Ozaukee County - Lasata Heights _Addendum 2_2021.11.30.pdf
PDF 783 KB Posted
- Solicitation number
- Not on record
- Issued by
- Ozaukee County, Wisconsin
About this file
This Addendum #2 modifies the original contract documents for the Lasata Heights Apartments Renovation project issued by Ozaukee County, Wisconsin. The project involves renovation of 24 senior-living apartments across three floors at the Lasata Heights Apartments facility located at W78 N675 Wauwatosa Road, Cedarburg, Wisconsin, along with carpet replacement in common areas on all three floors. The addendum clarifies project specifications and unit distribution: Type A comprises 10 units, Type B comprises 6 units, Type C comprises 5 units, and Type D comprises 3 units. A minimum of three units will be worked on simultaneously, with one unit per floor level, and plumbing and venting lines are shared vertically between unit types on different floors. The sealed bid submission deadline was Thursday, December 2, 2021, by 10:00 AM local time at the Ozaukee County Administration Center, 121 W Main Street, Port Washington, Wisconsin. A pre-bid meeting was held on November 21, 2021, with an attendee sign-in sheet attached to the addendum.
The addendum provides clarifications on specific materials and installation requirements, including 2-1/4" prefinished oak colonial door casing, new dryer ducts with roof exhaust vents for each unit, carpet specifications for apartments using broadloom carpet and carpet tiles for corridors, and flooring specifications for units that include LVT-1 luxury vinyl tile in place of standard 12"x12" vinyl tiles, with contact information provided for the manufacturer (Kyle Reynolds, 608-863-3692). The general contractor is responsible for demolition work. Existing wood wall base in corridors is to remain in place during carpet replacement. The project is funded through the Community Development Block Grant Program, and bidders were required to submit a certified check or bond in the amount of five percent of the total bid as a bid guarantee.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-1-
November 30, 2021
Ozaukee County - Lasata Heights Apartments Renovation
ADDENDUM #2
BIDS DUE: THURSDAY DECEMBER 2, 2021 BY 10:00AM Local Time to: Sealed bids will be received by Ozaukee County at the Ozaukee County Administration Center, 121 W Main Street, Port Washington, WI, for the Lasata Heights Apartments Renovation located at W78 N675 Wauwatosa Road, Cedarburg WI 53012. At that time, all bids will be publicly opened and read aloud
To all Contract Bidders of record.
This Addendum is issued to modify, explain or correct the original Drawings and Specifications as noted below, and is hereby made a part of the Contract documents.
Please attach this Addendum to the Specifications in your possession. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.
This Addendum consists of (2) written pages and (1) sign-in sheet.
GENERAL NOTES
1. See attached Sign-in sheet from the pre-bid meeting on 11/21/2021.
QUESTIONS AND ANSWERS
1. Can you please confirm style and width of the door casing you desire?
a. ½” x 2-1/4” Prefinished Oak colonial casing.
2. The addendum did not show how many of each type of room per floor are being done? (which floor level makes a difference)
a. There are 24 units in total. The minimum number of units being worked at a time is 3 units but on different levels. One on each level.
Typically, each model type is located on the same spot on the 1st, 2nd, and 3rd floor of the building and the main plumbing and venting lines are being shared between them. For example, when the plumbing line is shut off to work on unit A for the 2nd floor, the same unit A below and above will also have the water shut off.
3. Do we need a roof exhaust for the new venting??
a. Each new dryer shall have a new duct with a roof exhaust vent.
4. Do you have a count on each unit type or overall plans calling out the unit types? I know there are 24 units, I just need to know how many of each type.
a. Type A= 10 units, Type B= 6 Units, Type C= 5 units, and Type D= 3 units
-2-
5. Is the wall base in the corridors wood base? Does the base need to be removed and reinstalled or will it remain in place during the carpet replacement?
a. The existing wood wall base is existing to remain during carpet installation.
6. Who is responsible for the demo?
a. GC is responsible for the demo.
7. The spec book lists off multiple carpet specs, I’m unsure where each spec is to be used.
a. Apartments – Broad Loom – as indicated on spec section 09 68 00
8. What carpet spec is used in the corridors?
a. Carpet Tile Type 1 - indicated on spec section 09 68 00
9. What specs are we figuring in the units (Carpet, LVP, and 12”x12” Vinyl Tiles, and 4” Vinyl Base
LVT-1: Manufacture: Interface Collection: Natural Woodgrains Product Color: A00214 Bamboo Size: 25cm X 1m Installation: Ashlar Contact: Kyle Reynolds- 608-863-3692
CHANGE: LVT-1 shall be used lieu of 12”x12” Vinyl Tiles.
VCT-1: Manufacture: Armstrong Collection: Standard Excelon Product Color: To Be Selected From Manf. Standard Colors Size: 12" X 12" Installation: Per Manf. Recommendations