P-031-210-001 Plan set.pdf

PDF 7 MB Posted

Attached to
P-031-210-001 ADA Improvements Susquehanna State Park, Havre de Grace, MD
Solicitation number
BPM038062
Issued by
Harford County, Hebron Town, Maryland

About this file

This document contains the plan set for the ADA Improvements and Upgrades at Susquehanna State Park in Havre de Grace, Maryland for the Maryland Department of Natural Resources. The project involves modifications to the campground parking lots to comply with ADA requirements. Key details include a location plan, layout plans for the Beechnut Loop and Acorn Loop areas, grading plans, stormwater management plans, erosion and sediment control notes, and construction details. An addendum was issued on 6/26/23 with new pricing guidelines, so any previously submitted bids must be revised. The contract opportunity is open to the State of Maryland and Harford County, with the project site located in Hebron Town.

The plan set provides specifications for concrete walks, asphalt paving, signage, landscaping, and stormwater management. Pricing and funding information is not included in the plan set, but the addendum references new pricing guidelines. No information is provided about set asides, incumbents, or funding sources. The project appears to be funded and managed by the Maryland Department of Natural Resources.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUSQUEHANNA STATE PARK

ADA IMPROVEMENTS AND UPGRADES

4122 WILKINSON ROAD,

HAVRE DE GRACE, MD 21078

PROJECT No. P-031-210-001 MDE No. 22-SF-0184 for

MARYLAND DEPARTMENT OF NATURAL RESOURCES

02/03/2023

STATE OF MARYLAND

DEPARTMENT OF GENERAL SERVICES

ATIF CHAUDHRY, SECRETARY

ROOM 1405

301 WEST PRESTON STREET

BALTIMORE, MARYLAND 21201

BOARD OF PUBLIC WORKS

WES MOORE, GOVERNOR

BROOKE E. LIERMAN, COMPTROLLER

DERECK E. DAVIS, TREASURER

INDEX

SHEET 1 COVER SHEET

SHEET 2 LOCATION PLAN

SHEET 3 BEECHNUT LOOP (WEST LOOP) & PLAYGROUND AREA LAYOUT PLAN

SHEET 4 ACORN LOOP (EAST LOOP) LAYOUT PLAN

SHEET 5 BEECHNUT LOOP (WEST LOOP) & PLAYGROUND AREA GRADING PLAN

SHEET 6 ACORN LOOP (EAST LOOP) GRADING PLAN

SHEET 7 BEECHNUT LOOP (WEST LOOP) & PLAYGROUND AREA STORMWATER MANAGEMENT PLAN

SHEET 8 ACORN LOOP (EAST LOOP) STORMWATER MANAGEMENT PLAN

SHEET 9 EROSION AND SEDIMENT CONTROL NOTES

SHEET 10 HARDSCAPE & LANDSCAPE DETAILS

VICINITY MAP

SCALE 1":2000'

LOCATION MAP

SCALE 1":500'

PROFESSIONAL CERTIFICATION. I HEREBY

CERTIFY THAT THESE DOCUMENTS WERE

PREPARED OR APPROVED BY ME, AND THAT

I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE

OF MARYLAND, LICENSE NO. 28935

EXPIRATION DATE: 1/15/25

CODES

1.1 FOREST CONSERVATION AND REFORESTATION REQUIREMENTS are regulated under the provisions of COMAR

08.19.01 - 08.19.06. Regulations for development of Forest Stand Delineation and Forest Conservation Plan are outlined in COMAR 08.19.04.

1.2 SEDIMENT and EROSION CONTROL and STORMWATER MANAGEMENT shall comply with regulations of the Maryland Department of the Environment (MDE), Water Management Administration, Environment Article sections 4-101 through 4-116, Annotated Code of Maryland and COMAR 26.17.01and 26.17.02.

When applicable, work in Non- tidal Wetlands areas shall comply with COMAR 26.23, and work in Wetlands areas shall comply with COMAR 26.24.

1.3 ACCESSIBILITY requirements are governed by The Maryland Accessibility Code (COMAR 05.02.02), which references the most current Americans with Disabilities Act (ADA) Standards, Accessibility Guidelines (ADAAG), and other applicable Federal laws and regulations.

Rock Run Rd

Wilkinson Rd

C or ne r R d

Craigs

Corner Rd Craigs Stafford Rd

QualkerBottom Rd

Webster

Lapidum Rd

Qu alk er Bo tto m

R d

Cooley M ill Rd

Cooley Mill Rd

Rock Run Rd

Lapidum Rd

La pi du m

R d

Herring Run Rd

Corner Rd

Craigs

Corner Rd

Craigs

271804443.05

1 10

SITE

SITE

DEPARTMENT OF NATURAL RESOURCES

JOSH KURTZ, SECRETARY

ENGINEERING AND CONSTRUCTION

TAWES STATE OFFICE BUILDING D-3

580 TAYLOR AVENUE

ANNAPOLIS, MD 21401-2351

REVISIONS

NO. DATE DESCRIPTION BY

2 06/16/23 ADDENDUM #2 CTS

AutoCAD SHX Text

KCI JOB NUMBER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

LOD ADD

ALTERNATE

LOD BASE

BID

LOD BASE

BID

LOD ADD

ALTERNATE

LOD ADD

ALTERNATE

LOD ADD

ALTERNATE

LOD ADD

ALTERNATE

LOD BASE BID

LOD ADD

ALTERNATE

LOD BASE BID

271804443.05

WK/RH

WK

ADA Improvements and Upgrades at Susquehanna State Park

HARFORD COUNTY, MD

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY

ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25

02/03/2023

MDE NO. 22-SF-0184

LOCATION PLAN

021" = 50'

BEECHNUT LOOP

BEECHNUT LOOP

ACORN LOOP

ACORN LOOP

CAMPGROUND ROAD

CAMPG

ROUND ROAD

BEECHNUT LOOP

BATH HOUSE

ACORN LOOP

BATH HOUSE

PLAYGROUND

AMPHITHEATER

AREA

REGISTRATION

OFFICE

DUMP

STATION

CAMPGROUND ROAD

PLAYGROUND'S ADA ACCESS

AND PARKING LAYOUT PLAN -

SEE SHEET 03

ACORN LOOP BATH

HOUSE LAYOUT PLAN -

SEE SHEET 04

CAMP SITE 16/18 WEST

BEECHNUT LOOP NON-ADA

PATH CONNECTION LAYOUT

PLAN - SEE SHEET 03

BEECHNUT LOOP BATH

HOUSE LAYOUT PLAN -

SEE SHEET 03

GREEN TRAIL

TO

C

RA

IG

S

CORN

ER

R

OAD

GRAPHIC SCALE

50 0 50 100 150

NORTH

NOTES:

ALL ACCESSIBLE DETAILS & SIGNAGE SHALL CONFORM TO

CURRENT ADA CRITERIA / REQUIREMENTS ANSI A117.1-2017

AND MARYLAND STATE OR LOCAL LAW

VICINITY MAP SCALE: 1" = 5000'

CAMPGROUND

SITE AREA

Rock Run Rd

Wilkinson Rd

C or ne r R d

Craigs

Corner Rd Craigs Stafford Rd

Qualker Bottom Rd

Webster Lapidum Rd

Qu alk er B ot to m R d

Cooley M ill Rd

Cooley Mill Rd

N Earlton Rd Ext

Webster Lapidum Rd

Rock Run Rd

Lapidum Rd

La pi du m

R d

Herring Run Rd

CONTRACTOR TO TAKE NECESSARY

STEPS TO MINIMIZE TREE CLEARING

WHILE TIEING IN GRADES

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

HB

AutoCAD SHX Text

HB

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

HB

AutoCAD SHX Text S

AutoCAD SHX Text E 1,546,725

AutoCAD SHX Text E 1,546,725

AutoCAD SHX Text E 1,548,150

AutoCAD SHX Text E 1,548,150

AutoCAD SHX Text N 709,350

AutoCAD SHX Text N 709,425

AutoCAD SHX Text N 709,950

AutoCAD SHX Text N 709,950

AutoCAD SHX Text

WOODEN WALL

AutoCAD SHX Text

PLAY GROUND

AutoCAD SHX Text

(SEE DETAIL)

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KCI JOB NUMBER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

BY

AutoCAD SHX Text

PLOTTED: BY: FILE:

AutoCAD SHX Text

$DATE$

AutoCAD SHX Text

$USERNAME$

AutoCAD SHX Text

$FILE$

AutoCAD SHX Text 06/16/23

AutoCAD SHX Text

ADDENDUM #2

CTS

FL

FL

FL-15

FL-15

MB

EXISTING WATER FOUNTAIN TO BE

REMOVED AND REPLACED WITH

THE EXISTING WATER FOUNTAIN

FROM THE WEST WALL (WOMEN'S

ROOM).

EXISTING ACCESSIBLE WATER

FOUNTAIN TO BE RELOCATED TO

THE EXISTING SOUTH WALL WATER

FOUNTAIN LOCATION. EXISTING

PIPING TO BE CAPPED AND

ABANDONED.

HANDICAP PARKING SIGN*

SEE DETAIL

PRECAST CONCRETE

WHEELSTOP (TYP.) SEE DETAIL

PROPOSED ASPHALT PAVING EDGE

4&6

RELOCATED EXISTING

DUMPSTER

PRECAST CONCRETE

WHEELSTOP (TYP.)

SEE DETAIL

EXISTING PROPANE TANK

WITH WOODEN FENCE

ENCLOSURE

EXISTING GRAVEL

ROAD EDGE

EXISTING SEATING AREA

WITH TIMBER WALL TO

BE DEMOLISHED

PROPOSED TIMBER

POST BOLLARD*

SEE DETAIL

18'

HANDICAP PARKING SPACE

(TYP.) SEE DETAIL 2&5

PROPOSED ADA COMPLIANT

CONCRETE PAVEMENT/WALK

CONNECTION SEE DETAIL

OPTIONAL 16' X 18' RELOCATED

MULCHED SURFACE SEATING

AREA WITH PICNIC TABLES

20'

2'-6"

5'

22'

13'-3"

EXISTING PATH

EXISTING ROOF DRAIN TO BE

PIPED UNDER PROPOSED

EXPANDED CONCRETE WALK

(IF FEASIBLE, FUTURE PHASES

WILL DETERMINE FEASIBILITY)

EXISTING ROOF DRAIN TO BE PIPED

UNDER PROPOSED EXPANDED CONCRETE

WALK (IF FEASIBLE, FUTURE PHASES WILL

DETERMINE FEASIBILITY)

5'

'-6

HANDICAP PARKING SIGN*

SEE DETAIL 4&6

ADD ALTERNATE NON-ADA

MULCH PATH CONNECTION

4'-6"

5'

9'-6"

'x1

' S

ERV

IC

E

TRU

C K S

TALL

ADD ALTERNATE NON-ADA

MULCH PATH CONNECTION

EXISTING GRADES TO BE HELD

ADD ALTERNATE NON-ADA

MULCH PATH CONNECTION

OPTIONAL NON-ADA MULCH

PATH CONNECTION TO

RELOCATED PICNIC AREA

4:

3:1

3.5:1

2%

M

AX

M

AX

2% M

AX

249.55

+ 249.10

249.962

M

AX

+250.15

+249.90

3:

249.45

3:1

PROPOSED TIMBER

POST BOLLARD*

SEE DETAIL

NO PARKING ACCESS AISLE

SIGN* SEE DETAIL 4&6

PROPOSED WHITE TRAFFIC

PAINT ADA ROUTE

MARKINGS*, SEE DETAIL 5

TO WEST BEECHNUT LOOPCAMPSITE 16/18 CONNECTION

APPROX 839 SF OF CLEARING FOR

GRADING TIE-INS - CONTRACTOR TO

TAKE NECESSARY STEPS TO MINIMIZE

CLEARING IN ANY WAY POSSIBLE. SEE

CONSTRUCTION NOTES THIS SHEET.

APPROX 880 SF OF CLEARING FOR

GRADING TIE-INS - CONTRACTOR TO TAKE

NECESSARY STEPS TO MINIMIZE CLEARING

IN ANY WAY POSSIBLE. SEE

CONSTRUCTION NOTES THIS SHEET.

BEECHNUT LOOP

BEECHNUT LOOP

R3'

R24'

R12'

R8'

R3'

R120'

R4'

EXISTING BATHHOUSE

EDGE OF REALIGNED

GRAVEL ROAD/CAMPSITE

PARKING. (TO MATCH

EXISTING)

PAVEMENT TIE-IN. SEE

DETAIL 9

ASPHALT PAVING

SEE DETAIL 8

FILTER LOG - SEE

DETAILS SHEET 09

FILTER LOG - SEE

DETAILS SHEET 09

15' WIDE MOUNTABLE BERM -

SEE DETAILS SHEET 10

IF OPTION IS SELECTED,

BORDER AND MULCH TO

MATCH EXISTING MATERIALS

ADD SIGNAGE "USE WATER

FOUNTAIN OUTSIDE MEN'S

BATHROOM"

REMOVED.

X X

X

X

X

XX

X X X

X X

X X X X X X X XX X X X X X XX X X X X X XX X X X X X X X

X X

EX CULVERT TO BE REMOVED - GRADE

WEST SIDE OF DRIVE TO ELIMINATE

PONDING

R3'

EX PVC CLEANOUT TO BE CUT TO

PROPOSED GRADE. INSTALL TRAFFIC

BEARING LID W/COUNTERSUNK PLUG

EX WOOD BOLLARDS TO BE REMOVED

EX PVC CLEANOUT TO BE RAISED TO PROPOSED GRADE

X

X

XXX

X X

X

XX X X X X

X

XX

XX X

X X

X

X

X

X

X X

X

XXX

X

X X X X

X X X X

X X X X X X X X

X X

X X

X

X

X

X X

X X

X

X X

X X

X

X

X

X

X

X

X

X

X X

X

X X

X

X X X X

X X

X

X

X

X X X

X X X

XX

BEECHNUT LOOP

EXISTING WATER

SPIGOT

ADD ALTERNATE 3'-6"

MULCHED NON-ADA

PATH CONNECTION (TO

BE FIELD RELOCATED,

AS NECESSARY, TO

SAVE EXISTING TREES) -

EXISTING GRADES TO

BE HELD

BATH HOUSE

SIGNAGE (TO

MATCH EXISTING)

EXISTING PATH

TO BATHHOUSE

CAMPSITE 16

GRAVEL PARKING

NOTES:

1. CONTRACTOR TO FIELD VERIFY

UNDERGROUND UTILITIES CONFLICTS WITH

BOLLARD AND SIGN POSTS AND ADJUST

THE FINAL LOCATION ACCORDINGLY

+243.99

244.36+

+244.05

+243.95

+248.02

247.13

+246.77

+246.52

CAMPSITE 18

GRAVEL PARKING

R2'

R2'

R34.25'

R22.25'

ASPHALT PAVING EDGE

EXISTING GRAVEL ROAD

TO BE DEMOLISHED

8' 8'

8'

9' 9'

'-4

42'

PLAYGROUND TIMBER EDGE

SIZE/ SPECIFICATION TO

MATCH EXISTING

(PLAYGROUND MULCH FILL AS

NEEDED)

PRECAST CONCRETE

WHEELSTOP (TYP.)

SEE DETAIL

HANDICAP PARKING SIGN

(TYP.) SEE DETAIL

HANDICAP PARKING SPACE

(TYP.) SEE DETAIL

5' WIDE ASPHALT

WALK SEE DETAIL

PRECAST CONCRETE

WHEELSTOP (TYP.) SEE DETAIL 3

ADD 40 SF OF GRAVEL

TO EXISTING ROAD.

2&5

PROPOSED WHITE TRAFFIC

PAINT ADA ROUTE

MARKINGS, SEE DETAIL 5

EXISTING PLAYGROUND

MULCHED AREA

EXISTING BOLLARD

(X4) TO BE REMOVED

R4.0'

EXISTING SIGNS TO REMAIN

4&6

PROPOSED ASPHALT

PAVING EDGE

ASPHALT PAVING

SEE DETAIL 8

NOTES:

1. PROPOSED ADA PARKING AREA MAXIMUM

2% GRADE IN ANY DIRECTION.

2. PROPOSED ADA ACCESSIBLE ROUTE

MAXIMUM 5% WITH NO MORE THAN 2%

CROSS SLOPE.

3. CONTRACTOR TO FIELD VERIFY

UNDERGROUND UTILITIES CONFLICTS WITH

BOLLARD AND SIGN POSTS AND ADJUST

THE FINAL LOCATION ACCORDINGLY

WILLYGOAT ADA ACCESSIBLE

HALF RAMP, MODEL

APS-ADAHALFRAMP, OR

APPROVED EQUAL

PLAYGROUND ADA FLUSH

MOUNT HALF RAMP SYSTEM

(MANUFACTURE/DETAIL TBD)

1" = 10'

BEECHNUT LOOP (WEST LOOP)

& PLAYGROUND AREA LAYOUT PLAN

271804443.05

WK/RH

WK

ADA Improvements and Upgrades at Susquehanna State Park

HARFORD COUNTY, MD

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25

02/03/2023

MDE NO. 22-SF-0184

CAMPSITE 16/18 WEST BEECHNUT LOOP NON-ADA PATHWAY CONNECTION

PLAN

BEECHNUT LOOP BATH HOUSE

PLAN

CAMPGROUND ROAD PLAYGROUND AREA ADA ACCESS AND PARKING

PLAN1

NORTH

NORTH

NORTH

S

EE

B

EE

C H N U T

LO

O

P A R

EA

B A

TH

H O

U S E

LA

YO

U T

PL

A N

-0

S

EE

W

ES

T B

EE

C H N U T

LO

O

P (C

A M

PS

IT

E

/1

N O

N A

D A P

A

TH

W A Y

C O

N N

EC

TI

O

N L

A

YO

U T

PL

A N

-0

CONTRACTOR TO TAKE NECESSARY

STEPS TO MINIMIZE TREE CLEARING

WHILE TIEING IN GRADES

CONSTRUCTION NOTES:

1. CAMPING SEASON RUNS FROM APRIL THRU OCTOBER. IDEAL

CONSTRUCTION TO TAKE [PLACE FROM OCTOBER 1 THRU APRIL 1. IF

CONSTRUCTION IS TAKING PLACE DURING CAMPING SEASON, THE

FOLLOWING CONDITIONS MUST BE FOLLOWED:

- WORK IS TO BE PERFORMED ONLY MONDAY THRU FRIDAY WITH

WORK STARTING NO EARLIER THAN 8:00 A.M.;

- CAMPGROUND LOOP ROADS AND BATHHOUSES MUST BE OPEN

AND SAFELY ACCESSIBLE TO CAMPERS AT ALL TIMES;

- CONSTRUCTION ZONES MUST BE SECURE AND MUST BE

COMPLETELY OPEN AND "VISITOR FRIENDLY" EVERY WEEKEND.

2. CONTRACTOR ALLOWED TO MAKE MINOR GRADING CHANGES

DURING CONSTRUCTION TO MINIMIZE TREE REMOVAL. POSITIVE FLOW IS

TO BE MAINTAINED.

3. TREES THAT ARE REMOVED ARE TO BE REPLACED IN KIND IN SAME

APPROXIMATE LOCATION. SEE POTENTIAL TREE REPLACEMENT

SCHEDULE SHEET 04.

4. DURING THE PRE-CONSTRUCTION MEETING, AND PRIOR TO

CLEARING, TREE INSPECTION WILL TAKE PLACE TO DETERMINE WHICH

TREES ARE TO REMAIN, AND WHICH TREES ARE TO BE REMOVED AND

REPLACED.

5. BLAZE ORANGE FENCING TO BE INSTALLED AROUND CONSTRUCTION

AREA IN PUBLIC FACING AREAS. SEE DETAIL 10 SHEET 10.

6. ALL DISTURBED GRASS AREAS ARE TO BE PERMANENTLY STABILIZED

WITH ERNST SEEDS, MARYLAND UPLAND MIX, ERNMX-172, OR APPROVED

EQUAL.

7. ALL MULCHED PATHS ARE TO BE 3" DEEP.

8. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM THE SITE, WITH THE

EXCEPTION OF THE REMOVED WATER FOUNTAINS, AND ANY MILLINGS

THAT CAN BE SALVAGED. THE WATER FOUNTAINS AND MILLINGS ARE TO

BE GIVEN TO THE OWNER.

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

HB

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KCI JOB NUMBER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

BY

AutoCAD SHX Text

PLOTTED: BY: FILE:

AutoCAD SHX Text

$DATE$

AutoCAD SHX Text

$USERNAME$

AutoCAD SHX Text

$FILE$

AutoCAD SHX Text 06/16/23

AutoCAD SHX Text

ADDENDUM #2

1'-6"

HANDICAP PARKING

SIGN SEE DETAIL

PRECAST CONCRETE

WHEELSTOP (TYP.)

SEE DETAIL

2&5

PRECAST CONCRETE

WHEELSTOP (TYP.) SEE DETAIL8'

8' 8'

9'

HANDICAP PARKING

SIGN SEE DETAIL

NO PARKING ACCESS AISLE

SIGN SEE DETAIL 4&6

4&6

HANDICAP PARKING

SPACE (TYP.) SEE

DETAIL 2&5

TIMBER POST BOLLARD

(TYP.) SEE DETAIL 1

PROPOSED WHITE

TRAFFIC PAINT ADA

ROUTE MARKINGS,

SEE DETAIL

5'

EXISTING WATER FOUNTAIN TO

BE REMOVED. EX. PIPING TO

BE CAPPED AND ABANDONED.

ADD SIGNAGE "USE WATER

FOUNTAIN OUTSIDE WOMENS

BATHROOM"

PROPOSED ASPHALT

PAVING EDGE

EXISTING PROPANE TANK

WITH WOODEN FENCE

ENCLOSURE (TO REMAIN)

EXISTING GRAVEL

ROAD EDGE

PROPOSED ADA COMPLIANT

CONCRETE PAVEMENT/WALK

CONNECTION

SEE DETAIL

EXISTING ROOF DRAIN TO BE

PIPED UNDER PROPOSED

EXPANDED CONCRETE WALK

(IF FEASIBLE, FUTURE PHASES

WILL DETERMINE FEASIBILITY)

EXISTING PAVED

EDGE (NON-ADA

PARKINGS)

PROPOSED ASPHALT

PARKING (TO BE FIELD

VERIFIED TO SAVE

EXISTING TREES)

33'

14'-8"

3'- 9"

ADD ALTERNATE NON-ADA

MULCH PATH CONNECTION

MATCH EXISTING GROUND

FOR LINE & GRADE

ADD ALTERNATE

NON-ADA MULCH

PATH CONNECTION

MATCH EXISTING

GROUND FOR LINE

& GRADE

2%

4.5%

228.5

228.5

2%2%

2%

2%

2%

APPROX 966 SF OF CLEARING FOR

GRADING TIE-INS - CONTRACTOR TO

TAKE NECESSARY STEPS TO MINIMIZE

CLEARING IN ANY WAY POSSIBLE. SEE

CONSTRUCTION NOTES THIS SHEET.

APPROX 440 SF OF CLEARING FOR

GRADING TIE-INS - CONTRACTOR TO

TAKE NECESSARY STEPS TO

MINIMIZE CLEARING IN ANY WAY

POSSIBLE. SEE CONSTRUCTION

NOTES THIS SHEET.

APPROX 250 SF OF CLEARING FOR

GRADING TIE-INS - CONTRACTOR

TO TAKE NECESSARY STEPS TO

MINIMIZE CLEARING IN ANY WAY

POSSIBLE. SEE CONSTRUCTION

NOTES THIS SHEET.

APPROX 1,143 SF OF CLEARING FOR

GRADING TIE-INS - CONTRACTOR TO

TAKE NECESSARY STEPS TO MINIMIZE

CLEARING IN ANY WAY POSSIBLE.

SEE CONSTRUCTION NOTES THIS

SHEET.

R11'

R6'

R3'

R3'

R16'

R32'

R

R16'

AC

O

RN

L O O P

EXISTING BATH HOUSE

PAVEMENT TIE-IN.

SEE DETAIL 9

2MEN'S

ACORN LOOP (EAST LOOP)

LAYOUT PLAN

271804443.05

WK/RH

WK

ADA Improvements and Upgrades at Susquehanna State Park

HARFORD COUNTY, MD

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25

02/03/2023

MDE NO. 22-SF-0184

1" = 10'

ACORN LOOP BATH HOUSE

PLAN1

NORTH

CONTRACTOR TO TAKE NECESSARY

STEPS TO MINIMIZE TREE CLEARING

WHILE TIEING IN GRADES

POTENTIAL TREE REPLACEMENT SCHEDULE

QTY BOTANICAL NAME / COMMON NAME SIZE CONDITION

10 ACER SACCHARUM / SUGAR MAPLE 2.5" CAL. B&B

10 QUERCUS RUBRA / NORTHERN RED OAK 2.5" CAL. B&B

10 BITULA NIGRA / RIVER BIRCH 2.5" CAL. B&B

CONSTRUCTION NOTES:

1. CAMPING SEASON RUNS FROM APRIL THRU OCTOBER. IDEAL

CONSTRUCTION TO TAKE [PLACE FROM OCTOBER 1 THRU APRIL 1. IF

CONSTRUCTION IS TAKING PLACE DURING CAMPING SEASON, THE

FOLLOWING CONDITIONS MUST BE FOLLOWED:

- WORK IS TO BE PERFORMED ONLY MONDAY THRU FRIDAY WITH

WORK STARTING NO EARLIER THAN 8:00 A.M.;

- CAMPGROUND LOOP ROADS AND BATHHOUSES MUST BE OPEN

AND SAFELY ACCESSIBLE TO CAMPERS AT ALL TIMES;

- CONSTRUCTION ZONES MUST BE SECURE AND MUST BE

COMPLETELY OPEN AND "VISITOR FRIENDLY" EVERY WEEKEND.

2. CONTRACTOR ALLOWED TO MAKE MINOR GRADING CHANGES

DURING CONSTRUCTION TO MINIMIZE TREE REMOVAL. POSITIVE FLOW IS

TO BE MAINTAINED.

3. TREES THAT ARE REMOVED ARE TO BE REPLACED IN KIND IN SAME

APPROXIMATE LOCATION. SEE POTENTIAL TREE REPLACEMENT

SCHEDULE THIS SHEET.

4. DURING THE PRE-CONSTRUCTION MEETING, AND PRIOR TO

CLEARING, TREE INSPECTION WILL TAKE PLACE TO DETERMINE WHICH

TREES ARE TO REMAIN, AND WHICH TREES ARE TO BE REMOVED AND

REPLACED.

5. BLAZE ORANGE FENCING TO BE INSTALLED AROUND CONSTRUCTION

AREA IN PUBLIC FACING AREAS. SEE DETAIL 10 SHEET 10.

6. ALL DISTURBED GRASS AREAS ARE TO BE PERMANENTLY STABILIZED

WITH ERNST SEEDS, MARYLAND UPLAND MIX, ERNMX-172, OR APPROVED

EQUAL.

2 7. ALL MULCHED PATHS ARE TO BE 3" DEEP.

8. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM THE SITE, WITH THE

EXCEPTION OF THE REMOVED WATER FOUNTAINS, AND ANY MILLINGS

THAT CAN BE SALVAGED. THE WATER FOUNTAINS AND MILLINGS ARE TO

BE GIVEN TO THE OWNER.

AutoCAD SHX Text

GV

AutoCAD SHX Text

HB

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

HB

AutoCAD SHX Text

HB

AutoCAD SHX Text

HB

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KCI JOB NUMBER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

BY

AutoCAD SHX Text

PLOTTED: BY: FILE:

AutoCAD SHX Text

$DATE$

AutoCAD SHX Text

$USERNAME$

AutoCAD SHX Text

$FILE$

AutoCAD SHX Text 06/16/23

AutoCAD SHX Text

ADDENDUM #2

249.32+

+252.93

252.725

250.37

250.25

+253.00

+252.41

253.10

+ 250.10 249.77

249.68 +

4:

3:1

3.5:1

2%

M

AX

M

AX

2% M

AX

249.55

+ 249.10

249.962

M

AX

+250.15

+249.90

3:

249.45

3:1

MATCH EX. PAVEMENT

FOR LINE AND GRADE

MATCH EX. GRADES ALONG

EXISTING BUILDING

+ 244.30

+244.8

245.30

244.9

244.76

244.80

+245.30

244.90

244.70

+245.63

3.0%

2%

.8

1.

8%

244.76

244.81

244.73

244.39

244.52

MATCH EX. GRAVEL / PAVEMENT

FOR LINE AND GRADE

NORTH

1" = 10'

BEECHNUT LOOP (WEST LOOP)

& PLAYGROUND AREA GRADING PLAN

271804443.05

WK/RH

WK

ADA Improvements and Upgrades at Susquehanna State Park

HARFORD COUNTY, MD

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25

02/03/2023

MDE NO. 22-SF-0184

CAMPSITE 16/18 WEST BEECHNUT LOOP NON-ADA PATHWAY CONNECTION

PLAN

BEECHNUT LOOP AREA

PLAN

CAMPGROUND ROAD PLAYGROUND AREA ADA ACCESS AND PARKING

PLAN1

NORTH

NORTH

S

EE

B

EE

C H N U T

LO

O

P A R

EA

B A

TH

H O

U S E

G R A D

IN

G

P

LA

N

-0

S

EE

W

ES

T B

EE

C H N U T

LO

O

P (C

A M

PS

IT

E

-6

N O

N A

D A P

A

TH

W A Y

C O

N N

EC

TI

O

N G

R A D

IN

G

P

LA

N

-0

CONTRACTOR TO TAKE NECESSARY

STEPS TO MINIMIZE TREE CLEARING

WHILE TIEING IN GRADES

CONSTRUCTION NOTES:

1. CAMPING SEASON RUNS FROM APRIL THRU OCTOBER. IDEAL

CONSTRUCTION TO TAKE [PLACE FROM OCTOBER 1 THRU APRIL 1. IF

CONSTRUCTION IS TAKING PLACE DURING CAMPING SEASON, THE

FOLLOWING CONDITIONS MUST BE FOLLOWED:

- WORK IS TO BE PERFORMED ONLY MONDAY THRU FRIDAY WITH

WORK STARTING NO EARLIER THAN 8:00 A.M.;

- CAMPGROUND LOOP ROADS AND BATHHOUSES MUST BE OPEN

AND SAFELY ACCESSIBLE TO CAMPERS AT ALL TIMES;

- CONSTRUCTION ZONES MUST BE SECURE AND MUST BE

COMPLETELY OPEN AND "VISITOR FRIENDLY" EVERY WEEKEND.

2. CONTRACTOR ALLOWED TO MAKE MINOR GRADING CHANGES

DURING CONSTRUCTION TO MINIMIZE TREE REMOVAL. POSITIVE FLOW IS

TO BE MAINTAINED.

3. TREES THAT ARE REMOVED ARE TO BE REPLACED IN KIND IN SAME

APPROXIMATE LOCATION. SEE POTENTIAL TREE REPLACEMENT

SCHEDULE SHEET 04.

4. DURING THE PRE-CONSTRUCTION MEETING, AND PRIOR TO

CLEARING, TREE INSPECTION WILL TAKE PLACE TO DETERMINE WHICH

TREES ARE TO REMAIN, AND WHICH TREES ARE TO BE REMOVED AND

REPLACED.

5. BLAZE ORANGE FENCING TO BE INSTALLED AROUND CONSTRUCTION

AREA IN PUBLIC FACING AREAS. SEE DETAIL 10 SHEET 10.

6. ALL DISTURBED GRASS AREAS ARE TO BE PERMANENTLY STABILIZED

WITH ERNST SEEDS, MARYLAND UPLAND MIX, ERNMX-172, OR APPROVED

EQUAL.

7. ALL MULCHED PATHS ARE TO BE 3" DEEP.

8. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM THE SITE, WITH THE

EXCEPTION OF THE REMOVED WATER FOUNTAINS, AND ANY MILLINGS

THAT CAN BE SALVAGED. THE WATER FOUNTAINS AND MILLINGS ARE TO

BE GIVEN TO THE OWNER.

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

HB

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KCI JOB NUMBER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

BY

AutoCAD SHX Text

PLOTTED: BY: FILE:

AutoCAD SHX Text

$DATE$

AutoCAD SHX Text

$USERNAME$

AutoCAD SHX Text

$FILE$

AutoCAD SHX Text 06/16/23

AutoCAD SHX Text

ADDENDUM #2

+229.65

+231.48

HP

232.42

232.60

+229.31

+231.68

+232.10

232.73

233.31

231.82

232.22

232.32

231.37

231.77

232.52

232.12

233.00

+229.16

+245.32

+228.51

229.72

230.40

229.33

229.82

229.23

230.70

230.50

232.18

2%

3.9%

4.5%

228.98

2%

228.5

228.5

232.90 +

2% 2%

2%

2%

2%

+229.08

+229.11

+229.08

229.18+

+229.08

229.11+

.3

MATCH EX. PAVEMENT

FOR LINE AND GRADE

MATCH EX. GRADES ALONG

EXISTING BUILDING

EXISTING BATH HOUSE

MATCH EXISTING PAVEMENT

FOR LINE & GRADE

ACORN LOOP (EAST LOOP)

GRADING PLAN

271804443.05

WK/RH

WK

ADA Improvements and Upgrades at Susquehanna State Park

HARFORD COUNTY, MD

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25

02/03/2023

MDE NO. 22-SF-0184

1" = 10'

ACORN LOOP

PLAN1

NORTH

CONTRACTOR TO TAKE NECESSARY

STEPS TO MINIMIZE TREE CLEARING

WHILE TIEING IN GRADES

CONSTRUCTION NOTES:

1. CAMPING SEASON RUNS FROM APRIL THRU OCTOBER. IDEAL

CONSTRUCTION TO TAKE [PLACE FROM OCTOBER 1 THRU APRIL 1. IF

CONSTRUCTION IS TAKING PLACE DURING CAMPING SEASON, THE

FOLLOWING CONDITIONS MUST BE FOLLOWED:

- WORK IS TO BE PERFORMED ONLY MONDAY THRU FRIDAY WITH

WORK STARTING NO EARLIER THAN 8:00 A.M.;

- CAMPGROUND LOOP ROADS AND BATHHOUSES MUST BE OPEN

AND SAFELY ACCESSIBLE TO CAMPERS AT ALL TIMES;

- CONSTRUCTION ZONES MUST BE SECURE AND MUST BE

COMPLETELY OPEN AND "VISITOR FRIENDLY" EVERY WEEKEND.

2. CONTRACTOR ALLOWED TO MAKE MINOR GRADING CHANGES

DURING CONSTRUCTION TO MINIMIZE TREE REMOVAL. POSITIVE FLOW IS

TO BE MAINTAINED.

3. TREES THAT ARE REMOVED ARE TO BE REPLACED IN KIND IN SAME

APPROXIMATE LOCATION. SEE POTENTIAL TREE REPLACEMENT

SCHEDULE SHEET 04.

4. DURING THE PRE-CONSTRUCTION MEETING, AND PRIOR TO

CLEARING, TREE INSPECTION WILL TAKE PLACE TO DETERMINE WHICH

TREES ARE TO REMAIN, AND WHICH TREES ARE TO BE REMOVED AND

REPLACED.

5. BLAZE ORANGE FENCING TO BE INSTALLED AROUND CONSTRUCTION

AREA IN PUBLIC FACING AREAS. SEE DETAIL 10 SHEET 10.

6. ALL DISTURBED GRASS AREAS ARE TO BE PERMANENTLY STABILIZED

WITH ERNST SEEDS, MARYLAND UPLAND MIX, ERNMX-172, OR APPROVED

EQUAL.

2 7. ALL MULCHED PATHS ARE TO BE 3" DEEP.

8. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM THE SITE, WITH THE

EXCEPTION OF THE REMOVED WATER FOUNTAINS, AND ANY MILLINGS

THAT CAN BE SALVAGED. THE WATER FOUNTAINS AND MILLINGS ARE TO

BE GIVEN TO THE OWNER.

AutoCAD SHX Text

GV

AutoCAD SHX Text

HB

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

HB

AutoCAD SHX Text

HB

AutoCAD SHX Text

HB

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KCI JOB NUMBER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

BY

AutoCAD SHX Text

PLOTTED: BY: FILE:

AutoCAD SHX Text

$DATE$

AutoCAD SHX Text

$USERNAME$

AutoCAD SHX Text

$FILE$

AutoCAD SHX Text 06/16/23

AutoCAD SHX Text

ADDENDUM #2

+ 246.50

246.50 +

+251.48

+252.15+251.79

+252.74

+253.04

+253.99

+254.49

+253.54

253.30

+253.34

253.37 + +253.37

+252.46 +251.58+252.50

252.61

+253.08 +253.64

+253.00

+253.22

252.93

+252.59

+252.64

+252.39

+251.53

+252.73

+251.54

+251.88

253.20+

+253.23 253.22

253.17

253.13+

253.01 253.02

252.97

253.15

253.17

253.12

253.02

253.20

+253.07

253.07

+252.95

253.12

+253.08

+249.66 +249.60

249.34+

249.61

249.32+

+252.93

252.725

250.37

250.25

+253.00

+252.41253

253.10

+ 250.10+ 249.77

249.68 +

4:

3:1

3.5:1

2%

%M

AX

%M

AX

2% M

AX

249.55

+ 249.10

249.96

%M

AX

+250.15

+249.90

3:

249.45

3:1

2'W x 29.5'L x 1'D LEVEL SPREADER

AREA #3 - 24 CF STORAGE - SEE

DETAIL 12 ON PAGE 10

' M

AX

C

O N

TR

IB

U

TI

N G L

EN

G

TH

W /1

D

IS

C O

N N

EC

T

PA

TH

+243.99

244.36+

+244.05

+243.95

+248.02

247.13

+246.77

+246.52

EXISTING GRADES TO BE HELD

FOR NON-ADA PATHWAY

.9

+245.10 +245.32

+245.74

+ 244.30

+244.96

+244.96

244.65

+244.52

+244.80

+245.32

+245.18

+245.72 +245.68

+245.78 +245.81

+246.14

+245.30

244.53

244.70

243.98

244.09+

244.29+

244.00

244.41+

244.07+

+245.46

+245.56

+245.67

+245.76

+246.07

+244.8

245.30

244.9

244.76

244.80

+245.30

244.90

244.70

+245.63

43.0%

2%

.8

1.

8%

244.76

244.81

244.73

244.39

244.52

NORTH

1" = 20'

BEECHNUT LOOP (WEST LOOP)

& PLAYGROUND AREA STORMWATER

MANAGEMENT PLAN

271804443.05

WK/RH

WK

ADA Improvements and Upgrades at Susquehanna State Park

HARFORD COUNTY, MD

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25

02/03/2023

MDE NO. 22-SF-0184

2NON-ADA PATHWAY CONNECTION STORMWATER MANAGEMENT PLAN

CAMPSITE 16/18 WEST BEECHNUT LOOP

PLAN

BEECHNUT LOOP AREA STORMWATER MANAGEMENT PLAN

PLAN

ADA ACCESS AND PARKING STORMWATER MANAGEMENT PLAN

CAMPGROUND ROAD PLAYGROUND AREA

PLAN1

NORTH

DAILY STABILIZATION NOTE

THIS NOTE SHOULD BE USED FOR ALL AREAS WITHIN THE

LIMITS OF DISTURBANCE.

CONTRACTOR SHALL ONLY DISTURB THAT AREA WHICH CAN

BE STABILIZED BY THE END OF EACH WORK DAY.

STABILIZATION SHALL BE AS FOLLOWS:

1. FOR AREAS TO BE PAVED, THE APPLICATION OF STONE.

2. FOR AREAS TO BE VEGETATIVELY STABILIZED:

A. PERMANENT SEED AND SOIL STABILIZATION MATTING

OR SOD FOR ALL STEEP SLOPES, CHANNELS OR

SWALES

B. PERMANENT SEED AND MULCH FOR ALL OTHER AREAS

ANY AREAS WHICH CAN NOT BE STABILIZED BY THE END OF

EACH WORKING DAY MUST HAVE SILT FENCE INSTALLED ON

THE DOWNSLOPE SIDE

LEGEND

NON-ROOFTOP DISCONNECT

ROOFTOP DISCONNECT

SHEETFLOW TO CONSERVATION

LIMITS OF DISTURBANCELOD

S

EE

B

EE

C H N U T

LO

O

P A R

EA

S W

M P

LA

N

-0

S

EE

W

ES

T B

EE

C H N U T

LO

O

P (C

A M

PS

IT

ES

/1

N O

N A

D A P

A

TH

W A Y

C O

N N

EC

TI

O

N S

W M

P

LA

N

-0

NORTH

CONTRACTOR TO TAKE NECESSARY

STEPS TO MINIMIZE TREE CLEARING

WHILE TIEING IN GRADES

1,329 SF. OF

NON-ROOFTOP

DISCONNECT #1

2,396 SF. OF

SHEETFLOW TO

CONSERVATION AREA #2

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

HB

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KCI JOB NUMBER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

BY

AutoCAD SHX Text

PLOTTED: BY: FILE:

AutoCAD SHX Text

$DATE$

AutoCAD SHX Text

$USERNAME$

AutoCAD SHX Text

$FILE$

AutoCAD SHX Text 06/16/23

AutoCAD SHX Text

ADDENDUM #2

.0

.0

.0

3.

.0

.0

.5

.5

.0

.0

+229.65

+231.48

+229.31

+231.68 +232.10

232.73

2% 2%

2%

+229.16

+245.32

+228.51

2% 2%

4.5%

2%

228.5

228.5

+229.08

+229.11

+229.08

229.18+ +229.08

229.11+

.3

2'W x 78.5'L x 1'D LEVEL

SPREADER AREA #5 - 63 CF

STORAGE - SEE DETAIL 12 ON

' M

AX C

O

N

TRIB

U

TIN

G

LEN

G

TH

W /1

D

IS

C O

N N

EC

T PATH

' M

AX C

O

N

TRIB

U

TIN

G

LEN

G

TH

W /1

D

IS

C O

N N

EC

T PATH

2'W x 51'L x 1'D LEVEL

SPREADER AREA #5- 41 CF

STORAGE - SEE DETAIL 12 ON

' M

A X C

O N

TR

IB

U

TIN

G

LEN

G

TH

W /1

D

IS

C O

N N

EC

T PA

TH

2'W x 83'L x 1'D LEVEL

SPREADER AREA #5 - 66 CF

STORAGE - SEE DETAIL 12

ON PAGE 10

36' M

AX CONTRIBUTING LENGTH

W/100'+

DISCONNECT PATH

2'W x 23'L x 1'D LEVEL SPREADER

AREA #5 - 18 CF STORAGE - SEE

DETAIL 12 ON PAGE 10

ACORN LOOP (EAST LOOP)

STORMWATER MANAGEMENT PLAN

271804443.05

WK/RH

WK

ADA Improvements and Upgrades at Susquehanna State Park

HARFORD COUNTY, MD

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25

02/03/2023

MDE NO. 22-SF-0184

1" = 20'

ACORN LOOP STORMWATER MANAGEMENT PLAN

PLAN1

NORTH

DAILY STABILIZATION NOTE

THIS NOTE SHOULD BE USED FOR ALL AREAS WITHIN THE LIMITS OF DISTURBANCE.

CONTRACTOR SHALL ONLY DISTURB THAT AREA WHICH CAN BE STABILIZED BY THE

END OF EACH WORK DAY. STABILIZATION SHALL BE AS FOLLOWS:

1. FOR AREAS TO BE PAVED, THE APPLICATION OF STONE.

2. FOR AREAS TO BE VEGETATIVELY STABILIZED:

A. PERMANENT SEED AND SOIL STABILIZATION MATTING OR SOD FOR ALL

STEEP SLOPES, CHANNELS OR SWALES

B. PERMANENT SEED AND MULCH FOR ALL OTHER AREAS

ANY AREAS WHICH CAN NOT BE STABILIZED BY THE END OF EACH WORKING DAY

MUST HAVE SILT FENCE INSTALLED ON THE DOWNSLOPE SIDE

LEGEND

NON-ROOFTOP DISCONNECT

ROOFTOP DISCONNECT

SHEETFLOW TO CONSERVATION

LIMITS OF DISTURBANCELOD

CONTRACTOR TO TAKE NECESSARY

STEPS TO MINIMIZE TREE CLEARING

WHILE TIEING IN GRADES

4,051 SF. OF

SHEET FLOW TO

CONSERVATION #4

AutoCAD SHX Text

GV

AutoCAD SHX Text

HB

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

HB

AutoCAD SHX Text

HB

AutoCAD SHX Text

HB

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text E 1,548,150

AutoCAD SHX Text E 1,548,150

AutoCAD SHX Text N 709,425

AutoCAD SHX Text N 709,950

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KCI JOB NUMBER

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

BY

AutoCAD SHX Text

PLOTTED: BY: FILE:

AutoCAD SHX Text

$DATE$

AutoCAD SHX Text

$USERNAME$

AutoCAD SHX Text

$FILE$

AutoCAD SHX Text 06/16/23

AutoCAD SHX Text

ADDENDUM #2

DETAIL E- 6 FILTER LOG DETAIL E- 6 FILTER LOG

ACORN LOOP (EAST LOOP)

EROSION AND SEDIMENT CONTROL NOTES

271804443.05

WK/RH

WK

ADA Improvements and Upgrades at Susquehanna State Park

HARFORD COUNTY, MD

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 28935 EXPIRATION DATE: 1/15/25

02/03/2023

MDE NO. 22-SF-0184

1" = 20'

DAILY STABILIZATION NOTE

THIS NOTE SHOULD BE USED FOR ALL AREAS WITHIN THE LIMITS OF DISTURBANCE.

CONTRACTOR SHALL ONLY DISTURB THAT AREA WHICH CAN BE STABILIZED BY THE

END OF EACH WORK DAY. STABILIZATION SHALL BE AS FOLLOWS:

1. FOR AREAS TO BE PAVED, THE APPLICATION OF STONE.

2. FOR AREAS TO BE VEGETATIVELY STABILIZED:

A. PERMANENT SEED AND SOIL STABILIZATION MATTING OR SOD FOR ALL

STEEP SLOPES, CHANNELS OR SWALES

B. PERMANENT SEED AND MULCH FOR ALL OTHER AREAS

ANY AREAS WHICH CAN NOT BE STABILIZED BY THE END OF EACH WORKING DAY

MUST HAVE SILT FENCE OR FILTER LOGS INSTALLED ON THE DOWNSLOPE SIDE.

CONTRACTOR TO TAKE NECESSARY

STEPS TO MINIMIZE TREE CLEARING

WHILE TIEING IN GRADES

EROSION AND SEDIMENT CONTROL GENERAL NOTES

1. THE CONTRACTOR SHALL NOTIFY MDE AT (410) 537-3510 SEVEN (7) DAYS BEFORE

COMMENCING ANY LAND DISTURBING ACTIVITY AND, UNLESS WAIVED BY MDE, SHALL BE

REQUIRED TO HOLD A PRE-CONSTRUCTION MEETING BETWEEN PROJECT REPRESENTATIVES AND

A REPRESENTATIVE OF MDE.

2. THE CONTRACTOR SHALL NOTIFY MDE IN WRITING AND BY TELEPHONE AT THE FOLLOWING

POINTS:

A. THE REQUIRED PRE-CONSTRUCTION MEETING.

B. FOLLOWING INSTALLATION OF SEDIMENT CONTROL MEASURES.

C. DURING THE INSTALLATION OF SEDIMENT BASINS (TO BE CONVERTED INTO PERMANENT

STORMWATER MANAGEMENT STRUCTURES) AT THE REQUIRED INSPECTION POINTS (SEE

INSPECTION CHECKLIST ON PLAN). NOTIFICATION PRIOR TO COMMENCING CONSTRUCTION

OF EACH STEP IS MANDATORY.

D. PRIOR TO REMOVAL OR MODIFICATION OF ANY SEDIMENT CONTROL STRUCTURE(S).

E. PRIOR TO REMOVAL OF ALL SEDIMENT CONTROL DEVICES.

F. PRIOR TO FINAL ACCEPTANCE.

3. THE PLAN APPROVAL LETTER, APPROVED EROSION AND SEDIMENT CONTROL PLANS, DAILY LOG

BOOKS, AND TEST REPORTS SHALL BE AVAILABLE AT THE SITE FOR INSPECTION BY DULY

AUTHORIZED OFFICIALS OF MDE AND THE AGENCY RESPONSIBLE FOR THE PROJECT.

4. THE CONTRACTOR SHALL CONSTRUCT ALL EROSION AND SEDIMENT CONTROL MEASURES PER

THE APPROVED PLAN AND CONSTRUCTION SEQUENCE AND SHALL HAVE THEM INSPECTED AND

APPROVED BY THE MDE INSPECTOR PRIOR TO BEGINNING ANY OTHER LAND DISTURBANCES.

MINOR SEDIMENT CONTROL DEVICE LOCATION ADJUSTMENTS MAY BE MADE IN THE FIELD WITH

THE APPROVAL OF THE MDE INSPECTOR. THE CONTRACTOR SHALL ENSURE THAT ALL RUNOFF

FROM DISTURBED AREAS IS DIRECTED TO THE SEDIMENT CONTROL DEVICES AND SHALL NOT

REMOVE ANY EROSION OR SEDIMENT CONTROL MEASURE WITHOUT PRIOR PERMISSION FROM

MDE INSPECTOR. THE CONTRACTOR SHALL OBTAIN PRIOR AGENCY AND MDE APPROVAL FOR

MODIFICATIONS TO THE EROSION AND SEDIMENT CONTROL PLAN AND/OR SEQUENCE OF

CONSTRUCTION.

5. THE MDE INSPECTOR HAS THE OPTION OF REQUIRING ADDITIONAL SAFETY OR SEDIMENT

CONTROL MEASURES, IF DEEMED NECESSARY.

6. THE CONTRACTOR SHALL PROTECT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS TO

PREVENT THE DEPOSITION OF MATERIALS ONTO PUBLIC ROADS. ALL MATERIALS DEPOSITED

ONTO PUBLIC ROADS SHALL BE REMOVED IMMEDIATELY.

7. THE CONTRACTOR SHALL INSECT DAILY AND MAINTAIN CONTINUOUSLY IN AN EFFECTIVE

OPERATING CONDITION ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SUCH TIME AS

THEY ARE REMOVED WITH PRIOR PERMISSION FROM THE MDE INSPECTOR.

8. EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION SHALL BE PROVIDED IN

ACCORDANCE WITH APPROVED PLANS. UTILITY CONSTRUCTION SHALL ONLY BE FOR AREAS

WITHIN THE DELINEATED LIMIT OF DISTURBANCE. CALL "MISS UTILITY" AT 1-800-257-7777 48

HOURS PRIOR TO THE START OF WORK. WHEN SAME DAY STABILIZATION IS APPROVE:

A. EXCAVATED TRENCH MATERIAL SHALL BE PLACED ON THE HIGH SIDE OF THE TRENCH.

B. TRENCHES FOR UTILITY INSTALLATION SHALL BE BACKFILLED, COMPACTED, AND STABILIZED

AT THE END OF EACH WORKING DAY. NO MORE TRENCH SHALL BE OPENED THAN CAN BE

COMPLETED THE SAME DAY.

9. ALL WATER REMOVED FROM EXCAVATED AREAS SHALL BE PASSED THROUGH AN MDE

APPROVED DEWATERING PRACTICE OR PUMPED TO A SEDIMENT TRAP OR BASIN PRIOR TO

DISCHARGE TO A FUNCTIONAL STORM DRAIN SYSTEM OR TO STABLE GROUND SURFACE.

10. CONCRETE WASHOUT STRUCTURES SHALL BE USED WHEN CONCRETE TRUCKS, DRUMS,

PUMPS, CHUTES, OR OTHER EQUIPMENT IS RINSED OR CLEANED ON-SITE.

11. CONSTRUCTION ACTIVITIES PRODUCING DUST SHALL IMPLEMENT CONTROL MEASURES TO

AVOID THE SUSPENSION OF DUST PARTICLES AND/OR PREVENT DUST FROM BLOWING

OFF-SITE OR TO AREAS WITHOUT TREATMENT.

12. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR TEMPORARY

STABILIZATION SHALL BE COMPLETED WITHIN:

A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES,

SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1

VERTICAL (3:1); AND

B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE

PROJECT SITE NOT UNDER ACTIVE GRADING.

13. VEGETATIVE STABILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH THE 2011

MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.

REFER TO APPROPRIATE SPECIFICATIONS FOR TEMPORARY SEEDING, PERMANENT SEEDING,

MULCHING, SODDING, AND GROUND COVERS.

14. WHEN SEEDING, ALL DISTURBED AREAS WITH SLOPES FLATTER THAN 2:1 SHALL BE STABILIZED

WITH 4 INCHES OF TOPSOIL, SEED, AND MULCH. ALL DISTURBED AREAS WITH SLOPES 2:1

OR STEEPER SHALL BE STABILIZED WITH MATTING OVER 2 INCHES OF TOPSOIL AND SEED.

15. ALL SEDIMENT BASINS, TRAP EMBANKMENTS AND SLOPES, PERIMETER DIKES, SWALES AND

ALL DISTURBED SLOPES STEEPER OR EQUAL TO 3:1 SHALL BE STABILIZED WITH SEED AND

ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED STABILIZATION MEASURES, AS SOON

AS POSSIBLE BUT NO LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT. ALL

AREAS DISTURBED OUTSIDE OF THE PERIMETER SEDIMENT CONTROL SYSTEM SHALL BE

MINIMIZED. MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO ENSURE CONTINUED

STABILIZATION.

16. PERMANENT SWALES OR OTHER POINTS OF CONCENTRATED WATER FLOW SHALL BE

STABILIZED WITH SEED AND AN APPROVED EROSION CONTROL MATTING, SOD, RIP-RAP, OR

OTHER APPROVED STABILIZATION MEASURES.

17. FOR STOCKPILE SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1), THE

CONTRACTOR SHALL APPLY SEED AND ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED

STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN THREE (3) CALENDAR DAYS

OF ACTIVITY HAVING CEASED ON THE RESPECTIVE FACE. FOR SLOPES 3:1 OR FLATTER, THE

CONTRACTOR SHALL APPLY STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN

SEVEN (7) CALENDAR DAYS OF ACTIVITY HAVING CEASED ON THE RESPECTIVE FACE.

MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION.

18. FOR FINISHED GRADING, THE CONTRACTOR SHALL PROVIDE ADEQUATE GRADIENTS TO

PREVENT WATER FROM PONDING FOR MORE THAN TWENTY-FOUR (24) HOURS AFTER THE END

OF A RAINFALL EVENT. DRAINAGE COURSES AND SWALE FLOW AREAS MAY TAKE AS LONG AS

FORTY-EIGHT (48) HOURS AFTER THE END OF A RAINFALL EVENT TO DRAIN. AREAS DESIGNED

TO HAVE STANDING WATER SHALL NOT BE REQUIRED TO MEET THIS REQUIREMENT.

19. WHERE DEEMED APPROPRIATE BY THE ENGINEER OR INSPECTOR, SEDIMENT BASINS AND

TRAPS MAY NEED TO BE SURROUNDED WITH AN APPROVED SAFETY FENCE. THE FENCE MUST

CONFORM TO LOCAL ORDINANCES AND REGULATIONS. THE DEVELOPER OR OWNER SHALL

CHECK WITH LOCAL BUILDING OFFICIALS ON APPLICABLE SAFETY REQUIREMENTS. WHERE

SAFETY FENCE IS DEEMED APPROPRIATE AND LOCAL ORDINANCES DO NOT SPECIFY FENCING

SIZES AND TYPES, THE FOLLOWING SHALL BE USED AS A MINIMUM STANDARD: THE SAFETY

SHALL BE MADE OF WELDED WIRE AND AT LEAST 42 INCHES HIGH, HAVE POSTS NO FARTHER

APART THAN 8 FEET, HAVE MESH OPENINGS NO GREATER THAN 2 INCHES IN WIDTH AND 4

INCHES IN HEIGHT WITH A MINIMUM OF 14 GAUGE WIRE. SAFETY FENCE SHALL BE

MAINTAINED AND IN GOOD CONDITION AT ALL TIMES.

20. ALL SEDIMENT TRAP DEPTH DIMENSIONS ARE RELATIVE TO THE OUTLET ELEVATION. ALL TRAPS

SHALL HAVE A STABLE OUTFALL. ALL TRAPS AND BASINS SHALL HAVE STABLE INFLOW

POINTS.

21. SEDIMENT SHALL BE REMOVED AND THE TRAP OR BASIN RESTORED TO ITS ORIGINAL

DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE QUARTER OF THE TOTAL

DEPTH OF THE TRAP OR BASIN. TOTAL DEPTH SHALL BE MEASURED FROM THE TRAP OR

BASIN BOTTOM TO THE CREST OF THE OUTLET.

22. SEDIMENT REMOVED FROM TRAPS (AND BASINS) SHALL BE PLACED AND STABILIZED IN

APPROVED AREAS, BUT NOT WITHIN A FLOODPLAIN, WETLAND OR TREE-SAVE AREA. WHEN

PUMPING SEDIMENT LADEN WATER, THE DISCHARGE SHALL BE DIRECTED TO AN MDE

APPROVED SEDIMENT TRAPPING DEVICE PRIOR TO RELEASE FROM THE SITE. A SUMP PIT MAY

BE USED IF SEDIMENT TRAPS THEMSELVES ARE BEING PUMPED OUT.

23. PRIOR TO REMOVAL OF SEDIMENT CONTROL MEASURES, THE CONTRACTOR SHALL STABILIZE

AND HAVE ESTABLISHED PERMANENT STABILIZATION FOR ALL CONTRIBUTORY DISTURBED

AREAS USING SOD OR AN APPROVED PERMANENT SEED MIXTURE WITH REQUIRED SOIL

AMENDMENTS AND AN APPROVED ANCHORED MULCH. WOOD FIBER MULCH MAY ONLY BE

USED IN SEEDING SEASON WHERE THE SLOPE DOES NOT EXCEED 10% AND GRADING HAS

BEEN DONE TO PROMOTE SHEET FLOW DRAINAGE. AREAS BROUGHT TO FINISHED GRADE

DURING THE SEEDING SEASON SHALL BE PERMANENTLY STABILIZED AS SOON AS POSSIBLE,

BUT NOT LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT FOR SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) AND SEVEN (7) CALENDAR DAYS FOR

FLATTER SLOPES. WHEN PROPERTY IS BROUGHT TO FINISHED GRADE DURING THE MONTHS

OF NOVEMBER THROUGH FEBRUARY, AND PERMANENT STABILIZATION IS FOUND TO BE

IMPRACTICAL, TEMPORARY SEED AND ANCHORED STRAW MULCH SHALL BE APPLIED TO

DISTURBED AREAS. THE FINAL PERMANENT STABILIZATION OF SUCH PROPERTY SHALL BE

APPLIED BY MARCH 15 OR EARLIER IF GROUND AND WEATHER CONDITIONS ALLOW.

24. TEMPORARY SEDIMENT CONTROL DEVICES SHALL BE REMOVED WITH PERMISSION OF THE

MDE INSPECTOR WITHIN THIRTY (30) CALENDAR DAYS FOLLOWING ESTABLISHMENT OF

PERMANENT STABILIZATION IN ALL CONTRIBUTORY DRAINAGE AREAS. UPON REMOVAL OF

SEDIMENT CONTROL DEVICES, THE AREA DISTURBED BY REMOVAL SHALL BE STABILIZED WITH

TOPSOIL, SEED, AND MULCH, OR AS SPECIFIED, WITHIN 24 HOURS OF SAID REMOVAL.

STORMWATER MANAGEMENT STRUCTURES USED TEMPORARILY FOR SEDIMENT CONTROL

SHALL BE CONVERTED TO THE PERMANENT CONFIGURATION WITHIN THIS TIME PERIOD AS

WELL.

25. OFF-SITE SPOIL OR BORROW AREAS ON STATE OR FEDERAL PROPERTY SHALL HAVE PRIOR

APPROVAL BY MDE AND OTHER APPLICABLE STATE, FEDERAL, AND LOCAL AGENCIES;

OTHERWISE APPROVAL SHALL BE GRANTED BY THE LOCAL AUTHORITIES. ALL WASTE AND

BORROW AREAS OFF-SITE SHALL BE PROTECTED BY SEDIMENT CONTROL MEASURES AND

STABILIZED.

26. SITE INFORMATION:

A. AREA DISTURBED 0.60 ACRES

B. TOTAL CUT 193 CUBIC YARDS

C. TOTAL FILL 83 CUBIC YARDS

D. OFF-SITE WASTE/BORROW AREA LOCATION TBD

B-4 STANDARDS AND SPECIFICATIONS

FOR

VEGETATIVE STABILIZATION

Definition

Using vegetation as cover to protect exposed soil from erosion.

Purpose

To promote the establishment of vegetation on exposed soil.

Conditions Where Practice Applies

On all disturbed areas not stabilized by other methods. This specification is divided into sections on incremental stabilization; soil preparation, soil amendments and topsoiling; seeding and mulching; temporary stabilization;

and permanent stabilization.

Effects on Water Quality and Quantity Stabilization practices are used to promote the establishment of vegetation on exposed soil. When soil is stabilized with vegetation, the soil is less likely to erode and more likely to allow infiltration of rainfall, thereby reducing sediment loads and runoff to downstream areas.

Planting vegetation in disturbed areas will have an effect on the water budget, especially on volumes and rates of runoff, infiltration, evaporation, transpiration, percolation, and groundwater recharge. Over time, vegetation will increase organic matter content and improve the water holding capacity of the soil and subsequent plant growth.

Vegetation will help reduce the movement of sediment, nutrients, and other chemicals carried by runoff to receiving waters. Plants will also help protect groundwater supplies by assimilating those substances present within the root zone.

Sediment control practices must remain in place during grading, seedbed preparation, seeding, mulching, and vegetative establishment.

Adequate Vegetative Establishment Inspect seeded areas for vegetative establishment and make necessary repairs, replacements, and reseedings within the planting season.

1. Adequate vegetative stabilization requires 95 percent groundcover.

2. If an area has less than 40 percent groundcover, restabilize following the original recommendations for lime, fertilizer, seedbed preparation, and seeding.

3. If an area has between 40 and 94 percent groundcover, over-seed and fertilize using half of the rates originally specified.

4. Maintenance fertilizer rates for permanent seeding are shown in Table B.6.

B-4-1 STANDARDS AND SPECIFICATIONS

FOR

INCREMENTAL STABILIZATION

Definition

Establishment of vegetative cover on cut and fill slopes.

Purpose

To provide timely vegetative cover on cut and fill slopes as work progresses.

Conditions Where Practice Applies

Any cut or fill slope greater than 15 feet in height. This practice also applies to stockpiles.

Criteria

A. Incremental Stabilization - Cut Slopes

1. Excavate and stabilize cut slopes in increments not to exceed 15 feet in height. Prepare seedbed and apply seed and mulch on all cut slopes as the work progresses.

2. Construction sequence example (Refer to Figure B.1):

a. Construct and stabilize all temporary swales or dikes that will be used to convey runoff around the excavation.

b. Perform Phase 1 excavation, prepare seedbed, and stabilize.

c. Perform Phase 2 excavation, prepare seedbed, and stabilize. Overseed Phase 1 areas as necessary.

d. Perform final phase excavation, prepare seedbed, and stabilize. Overseed previously seeded areas as necessary.

Note: Once excavation has begun the operation should be continuous from grubbing through the completion of grading and placement of topsoil (if required) and permanent seed and mulch. Any interruptions in the operation or completing the operation out of the seeding season will necessitate the application of temporary stabilization.

Figure B.

Figure B.1: Incremental Stabilization – Cut

B. Incremental Stabilization - Fill Slopes

1. Construct and stabilize fill slopes in increments not to exceed 15 feet in height. Prepare seedbed and apply seed and mulch on all slopes as the work progresses.

2. Stabilize slopes immediately when the vertical height of a lift reaches 15 feet, or when the grading operation ceases as prescribed in the plans.

3. At the end of each day, install temporary water conveyance practice(s), as necessary, to intercept surface runoff and convey it down the slope in a non-erosive manner.

4. Construction sequence example (Refer to Figure B.2):

a. Construct and stabilize all temporary swales or dikes that will be used to divert runoff around the fill. Construct silt fence on low side of fill unless other methods shown on the plans address this area.

b. At the end of each day, install temporary water conveyance practice(s), as necessary, to intercept surface runoff and convey it down the slope in a non-erosive manner.

c. Place Phase 1 fill, prepare seedbed, and stabilize.

d. Place Phase 2 fill, prepare seedbed, and stabilize.

e. Place final phase fill, prepare seedbed, and stabilize. Overseed previously seeded areas as necessary.

Note: Once the placement of fill has begun the operation should be continuous from grubbing through the completion of grading and placement of topsoil (if required) and permanent seed and mulch. Any interruptions in the operation or completing the operation out of the seeding season will necessitate the application of temporary stabilization.

Figure B.

Figure B.2: Incremental Stabilization – Fill

B-4-2 STANDARDS AND SPECIFICATIONS

FOR

SOIL PREPARATION, TOPSOILING, AND SOIL AMENDMENTS

Definition

The process of preparing the soils to sustain adequate vegetative stabilization.

Purpose

To provide a suitable soil medium for vegetative growth.

Conditions Where Practice Applies

Where vegetative stabilization is to be established.

Criteria

A. Soil Preparation

1. Temporary Stabilization

a. Seedbed preparation consists of loosening soil to a depth of 3 to 5 inches by means of suitable agricultural or construction equipment, such as disc harrows or chisel plows or rippers mounted on construction equipment. After the soil is loosened, it must not be rolled or dragged smooth but left in the roughened condition. Slopes 3:1 or flatter are to be tracked with ridges running parallel to the contour of the slope.

b. Apply fertilizer and lime as prescribed on the plans.

c. Incorporate lime and fertilizer into the top 3 to 5 inches of soil by disking or other suitable means.

2. Permanent Stabilization

a. A soil test is required for any earth disturbance of 5 acres or more. The minimum soil conditions required for permanent vegetative establishment are:

i. Soil pH between 6.0 and 7.0.

ii. Soluble salts less than 500 parts per million (ppm).

iii. Soil contains less than 40 percent clay but enough fine grained material (greater than 30 percent silt plus clay) to provide the capacity to hold a moderate amount of moisture. An exception: if lovegrass will be planted, then a sandy soil (less than 30 percent silt plus clay) would be acceptable.

iv. Soil contains 1.5 percent minimum organic matter by weight.

v. Soil contains sufficient pore space to permit adequate root penetration.

b. Application of amendments or topsoil is required if on-site soils do not meet the above conditions.

c. Graded areas must be maintained in a true and even grade as specified on the approved plan, then scarified or otherwise loosened to a depth of 3 to 5 inches.

d. Apply soil amendments as specified on the approved plan or as indicated by the results of a soil test.

e. Mix soil amendments into the top 3 to 5 inches of soil by disking or other suitable means. Rake lawn areas to smooth the surface, remove large objects like stones and branches, and ready the area for seed application. Loosen surface soil by dragging with a heavy chain or other equipment to roughen the surface where site conditions will not permit normal seedbed preparation. Track slopes 3:1 or flatter with tracked equipment leaving the soil in an irregular condition with ridges running parallel to the contour of the slope. Leave the top 1 to 3 inches of soil loose and friable. Seedbed loosening may be unnecessary on newly disturbed areas.

B. Topsoiling

1. Topsoil is placed over prepared subsoil…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .