OWS Service Contract Pricelist - (Revised).xlsx
XLSX spreadsheet 47 KB Posted
- Attached to
- Oil Water Separator Services - McConnell AFB Federal contract opportunity
- Solicitation number
- FA462124Q0006
About this file
This price list document outlines the costs for oil water separator services at McConnell Air Force Base over a potential five-year period from fiscal year 2019 to fiscal year 2028. Key services include maintenance of oil water separators, testing and analysis, flushing sewer lines, pumping septic tanks, cleaning grease traps, maintaining sand traps and interior trench drains, and disposal of hazardous and non-hazardous waste. The document provides unit costs for each line item increasing slightly for each option year. However, no costs are provided for the basic or option years beyond fiscal year 2024, indicating this is a template or sample price list rather than a finalized contract award. The related federal contract opportunity is for oil water separator services at McConnell AFB, issued by the Department of the Air Force Air Mobility Command, though no further details are given.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS with Maps - Oil Water Services - 21 Jun 2023.pdf | ||
| Solicitation Amendment FA462124Q00060001 SF 30.pdf | ||
| WD 2015-5341 - Rev 24 - 5 Aug 2023.pdf | ||
| PWS with Maps - Oil Water Services - 21 Jun 23.pdf | ||
| FAR 52.228-5 Addendum.pdf | ||
| FAR 52.212-4 Addendum.pdf | ||
| Solicitation - FA462124Q0006 - signed.pdf | ||
| FAR 52.212-2 Addendum.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE Basic Year FY 24 (2)
| Oil/Water Separator Services | |||||
| Base Year - 1 Apr 2019 to 31 Mar 2020 | (FY19) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 0001 AA | Maintenance of Oil/Water Separators: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervision and labor necessary for the inspection, cleaning, pumping, and maintenance of oil/water separators listed in Appendix A and in accordance with the PWS para. 1.1.1. through 1.1.2., 1.1.4., 1.1.6., and 1.1.7. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
SIGNAL CODE: A
| 12 | Month(s) | $ 2,175.00 | $ 26,100.00 | ||
| 0001 AB | Testing/Analysis: FFP Non-Personal Services. The Contractor shall provide all materials, equipment, tools, supervision, and labor necessary to perform sampling , and testing/analysis of oil/water separators in accordance with the PWS, Appendix A, and B, and para. 1.1.1., 1.1.3. through 1.1.3.3. (Each item includes sampling of 20 oil/water separators, and a total of 20 individual and composite testing/analysis samples as required by the quarterly, and annual test requirements in the PWS). (Item description same for all subsequent option year CLINs) |
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 4 | Each (Quarterly) | $ 2,000.00 | $ 8,000.00 | ||
| 0001 AC | MFH and Base Sewer Line Flush: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervision and labor necessary to flush 220,000 (estimate) linear feet of base sewer lines as listed in Appendix A and in accordance with PWS para. 1.4 - 1.4.2. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 1 | Each | $ 60,500.00 | $ 60,500.00 | ||
| 0001 AD | Septic/Holding Tank Pump: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to properly empty all septic tank and holding tank contents. (As needed basis) listed in Appendix A and in accordance with PWS para. 1.3. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 29 | Each | $ 300.00 | $ 8,700.00 | ||
| 0001 AE | Clean Grease Traps: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to service each grease trap listed in Appendix A, and in accordance with PWS para. 1.2., and 1.2.1. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
SIGNAL CODE: A
| 12 | Each | $ 500.00 | $ 6,000.00 | ||
| 0001 AF | Maintain Sand Traps: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the maintenance of 4 sand traps located at separators 2, 3, and 5 as listed in Appendix A, and in accordance with PWS para. 1.1.5. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 12 | Month(s) | $ 250.00 | $ 3,000.00 | ||
| 0001 AG | Maintain Interior Trench Drains: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to maintain the interior trench drain outlets and their service lines, as listed in Appendix A, and in accordance with PWS para. 1.5. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 12 | Month(s) | $ 250.00 | $ 3,000.00 | ||
| 0001 AH | Disposal of Non-Hazardous Waste: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the pumping and disposal of Non-Hazardous Waste (liquid and solid) in accordance with PWS para. 1.1.1.1. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 12 | Month(s) | $ 100.00 | $ 1,200.00 | ||
| 0001 AI | Disposal of Hazardous Waste: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the pumping and disposal of hazardous waste (liquid and solid) in accordance with PWS para. 1.1.1.2. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 1,600 | Gallon(s) | $ 10.00 | $ 16,000.00 | ||
| 0001 AJ | Parts: FFP - Requirements |
Non-Personal Services. Reimburse contractor for parts used to repair the oil/water serparator systems in accordance with PWS para. 1.1.1. and 1.1.2. in an amount not to exceed $2,000.00. The contractor will be paid for the amount actually used. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 1 | Lot | $ 2,000.00 | $ 2,000.00 | ||
| 0001 AK | Labor Hours for Parts Installation: FFP - Requirements |
Non-Personal Services. Labor hours for parts installation for oil/water separator maintenance and repairs in accordance with PWS para. 1.1.1. and 1.1.2. The contractor will be paid for the amount actually used. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 20 | Hour(s) | $ 75.00 | $ 1,500.00 | ||
| 0001 AL | Emergency Service Calls: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the inspection, maintenance, testing, analysis and cleaning of oil/water separators listed in Appendix A and in accordance with PWS para. 1.7. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination SIGNAL CODE: A 10 Hour(s) $ 300.00 $ 3,000.00
TOTAL FY 19: $ 139,000.00
| Option Year (1) - 1 Apr 2020 to 31 Mar 2021 | (FY20) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 1001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Month(s) | $ 2,175.00 | $ 26,100.00 |
| 1001 AB | Testing/Analysis: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 4 | Each (Quarterly) | $ 2,000.00 | $ 8,000.00 |
| 1001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 1 | Each | $ 60,500.00 | $ 60,500.00 |
| 1001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 29 | Each | $ 300.00 | $ 8,700.00 |
| 1001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Each | $ 500.00 | $ 6,000.00 |
| 1001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Month(s) | $ 250.00 | $ 3,000.00 |
| 1002 AG | Maintain Interior Trench Drains: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Month(s) | $ 250.00 | $ 3,000.00 |
| 1001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Month(s) | $ 100.00 | $ 1,200.00 |
| 1001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 1,600 | Gallon(s) | $ 10.00 | $ 16,000.00 |
| 1001 AJ | Parts: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 1 | Lot | $ 2,000.00 | $ 2,000.00 |
| 1001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 20 | Hour(s) | $ 75.00 | $ 1,500.00 |
| 1001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 10 | Hour(s) | $ 300.00 | $ 3,000.00 |
TOTAL FY 20: $ 139,000.00
| Option Year (2) - 1 Apr 2021 to 31 Mar 2022 | (FY21) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 2001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Month(s) | $ 2,230.00 | $ 26,760.00 |
| 2001 AB | Testing/Analysis: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 4 | Each (Quarterly) | $ 2,050.00 | $ 8,200.00 |
| 2001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 1 | Each | $ 62,015.00 | $ 62,015.00 |
| 2001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 29 | Each | $ 308.00 | $ 8,932.00 |
| 2001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Each | $ 513.00 | $ 6,156.00 |
| 2001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Month(s) | $ 257.00 | $ 3,084.00 |
| 2002 AG | Maintain Interior Trench Drains: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Month(s) | $ 257.00 | $ 3,084.00 |
| 2001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Month(s) | $ 103.00 | $ 1,236.00 |
| 2001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 1,600 | Gallon(s) | $ 10.25 | $ 16,400.00 |
| 2001 AJ | Parts: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 1 | Lot | $ 2,000.00 | $ 2,000.00 |
| 2001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 20 | Hour(s) | $ 75.00 | $ 1,500.00 |
| 2001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 10 | Hour(s) | $ 300.00 | $ 3,000.00 |
TOTAL FY 21: $ 142,367.00
| Option Year (3) - 1 Apr 2022 to 31 Mar 2023 | (FY22) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 3001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 12 | Month(s) | $ 2,287.00 | $ 27,444.00 |
| 3001 AB | Testing/Analysis: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 4 | Each (Quarterly) | $ 2,102.00 | $ 8,408.00 |
| 3001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 1 | Each | $ 63,570.00 | $ 63,570.00 |
| 3001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 29 | Each | $ 316.00 | $ 9,164.00 |
| 3001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 8 | Each | $ 527.00 | $ 4,216.00 |
| 3001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 12 | Month(s) | $ 264.00 | $ 3,168.00 |
| 3002 AF | Maintain Interior Trench Drains: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 12 | Month(s) | $ 264.00 | $ 3,168.00 |
| 3001 AG | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 12 | Month(s) | $ 106.00 | $ 1,272.00 |
| 3001 AH | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 1,600 | Gallon(s) | $ 10.50 | $ 16,800.00 |
| 3001 AJ | Parts: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 1 | Lot | $ 2,000.00 | $ 2,000.00 |
| 3001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 20 | Hour(s) | $ 75.00 | $ 1,500.00 |
| 3001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 10 | Hour(s) | $ 300.00 | $ 3,000.00 |
TOTAL FY 21: $ 143,710.00
| Basic Year - 1 Apr 2024 to 31 Mar 2025 | (FY24) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 0001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 12 | Month(s) | ERROR:#REF! | ERROR:#REF! |
| 0001 AB | Testing/Analysis: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 4 | Each (Quarterly) | ERROR:#REF! | ERROR:#REF! |
| 0001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 1 | Each | ERROR:#REF! | ERROR:#REF! |
| 0001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 29 | Each | ERROR:#REF! | ERROR:#REF! |
| 0001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 8 | Each | ERROR:#REF! | ERROR:#REF! |
| 0001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 12 | Month(s) | ERROR:#REF! | ERROR:#REF! |
| 0002 AG | Maintain Interior Trench Drains: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 12 | Month(s) | ERROR:#REF! | ERROR:#REF! |
| 0001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 12 | Month(s) | ERROR:#REF! | ERROR:#REF! |
| 0001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 1,600 | Gallon(s) | ERROR:#REF! | ERROR:#REF! |
| 0001 AJ | Parts: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 1 | Lot | ERROR:#REF! | ERROR:#REF! |
| 0001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 20 | Hour(s) | ERROR:#REF! | ERROR:#REF! |
| 0001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 10 | Hour(s) | ERROR:#REF! | ERROR:#REF! |
TOTAL FY 24: ERROR:#REF!
61.43
&"Times New Roman,Regular"&12FA4621-19-C-A011, Oil/Water Separator Services
| &"-,Bold"&12&UPRICE LIST | |
| 20 February 2019 | &"Times New Roman,Regular"&12ATTACHMENT 2 |
&"Times New Roman,Regular"&12&P
Summary
| Oil/Water Separator Services Summary | |
| Base Year | $ - 0 |
| Option Year 1 | $ - 0 |
| Option Year 2 | $ - 0 |
| Option Year 3 | $ - 0 |
| Option Year 4 | $ - 0 |
| Total Contract Value | $ - 0 |
Base Year FY24
| Oil/Water Separator Services | |||||
| POP: Base Year - 1 Apr 2024 to 31 Mar 2025 | (FY24) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 0002 AA | Maintenance of Oil/Water Separators: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 12 | Month(s) | $ - 0 | $ - 0 |
| 0001 AB | Testing/Analysis: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 4 | Each (Quarterly) | $ - 0 | $ - 0 |
| 0001 AC | MFH and Base Sewer Line Flush: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 1 | Each | $ - 0 | $ - 0 |
| 0001 AD | Septic/Holding Tank Pump: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 29 | Each | $ - 0 | $ - 0 |
| 0001 AE | Clean Grease Traps: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 8 | Each | $ - 0 | $ - 0 |
| 0001 AF | Maintain Sand Traps: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 12 | Month(s) | $ - 0 | $ - 0 |
| 0001 AG | Maintain Interior Trench Drains: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 12 | Month(s) | $ - 0 | $ - 0 |
| 0001 AH | Disposal of Non-Hazardous Waste: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 12 | Month(s) | $ - 0 | $ - 0 |
| 0001 AI | Disposal of Hazardous Waste: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 1,600 | Gallon(s) | $ - 0 | $ - 0 |
| 0002 AJ | Parts: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 1 | Lot | $ - 0 | $ - 0 |
| 0002 AK | Labor Hours for Parts Installation: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 20 | Hour(s) | $ - 0 | $ - 0 |
| 0002 AL | Emergency Service Calls: Base Year Period of Performance: (1 Apr 2024 to 31 Mar 2025) | 10 | Hour(s) | $ - 0 | $ - 0 |
TOTAL FY 24: $ - 0
| &"-,Bold"&12&UPRICE LIST | |
| 20 February 2019 | &"Times New Roman,Regular"&12ATTACHMENT 2 |
&"Times New Roman,Regular"&12&P
Option Year 1 FY25
| Oil/Water Separator Services | |||||
| POP: Option Year (1) - 1 Apr 2025 to 31 Mar 2026 | (FY25) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 1002 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 12 | Month(s) | $ - 0 | $ - 0 |
| 1001 AB | Testing/Analysis: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 4 | Each (Quarterly) | $ - 0 | $ - 0 |
| 1001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 1 | Each | $ - 0 | $ - 0 |
| 1001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 29 | Each | $ - 0 | $ - 0 |
| 1001 AE | Clean Grease Traps: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 8 | Each | $ - 0 | $ - 0 |
| 1001 AF | Maintain Sand Traps: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 12 | Month(s) | $ - 0 | $ - 0 |
| 1001 AG | Maintain Interior Trench Drains: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 12 | Month(s) | $ - 0 | $ - 0 |
| 1001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 12 | Month(s) | $ - 0 | $ - 0 |
| 1001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 1,600 | Gallon(s) | $ - 0 | $ - 0 |
| 1002 AJ | Parts: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 1 | Lot | $ - 0 | $ - 0 |
| 1002 AK | Labor Hours for Parts Installation: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 20 | Hour(s) | $ - 0 | $ - 0 |
| 1002 AL | Emergency Service Calls: Option Year Period of Performance: 1 Apr 2025 to 31 Mar 2026 | 10 | Hour(s) | $ - 0 | $ - 0 |
TOTAL FY 25: $ - 0
| &"-,Bold"&12&UPRICE LIST | |
| 20 February 2019 | &"Times New Roman,Regular"&12ATTACHMENT 2 |
&"Times New Roman,Regular"&12&P
Option Year 2 FY26
| Oil/Water Separator Services | |||||
| POP: Option Year (2) - 1 Apr 2026 to 31 Mar 2027 | (FY26) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 2002 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 12 | Month(s) | $ - 0 | $ - 0 |
| 2001 AB | Testing/Analysis: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 4 | Each (Quarterly) | $ - 0 | $ - 0 |
| 2001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 1 | Each | $ - 0 | $ - 0 |
| 2001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 29 | Each | $ - 0 | $ - 0 |
| 2001 AE | Clean Grease Traps: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 8 | Each | $ - 0 | $ - 0 |
| 2001 AF | Maintain Sand Traps: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 12 | Month(s) | $ - 0 | $ - 0 |
| 2001 AG | Maintain Interior Trench Drains: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 12 | Month(s) | $ - 0 | $ - 0 |
| 2001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 12 | Month(s) | $ - 0 | $ - 0 |
| 2001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 1,600 | Gallon(s) | $ - 0 | $ - 0 |
| 2002 AJ | Parts: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 1 | Lot | $ - 0 | $ - 0 |
| 2002 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 20 | Hour(s) | $ - 0 | $ - 0 |
| 2002 AL | Emergency Service Calls: Option Year Period of Performance: 1 Apr 2026 to 31 Mar 2027 | 10 | Hour(s) | $ - 0 | $ - 0 |
TOTAL FY 26: $ - 0
| &"-,Bold"&12&UPRICE LIST | |
| 20 February 2019 | &"Times New Roman,Regular"&12ATTACHMENT 2 |
&"Times New Roman,Regular"&12&P
Option Year 3 FY27
| Oil/Water Separator Services | |||||
| POP: Option Year (3) - 1 Apr 2027 to 31 Mar 2028 | (FY27) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 3002 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 12 | Month(s) | $ - 0 | $ - 0 |
| 3001 AB | Testing/Analysis: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 4 | Each (Quarterly) | $ - 0 | $ - 0 |
| 3001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 1 | Each | $ - 0 | $ - 0 |
| 3001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 29 | Each | $ - 0 | $ - 0 |
| 3001 AE | Clean Grease Traps: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 8 | Each | $ - 0 | $ - 0 |
| 3001 AF | Maintain Sand Traps: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 12 | Month(s) | $ - 0 | $ - 0 |
| 3001 AG | Maintain Interior Trench Drains: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 12 | Month(s) | $ - 0 | $ - 0 |
| 3001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 12 | Month(s) | $ - 0 | $ - 0 |
| 3001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 1,600 | Gallon(s) | $ - 0 | $ - 0 |
| 3002 AJ | Parts: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 1 | Lot | $ - 0 | $ - 0 |
| 3002 AK | Labor Hours for Parts Installation: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 20 | Hour(s) | $ - 0 | $ - 0 |
| 3002 AL | Emergency Service Calls: Option Year Period of Performance: 1 Apr 2027 to 31 Mar 2028 | 10 | Hour(s) | $ - 0 | $ - 0 |
TOTAL FY 27: $ - 0
| &"-,Bold"&12&UPRICE LIST | |
| 20 February 2019 | &"Times New Roman,Regular"&12ATTACHMENT 2 |
&"Times New Roman,Regular"&12&P
Option Year 4 FY28
| Oil/Water Separator Services | |||||
| POP: Option Year (4) - 1 Apr 2028 to 31 Mar 2029 | (FY28) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 4002 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 12 | Month(s) | $ - 0 | $ - 0 |
| 4001 AB | Testing/Analysis: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 4 | Each (Quarterly) | $ - 0 | $ - 0 |
| 4001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 1 | Each | $ - 0 | $ - 0 |
| 4001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 29 | Each | $ - 0 | $ - 0 |
| 4001 AE | Clean Grease Traps: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 8 | Each | $ - 0 | $ - 0 |
| 4001 AF | Maintain Sand Traps: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 12 | Month(s) | $ - 0 | $ - 0 |
| 4002 AG | Maintain Interior Trench Drains: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 12 | Month(s) | $ - 0 | $ - 0 |
| 4001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 12 | Month(s) | $ - 0 | $ - 0 |
| 4001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 1,600 | Gallon(s) | $ - 0 | $ - 0 |
| 4002 AJ | Parts: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 1 | Lot | $ - 0 | $ - 0 |
| 4002 AK | Labor Hours for Parts Installation: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 20 | Hour(s) | $ - 0 | $ - 0 |
| 4002 AL | Emergency Service Calls: Option Year Period of Performance: 1 Apr 2028 to 31 Mar 2029 | 10 | Hour(s) | $ - 0 | $ - 0 |
TOTAL FY 28: $ - 0
| &"-,Bold"&12&UPRICE LIST | |
| 20 February 2019 | &"Times New Roman,Regular"&12ATTACHMENT 2 |
&"Times New Roman,Regular"&12&P
File details come from the government source that posted it. Updated .