training Room/Break Room and Corridor
Special Dimensions:
Minimum Ceiling Height: 10’-0”
Acoustics: N/A
Access: N/A
Number of Occupants: 4
Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
C101001 FIXED PARTITIONS 2 200sf +/- 3 5/8” Metal stud with 5/8” GWB on each side
C102001
STANDARD INTERIOR
DOORS
3’-0” x 7’-0” x 1 ¾”
Hollow metal door and frame
C102007
INTERIOR DOOR
HARDWARE
AR AR
Passage hardware, hinges, Accessible thresholds, wall stops, kick plates, door closers, panic hardware
C103003
MARKER AND TACK
BOARDS
AR AR Provide 1 of each
C103004
IDENTIFYING
DEVICES
AR AR Wall mounted acrylic signage
C3010 WALL FINISHES 3 walls 230sf +/- Paint
C3020 FLOOR FINISHES 1 450sf +/- Resilient floor tile with rubber wall base
C3030 CEILING FINISHES 1 450sf +/- 24” x 24” Acoustic ceiling panel system
D30 HVAC Provide per Part 3 Engineering System Requirements
D4010 FIRE ALARM SYSTEM
Provide a fire alarm and mass notification system per Part 3 Engineering System Requirements
D4040 SPRINKLER SYSTEM
Provide a wet pipe sprinkler system throughout the facility per Part 3 Engineering System Requirements
D503001
TELECOMMUNICATIO
NS SYSTEMS
Provide a minimum of one outlet with (1) NIPRNET and (1) Voice jack per each workstation.
E201002
WINDOW
TREATMENTS
3 24sf +/- Manually operated roller shades
101 – Open Office
Space Characteristics
Function/adjacencies: Adjacent to Training Room/Break Room and Corridor
Special Dimensions:
Minimum Ceiling Height: 10’-0”
Acoustics: N/A
Access: N/A
Number of Occupants: 4
Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
E202002
MODULAR
PREFABRICATED
FURNITURE
L-shaped workstation in panel system as defined during programming. Low panels at windows as to not block them. Height adjustable side section or full L.
E202003
FREESTANDING
FURNITURE
4 Task chairs
5.0 ROOM REQUIREMENTS
102 – Break/Training
Space Characteristics
Function/adjacencies: Adjacent to Open Office and Corridor
Special Dimensions:
Minimum Ceiling Height: 10’-0”
Acoustics: N/A
Access: N/A
Number of Occupants: 19 maximum, only for annual training sessions
Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
C101001 FIXED PARTITIONS 1 145sf +/- 3 5/8” Metal stud with 5/8” GWB on each side
C102002
GLAZED INTERIOR
DOORS
3’-0” x 7’-0” x 1 ¾”
Hollow metal door and frame with vision lite
C102007
INTERIOR DOOR
HARDWARE
AR AR
Passage hardware, hinges, Accessible thresholds, wall stops, kick plates, door closers
C103008 COUNTERS 1 20sf +/- Solid surface countertop. Min length 9 feet. Solid surface backsplash that extends from top of the counter to underside of upper wall cabinet.
C103003
MARKER AND TACK
BOARDS
AR AR Provide 1 of each
C103009 CABINETS 6 total Upper and lower plastic laminate cabinets
C3010 WALL FINISHES 2 walls 380sf +/- Semi-gloss paint
C3020 FLOOR FINISHES 1 285sf +/- Resilient floor tile with 4” rubber wall base
C3030 CEILING FINISHES 1 285sf +/- 24” x 24” Acoustic ceiling panel system
D201004 SINKS 1
Stainless steel, double bowl, undermount sink with waste disposal unit. Provide water filter at sink to provide potable drinking water.
D30 HVAC Provide per Part 3 Engineering System Requirements
D4010 FIRE ALARM SYSTEM
Provide a fire alarm and mass notification system per Part 3 Engineering System Requirements
D4040 SPRINKLER SYSTEM
Provide a wet pipe sprinkler system throughout the
102 – Break/Training
Space Characteristics
Function/adjacencies: Adjacent to Open Office and Corridor
Special Dimensions:
Minimum Ceiling Height: 10’-0”
Acoustics: N/A
Access: N/A
Number of Occupants: 19 maximum, only for annual training sessions
Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
D503001
TELECOMMUNICATIO
NS SYSTEMS
Provide outlets with (1) NIPRNET and (1) Voice jack to support the breakroom and Audiovisual requirements.
D503004
TELEVISION
SYSTEMS
Provide CATV outlet for wall mount television
E102009
AUDIOVISUAL
EQUIPMENT
As defined during programming
E201002
WINDOW
TREATMENTS
5 24sf +/- Manually operated roller shades
E2020
MOVABLE
FURNITURE
AR AR Training tables and chairs
E202090
OTHER MOVABLE
FURNISHINGS
1 of each appliance
AR
Refrigerator, Coffee Machine, Microwave, Waste Receptacles
5.0 ROOM REQUIREMENTS
103 – Corridor
Space Characteristics
Function/adjacencies: Adjacent to Open Office, Toilet, Shower, Janitor, Telecom, Electrical, Mechanical, and Hazardous Storage
Special Dimensions:
Minimum Ceiling Height: 8’-0”
Acoustics: N/A
Access: Common space
Number of Occupants: Not continuously occupied – for circulation
Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
C102002
GLAZED INTERIOR
DOORS
3’-0” x 7’-0” x 1 ¾”
Hollow metal door and frame with vision lite for viewing oncoming personnel traffic from the Hazardous Storage Area
C102007
INTERIOR DOOR
HARDWARE
AR AR
Passage hardware, hinges, Accessible thresholds, wall stops, kick plates, door closers, panic hardware
C103005 LOCKERS 4
1’-6” W x 6’-0” H x 1’- 3”D
Provide floor-mounted, powder coated, 3-tier lockers
C103090
OTHER INTERIOR
SPECIALTIES
AR AR Corner guards and wall guards
C3010 WALL FINISHES 8 walls 200sf +/- Semi-gloss paint
C3020 FLOOR FINISHES 1 250sf +/- Resilient floor tile with rubber wall base
C3030 CEILING FINISHES 1 250sf +/- 24” x 24” Acoustic ceiling panel system
D30 HVAC Provide per Part 3 Engineering System Requirements
D4010 FIRE ALARM SYSTEM
Provide a fire alarm and mass notification system per Part 3 Engineering System Requirements
D4040 SPRINKLER SYSTEM
5.0 ROOM REQUIREMENTS
104, 105 – Shower/Changing, Toilet
Space Characteristics
Function/adjacencies: Adjacent to Corridor, Janitor, Break/Training, and Acid Secondary Containment
Special Dimensions:
Minimum Ceiling Height: 8’-0”
Acoustics: N/A
Access: Common
Number of Occupants: Non-occupied space
Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
C101001 FIXED PARTITIONS 4 per room 72 SF +/- per partition
3 5/8” Metal stud with 5/8” GWB on each side
C102001
STANDARD INTERIOR
DOORS
3’-0” x 7’-0” x 1 ¾”
Hollow metal doors and frames.
C102007
INTERIOR DOOR
HARDWARE
AR AR
Privacy Lockset, Hinges, Accessible thresholds, wall stops, kick plates, door closers.
C103002
TOILET AND BATH
ACCESSORIES
AR AR
Shower 104: ABA grab bars in shower, Towel bar, (2) Robe Hooks, ABA flip-up shower seat, Shower curtain and rod and hooks. All Toilet and bath accessories must be mounted at ABA-compliant mounting heights
C103002
TOILET AND BATH
ACCESSORIES
AR AR
Toilet 105:…