P-031-210-001 Plan set.pdf
PDF 7 MB Posted
- Solicitation number
- BPM038062
- Issued by
- Harford County, Hebron Town, Maryland
About this file
This document contains the plan set for the ADA Improvements and Upgrades at Susquehanna State Park in Havre de Grace, Maryland for the Maryland Department of Natural Resources. The project involves modifications to the campground parking lots to comply with ADA requirements. Key details include a location plan, layout plans for the Beechnut Loop and Acorn Loop areas, grading plans, stormwater management plans, erosion and sediment control notes, and construction details. An addendum was issued on 6/26/23 with new pricing guidelines, so any previously submitted bids must be revised. The contract opportunity is open to the State of Maryland and Harford County, with the project site located in Hebron Town.
The plan set provides specifications for concrete walks, asphalt paving, signage, landscaping, and stormwater management. Pricing and funding information is not included in the plan set, but the addendum references new pricing guidelines. No information is provided about set asides, incumbents, or funding sources. The project appears to be funded and managed by the Maryland Department of Natural Resources.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUSQUEHANNA STATE PARK
ADA IMPROVEMENTS AND UPGRADES
4122 WILKINSON ROAD,
HAVRE DE GRACE, MD 21078
PROJECT No. P-031-210-001 MDE No. 22-SF-0184 for
MARYLAND DEPARTMENT OF NATURAL RESOURCES
02/03/2023
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES
ATIF CHAUDHRY, SECRETARY
ROOM 1405
301 WEST PRESTON STREET
BALTIMORE, MARYLAND 21201
BOARD OF PUBLIC WORKS
WES MOORE, GOVERNOR
BROOKE E. LIERMAN, COMPTROLLER
DERECK E. DAVIS, TREASURER
INDEX
SHEET 1 COVER SHEET
SHEET 2 LOCATION PLAN
SHEET 3 BEECHNUT LOOP (WEST LOOP) & PLAYGROUND AREA LAYOUT PLAN
SHEET 4 ACORN LOOP (EAST LOOP) LAYOUT PLAN
SHEET 5 BEECHNUT LOOP (WEST LOOP) & PLAYGROUND AREA GRADING PLAN
SHEET 6 ACORN LOOP (EAST LOOP) GRADING PLAN
SHEET 7 BEECHNUT LOOP (WEST LOOP) & PLAYGROUND AREA STORMWATER MANAGEMENT PLAN
SHEET 8 ACORN LOOP (EAST LOOP) STORMWATER MANAGEMENT PLAN
SHEET 9 EROSION AND SEDIMENT CONTROL NOTES
SHEET 10 HARDSCAPE & LANDSCAPE DETAILS
VICINITY MAP
SCALE 1":2000'
LOCATION MAP
SCALE 1":500'
PROFESSIONAL CERTIFICATION. I HEREBY
CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, AND THAT
I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE
OF MARYLAND, LICENSE NO. 28935
EXPIRATION DATE: 1/15/25
CODES
1.1 FOREST CONSERVATION AND REFORESTATION REQUIREMENTS are regulated under the provisions of COMAR
08.19.01 - 08.19.06. Regulations for development of Forest Stand Delineation and Forest Conservation Plan are outlined in COMAR 08.19.04.
1.2 SEDIMENT and EROSION CONTROL and STORMWATER MANAGEMENT shall comply with regulations of the Maryland Department of the Environment (MDE), Water Management Administration, Environment Article sections 4-101 through 4-116, Annotated Code of Maryland and COMAR 26.17.01and 26.17.02.
When applicable, work in Non- tidal Wetlands areas shall comply with COMAR 26.23, and work in Wetlands areas shall comply with COMAR 26.24.
1.3 ACCESSIBILITY requirements are governed by The Maryland Accessibility Code (COMAR 05.02.02), which references the most current Americans with Disabilities Act (ADA) Standards, Accessibility Guidelines (ADAAG), and other applicable Federal laws and regulations.
Rock Run Rd
Wilkinson Rd
C or ne r R d
Craigs
Corner Rd Craigs Stafford Rd
QualkerBottom Rd
Webster
Lapidum Rd
Qu alk er Bo tto m
R d
Cooley M ill Rd
Cooley Mill Rd
Rock Run Rd
Lapidum Rd
La pi du m
R d
Herring Run Rd
Corner Rd
Craigs
Corner Rd
Craigs
271804443.05
1 10
SITE
SITE
DEPARTMENT OF NATURAL RESOURCES
JOSH KURTZ, SECRETARY
ENGINEERING AND CONSTRUCTION
TAWES STATE OFFICE BUILDING D-3
580 TAYLOR AVENUE
ANNAPOLIS, MD 21401-2351
REVISIONS
NO. DATE DESCRIPTION BY
2 06/16/23 ADDENDUM #2 CTS
AutoCAD SHX Text
KCI JOB NUMBER
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
LOD ADD
ALTERNATE
LOD BASE
BID
LOD BASE
BID
LOD ADD
ALTERNATE
LOD ADD
ALTERNATE
LOD ADD
ALTERNATE
LOD ADD
ALTERNATE
LOD BASE BID
LOD ADD
ALTERNATE
LOD BASE BID
271804443.05
WK/RH
WK
ADA Improvements and Upgrades at Susquehanna State Park
HARFORD COUNTY, MD
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY
ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25
02/03/2023
MDE NO. 22-SF-0184
LOCATION PLAN
021" = 50'
BEECHNUT LOOP
BEECHNUT LOOP
ACORN LOOP
ACORN LOOP
CAMPGROUND ROAD
CAMPG
ROUND ROAD
BEECHNUT LOOP
BATH HOUSE
ACORN LOOP
BATH HOUSE
PLAYGROUND
AMPHITHEATER
AREA
REGISTRATION
OFFICE
DUMP
STATION
CAMPGROUND ROAD
PLAYGROUND'S ADA ACCESS
AND PARKING LAYOUT PLAN -
SEE SHEET 03
ACORN LOOP BATH
HOUSE LAYOUT PLAN -
SEE SHEET 04
CAMP SITE 16/18 WEST
BEECHNUT LOOP NON-ADA
PATH CONNECTION LAYOUT
PLAN - SEE SHEET 03
BEECHNUT LOOP BATH
HOUSE LAYOUT PLAN -
SEE SHEET 03
GREEN TRAIL
TO
C
RA
IG
S
CORN
ER
R
OAD
GRAPHIC SCALE
50 0 50 100 150
NORTH
NOTES:
ALL ACCESSIBLE DETAILS & SIGNAGE SHALL CONFORM TO
CURRENT ADA CRITERIA / REQUIREMENTS ANSI A117.1-2017
AND MARYLAND STATE OR LOCAL LAW
VICINITY MAP SCALE: 1" = 5000'
CAMPGROUND
SITE AREA
Rock Run Rd
Wilkinson Rd
C or ne r R d
Craigs
Corner Rd Craigs Stafford Rd
Qualker Bottom Rd
Webster Lapidum Rd
Qu alk er B ot to m R d
Cooley M ill Rd
Cooley Mill Rd
N Earlton Rd Ext
Webster Lapidum Rd
Rock Run Rd
Lapidum Rd
La pi du m
R d
Herring Run Rd
CONTRACTOR TO TAKE NECESSARY
STEPS TO MINIMIZE TREE CLEARING
WHILE TIEING IN GRADES
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
GV
AutoCAD SHX Text
HB
AutoCAD SHX Text S
AutoCAD SHX Text E 1,546,725
AutoCAD SHX Text E 1,546,725
AutoCAD SHX Text E 1,548,150
AutoCAD SHX Text E 1,548,150
AutoCAD SHX Text N 709,350
AutoCAD SHX Text N 709,425
AutoCAD SHX Text N 709,950
AutoCAD SHX Text N 709,950
AutoCAD SHX Text
WOODEN WALL
AutoCAD SHX Text
PLAY GROUND
AutoCAD SHX Text
(SEE DETAIL)
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KCI JOB NUMBER
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
PLOTTED: BY: FILE:
AutoCAD SHX Text
$DATE$
AutoCAD SHX Text
$USERNAME$
AutoCAD SHX Text
$FILE$
AutoCAD SHX Text 06/16/23
AutoCAD SHX Text
ADDENDUM #2
CTS
FL
FL
FL-15
FL-15
MB
EXISTING WATER FOUNTAIN TO BE
REMOVED AND REPLACED WITH
THE EXISTING WATER FOUNTAIN
FROM THE WEST WALL (WOMEN'S
ROOM).
EXISTING ACCESSIBLE WATER
FOUNTAIN TO BE RELOCATED TO
THE EXISTING SOUTH WALL WATER
FOUNTAIN LOCATION. EXISTING
PIPING TO BE CAPPED AND
ABANDONED.
HANDICAP PARKING SIGN*
SEE DETAIL
PRECAST CONCRETE
WHEELSTOP (TYP.) SEE DETAIL
PROPOSED ASPHALT PAVING EDGE
4&6
RELOCATED EXISTING
DUMPSTER
PRECAST CONCRETE
WHEELSTOP (TYP.)
SEE DETAIL
EXISTING PROPANE TANK
WITH WOODEN FENCE
ENCLOSURE
EXISTING GRAVEL
ROAD EDGE
EXISTING SEATING AREA
WITH TIMBER WALL TO
BE DEMOLISHED
PROPOSED TIMBER
POST BOLLARD*
SEE DETAIL
18'
HANDICAP PARKING SPACE
(TYP.) SEE DETAIL 2&5
PROPOSED ADA COMPLIANT
CONCRETE PAVEMENT/WALK
CONNECTION SEE DETAIL
OPTIONAL 16' X 18' RELOCATED
MULCHED SURFACE SEATING
AREA WITH PICNIC TABLES
20'
2'-6"
5'
22'
13'-3"
EXISTING PATH
EXISTING ROOF DRAIN TO BE
PIPED UNDER PROPOSED
EXPANDED CONCRETE WALK
(IF FEASIBLE, FUTURE PHASES
WILL DETERMINE FEASIBILITY)
EXISTING ROOF DRAIN TO BE PIPED
UNDER PROPOSED EXPANDED CONCRETE
WALK (IF FEASIBLE, FUTURE PHASES WILL
DETERMINE FEASIBILITY)
5'
'-6
HANDICAP PARKING SIGN*
SEE DETAIL 4&6
ADD ALTERNATE NON-ADA
MULCH PATH CONNECTION
4'-6"
5'
9'-6"
'x1
' S
ERV
IC
E
TRU
C K S
TALL
ADD ALTERNATE NON-ADA
MULCH PATH CONNECTION
EXISTING GRADES TO BE HELD
ADD ALTERNATE NON-ADA
MULCH PATH CONNECTION
OPTIONAL NON-ADA MULCH
PATH CONNECTION TO
RELOCATED PICNIC AREA
4:
3:1
3.5:1
2%
M
AX
M
AX
2% M
AX
249.55
+ 249.10
249.962
M
AX
+250.15
+249.90
3:
249.45
3:1
PROPOSED TIMBER
POST BOLLARD*
SEE DETAIL
NO PARKING ACCESS AISLE
SIGN* SEE DETAIL 4&6
PROPOSED WHITE TRAFFIC
PAINT ADA ROUTE
MARKINGS*, SEE DETAIL 5
TO WEST BEECHNUT LOOPCAMPSITE 16/18 CONNECTION
APPROX 839 SF OF CLEARING FOR
GRADING TIE-INS - CONTRACTOR TO
TAKE NECESSARY STEPS TO MINIMIZE
CLEARING IN ANY WAY POSSIBLE. SEE
CONSTRUCTION NOTES THIS SHEET.
APPROX 880 SF OF CLEARING FOR
GRADING TIE-INS - CONTRACTOR TO TAKE
NECESSARY STEPS TO MINIMIZE CLEARING
IN ANY WAY POSSIBLE. SEE
CONSTRUCTION NOTES THIS SHEET.
BEECHNUT LOOP
BEECHNUT LOOP
R3'
R24'
R12'
R8'
R3'
R120'
R4'
EXISTING BATHHOUSE
EDGE OF REALIGNED
GRAVEL ROAD/CAMPSITE
PARKING. (TO MATCH
EXISTING)
PAVEMENT TIE-IN. SEE
DETAIL 9
ASPHALT PAVING
SEE DETAIL 8
FILTER LOG - SEE
DETAILS SHEET 09
FILTER LOG - SEE
DETAILS SHEET 09
15' WIDE MOUNTABLE BERM -
SEE DETAILS SHEET 10
IF OPTION IS SELECTED,
BORDER AND MULCH TO
MATCH EXISTING MATERIALS
ADD SIGNAGE "USE WATER
FOUNTAIN OUTSIDE MEN'S
BATHROOM"
REMOVED.
X X
X
X
X
XX
X X X
X X
X X X X X X X XX X X X X X XX X X X X X XX X X X X X X X
X X
EX CULVERT TO BE REMOVED - GRADE
WEST SIDE OF DRIVE TO ELIMINATE
PONDING
R3'
EX PVC CLEANOUT TO BE CUT TO
PROPOSED GRADE. INSTALL TRAFFIC
BEARING LID W/COUNTERSUNK PLUG
EX WOOD BOLLARDS TO BE REMOVED
EX PVC CLEANOUT TO BE RAISED TO PROPOSED GRADE
X
X
XXX
X X
X
XX X X X X
X
XX
XX X
X X
X
X
X
X
X X
X
XXX
X
X X X X
X X X X
X X X X X X X X
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X
X
X
X
X
X
X
X X
X
X X
X
X X X X
X X
X
X
X
X X X
X X X
XX
BEECHNUT LOOP
EXISTING WATER
SPIGOT
ADD ALTERNATE 3'-6"
MULCHED NON-ADA
PATH CONNECTION (TO
BE FIELD RELOCATED,
AS NECESSARY, TO
SAVE EXISTING TREES) -
EXISTING GRADES TO
BE HELD
BATH HOUSE
SIGNAGE (TO
MATCH EXISTING)
EXISTING PATH
TO BATHHOUSE
CAMPSITE 16
GRAVEL PARKING
NOTES:
1. CONTRACTOR TO FIELD VERIFY
UNDERGROUND UTILITIES CONFLICTS WITH
BOLLARD AND SIGN POSTS AND ADJUST
THE FINAL LOCATION ACCORDINGLY
+243.99
244.36+
+244.05
+243.95
+248.02
247.13
+246.77
+246.52
CAMPSITE 18
GRAVEL PARKING
R2'
R2'
R34.25'
R22.25'
ASPHALT PAVING EDGE
EXISTING GRAVEL ROAD
TO BE DEMOLISHED
8' 8'
8'
9' 9'
'-4
42'
PLAYGROUND TIMBER EDGE
SIZE/ SPECIFICATION TO
MATCH EXISTING
(PLAYGROUND MULCH FILL AS
NEEDED)
PRECAST CONCRETE
WHEELSTOP (TYP.)
SEE DETAIL
HANDICAP PARKING SIGN
(TYP.) SEE DETAIL
HANDICAP PARKING SPACE
(TYP.) SEE DETAIL
5' WIDE ASPHALT
WALK SEE DETAIL
PRECAST CONCRETE
WHEELSTOP (TYP.) SEE DETAIL 3
ADD 40 SF OF GRAVEL
TO EXISTING ROAD.
2&5
PROPOSED WHITE TRAFFIC
PAINT ADA ROUTE
MARKINGS, SEE DETAIL 5
EXISTING PLAYGROUND
MULCHED AREA
EXISTING BOLLARD
(X4) TO BE REMOVED
R4.0'
EXISTING SIGNS TO REMAIN
4&6
PROPOSED ASPHALT
PAVING EDGE
ASPHALT PAVING
SEE DETAIL 8
NOTES:
1. PROPOSED ADA PARKING AREA MAXIMUM
2% GRADE IN ANY DIRECTION.
2. PROPOSED ADA ACCESSIBLE ROUTE
MAXIMUM 5% WITH NO MORE THAN 2%
CROSS SLOPE.
3. CONTRACTOR TO FIELD VERIFY
UNDERGROUND UTILITIES CONFLICTS WITH
BOLLARD AND SIGN POSTS AND ADJUST
THE FINAL LOCATION ACCORDINGLY
WILLYGOAT ADA ACCESSIBLE
HALF RAMP, MODEL
APS-ADAHALFRAMP, OR
APPROVED EQUAL
PLAYGROUND ADA FLUSH
MOUNT HALF RAMP SYSTEM
(MANUFACTURE/DETAIL TBD)
1" = 10'
BEECHNUT LOOP (WEST LOOP)
& PLAYGROUND AREA LAYOUT PLAN
271804443.05
WK/RH
WK
ADA Improvements and Upgrades at Susquehanna State Park
HARFORD COUNTY, MD
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25
02/03/2023
MDE NO. 22-SF-0184
CAMPSITE 16/18 WEST BEECHNUT LOOP NON-ADA PATHWAY CONNECTION
PLAN
BEECHNUT LOOP BATH HOUSE
PLAN
CAMPGROUND ROAD PLAYGROUND AREA ADA ACCESS AND PARKING
PLAN1
NORTH
NORTH
NORTH
S
EE
B
EE
C H N U T
LO
O
P A R
EA
B A
TH
H O
U S E
LA
YO
U T
PL
A N
-0
S
EE
W
ES
T B
EE
C H N U T
LO
O
P (C
A M
PS
IT
E
/1
N O
N A
D A P
A
TH
W A Y
C O
N N
EC
TI
O
N L
A
YO
U T
PL
A N
-0
CONTRACTOR TO TAKE NECESSARY
STEPS TO MINIMIZE TREE CLEARING
WHILE TIEING IN GRADES
CONSTRUCTION NOTES:
1. CAMPING SEASON RUNS FROM APRIL THRU OCTOBER. IDEAL
CONSTRUCTION TO TAKE [PLACE FROM OCTOBER 1 THRU APRIL 1. IF
CONSTRUCTION IS TAKING PLACE DURING CAMPING SEASON, THE
FOLLOWING CONDITIONS MUST BE FOLLOWED:
- WORK IS TO BE PERFORMED ONLY MONDAY THRU FRIDAY WITH
WORK STARTING NO EARLIER THAN 8:00 A.M.;
- CAMPGROUND LOOP ROADS AND BATHHOUSES MUST BE OPEN
AND SAFELY ACCESSIBLE TO CAMPERS AT ALL TIMES;
- CONSTRUCTION ZONES MUST BE SECURE AND MUST BE
COMPLETELY OPEN AND "VISITOR FRIENDLY" EVERY WEEKEND.
2. CONTRACTOR ALLOWED TO MAKE MINOR GRADING CHANGES
DURING CONSTRUCTION TO MINIMIZE TREE REMOVAL. POSITIVE FLOW IS
TO BE MAINTAINED.
3. TREES THAT ARE REMOVED ARE TO BE REPLACED IN KIND IN SAME
APPROXIMATE LOCATION. SEE POTENTIAL TREE REPLACEMENT
SCHEDULE SHEET 04.
4. DURING THE PRE-CONSTRUCTION MEETING, AND PRIOR TO
CLEARING, TREE INSPECTION WILL TAKE PLACE TO DETERMINE WHICH
TREES ARE TO REMAIN, AND WHICH TREES ARE TO BE REMOVED AND
REPLACED.
5. BLAZE ORANGE FENCING TO BE INSTALLED AROUND CONSTRUCTION
AREA IN PUBLIC FACING AREAS. SEE DETAIL 10 SHEET 10.
6. ALL DISTURBED GRASS AREAS ARE TO BE PERMANENTLY STABILIZED
WITH ERNST SEEDS, MARYLAND UPLAND MIX, ERNMX-172, OR APPROVED
EQUAL.
7. ALL MULCHED PATHS ARE TO BE 3" DEEP.
8. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM THE SITE, WITH THE
EXCEPTION OF THE REMOVED WATER FOUNTAINS, AND ANY MILLINGS
THAT CAN BE SALVAGED. THE WATER FOUNTAINS AND MILLINGS ARE TO
BE GIVEN TO THE OWNER.
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
GV
AutoCAD SHX Text
HB
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KCI JOB NUMBER
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
PLOTTED: BY: FILE:
AutoCAD SHX Text
$DATE$
AutoCAD SHX Text
$USERNAME$
AutoCAD SHX Text
$FILE$
AutoCAD SHX Text 06/16/23
AutoCAD SHX Text
ADDENDUM #2
1'-6"
HANDICAP PARKING
SIGN SEE DETAIL
PRECAST CONCRETE
WHEELSTOP (TYP.)
SEE DETAIL
2&5
PRECAST CONCRETE
WHEELSTOP (TYP.) SEE DETAIL8'
8' 8'
9'
HANDICAP PARKING
SIGN SEE DETAIL
NO PARKING ACCESS AISLE
SIGN SEE DETAIL 4&6
4&6
HANDICAP PARKING
SPACE (TYP.) SEE
DETAIL 2&5
TIMBER POST BOLLARD
(TYP.) SEE DETAIL 1
PROPOSED WHITE
TRAFFIC PAINT ADA
ROUTE MARKINGS,
SEE DETAIL
5'
EXISTING WATER FOUNTAIN TO
BE REMOVED. EX. PIPING TO
BE CAPPED AND ABANDONED.
ADD SIGNAGE "USE WATER
FOUNTAIN OUTSIDE WOMENS
BATHROOM"
PROPOSED ASPHALT
PAVING EDGE
EXISTING PROPANE TANK
WITH WOODEN FENCE
ENCLOSURE (TO REMAIN)
EXISTING GRAVEL
ROAD EDGE
PROPOSED ADA COMPLIANT
CONCRETE PAVEMENT/WALK
CONNECTION
SEE DETAIL
EXISTING ROOF DRAIN TO BE
PIPED UNDER PROPOSED
EXPANDED CONCRETE WALK
(IF FEASIBLE, FUTURE PHASES
WILL DETERMINE FEASIBILITY)
EXISTING PAVED
EDGE (NON-ADA
PARKINGS)
PROPOSED ASPHALT
PARKING (TO BE FIELD
VERIFIED TO SAVE
EXISTING TREES)
33'
14'-8"
3'- 9"
ADD ALTERNATE NON-ADA
MULCH PATH CONNECTION
MATCH EXISTING GROUND
FOR LINE & GRADE
ADD ALTERNATE
NON-ADA MULCH
PATH CONNECTION
MATCH EXISTING
GROUND FOR LINE
& GRADE
2%
4.5%
228.5
228.5
2%2%
2%
2%
2%
APPROX 966 SF OF CLEARING FOR
GRADING TIE-INS - CONTRACTOR TO
TAKE NECESSARY STEPS TO MINIMIZE
CLEARING IN ANY WAY POSSIBLE. SEE
CONSTRUCTION NOTES THIS SHEET.
APPROX 440 SF OF CLEARING FOR
GRADING TIE-INS - CONTRACTOR TO
TAKE NECESSARY STEPS TO
MINIMIZE CLEARING IN ANY WAY
POSSIBLE. SEE CONSTRUCTION
NOTES THIS SHEET.
APPROX 250 SF OF CLEARING FOR
GRADING TIE-INS - CONTRACTOR
TO TAKE NECESSARY STEPS TO
MINIMIZE CLEARING IN ANY WAY
POSSIBLE. SEE CONSTRUCTION
NOTES THIS SHEET.
APPROX 1,143 SF OF CLEARING FOR
GRADING TIE-INS - CONTRACTOR TO
TAKE NECESSARY STEPS TO MINIMIZE
CLEARING IN ANY WAY POSSIBLE.
SEE CONSTRUCTION NOTES THIS
SHEET.
R11'
R6'
R3'
R3'
R16'
R32'
R
R16'
AC
O
RN
L O O P
EXISTING BATH HOUSE
PAVEMENT TIE-IN.
SEE DETAIL 9
2MEN'S
ACORN LOOP (EAST LOOP)
LAYOUT PLAN
271804443.05
WK/RH
WK
ADA Improvements and Upgrades at Susquehanna State Park
HARFORD COUNTY, MD
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25
02/03/2023
MDE NO. 22-SF-0184
1" = 10'
ACORN LOOP BATH HOUSE
PLAN1
NORTH
CONTRACTOR TO TAKE NECESSARY
STEPS TO MINIMIZE TREE CLEARING
WHILE TIEING IN GRADES
POTENTIAL TREE REPLACEMENT SCHEDULE
QTY BOTANICAL NAME / COMMON NAME SIZE CONDITION
10 ACER SACCHARUM / SUGAR MAPLE 2.5" CAL. B&B
10 QUERCUS RUBRA / NORTHERN RED OAK 2.5" CAL. B&B
10 BITULA NIGRA / RIVER BIRCH 2.5" CAL. B&B
CONSTRUCTION NOTES:
1. CAMPING SEASON RUNS FROM APRIL THRU OCTOBER. IDEAL
CONSTRUCTION TO TAKE [PLACE FROM OCTOBER 1 THRU APRIL 1. IF
CONSTRUCTION IS TAKING PLACE DURING CAMPING SEASON, THE
FOLLOWING CONDITIONS MUST BE FOLLOWED:
- WORK IS TO BE PERFORMED ONLY MONDAY THRU FRIDAY WITH
WORK STARTING NO EARLIER THAN 8:00 A.M.;
- CAMPGROUND LOOP ROADS AND BATHHOUSES MUST BE OPEN
AND SAFELY ACCESSIBLE TO CAMPERS AT ALL TIMES;
- CONSTRUCTION ZONES MUST BE SECURE AND MUST BE
COMPLETELY OPEN AND "VISITOR FRIENDLY" EVERY WEEKEND.
2. CONTRACTOR ALLOWED TO MAKE MINOR GRADING CHANGES
DURING CONSTRUCTION TO MINIMIZE TREE REMOVAL. POSITIVE FLOW IS
TO BE MAINTAINED.
3. TREES THAT ARE REMOVED ARE TO BE REPLACED IN KIND IN SAME
APPROXIMATE LOCATION. SEE POTENTIAL TREE REPLACEMENT
SCHEDULE THIS SHEET.
4. DURING THE PRE-CONSTRUCTION MEETING, AND PRIOR TO
CLEARING, TREE INSPECTION WILL TAKE PLACE TO DETERMINE WHICH
TREES ARE TO REMAIN, AND WHICH TREES ARE TO BE REMOVED AND
REPLACED.
5. BLAZE ORANGE FENCING TO BE INSTALLED AROUND CONSTRUCTION
AREA IN PUBLIC FACING AREAS. SEE DETAIL 10 SHEET 10.
6. ALL DISTURBED GRASS AREAS ARE TO BE PERMANENTLY STABILIZED
WITH ERNST SEEDS, MARYLAND UPLAND MIX, ERNMX-172, OR APPROVED
EQUAL.
2 7. ALL MULCHED PATHS ARE TO BE 3" DEEP.
8. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM THE SITE, WITH THE
EXCEPTION OF THE REMOVED WATER FOUNTAINS, AND ANY MILLINGS
THAT CAN BE SALVAGED. THE WATER FOUNTAINS AND MILLINGS ARE TO
BE GIVEN TO THE OWNER.
AutoCAD SHX Text
GV
AutoCAD SHX Text
HB
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KCI JOB NUMBER
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
PLOTTED: BY: FILE:
AutoCAD SHX Text
$DATE$
AutoCAD SHX Text
$USERNAME$
AutoCAD SHX Text
$FILE$
AutoCAD SHX Text 06/16/23
AutoCAD SHX Text
ADDENDUM #2
249.32+
+252.93
252.725
250.37
250.25
+253.00
+252.41
253.10
+ 250.10 249.77
249.68 +
4:
3:1
3.5:1
2%
M
AX
M
AX
2% M
AX
249.55
+ 249.10
249.962
M
AX
+250.15
+249.90
3:
249.45
3:1
MATCH EX. PAVEMENT
FOR LINE AND GRADE
MATCH EX. GRADES ALONG
EXISTING BUILDING
+ 244.30
+244.8
245.30
244.9
244.76
244.80
+245.30
244.90
244.70
+245.63
3.0%
2%
.8
1.
8%
244.76
244.81
244.73
244.39
244.52
MATCH EX. GRAVEL / PAVEMENT
FOR LINE AND GRADE
NORTH
1" = 10'
BEECHNUT LOOP (WEST LOOP)
& PLAYGROUND AREA GRADING PLAN
271804443.05
WK/RH
WK
ADA Improvements and Upgrades at Susquehanna State Park
HARFORD COUNTY, MD
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25
02/03/2023
MDE NO. 22-SF-0184
CAMPSITE 16/18 WEST BEECHNUT LOOP NON-ADA PATHWAY CONNECTION
PLAN
BEECHNUT LOOP AREA
PLAN
CAMPGROUND ROAD PLAYGROUND AREA ADA ACCESS AND PARKING
PLAN1
NORTH
NORTH
S
EE
B
EE
C H N U T
LO
O
P A R
EA
B A
TH
H O
U S E
G R A D
IN
G
P
LA
N
-0
S
EE
W
ES
T B
EE
C H N U T
LO
O
P (C
A M
PS
IT
E
-6
N O
N A
D A P
A
TH
W A Y
C O
N N
EC
TI
O
N G
R A D
IN
G
P
LA
N
-0
CONTRACTOR TO TAKE NECESSARY
STEPS TO MINIMIZE TREE CLEARING
WHILE TIEING IN GRADES
CONSTRUCTION NOTES:
1. CAMPING SEASON RUNS FROM APRIL THRU OCTOBER. IDEAL
CONSTRUCTION TO TAKE [PLACE FROM OCTOBER 1 THRU APRIL 1. IF
CONSTRUCTION IS TAKING PLACE DURING CAMPING SEASON, THE
FOLLOWING CONDITIONS MUST BE FOLLOWED:
- WORK IS TO BE PERFORMED ONLY MONDAY THRU FRIDAY WITH
WORK STARTING NO EARLIER THAN 8:00 A.M.;
- CAMPGROUND LOOP ROADS AND BATHHOUSES MUST BE OPEN
AND SAFELY ACCESSIBLE TO CAMPERS AT ALL TIMES;
- CONSTRUCTION ZONES MUST BE SECURE AND MUST BE
COMPLETELY OPEN AND "VISITOR FRIENDLY" EVERY WEEKEND.
2. CONTRACTOR ALLOWED TO MAKE MINOR GRADING CHANGES
DURING CONSTRUCTION TO MINIMIZE TREE REMOVAL. POSITIVE FLOW IS
TO BE MAINTAINED.
3. TREES THAT ARE REMOVED ARE TO BE REPLACED IN KIND IN SAME
APPROXIMATE LOCATION. SEE POTENTIAL TREE REPLACEMENT
SCHEDULE SHEET 04.
4. DURING THE PRE-CONSTRUCTION MEETING, AND PRIOR TO
CLEARING, TREE INSPECTION WILL TAKE PLACE TO DETERMINE WHICH
TREES ARE TO REMAIN, AND WHICH TREES ARE TO BE REMOVED AND
REPLACED.
5. BLAZE ORANGE FENCING TO BE INSTALLED AROUND CONSTRUCTION
AREA IN PUBLIC FACING AREAS. SEE DETAIL 10 SHEET 10.
6. ALL DISTURBED GRASS AREAS ARE TO BE PERMANENTLY STABILIZED
WITH ERNST SEEDS, MARYLAND UPLAND MIX, ERNMX-172, OR APPROVED
EQUAL.
7. ALL MULCHED PATHS ARE TO BE 3" DEEP.
8. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM THE SITE, WITH THE
EXCEPTION OF THE REMOVED WATER FOUNTAINS, AND ANY MILLINGS
THAT CAN BE SALVAGED. THE WATER FOUNTAINS AND MILLINGS ARE TO
BE GIVEN TO THE OWNER.
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
GV
AutoCAD SHX Text
HB
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KCI JOB NUMBER
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
PLOTTED: BY: FILE:
AutoCAD SHX Text
$DATE$
AutoCAD SHX Text
$USERNAME$
AutoCAD SHX Text
$FILE$
AutoCAD SHX Text 06/16/23
AutoCAD SHX Text
ADDENDUM #2
+229.65
+231.48
HP
232.42
232.60
+229.31
+231.68
+232.10
232.73
233.31
231.82
232.22
232.32
231.37
231.77
232.52
232.12
233.00
+229.16
+245.32
+228.51
229.72
230.40
229.33
229.82
229.23
230.70
230.50
232.18
2%
3.9%
4.5%
228.98
2%
228.5
228.5
232.90 +
2% 2%
2%
2%
2%
+229.08
+229.11
+229.08
229.18+
+229.08
229.11+
.3
MATCH EX. PAVEMENT
FOR LINE AND GRADE
MATCH EX. GRADES ALONG
EXISTING BUILDING
EXISTING BATH HOUSE
MATCH EXISTING PAVEMENT
FOR LINE & GRADE
ACORN LOOP (EAST LOOP)
GRADING PLAN
271804443.05
WK/RH
WK
ADA Improvements and Upgrades at Susquehanna State Park
HARFORD COUNTY, MD
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25
02/03/2023
MDE NO. 22-SF-0184
1" = 10'
ACORN LOOP
PLAN1
NORTH
CONTRACTOR TO TAKE NECESSARY
STEPS TO MINIMIZE TREE CLEARING
WHILE TIEING IN GRADES
CONSTRUCTION NOTES:
1. CAMPING SEASON RUNS FROM APRIL THRU OCTOBER. IDEAL
CONSTRUCTION TO TAKE [PLACE FROM OCTOBER 1 THRU APRIL 1. IF
CONSTRUCTION IS TAKING PLACE DURING CAMPING SEASON, THE
FOLLOWING CONDITIONS MUST BE FOLLOWED:
- WORK IS TO BE PERFORMED ONLY MONDAY THRU FRIDAY WITH
WORK STARTING NO EARLIER THAN 8:00 A.M.;
- CAMPGROUND LOOP ROADS AND BATHHOUSES MUST BE OPEN
AND SAFELY ACCESSIBLE TO CAMPERS AT ALL TIMES;
- CONSTRUCTION ZONES MUST BE SECURE AND MUST BE
COMPLETELY OPEN AND "VISITOR FRIENDLY" EVERY WEEKEND.
2. CONTRACTOR ALLOWED TO MAKE MINOR GRADING CHANGES
DURING CONSTRUCTION TO MINIMIZE TREE REMOVAL. POSITIVE FLOW IS
TO BE MAINTAINED.
3. TREES THAT ARE REMOVED ARE TO BE REPLACED IN KIND IN SAME
APPROXIMATE LOCATION. SEE POTENTIAL TREE REPLACEMENT
SCHEDULE SHEET 04.
4. DURING THE PRE-CONSTRUCTION MEETING, AND PRIOR TO
CLEARING, TREE INSPECTION WILL TAKE PLACE TO DETERMINE WHICH
TREES ARE TO REMAIN, AND WHICH TREES ARE TO BE REMOVED AND
REPLACED.
5. BLAZE ORANGE FENCING TO BE INSTALLED AROUND CONSTRUCTION
AREA IN PUBLIC FACING AREAS. SEE DETAIL 10 SHEET 10.
6. ALL DISTURBED GRASS AREAS ARE TO BE PERMANENTLY STABILIZED
WITH ERNST SEEDS, MARYLAND UPLAND MIX, ERNMX-172, OR APPROVED
EQUAL.
2 7. ALL MULCHED PATHS ARE TO BE 3" DEEP.
8. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM THE SITE, WITH THE
EXCEPTION OF THE REMOVED WATER FOUNTAINS, AND ANY MILLINGS
THAT CAN BE SALVAGED. THE WATER FOUNTAINS AND MILLINGS ARE TO
BE GIVEN TO THE OWNER.
AutoCAD SHX Text
GV
AutoCAD SHX Text
HB
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KCI JOB NUMBER
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
PLOTTED: BY: FILE:
AutoCAD SHX Text
$DATE$
AutoCAD SHX Text
$USERNAME$
AutoCAD SHX Text
$FILE$
AutoCAD SHX Text 06/16/23
AutoCAD SHX Text
ADDENDUM #2
+ 246.50
246.50 +
+251.48
+252.15+251.79
+252.74
+253.04
+253.99
+254.49
+253.54
253.30
+253.34
253.37 + +253.37
+252.46 +251.58+252.50
252.61
+253.08 +253.64
+253.00
+253.22
252.93
+252.59
+252.64
+252.39
+251.53
+252.73
+251.54
+251.88
253.20+
+253.23 253.22
253.17
253.13+
253.01 253.02
252.97
253.15
253.17
253.12
253.02
253.20
+253.07
253.07
+252.95
253.12
+253.08
+249.66 +249.60
249.34+
249.61
249.32+
+252.93
252.725
250.37
250.25
+253.00
+252.41253
253.10
+ 250.10+ 249.77
249.68 +
4:
3:1
3.5:1
2%
%M
AX
%M
AX
2% M
AX
249.55
+ 249.10
249.96
%M
AX
+250.15
+249.90
3:
249.45
3:1
2'W x 29.5'L x 1'D LEVEL SPREADER
AREA #3 - 24 CF STORAGE - SEE
DETAIL 12 ON PAGE 10
' M
AX
C
O N
TR
IB
U
TI
N G L
EN
G
TH
W /1
D
IS
C O
N N
EC
T
PA
TH
+243.99
244.36+
+244.05
+243.95
+248.02
247.13
+246.77
+246.52
EXISTING GRADES TO BE HELD
FOR NON-ADA PATHWAY
.9
+245.10 +245.32
+245.74
+ 244.30
+244.96
+244.96
244.65
+244.52
+244.80
+245.32
+245.18
+245.72 +245.68
+245.78 +245.81
+246.14
+245.30
244.53
244.70
243.98
244.09+
244.29+
244.00
244.41+
244.07+
+245.46
+245.56
+245.67
+245.76
+246.07
+244.8
245.30
244.9
244.76
244.80
+245.30
244.90
244.70
+245.63
43.0%
2%
.8
1.
8%
244.76
244.81
244.73
244.39
244.52
NORTH
1" = 20'
BEECHNUT LOOP (WEST LOOP)
& PLAYGROUND AREA STORMWATER
MANAGEMENT PLAN
271804443.05
WK/RH
WK
ADA Improvements and Upgrades at Susquehanna State Park
HARFORD COUNTY, MD
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25
02/03/2023
MDE NO. 22-SF-0184
2NON-ADA PATHWAY CONNECTION STORMWATER MANAGEMENT PLAN
CAMPSITE 16/18 WEST BEECHNUT LOOP
PLAN
BEECHNUT LOOP AREA STORMWATER MANAGEMENT PLAN
PLAN
ADA ACCESS AND PARKING STORMWATER MANAGEMENT PLAN
CAMPGROUND ROAD PLAYGROUND AREA
PLAN1
NORTH
DAILY STABILIZATION NOTE
THIS NOTE SHOULD BE USED FOR ALL AREAS WITHIN THE
LIMITS OF DISTURBANCE.
CONTRACTOR SHALL ONLY DISTURB THAT AREA WHICH CAN
BE STABILIZED BY THE END OF EACH WORK DAY.
STABILIZATION SHALL BE AS FOLLOWS:
1. FOR AREAS TO BE PAVED, THE APPLICATION OF STONE.
2. FOR AREAS TO BE VEGETATIVELY STABILIZED:
A. PERMANENT SEED AND SOIL STABILIZATION MATTING
OR SOD FOR ALL STEEP SLOPES, CHANNELS OR
SWALES
B. PERMANENT SEED AND MULCH FOR ALL OTHER AREAS
ANY AREAS WHICH CAN NOT BE STABILIZED BY THE END OF
EACH WORKING DAY MUST HAVE SILT FENCE INSTALLED ON
THE DOWNSLOPE SIDE
LEGEND
NON-ROOFTOP DISCONNECT
ROOFTOP DISCONNECT
SHEETFLOW TO CONSERVATION
LIMITS OF DISTURBANCELOD
S
EE
B
EE
C H N U T
LO
O
P A R
EA
S W
M P
LA
N
-0
S
EE
W
ES
T B
EE
C H N U T
LO
O
P (C
A M
PS
IT
ES
/1
N O
N A
D A P
A
TH
W A Y
C O
N N
EC
TI
O
N S
W M
P
LA
N
-0
NORTH
CONTRACTOR TO TAKE NECESSARY
STEPS TO MINIMIZE TREE CLEARING
WHILE TIEING IN GRADES
1,329 SF. OF
NON-ROOFTOP
DISCONNECT #1
2,396 SF. OF
SHEETFLOW TO
CONSERVATION AREA #2
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
GV
AutoCAD SHX Text
HB
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KCI JOB NUMBER
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
PLOTTED: BY: FILE:
AutoCAD SHX Text
$DATE$
AutoCAD SHX Text
$USERNAME$
AutoCAD SHX Text
$FILE$
AutoCAD SHX Text 06/16/23
AutoCAD SHX Text
ADDENDUM #2
.0
.0
.0
3.
.0
.0
.5
.5
.0
.0
+229.65
+231.48
+229.31
+231.68 +232.10
232.73
2% 2%
2%
+229.16
+245.32
+228.51
2% 2%
4.5%
2%
228.5
228.5
+229.08
+229.11
+229.08
229.18+ +229.08
229.11+
.3
2'W x 78.5'L x 1'D LEVEL
SPREADER AREA #5 - 63 CF
STORAGE - SEE DETAIL 12 ON
' M
AX C
O
N
TRIB
U
TIN
G
LEN
G
TH
W /1
D
IS
C O
N N
EC
T PATH
' M
AX C
O
N
TRIB
U
TIN
G
LEN
G
TH
W /1
D
IS
C O
N N
EC
T PATH
2'W x 51'L x 1'D LEVEL
SPREADER AREA #5- 41 CF
STORAGE - SEE DETAIL 12 ON
' M
A X C
O N
TR
IB
U
TIN
G
LEN
G
TH
W /1
D
IS
C O
N N
EC
T PA
TH
2'W x 83'L x 1'D LEVEL
SPREADER AREA #5 - 66 CF
STORAGE - SEE DETAIL 12
ON PAGE 10
36' M
AX CONTRIBUTING LENGTH
W/100'+
DISCONNECT PATH
2'W x 23'L x 1'D LEVEL SPREADER
AREA #5 - 18 CF STORAGE - SEE
DETAIL 12 ON PAGE 10
ACORN LOOP (EAST LOOP)
STORMWATER MANAGEMENT PLAN
271804443.05
WK/RH
WK
ADA Improvements and Upgrades at Susquehanna State Park
HARFORD COUNTY, MD
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25
02/03/2023
MDE NO. 22-SF-0184
1" = 20'
ACORN LOOP STORMWATER MANAGEMENT PLAN
PLAN1
NORTH
DAILY STABILIZATION NOTE
THIS NOTE SHOULD BE USED FOR ALL AREAS WITHIN THE LIMITS OF DISTURBANCE.
CONTRACTOR SHALL ONLY DISTURB THAT AREA WHICH CAN BE STABILIZED BY THE
END OF EACH WORK DAY. STABILIZATION SHALL BE AS FOLLOWS:
1. FOR AREAS TO BE PAVED, THE APPLICATION OF STONE.
2. FOR AREAS TO BE VEGETATIVELY STABILIZED:
A. PERMANENT SEED AND SOIL STABILIZATION MATTING OR SOD FOR ALL
STEEP SLOPES, CHANNELS OR SWALES
B. PERMANENT SEED AND MULCH FOR ALL OTHER AREAS
ANY AREAS WHICH CAN NOT BE STABILIZED BY THE END OF EACH WORKING DAY
MUST HAVE SILT FENCE INSTALLED ON THE DOWNSLOPE SIDE
LEGEND
NON-ROOFTOP DISCONNECT
ROOFTOP DISCONNECT
SHEETFLOW TO CONSERVATION
LIMITS OF DISTURBANCELOD
CONTRACTOR TO TAKE NECESSARY
STEPS TO MINIMIZE TREE CLEARING
WHILE TIEING IN GRADES
4,051 SF. OF
SHEET FLOW TO
CONSERVATION #4
AutoCAD SHX Text
GV
AutoCAD SHX Text
HB
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
HB
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text E 1,548,150
AutoCAD SHX Text E 1,548,150
AutoCAD SHX Text N 709,425
AutoCAD SHX Text N 709,950
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KCI JOB NUMBER
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
PLOTTED: BY: FILE:
AutoCAD SHX Text
$DATE$
AutoCAD SHX Text
$USERNAME$
AutoCAD SHX Text
$FILE$
AutoCAD SHX Text 06/16/23
AutoCAD SHX Text
ADDENDUM #2
DETAIL E- 6 FILTER LOG DETAIL E- 6 FILTER LOG
ACORN LOOP (EAST LOOP)
EROSION AND SEDIMENT CONTROL NOTES
271804443.05
WK/RH
WK
ADA Improvements and Upgrades at Susquehanna State Park
HARFORD COUNTY, MD
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25
02/03/2023
MDE NO. 22-SF-0184
1" = 20'
DAILY STABILIZATION NOTE
THIS NOTE SHOULD BE USED FOR ALL AREAS WITHIN THE LIMITS OF DISTURBANCE.
CONTRACTOR SHALL ONLY DISTURB THAT AREA WHICH CAN BE STABILIZED BY THE
END OF EACH WORK DAY. STABILIZATION SHALL BE AS FOLLOWS:
1. FOR AREAS TO BE PAVED, THE APPLICATION OF STONE.
2. FOR AREAS TO BE VEGETATIVELY STABILIZED:
A. PERMANENT SEED AND SOIL STABILIZATION MATTING OR SOD FOR ALL
STEEP SLOPES, CHANNELS OR SWALES
B. PERMANENT SEED AND MULCH FOR ALL OTHER AREAS
ANY AREAS WHICH CAN NOT BE STABILIZED BY THE END OF EACH WORKING DAY
MUST HAVE SILT FENCE OR FILTER LOGS INSTALLED ON THE DOWNSLOPE SIDE.
CONTRACTOR TO TAKE NECESSARY
STEPS TO MINIMIZE TREE CLEARING
WHILE TIEING IN GRADES
EROSION AND SEDIMENT CONTROL GENERAL NOTES
1. THE CONTRACTOR SHALL NOTIFY MDE AT (410) 537-3510 SEVEN (7) DAYS BEFORE
COMMENCING ANY LAND DISTURBING ACTIVITY AND, UNLESS WAIVED BY MDE, SHALL BE
REQUIRED TO HOLD A PRE-CONSTRUCTION MEETING BETWEEN PROJECT REPRESENTATIVES AND
A REPRESENTATIVE OF MDE.
2. THE CONTRACTOR SHALL NOTIFY MDE IN WRITING AND BY TELEPHONE AT THE FOLLOWING
POINTS:
A. THE REQUIRED PRE-CONSTRUCTION MEETING.
B. FOLLOWING INSTALLATION OF SEDIMENT CONTROL MEASURES.
C. DURING THE INSTALLATION OF SEDIMENT BASINS (TO BE CONVERTED INTO PERMANENT
STORMWATER MANAGEMENT STRUCTURES) AT THE REQUIRED INSPECTION POINTS (SEE
INSPECTION CHECKLIST ON PLAN). NOTIFICATION PRIOR TO COMMENCING CONSTRUCTION
OF EACH STEP IS MANDATORY.
D. PRIOR TO REMOVAL OR MODIFICATION OF ANY SEDIMENT CONTROL STRUCTURE(S).
E. PRIOR TO REMOVAL OF ALL SEDIMENT CONTROL DEVICES.
F. PRIOR TO FINAL ACCEPTANCE.
3. THE PLAN APPROVAL LETTER, APPROVED EROSION AND SEDIMENT CONTROL PLANS, DAILY LOG
BOOKS, AND TEST REPORTS SHALL BE AVAILABLE AT THE SITE FOR INSPECTION BY DULY
AUTHORIZED OFFICIALS OF MDE AND THE AGENCY RESPONSIBLE FOR THE PROJECT.
4. THE CONTRACTOR SHALL CONSTRUCT ALL EROSION AND SEDIMENT CONTROL MEASURES PER
THE APPROVED PLAN AND CONSTRUCTION SEQUENCE AND SHALL HAVE THEM INSPECTED AND
APPROVED BY THE MDE INSPECTOR PRIOR TO BEGINNING ANY OTHER LAND DISTURBANCES.
MINOR SEDIMENT CONTROL DEVICE LOCATION ADJUSTMENTS MAY BE MADE IN THE FIELD WITH
THE APPROVAL OF THE MDE INSPECTOR. THE CONTRACTOR SHALL ENSURE THAT ALL RUNOFF
FROM DISTURBED AREAS IS DIRECTED TO THE SEDIMENT CONTROL DEVICES AND SHALL NOT
REMOVE ANY EROSION OR SEDIMENT CONTROL MEASURE WITHOUT PRIOR PERMISSION FROM
MDE INSPECTOR. THE CONTRACTOR SHALL OBTAIN PRIOR AGENCY AND MDE APPROVAL FOR
MODIFICATIONS TO THE EROSION AND SEDIMENT CONTROL PLAN AND/OR SEQUENCE OF
CONSTRUCTION.
5. THE MDE INSPECTOR HAS THE OPTION OF REQUIRING ADDITIONAL SAFETY OR SEDIMENT
CONTROL MEASURES, IF DEEMED NECESSARY.
6. THE CONTRACTOR SHALL PROTECT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS TO
PREVENT THE DEPOSITION OF MATERIALS ONTO PUBLIC ROADS. ALL MATERIALS DEPOSITED
ONTO PUBLIC ROADS SHALL BE REMOVED IMMEDIATELY.
7. THE CONTRACTOR SHALL INSECT DAILY AND MAINTAIN CONTINUOUSLY IN AN EFFECTIVE
OPERATING CONDITION ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SUCH TIME AS
THEY ARE REMOVED WITH PRIOR PERMISSION FROM THE MDE INSPECTOR.
8. EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF DISTURBANCE. CALL "MISS UTILITY" AT 1-800-257-7777 48
HOURS PRIOR TO THE START OF WORK. WHEN SAME DAY STABILIZATION IS APPROVE:
A. EXCAVATED TRENCH MATERIAL SHALL BE PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL BE BACKFILLED, COMPACTED, AND STABILIZED
AT THE END OF EACH WORKING DAY. NO MORE TRENCH SHALL BE OPENED THAN CAN BE
COMPLETED THE SAME DAY.
9. ALL WATER REMOVED FROM EXCAVATED AREAS SHALL BE PASSED THROUGH AN MDE
APPROVED DEWATERING PRACTICE OR PUMPED TO A SEDIMENT TRAP OR BASIN PRIOR TO
DISCHARGE TO A FUNCTIONAL STORM DRAIN SYSTEM OR TO STABLE GROUND SURFACE.
10. CONCRETE WASHOUT STRUCTURES SHALL BE USED WHEN CONCRETE TRUCKS, DRUMS,
PUMPS, CHUTES, OR OTHER EQUIPMENT IS RINSED OR CLEANED ON-SITE.
11. CONSTRUCTION ACTIVITIES PRODUCING DUST SHALL IMPLEMENT CONTROL MEASURES TO
AVOID THE SUSPENSION OF DUST PARTICLES AND/OR PREVENT DUST FROM BLOWING
OFF-SITE OR TO AREAS WITHOUT TREATMENT.
12. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR TEMPORARY
STABILIZATION SHALL BE COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES,
SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1
VERTICAL (3:1); AND
B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE
PROJECT SITE NOT UNDER ACTIVE GRADING.
13. VEGETATIVE STABILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH THE 2011
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
REFER TO APPROPRIATE SPECIFICATIONS FOR TEMPORARY SEEDING, PERMANENT SEEDING,
MULCHING, SODDING, AND GROUND COVERS.
14. WHEN SEEDING, ALL DISTURBED AREAS WITH SLOPES FLATTER THAN 2:1 SHALL BE STABILIZED
WITH 4 INCHES OF TOPSOIL, SEED, AND MULCH. ALL DISTURBED AREAS WITH SLOPES 2:1
OR STEEPER SHALL BE STABILIZED WITH MATTING OVER 2 INCHES OF TOPSOIL AND SEED.
15. ALL SEDIMENT BASINS, TRAP EMBANKMENTS AND SLOPES, PERIMETER DIKES, SWALES AND
ALL DISTURBED SLOPES STEEPER OR EQUAL TO 3:1 SHALL BE STABILIZED WITH SEED AND
ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED STABILIZATION MEASURES, AS SOON
AS POSSIBLE BUT NO LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT. ALL
AREAS DISTURBED OUTSIDE OF THE PERIMETER SEDIMENT CONTROL SYSTEM SHALL BE
MINIMIZED. MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO ENSURE CONTINUED
STABILIZATION.
16. PERMANENT SWALES OR OTHER POINTS OF CONCENTRATED WATER FLOW SHALL BE
STABILIZED WITH SEED AND AN APPROVED EROSION CONTROL MATTING, SOD, RIP-RAP, OR
OTHER APPROVED STABILIZATION MEASURES.
17. FOR STOCKPILE SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1), THE
CONTRACTOR SHALL APPLY SEED AND ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED
STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN THREE (3) CALENDAR DAYS
OF ACTIVITY HAVING CEASED ON THE RESPECTIVE FACE. FOR SLOPES 3:1 OR FLATTER, THE
CONTRACTOR SHALL APPLY STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN
SEVEN (7) CALENDAR DAYS OF ACTIVITY HAVING CEASED ON THE RESPECTIVE FACE.
MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION.
18. FOR FINISHED GRADING, THE CONTRACTOR SHALL PROVIDE ADEQUATE GRADIENTS TO
PREVENT WATER FROM PONDING FOR MORE THAN TWENTY-FOUR (24) HOURS AFTER THE END
OF A RAINFALL EVENT. DRAINAGE COURSES AND SWALE FLOW AREAS MAY TAKE AS LONG AS
FORTY-EIGHT (48) HOURS AFTER THE END OF A RAINFALL EVENT TO DRAIN. AREAS DESIGNED
TO HAVE STANDING WATER SHALL NOT BE REQUIRED TO MEET THIS REQUIREMENT.
19. WHERE DEEMED APPROPRIATE BY THE ENGINEER OR INSPECTOR, SEDIMENT BASINS AND
TRAPS MAY NEED TO BE SURROUNDED WITH AN APPROVED SAFETY FENCE. THE FENCE MUST
CONFORM TO LOCAL ORDINANCES AND REGULATIONS. THE DEVELOPER OR OWNER SHALL
CHECK WITH LOCAL BUILDING OFFICIALS ON APPLICABLE SAFETY REQUIREMENTS. WHERE
SAFETY FENCE IS DEEMED APPROPRIATE AND LOCAL ORDINANCES DO NOT SPECIFY FENCING
SIZES AND TYPES, THE FOLLOWING SHALL BE USED AS A MINIMUM STANDARD: THE SAFETY
SHALL BE MADE OF WELDED WIRE AND AT LEAST 42 INCHES HIGH, HAVE POSTS NO FARTHER
APART THAN 8 FEET, HAVE MESH OPENINGS NO GREATER THAN 2 INCHES IN WIDTH AND 4
INCHES IN HEIGHT WITH A MINIMUM OF 14 GAUGE WIRE. SAFETY FENCE SHALL BE
MAINTAINED AND IN GOOD CONDITION AT ALL TIMES.
20. ALL SEDIMENT TRAP DEPTH DIMENSIONS ARE RELATIVE TO THE OUTLET ELEVATION. ALL TRAPS
SHALL HAVE A STABLE OUTFALL. ALL TRAPS AND BASINS SHALL HAVE STABLE INFLOW
POINTS.
21. SEDIMENT SHALL BE REMOVED AND THE TRAP OR BASIN RESTORED TO ITS ORIGINAL
DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE QUARTER OF THE TOTAL
DEPTH OF THE TRAP OR BASIN. TOTAL DEPTH SHALL BE MEASURED FROM THE TRAP OR
BASIN BOTTOM TO THE CREST OF THE OUTLET.
22. SEDIMENT REMOVED FROM TRAPS (AND BASINS) SHALL BE PLACED AND STABILIZED IN
APPROVED AREAS, BUT NOT WITHIN A FLOODPLAIN, WETLAND OR TREE-SAVE AREA. WHEN
PUMPING SEDIMENT LADEN WATER, THE DISCHARGE SHALL BE DIRECTED TO AN MDE
APPROVED SEDIMENT TRAPPING DEVICE PRIOR TO RELEASE FROM THE SITE. A SUMP PIT MAY
BE USED IF SEDIMENT TRAPS THEMSELVES ARE BEING PUMPED OUT.
23. PRIOR TO REMOVAL OF SEDIMENT CONTROL MEASURES, THE CONTRACTOR SHALL STABILIZE
AND HAVE ESTABLISHED PERMANENT STABILIZATION FOR ALL CONTRIBUTORY DISTURBED
AREAS USING SOD OR AN APPROVED PERMANENT SEED MIXTURE WITH REQUIRED SOIL
AMENDMENTS AND AN APPROVED ANCHORED MULCH. WOOD FIBER MULCH MAY ONLY BE
USED IN SEEDING SEASON WHERE THE SLOPE DOES NOT EXCEED 10% AND GRADING HAS
BEEN DONE TO PROMOTE SHEET FLOW DRAINAGE. AREAS BROUGHT TO FINISHED GRADE
DURING THE SEEDING SEASON SHALL BE PERMANENTLY STABILIZED AS SOON AS POSSIBLE,
BUT NOT LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT FOR SLOPES
STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) AND SEVEN (7) CALENDAR DAYS FOR
FLATTER SLOPES. WHEN PROPERTY IS BROUGHT TO FINISHED GRADE DURING THE MONTHS
OF NOVEMBER THROUGH FEBRUARY, AND PERMANENT STABILIZATION IS FOUND TO BE
IMPRACTICAL, TEMPORARY SEED AND ANCHORED STRAW MULCH SHALL BE APPLIED TO
DISTURBED AREAS. THE FINAL PERMANENT STABILIZATION OF SUCH PROPERTY SHALL BE
APPLIED BY MARCH 15 OR EARLIER IF GROUND AND WEATHER CONDITIONS ALLOW.
24. TEMPORARY SEDIMENT CONTROL DEVICES SHALL BE REMOVED WITH PERMISSION OF THE
MDE INSPECTOR WITHIN THIRTY (30) CALENDAR DAYS FOLLOWING ESTABLISHMENT OF
PERMANENT STABILIZATION IN ALL CONTRIBUTORY DRAINAGE AREAS. UPON REMOVAL OF
SEDIMENT CONTROL DEVICES, THE AREA DISTURBED BY REMOVAL SHALL BE STABILIZED WITH
TOPSOIL, SEED, AND MULCH, OR AS SPECIFIED, WITHIN 24 HOURS OF SAID REMOVAL.
STORMWATER MANAGEMENT STRUCTURES USED TEMPORARILY FOR SEDIMENT CONTROL
SHALL BE CONVERTED TO THE PERMANENT CONFIGURATION WITHIN THIS TIME PERIOD AS
WELL.
25. OFF-SITE SPOIL OR BORROW AREAS ON STATE OR FEDERAL PROPERTY SHALL HAVE PRIOR
APPROVAL BY MDE AND OTHER APPLICABLE STATE, FEDERAL, AND LOCAL AGENCIES;
OTHERWISE APPROVAL SHALL BE GRANTED BY THE LOCAL AUTHORITIES. ALL WASTE AND
BORROW AREAS OFF-SITE SHALL BE PROTECTED BY SEDIMENT CONTROL MEASURES AND
STABILIZED.
26. SITE INFORMATION:
A. AREA DISTURBED 0.60 ACRES
B. TOTAL CUT 193 CUBIC YARDS
C. TOTAL FILL 83 CUBIC YARDS
D. OFF-SITE WASTE/BORROW AREA LOCATION TBD
B-4 STANDARDS AND SPECIFICATIONS
FOR
VEGETATIVE STABILIZATION
Definition
Using vegetation as cover to protect exposed soil from erosion.
Purpose
To promote the establishment of vegetation on exposed soil.
Conditions Where Practice Applies
On all disturbed areas not stabilized by other methods. This specification is divided into sections on incremental stabilization; soil preparation, soil amendments and topsoiling; seeding and mulching; temporary stabilization;
and permanent stabilization.
Effects on Water Quality and Quantity Stabilization practices are used to promote the establishment of vegetation on exposed soil. When soil is stabilized with vegetation, the soil is less likely to erode and more likely to allow infiltration of rainfall, thereby reducing sediment loads and runoff to downstream areas.
Planting vegetation in disturbed areas will have an effect on the water budget, especially on volumes and rates of runoff, infiltration, evaporation, transpiration, percolation, and groundwater recharge. Over time, vegetation will increase organic matter content and improve the water holding capacity of the soil and subsequent plant growth.
Vegetation will help reduce the movement of sediment, nutrients, and other chemicals carried by runoff to receiving waters. Plants will also help protect groundwater supplies by assimilating those substances present within the root zone.
Sediment control practices must remain in place during grading, seedbed preparation, seeding, mulching, and vegetative establishment.
Adequate Vegetative Establishment Inspect seeded areas for vegetative establishment and make necessary repairs, replacements, and reseedings within the planting season.
1. Adequate vegetative stabilization requires 95 percent groundcover.
2. If an area has less than 40 percent groundcover, restabilize following the original recommendations for lime, fertilizer, seedbed preparation, and seeding.
3. If an area has between 40 and 94 percent groundcover, over-seed and fertilize using half of the rates originally specified.
4. Maintenance fertilizer rates for permanent seeding are shown in Table B.6.
B-4-1 STANDARDS AND SPECIFICATIONS
FOR
INCREMENTAL STABILIZATION
Definition
Establishment of vegetative cover on cut and fill slopes.
Purpose
To provide timely vegetative cover on cut and fill slopes as work progresses.
Conditions Where Practice Applies
Any cut or fill slope greater than 15 feet in height. This practice also applies to stockpiles.
Criteria
A. Incremental Stabilization - Cut Slopes
1. Excavate and stabilize cut slopes in increments not to exceed 15 feet in height. Prepare seedbed and apply seed and mulch on all cut slopes as the work progresses.
2. Construction sequence example (Refer to Figure B.1):
a. Construct and stabilize all temporary swales or dikes that will be used to convey runoff around the excavation.
b. Perform Phase 1 excavation, prepare seedbed, and stabilize.
c. Perform Phase 2 excavation, prepare seedbed, and stabilize. Overseed Phase 1 areas as necessary.
d. Perform final phase excavation, prepare seedbed, and stabilize. Overseed previously seeded areas as necessary.
Note: Once excavation has begun the operation should be continuous from grubbing through the completion of grading and placement of topsoil (if required) and permanent seed and mulch. Any interruptions in the operation or completing the operation out of the seeding season will necessitate the application of temporary stabilization.
Figure B.
Figure B.1: Incremental Stabilization – Cut
B. Incremental Stabilization - Fill Slopes
1. Construct and stabilize fill slopes in increments not to exceed 15 feet in height. Prepare seedbed and apply seed and mulch on all slopes as the work progresses.
2. Stabilize slopes immediately when the vertical height of a lift reaches 15 feet, or when the grading operation ceases as prescribed in the plans.
3. At the end of each day, install temporary water conveyance practice(s), as necessary, to intercept surface runoff and convey it down the slope in a non-erosive manner.
4. Construction sequence example (Refer to Figure B.2):
a. Construct and stabilize all temporary swales or dikes that will be used to divert runoff around the fill. Construct silt fence on low side of fill unless other methods shown on the plans address this area.
b. At the end of each day, install temporary water conveyance practice(s), as necessary, to intercept surface runoff and convey it down the slope in a non-erosive manner.
c. Place Phase 1 fill, prepare seedbed, and stabilize.
d. Place Phase 2 fill, prepare seedbed, and stabilize.
e. Place final phase fill, prepare seedbed, and stabilize. Overseed previously seeded areas as necessary.
Note: Once the placement of fill has begun the operation should be continuous from grubbing through the completion of grading and placement of topsoil (if required) and permanent seed and mulch. Any interruptions in the operation or completing the operation out of the seeding season will necessitate the application of temporary stabilization.
Figure B.
Figure B.2: Incremental Stabilization – Fill
B-4-2 STANDARDS AND SPECIFICATIONS
FOR
SOIL PREPARATION, TOPSOILING, AND SOIL AMENDMENTS
Definition
The process of preparing the soils to sustain adequate vegetative stabilization.
Purpose
To provide a suitable soil medium for vegetative growth.
Conditions Where Practice Applies
Where vegetative stabilization is to be established.
Criteria
A. Soil Preparation
1. Temporary Stabilization
a. Seedbed preparation consists of loosening soil to a depth of 3 to 5 inches by means of suitable agricultural or construction equipment, such as disc harrows or chisel plows or rippers mounted on construction equipment. After the soil is loosened, it must not be rolled or dragged smooth but left in the roughened condition. Slopes 3:1 or flatter are to be tracked with ridges running parallel to the contour of the slope.
b. Apply fertilizer and lime as prescribed on the plans.
c. Incorporate lime and fertilizer into the top 3 to 5 inches of soil by disking or other suitable means.
2. Permanent Stabilization
a. A soil test is required for any earth disturbance of 5 acres or more. The minimum soil conditions required for permanent vegetative establishment are:
i. Soil pH between 6.0 and 7.0.
ii. Soluble salts less than 500 parts per million (ppm).
iii. Soil contains less than 40 percent clay but enough fine grained material (greater than 30 percent silt plus clay) to provide the capacity to hold a moderate amount of moisture. An exception: if lovegrass will be planted, then a sandy soil (less than 30 percent silt plus clay) would be acceptable.
iv. Soil contains 1.5 percent minimum organic matter by weight.
v. Soil contains sufficient pore space to permit adequate root penetration.
b. Application of amendments or topsoil is required if on-site soils do not meet the above conditions.
c. Graded areas must be maintained in a true and even grade as specified on the approved plan, then scarified or otherwise loosened to a depth of 3 to 5 inches.
d. Apply soil amendments as specified on the approved plan or as indicated by the results of a soil test.
e. Mix soil amendments into the top 3 to 5 inches of soil by disking or other suitable means. Rake lawn areas to smooth the surface, remove large objects like stones and branches, and ready the area for seed application. Loosen surface soil by dragging with a heavy chain or other equipment to roughen the surface where site conditions will not permit normal seedbed preparation. Track slopes 3:1 or flatter with tracked equipment leaving the soil in an irregular condition with ridges running parallel to the contour of the slope. Leave the top 1 to 3 inches of soil loose and friable. Seedbed loosening may be unnecessary on newly disturbed areas.
B. Topsoiling
1. Topsoil is placed over prepared subsoil…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .