P-2025-000058 IFQ Package no plans.pdf

PDF 6 MB Posted

Attached to
West County Senior Center Sidewalk Repair
Solicitation number
IFB 410 P-2025-000058 3
Issued by
Palm Beach County, Florida

About this file

This Invitation for Quote/Bid (IFQ/B) is issued by Palm Beach County's Facilities Development & Operations Department, Capital Improvements Division, for sidewalk and asphalt repair services at the West County Senior Center located at 2916 S.R. 15 and 38673 James Wheeler Way in Belle Glade, Florida. The project requires the furnishing of all labor, equipment, materials, permits, and supervision necessary to replace sidewalks and asphalt per specifications detailed in the solicitation. Bidders must submit pricing for both a Base Bid (covering work at locations identified in Exhibits 1 and 2) and a Mandatory Alternate Bid (which includes the Base Bid scope plus an additional parking lot area in Exhibit 3). A mandatory pre-bid conference will be held on August 5, 2026, at 10:00 a.m. at the West County Senior Center parking lot. The bid due date is August 27, 2026, at 2:00 p.m., with public opening at that time and location. The contractor must substantially complete all work within 300 calendar days from the Notice to Proceed. Liquidated damages of $120 per day will apply for failure to achieve substantial completion within the specified timeframe.

Only contractors qualified under Palm Beach County's Annual Contract for Asphalt, Pavers & Pathway are eligible to submit bids, and qualification applications must be submitted at least 10 days before the bid due date. Bid security in the form of a certified check, cashier's check, money order, or bid bond is required for bids of $200,000 or more, in an amount equal to at least 5 percent of the bid price. Successful bidders must furnish a public construction bond equal to 100 percent of the work order amount within 14 calendar days of notification of award. All bidders must submit Small Business Development (SBD) Program schedules documenting subcontractor participation and proposed SBE participation percentages. The County reserves the right to award based on either the Base Bid or Alternate Bid, whichever it determines to be in its best interest. Geotechnical investigation reports indicate the presence of organic peat materials and lack of adequate base course materials, which are primary causes of existing pavement distress; the pavement recommendations include a minimum compressive strength of 3,000 psi concrete and various construction specifications including ADA compliance requirements, temporary traffic control, proper drainage, and sod replacement with Argentine Bahia grass maintained for 60 days post-installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFQ/B Page 1 Form Rev. 04/02/26 Invitation for Quote/Bid - NonFederal

INVITATION FOR QUOTE/BID

ANNUAL CONTRACT

DATE:

July 17, 2026

SENT TO:

Qualified Contractors

On the Annual Contract - Asphalt, Pavers & Pathway

SENT FROM: Capital Improvements Division

SENDER: Chris Vacca, Facilities Systems Project Manager

PHONE: (561)233-2050

PROJECT NAME: West County Senior Center Sidewalk Repair

PROJECT NUMBER:

P-2025-000058

Mandatory Pre-Bid Conference. There will be a Mandatory Pre-Bid Meeting at West

County Senior Center (meet in parking lot), located at 2916 S.R. 15 and 38673 James

Wheeler Way, Belle Glade, FL at 10:00 a.m. on August 5, 2026. The purpose of this pre-bid meeting will be to review the requirements for the project described in this Invitation for Quote/Bid. You must attend this meeting if you intend to bid this work.

The work is to be done under the terms and conditions of Palm Beach County’s

Annual Contract - Asphalt, Pavers & Pathway as supplemented by this Invitation for Quote/Bid.

Questions must be e-mailed to FDO-CID-Bids@pbc.gov at least seven (7) calendar days prior to the bid due date. Only questions received in writing will be responded to regarding this Invitation for Quote/Bid.

Facilities Development &

Operations Department

2633 Vista Parkway

West Palm Beach, FL 33411

Telephone - (561) 233-0200

Palm Beach County

Board of County

Commissioners

Sara Baxter, Mayor

Marci Woodward, Vice Mayor

Maria G. Marino

Gregg K. Weiss

Joel G. Flores

Maria Sachs

Bobby Powell Jr.

County Administrator

Joseph Abruzzo

“An Equal Opportunity

Employer” file://///pbcgov.org/FDO/common/Business/Znachko%20Working%20File/CID%20Forms/Contracts/Construction%20-%20Annual%20(Pre-Qual)/NonFederal/Invitation%20for%20Quote/FDO-CID-Bids@pbc.gov

IFQ/B Page 2

Submitting the Quote/Bid Package

The Quote/Bid Package must be enclosed in a sealed opaque envelope. The envelope must be addressed as follows:

Project Name: West County Senior Center Sidewalk Repair

Project Number: P-2025-000058

Capital Improvements Division

2633 Vista Parkway

West Palm Beach, Florida 33411

Attention:

No responsibility will be attached to the Owner for premature opening of or failure to open a quote/bid not properly identified. If the quote/bid is sent by mail, the sealed envelope must be enclosed in a separate mailing with the notation "SEALED QUOTE/BID ENCLOSED" on the face thereof.

PROJECT NO.: P-2025-000058

*DUE: August 27, 2026 by 2:00 p.m.

* The Quotes/Bids received by this time will be opened at this time at a public meeting at the below address.

RETURN TO: Capital Improvements Division

2633 Vista Parkway

West Palm Beach, FL 33411

Qualification of Contractors. In order to submit a quote/bid in response to this IFQ/B, a contractor must be qualified under the Annual Contract - Asphalt, Pavers & Pathway. A contractor may obtain a Qualification Application for this Annual Contract by sending an email with the Project # in the subject line to: FDO-CID-Bids@pbc.gov or call (561) 233-0261. Qualification applications may also be downloaded from the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.pbc.gov/vssprd/Advantage4. The contractor must submit the Qualification

Application at least 10 days before the Quote/Bid Due Date in order for its quote/bid to be considered.

file://///pbcgov.org/FDO/common/Business/Znachko%20Working%20File/CID%20Forms/Contracts/Construction%20-%20Annual%20(Pre-Qual)/NonFederal/Invitation%20for%20Quote/FDO-CID-Bids@pbc.gov https://pbcvssp.pbc.gov/vssprd/Advantage4 https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService

IFQ/B Page 3

1. SCOPE OF WORK: This Quote/Bid is to furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to replace sidewalks and asphalt per the project requirements provided by Capital Improvements Division in this Invitation for Quote/Bid at Attachment “C” and all exhibits and addenda thereto. Work is to be done under the terms and conditions of Palm Beach County’s Annual

Contract - Asphalt, Pavers & Pathway, and pursuant to the conditions of the Work Order, both of which are incorporated into the Contract Documents by reference.

2. SCHEDULE OF TIME FOR COMPLETION. The time of completion for this Project will be as follows: The Contractor must substantially complete the work within three hundred (300) calendar days from the Notice to Proceed from Owner.

3. LIQUIDATED DAMAGES. Liquidated Damages are $120/day for failure to achieve certification of

Substantial Completion within the Work Order time or approved extension thereof.

4. BID SECURITY AND PUBLIC CONSTRUCTION BOND. Bid Security and Public Construction

Bond are required for this Project in accordance with Section 5.2 of the Instructions to Bidders of the Annual

Contract as follows:

Bid Security. If Bid is $200,000 or over, this Bid must be accompanied by a Bid Security (in the form of, at Bidder's option, cashier's check, certified check, money order or Bid Bond in favor of the County) in the amount of at least five percent (5%) of the bid price, see Section 5.2.2 of the

Instructions to Bidders of the Annual Contract for detailed requirements regarding Bid Security and Attachment “B”.

Public Construction Bond. If Bid is $200,000 or over (or if cumulative open work orders are

$200,000 or over), then prior to execution of a Work Order, and not later than fourteen (14) calendar days after notification from Owner, the successful Bidder must furnish a Public

Construction Bond in the amount of 100% of the Work Order and Guarantee, see Section 5.2.3 of the Instructions to Bidders of the Annual Contract for detailed requirements regarding the Public

Construction Bond and Guarantee.

5. Small Business Development (SBD) Program. Section 5.3 of the Instruction to Bidders of the Annual

Contract sets out the requirements of the County’s Small Business Development Program. All Bidders are required to submit with their bid the appropriate SBD Program schedules. SBD Schedules to be submitted with the quote/bid are as follows:

a) Schedule 1 - List of All Proposed Subcontractors, including SBE Participation. A completed Schedule 1 submitted by the prime shall list the names of all subcontractors, intended to be used in performance of the contract, if awarded. The total proposed percentage of SBE participation shall also be included on this form. This schedule must also be used if an SBE prime bidder is performing any portion of this contract with their work force.

b) Schedule(s) 2 - Letter(s) of Intent to Perform as a Subcontractor, including SBE

Subcontractors. A completed Schedule 2 is a binding agreement between the prime contractor and the subcontractor (of any tier) and should be treated as such. Each Schedule 2 shall be properly executed by the Prime Contractor and proposed subcontractor. If the Contractor is an SBE, a Schedule 2 shall be submitted to document work to be performed by its workforce.

IFQ/B Page 4

Completed and submitted SBD forms are incorporated into and made a part of the Contract Documents.

Attachment “A” identifies the affirmative procurement initiatives (APIs) applicable to this Invitation for Quote/Bid.

If Bidder is unable to comply with the API requirements as set forth in Attachment “A”, Bidder shall submit a request for a waiver or partial waiver with its bid by the quote/bid due date. Each waiver request shall include documentation demonstrating the Bidder undertook satisfactory Good Faith

Efforts, as defined in the SBD Ordinance, and set forth in Section 5.3 of the Annual Contract’s

Instruction to Bidders. Waiver requests not submitted at the time of bid submission shall not be considered. If the Office of SBD determines that adequate Good Faith Efforts have been demonstrated to warrant a partial or total waiver, the waiver shall be granted accordingly. If the

Office of SBD determines that the Bidder failed to submit documentation sufficient to demonstrate

Good Faith Efforts, the request for waiver or partial waiver shall be denied and the Bidder shall be deemed non-responsive. The granting of a waiver shall apply solely to the Bidders to whom it is issued and shall not, by itself, amend, reduce, or otherwise alter the API requirements applicable to other

Bidders under the solicitation. A Bidder may seek reconsideration of an adverse waiver determination as set forth in Section 5.3 of the Annual Contract’s Instruction to Bidders and the SBD

Ordinance.

6. Addendum. Any interpretation, clarification, correction, or change of the Bidding Documents will be made only by Addendum. The Department will send written instructions regarding discrepancies, omissions or unclear intents to all Bidders who are Qualified Contractors with an Annual Contract. For projects

$150,000 and over all Addendum to a solicitation will also be posted under the applicable solicitation on the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.pbc.gov/vssprd/Advantage4.

Interpretations, corrections or changes to the Bidding Documents made in any other manner will not be binding, and Bidders shall not rely upon such interpretations, corrections and changes. Prior to submission of its Bid/Quote, each Bidder must ascertain that it has received all Addenda issued. The Bidder must acknowledge receipt of each individual Addendum at the time of issuance and final receipt of all Addenda by completing the acknowledgment space provided on the Addendum Form. Failure to acknowledge receipt may result in rejection of a bid/quote.

7. Failure to Provide the Required Documents after Notification of Award. If after Notification of award from the County, the successful Bidder does not provide within 14 Days of Notification the signed

Work Order, the Public Construction Bond and Guarantee (when required), and the required certificates of insurance, the County may: 1. Call in the bid security when provided; 2. Cancel the notification of recommended award and award the project to the next responsive, responsible low bidder; 3. Terminate this Annual Contract for cause; 4. Suspend or debar the Bidder from bidding on future projects for a period of two (2) years, in accordance with the Palm Beach County Purchasing Ordinance; and/or 5. Pursue any and all remedies available against the Bidder for damages resulting from its failure to enter into a Work

Order and provide all required documents within 14 Days after notification.

8. Prohibition against Considering Social, Political or Ideological Interests in Government

Contracting - F.S. 287.05701. Bidders are hereby notified of the provisions of section 287.05701, Florida

Statutes, as amended, that the County will not request documentation of or consider a Bidder's social, political, or ideological interests when determining if the Bidder is a responsible Bidder. Bidders are further notified that the County's governing body may not give preference to a Bidder based on the Bidder's social, political, or ideological interests.

9. Human Trafficking Affidavit. Contractor warrants and represents that it does not use coercion https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService

IFQ/B Page 5 for labor or services as defined in section 787.06, Florida Statutes. Contractor shall execute

Attachment “D”, Nongovernmental Entity Human Trafficking Affidavit, which is attached hereto and incorporated herein by reference.

10. Living Wage Ordinance. Pursuant to section 255.0992, Florida Statutes, the County’s Living Wage

Ordinance shall not apply to this Invitation for Quote/Bid and any resulting Work Order(s), notwithstanding any provision of an existing Annual Contract to the contrary, including, but not limited to, the Instructions to Bidders, the General Conditions to the Annual Contract and the Certification of Compliance with the

Living Wage Ordinance.

11. CONTRACT AMENDMENTS. The Annual Contract is amended as follows:

The following General Conditions are added to the General Conditions:

GC 84 INTERACTIONS WITH COUNTY STAFF

In all interactions with County staff, Contractor and its employees will conduct themselves in a professional manner at all times and treat County staff with respect and dignity. Use of offensive and demeaning language will not be tolerated. Failure to comply with this requirement will be considered a default under this Contract and may result in termination of this Contract.

GC 85 DISCLOSURE OF FOREIGN GIFTS AND CONTRACTS WITH FOREIGN

COUNTRIES OF CONCERN

Pursuant to F.S. 286.101, as may be amended, by entering into a contract or performing any work in furtherance thereof, the Contractor certifies that it has disclosed any current or prior interest of, any contract with, or any grant or gift received from a foreign country of concern where such interest, contract, or grant or gift has a value of $50,000 or more and such interest existed at any time or such contract or grant or gift was received or in force at any time during the previous five

(5) years.

GC 86 HUMAN TRAFFICKING AFFIDAVIT

Contractor warrants and represents that it does not use coercion for labor or services as defined in section 787.06, Florida Statutes. Contractor has executed the Nongovernmental Entity Human

Trafficking Affidavit.

GC 87 DIGITAL ACCESSIBILITY COMPLIANCE

Contractor acknowledges that the County is a public entity subject to Title II of the Americans with

Disabilities Act (ADA) and applicable federal accessibility regulations. Contractor represents and warrants that all websites, web-based applications, digital services, electronic documents, multimedia, and other electronic content created, developed, provided, submitted, maintained, or delivered under this Contract that may be electronically displayed, accessed, distributed, or made available to the public by the County shall conform to the Web Content Accessibility Guidelines

(WCAG) 2.1, Level AA, or any successor standard adopted by the U.S. Department of Justice.

All electronic documents submitted to the County, including but not limited to PDFs, reports, forms, presentations, and public-facing materials, shall be provided in an accessible format compliant

IFQ/B Page 6 with the applicable accessibility standard at the time of delivery.

Contractor shall ensure that any updates, revisions, or modifications to such digital content remain compliant throughout the term of this Contract. Upon request, Contractor shall provide documentation reasonably demonstrating accessibility compliance. If any deliverable is determined by the County to be noncompliant, Contractor shall promptly remediate the noncompliance at no additional cost to the County and within a timeframe specified by the County.

Contractor shall ensure that any third-party digital content or platforms used in performance of this Contract either comply with the requirements herein or that an accessible alternative acceptable to the County is provided.

Failure to comply with this subsection shall constitute a material breach of this Contract.

Section 4.2.3 of the “Instructions To Bidders” of the Contract, the third sentence of this section is amended and modified to reflect the revised threshold amount for advertisement on the vendor self-service (VSS) website as follows:

For projects $150,000 and over, all Addendum to a solicitation will also be posted under the applicable solicitation on the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.pbc.gov/vssprd/Advantage4.

Section 4.3.1 of the “Instructions To Bidders” of the Contract, the second sentence of this section is

For projects $150,000 and over, all Addendum to a solicitation will also be posted under the applicable solicitation on the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.pbc.gov/vssprd/Advantage4.

Section 6.3.2 of the “Instructions To Bidders” of the Contract is deleted in its entirety and replaced with the following:

6.3.2 For awards of $150,000 or greater, bid/quote tabulations and Notification from Owner, with recommended awards, will be posted at the location where bids were opened, for review by interested parties prior to submission through the appropriate approval process, and will remain posted for a period of five (5) business days. For awards of $150,000 or greater, any bidder who is aggrieved in connection with the recommended award of a Work Order under an Annual

Contract may protest to the County’s Director of Procurement. The protest must be received by the Procurement Director within five (5) business days after posting of the award recommendation. The protest must be submitted in writing, must identify the protestor and the solicitation, must include a factual summary of the basis of the protest and must include a protest bond in the amount of: (1) one thousand five hundred dollars ($1,500.00) for solicitations less than one million dollars ($1,000,000.00); (2) three thousand dollars ($3,000.00) for solicitations one million dollars ($1,000,000.00) to less than five million dollars ($5,000,000.00); or (3) five thousand dollars ($5,000.00) for solicitations five million dollars ($5,000,000.00) or greater, which bond shall be remitted in the form of a money order, certified check, a cashier’s check, or a bank check payable to Palm Beach County. Such protest is considered filed when it is received and date/time stamped by the Department of Procurement. The date/time stamp of the

Procurement Department shall control when determining whether the protest was received by the

Director of Procurement within the time frame specified for the notice of protest. Neither the

IFQ/B Page 7

Director of Procurement nor a special master shall consider any issue not submitted in writing within the time frame specified for the notice of protest.

Section 10.0 of the “Instructions To Bidders” of the Contract, is amended and modified to reflect the revised threshold amount for the Lobbying section to apply as follows:

LOBBYING (for Bids that Exceed $150,000)

Section 14.1 of the Instructions To Bidders of the Contract, the fourth sentence of this section is

Projects $150,000 and over will also be advertised on VSS.

Quote/Bid Form Page 1 Form Rev. 02/04/26 Quote/Bid Form - NonFederal

QUOTE/BID FORM

PROJECT NUMBER: P-2025-000058

PROJECT NAME: West County Senior Center Sidewalk Repair

IN ORDER TO BE DEEMED RESPONSIVE TO THIS INVITATION FOR QUOTE/BID,

THE QUOTE/BID PACKAGE MUST CONTAIN:

a) This Quote/Bid Form completed and executed.

b) OSBD Schedules 1 and 2 completed and executed.

c) Bid Security. (If the bid is $200,000 or more).

d) Signed Addenda, if any issued

THE FOLLOWING MUST BE COMPLETED AND SIGNED BY CONTRACTOR

1. BASE BID AMOUNT $ ____________

Written amount ____________

AND

ALT BID AMOUNT $ _____

Written amount ____________

Bidders must submit pricing for both the Base Bid and the Alternate (ALT) Bid to be deemed responsive to this solicitation. The County reserves the right to award the contract based on either the Base Bid or the Alternate (ALT) Bid, whichever the County determines, in its sole discretion, to be in its best interest. If the County determines that the Alternate (ALT) Bid is the most advantageous, meets the County's operational needs, and is within available budget, the contract may be awarded to the lowest responsive, responsible bidder submitting the

Alternate (ALT) Bid. If the County determines that the Alternate (ALT) Bid does not satisfy these criteria, the contract will be awarded to the lowest responsive, responsible bidder submitting the Base Bid.

2. Bidder commits to achieving the APIs applicable to this solicitation as designated on Attachment

A and as submitted on its OSBD Schedules 1 and 2.

The Bidder must provide a separate Schedule 1 and Schedule 2 for the Base Bid and the ALT

Bid. Each schedule shall be clearly labeled and identify the specific option to which it applies.

3. Is the Bidder a Palm Beach County certified SBE? Yes_____ No_____

4. Commercial Non-Discrimination Certification. The undersigned Bidder hereby certifies and agrees that the following information is correct: In preparing its response to this Solicitation, the

Bidder has considered all proposals submitted from qualified, potential Subcontractors and suppliers, and has not engaged in "discrimination" as defined in the County’s Commercial

Quote/Bid Form Page 2

Nondiscrimination Policy as set forth in Resolution 2025-0748, as may be amended, to wit:

discrimination in the solicitation, selection or commercial treatment of any Subcontractor, vendor, supplier or commercial customer on the basis of race, color, national origin, religion, ancestry, sex, age, marital status, familial status, sexual orientation, disability, or genetic information, or on the basis of any otherwise unlawful use of characteristics regarding the vendor's, supplier's or commercial customer's employees or owners; provided that nothing in this policy shall be construed to prohibit or limit otherwise lawful efforts to remedy the effects of discrimination.

Without limiting the foregoing, "discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination." Without limiting any other provision of the solicitation, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the County to reject the bid submitted by the Bidder for this Solicitation, and to terminate any contract awarded based on the response. As part of its bid, the Bidder shall provide to the County a list of all instances within the immediate past four (4) years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Florida that the Bidder discriminated against its Subcontractors, vendors, suppliers or commercial customers, and a description of the status or resolution of that complaint, including any remedial action taken. As a condition of submitting a bid to the County, the Bidder agrees to comply with the County’s Commercial Nondiscrimination Policy as described in Resolution 2025-

0748, as may be amended.

5. The Bidder shall be bound by the terms of its Bid for a period of one hundred twenty (120) calendar Days from the date of the bid opening and may not withdraw its Bid within that time period. If the County issues a Notification from Owner within the above 120-Day period, then the

Bidder will be bound by the Bid as submitted. If the County fails to issue a Notification from

Owner to the successful Bidder within the above identified 120-Day period, the successful bidder will not be required to honor its bid unless otherwise agreed to by both parties. County anticipates, but does not guarantee, the award of a Work Order and written notice to proceed within ninety (90) calendar Days of Notification from Owner, absent the filing of a timely bid protest.

6. It is agreed that the undersigned has received all addenda complete as issued by the County and that related costs are included in the bid submitted. The undersigned acknowledges receipt of said addenda as follows:

Addendum # dated Addendum# dated________

Addendum # dated Addendum# dated

The undersigned has included the signed addenda, if issued, in its bid package.

7. The undersigned does hereby declare that the Bid covers all expenses of every kind incidental to the completion of said Work in accordance with the Contract Documents, including all claims that may arise through damages or other causes whatsoever. The undersigned does hereby declare that it shall make no claim on account of any variation from any estimate in the quantities of Work to be done, nor on account of any misunderstanding or misconception of the nature of the Work to be done or the grounds, subsurface conditions, or place where the Work is to be done.

Quote/Bid Form Page 3

QUOTE/BID PROVIDED BY:

Contractor Name

Date Signature

Print Name and Title

Quote/Bid Must Contain Original Signatures. No Copies or Emailed/Faxed Quotes/Bids Will

Be Accepted

OSBD SCHEDULE 1

SOLICITATION/PROJECT/BID NAME: ______________ _ SOLICITATION/PROJECT/BID NO.: _____________ _

SOLICITATION OPENING/SUBMITTAL DATE: ______________ COUNTY DEPARTMENT: __________________

Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:

NAME OF PRIME RESPONDENT/BIDDER: __________________ ADDRESS: ___________________ _

CONTACT PERSON: _____________________ PHONE NO.: __________ E-MAIL:._____________ _

PRIME'S DOLLAR AMOUNT OR PERCENTAGE OF WORK: _____________ _ Non-SBE SBE

SBE Prime's must include their percentage or dollar amount in the Total Participation line under section B.

Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:

(Check all Applicable Categories) DOLLAR AMOUNT OR Subcontractor/Sub consultant Name

PERCENTAGE OF WORK

Non-SBE SBE

1. □ DI

2. □ □

3. □ □

4. □ □

5. □ □ (Please use additional sheets if necessary)

Total

Total Bid/Offer Price$. ______________ Total Certified SBE Participation $

I hereby certify that the above information is accurate to the best of my knowledge:

Name & Authorized Signature Title

Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.

2. Only those firms certified by Palm Beach County at the time of solicitation due date are eligible to meet the established OSBD Affirmative Procurement Initiative (API). Please

3. Modification of this form is not permitted and will be rejected upon submittal.

4. If a Mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation.

OSBD LETTER OF INTENT- SCHEDULE 2

A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant � any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a Mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.

SOLICITATION/PROJECT NUMBER:------------------------------

SOLICITATION/PROJECT NAME:--------------------------------

Prime Contractor:___________________.Subcontractor:_________________ (Check box(s) that apply)

□ SBE □ Non-SBE □ Supplier Date of Palm Beach County Certification (if applicable): _______

SBE PARTICIPATION - SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/ proposal may be attached to a properly executed Schedule 2 for additional information.

Line

Item

Item Description Unit Price Quantity/

Units

Contingencies/

Allowances

Total Price/Percentage

The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage: ________________

If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.

Name of 2nd/3rd tier Subcontractor/subconsultant

Print Name of Prime

By:_________________ Authorized Signature

Print Name

Title

Date: __________________

Price or Percentage: ______________ _

Print Name of Subcontractor/subconsultant

By:------------------ Authorized Signature

Print Name

Title

Date: ___________________

Angela Smith Cross-Out

OEBO SCHEDULE 1*

SOLICITATION/PROJECT/BID NAME: SOLICITATION/PROJECT/BID NO.:

SOLICITATION OPENING/SUBMITTAL DATE: COUNTY DEPARTMENT:

Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:

NAME OF PRIME RESPONDENT/BIDDER: ADDRESS:

CONTACT PERSON: PHONE NO.: E-MAIL:

Non-SBE SBE

Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:

Subcontractor/Sub consultant Name (Check all Applicable Categories)

Non-SBE SBE

DOLLAR AMOUNT OR

PERCENTAGE OF WORK

1.

2.

3.

4.

5.

(Please use additional sheets if necessary) Total _________________________

Total Bid/Offer Price $ Total Certified SBE Participation $

I hereby certify that the above information is accurate to the best of my knowledge:

Title

DIRECTION: List Firm Name, Address & Provide PBC Vendor ID#. (https://www.pbcgov.org/pbcvendors)

Subcontractor 1 1222 Easy St., WPB, FL 33401

561-123-4567 VC178229

Subcontractor 2 5600 Carefree Lane, WPB, FL 33411

954-345-6789 VC123459

SAM

PLE

John Doe

PRIME’S DOLLAR AMOUNT OR PERCENTAGE OF WORK:

SBE Prime’s must include their percentage or dollar amount in the Total Certified SBE Participation line under section B.

Name & Authorized Signature Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.

2. Only those firms certified by Palm Beach County at the time of solicitation due date are eligible to meet the established OEBO Affirmative Procurement Initiative (API). Please check the applicable box and list the dollar amount or percentage under the appropriate demographic category.

3. Modification of this form is not permitted and will be rejected upon submittal.

4. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation.

*Revised 6.5.2025 pursuant to Emergency Ordinance 2025-014, approved on June 3, 2025 ddelriocabrera Textbox MUST List ALL Subcontractors/Subconsultants ddelriocabrera Textbox Add All Certified SBE Amounts, Including Prime SBE ddelriocabrera Typewriter $145,385.80 ddelriocabrera Typewriter 181,380.85 ddelriocabrera Textbox

SAMPLE

ddelriocabrera Textbox $86,380.85

Subcontractor:

SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.

The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:

Print Name of Prime

By:

Authorized Signature

Print Name of Subcontractor/subconsultant

By:

Authorized Signature

Print Name Print Name

Line Item

Item Description Unit Price Quantity/ Units

Contingencies/ Allowances

Total Price/Percentage

If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.

Price or Percentage:

Name of 2nd/3rd tier Subcontractor/subconsultant

*Revised�6.5.2025�pursuant�to�Emergency�Ordinance�2025-014,�approved�on�June�3,�2025

SAMPLE OEBO LETTER OF INTENT – SCHEDULE 2*

SOLICITATION/PROJECT NUMBER:

SOLICITATION/PROJECT NAME:

19600

Carlin Park, Maintenance Bldg, Roofing Replacement

$95,000Remove and replace existing roof

President

John Doe

Roofers Are Us, Inc.

Prime Contractor: Roofers Are Us, Inc.

(Check box(s) that apply)

☒ SBE □ Non-SBE □ Supplier

Title

Date: 6/4/2025

A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.

Date of Palm Beach County Certification (if applicable):3/30/2024 .

Title

Date: 6/4/2025 dlynch Highlight dlynch Highlight

Subcontractor:

SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.

The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:

Print Name of Prime

By:

Authorized Signature

Print Name of Subcontractor/subconsultant

By:

Authorized Signature

Print Name Print Name

Title

Date:

Line Item

Item Description Unit Price Quantity/ Units

Contingencies/ Allowances

Total Price/Percentage

If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.

Price or Percentage:

Name of 2nd/3rd tier Subcontractor/subconsultant

*Revised 6.5.2025 pursuant to Emergency Ordinance 2025-014, approved on June 3, 2025

Remove and replace existing roof

Subcontractor 1

President Assistant Vice President

John Doe James Doe

Roofers Are Us, Inc.

SAM

PLE

Subcontractor 1

$50,385.80

Date: 6/4/2025 6/4/2025

SAMPLE OEBO LETTER OF INTENT – SCHEDULE 2*

A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.

SOLICITATION/PROJECT NUMBER: 19600

SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement

Date of Palm Beach County Certification (if applicable):1/1/2024

Prime Contractor: Roofers Are Us, Inc.

(Check box(s) that apply)

☒ SBE ☐ Non-SBE □ Supplier dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Placed Image

Placed Image

SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.

The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:

Print Name of Prime

By:

Authorized Signature

Print Name

Date:

Line Item

Item Description Unit Price Quantity/ Units

Contingencies/ Allowances

Total Price/Percentage

If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.

Price or Percentage:

President

John Doe

Roofers Are Us, Inc.

SAM

Prime Contractor: Roofers Are Us, Inc.

Subcontractor 2 Print Name of Subcontractor/subconsultant

By:

Authorized Signature

Jane Doe Print Name

Vice President

Subcontractor: Subcontractor 2

Date of Palm Beach County Certification (if applicable):

$35,995.05

$25,995.05

$10,0002nd Tier Subcontractor

Date: 6/4/2025 6/4/2025

SAMPLE OEBO LETTER OF INTENT – SCHEDULE 2*

A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.

SOLICITATION/PROJECT NUMBER: 19600

SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement

(Check box(s) that apply)

□ SBE ☒ Non-SBE □ Supplier dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight

Placed Image

SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.

The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:

Print Name of Prime

Line Item

Item Description Unit Price Quantity/ Units

Contingencies/ Allowances

Total Price/Percentage

If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.

Price or Percentage:

SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement

SAM

Date of Palm Beach County Certification (if applicable):

Prime Contractor: Subcontractor 2 Subcontractor: 2nd Tier Subcontractor

$10,000.00

Jude Doe

Manager

Jane Doe Print Name

Vice President

Subcontractor 2 2nd Tier Subcontractor Print Name of Subcontractor/subconsultant

(Check box(s) that apply)

□ SBE ☒ Non-SBE □ Supplier

SAMPLE OEBO LETTER OF INTENT – SCHEDULE 2*

A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.

SOLICITATION/PROJECT NUMBER: 19600

Title

Date: 6/4/2025

Title

Date: 6/4/2025 dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight

Highlight

Form Rev. 6/04/2026 Attachment A for Annual Construction–Single Trade

X SBE Price Preference For Single Trade Construction

The work orders under this contract for single trade construction shall be awarded to the lowest, responsive, responsible bidder unless a certified SBE’s bid is within ten percent (10%) of the lowest non-SBE bid, in which case the award shall be made to the certified SBE bidder. Construction contracts where there are no opportunities for subcontracting (i.e. single trade), may include a provision requiring awards of the contract to be made to the lowest responsive, responsible respondent or bidder unless a certified

SBE’s bid is within ten (10) percent of the lowest non-small business bid, in which case the award shall be made to the certified small business bidder submitting the lowest responsive, responsible bid at the price that it bid.

ATTACHMENT “A”

(Annual Construction - Single Trade)

AFFIRMATIVE PROCUREMENT INITIATIVES (APIs) FOR CONSTRUCTION

PROCUREMENT

The API(s) approved for this project are selected below by ☒. Fillable pdfs of all OSB forms can be found on the OSBD website at https://discover.pbc.gov/hed/osbd/

Pages/Documents.aspx . Also, see the SBD Ordinance and Countywide PPM CW-O-043 for further information on APIs.

https://discover.pbc.gov/hed/osbd/Pages/Documents.aspx https://discover.pbc.gov/hed/osbd/Pages/Documents.aspx

Bid Bond / Page 1 Form Rev. 02/04/26 Bid Bond - NonFederal

IFQ/B ATTACHMENT B

Return Attachment B if bid is $200,000 or more

PROJECT NUMBER: P-2025-000058

BID BOND

STATE OF FLORIDA

COUNTY OF PALM BEACH

KNOW ALL MEN BY THESE PRESENTS: That we, (hereinafter called "Principal"), and

(hereinafter called "Surety") are held and firmly bound unto Palm Beach County, a Political Subdivision in the State of Florida, by and through its Board of

County Commissioners, (hereinafter called "County") in the sum of

Dollars,($ ), (which sum is at least 5% of the bid price), lawful money of the United States of America, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly be these presents;

WHEREAS, the "Principal" contemplates submitting or has submitted a bid to the Board of County

Commissioners, Palm Beach County, Florida, for furnishing and paying for all necessary labor materials, equipment, machinery, tools, apparatus, services, all state workmen's compensation and unemployment compensation taxes incurred in the performance of the Contract, means of transportation for and complete

Construction of: (Project Name West County Senior Center Sidewalk Repair and Number P-2025-

000058), in the County of Palm Beach, State of Florida; and

WHEREAS, it was a condition precedent to the submission of said bid that a certified check cashier's check, money order or bid bond in the amount of five percent (5%) of the base bid be submitted with said bid as a guarantee that the bidder would, if given a Notification from Owner, enter into a written contract with the

County, and furnish a public construction bond in an amount equal to one hundred (100%) of the total

Contract, within fourteen (14) consecutive calendar days after the County issues the Notification from

Owner.

NOW THEREFORE, THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, if the bid of the "Principal" herein is accepted and said "Principal", within fourteen (14) consecutive calendar days after written notice being given of such acceptance, (i) enter into a written contract with the County and (ii) furnishes a public construction contract bond in the amount equal to one hundred percent (100%) of the total contract amount and in a form satisfactory to the County, then this obligation shall be void. If the

Principal fails to complete (i) and (ii) above, the sum herein stated shall be due and payable to the "County", and the "Surety" herein agrees to pay said sum immediately upon demand of the "County", in good and lawful money of the United States of America, as liquidated damages for failure of said "Principal".

Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.

Bid Bond / Page 2 Form Rev. 02/04/26 Bid Bond - NonFederal

PROJECT NUMBER: P-2025-000058

IN WITNESS WHEREOF, the said as "Principal" herein, has caused these presents to be signed in its name, by its

, and attested by its under the corporate seal, and the said as "Surety" herein, has caused these presents to be signed in its name, by its

, and attested by its corporate Seal, this day of , A.D., 20 .

ATTEST:

TITLE:

(SEAL)

(Contractor Name)

(Signature)

Print Name and Title:

ATTEST:

TITLE:

(SEAL)

(Surety Name)

(Signature)

Print Name and Title:

Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.

CAPITAL IMPROVEMENTS DIVISION

IFQ/B ATTACHMENT C

PROJECT REQUIREMENTS

ANNUAL CONTRACT - ASPHALT/PAVING/PATHWAY

Contact: Chris Vacca, Facilities Systems Project Manager Phone: (561)233-2050 Project Title: West County Senior Center Sidewalk Repair Project #: P-2025-000058 Project Location(s): 2916 S.R. 15 and 38673 James Wheeler Way, Belle Glade, FL

1. GENERAL

a. The work covered by this Invitation for Quote/Bid consists of the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting, and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work.

b. Please reference the Annual Contract – Asphalt/Paving/Pathway for additional requirements.

c. Work to be completed during the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday.

d. Contractor shall contact the Project Manager within seventy-two (72) hours of notice to proceed to establish scheduling, etc. required for project implementation.

e. Work to be completed within three hundred (300) calendar days from Notice to Proceed.

Permit application, if required, is to be submitted by Contractor within five (5) days of “Notice to Proceed” and due diligence exercised to address all Building Department comments.

f. Liquidated damages will accrue in the amount of $120 per day.

g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment.

h. Contractor is responsible for obtaining all measurements during the site inspection

2. SCOPE OF WORK

To replace sidewalks and asphalt per the project requirements provided below and the architectural drawings and specifications included as Exhibits “1” – “3”:

Contractors/Bidders must submit pricing for both the Base Bid and the Alternate (ALT) Bid to be deemed responsive to this solicitation.

The Base Bid shall include all services specified herein for the locations identified in Exhibits

1 and 2.

The Alternate (ALT) Bid shall include all services identified in the Base Bid for the locations in Exhibits 1 and 2, plus all services identified for the location identified in Exhibit 3.

The County reserves the right to award the contract based on either the Base Bid or the Alternate (ALT) Bid, whichever the County determines, in its sole discretion, to be in its best interest. If the County determines that the Alternate (ALT) Bid is the most advantageous, meets the County's operational needs, and is within available budget, the contract may be awarded to the lowest responsive, responsible bidder submitting the Alternate (ALT) Bid. If the County determines that the Alternate (ALT) Bid does not satisfy these criteria, the contract will be awarded to the lowest responsive, responsible bidder submitting the Base Bid.

BASE BID (see Exhibits 1 and 2)

i. The contractor shall use a minimum compressive strength of 3,000 psi (pounds per square inch) concrete to ensure that concrete can withstand pedestrian traffic and environmental loads. All repairs must follow proper procedures for asphalt/concrete removal and replacement.

ii. The concrete surface shall be finished with a broom finish or other textured surface to provide slip resistance. The texture shall be uniform and not too rough to avoid tripping hazards.

iii. Contractor shall use ADA traction pads, also known as detectable warning surfaces, where required for ADA compliance.

iv. Contractor shall properly and promptly dispose of all removed debris (concrete, asphalt, roots, branches etc.) off-site as required by local, state and federal environmental regulations.

v. All underground utilities shall be identified prior to excavation.

vi. Contractor shall de-muck an additional 2 feet offset from all edges of concrete/curb/pavement removal. A majority of the smaller parking lot islands will need to be de-mucked entirely and any landscaping 2’ from the sidewalk that surrounds the existing building will need to be removed as a result. Any trees or bushes that are removed because of the de-mucking, shall be replaced like for like.

Contractor shall provide pole holds wherever feasible or reset any light poles that may be affected by de-mucking.

vii. Contractor shall identify any trees that may need to be trimmed, dug up, or have their roots removed. Contractor shall root prune and install root barriers where roots are protruding. Refer to Section 5d, “Materials” of scope of work (SOW), for root barrier product details. No trees shall be removed without approval.

viii. Contractor shall provide the necessary fill, grading and compaction for all areas including; any sinking areas, areas with removed debris, and voids created from removed material or drains. Surface slopes shall be maintained to provide positive stormwater drainage.

ix. Contractor shall replace all wheel stops with like in kind. Wheel stops are to be uniform, matching existing layout and colors. This only applies to parking lots and/or parking stalls where the contractor is doing asphalt work.

x. All parking lot markings, Americans with Disabilities Act (ADA) compliant parking spots, directional arrows, chevrons, fire lanes, stop bars and any other directional striping on the lot itself shall be traffic painted per the latest Florida Department of Transportation (FDOT) specifications. Any crosswalks shall be retroreflective. No Thermo-plastic striping is to be used in parking lots or walkways to avoid slip & fall hazards.

xi. Contractor shall provide temporary traffic control (TTC) throughout the duration of the project to ensure the safety of pedestrians and vehicles during construction. This may include signage, barricades, and flaggers.

xii. All work shall be coordinated with Project Manager and may require phasing. Any areas that will be closed for extended periods shall be approved of in advance of commencement of work.

xiii. All curbs and/or pipe…